SP450026R0015 Amendment 0007.pdf
PDF 354 KB Posted
- Attached to
- Turkey Hazardous Waste Solicitation
- Solicitation number
- SP450026R0015
- Issued by
-
Defense Logistics Agency
About this file
Amendment 0007 to Solicitation SP450026R0015: Turkey Hazardous Waste Solicitation
This is an amendment to a Defense Logistics Agency (DLA) Disposition Services federal contract solicitation for hazardous waste management services in Turkey, issued by DLA Acquisition at Battle Creek, Michigan on 25 November 2026. The amendment extends the offer due date and implements comprehensive revisions to the Performance Work Statement (Attachment 1) and Price Schedule (Attachment 2), with all changes marked in red. Offerors must acknowledge receipt and acceptance of Amendments 0001 through 0007 by signing the acknowledgment page and submitting it with their offer package. This amendment represents the final change before offers are due.
The revision introduces significant operational changes: elimination of all equipment rental CLINs (Roll-Off Boxes, skips, FRAC tanks) to remove idle rental fee liabilities during security vetting; transition to a strictly containerized waste disposal model using only Containerized Suffix "C8" CLINs measured in kilograms, eliminating bulk liquid and solid removal options; removal of expedited service CLINs due to mandatory 15-20 business day Turkish Air Force security vetting requirements; standardization of all standard task orders to a uniform 30-business-day performance baseline with physical pickups authorized between Day 21 and Day 30; restructured testing and characterization timelines allowing 30 business days for sample collection and an additional 20 business days for lab reports; elimination of transboundary shipments and mandate that all waste be treated, recycled, or disposed of 100% in-country within Turkey; clarification that Industrial Cleaning Services CLINs cover labor only with resultant residues hauled under Transportation CLINs; establishment of a one-for-one container exchange program for large-capacity reusable containers; addition of direct-purchase supply CLINs for IBC Totes, Rigid Plastic Battery Boxes, and Military Tri-Wall Boxes; formalization of paired Transportation CLINs per removal Task Order with authorization for multiple truckloads; and harmonization with Turkish AYK waste codes and international ADR/IMDG transport standards. Specific CLINs removed include 1144RE, 1145RE, PL06B8, 1010RE, 1020RE, 1040RE, and 1200RE; Transportation CLINs TR05TR, TR06TR, and TR07TR have been added for specific removal sites; and multiple service CLINs have been updated or added.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 | P a g e
Solicitation: SP450026R0015, Turkey Hazardous Waste Solicitation
Amendment: 0007
Date: 25 November 2026
Issued by:
DLA DISPOSITION SERVICES
DLA Acquisition, J-763
74 WASHINGTON AVENUE NORTH
BATTLE CREEK, MI 49037-3092
The above numbered solicitation is amended as follows:
1. The hour and date of the receipt of offers/date offer due has been extended. Please refer to the subject solicitation in SAM.Gov for the updated date/time.
2. The awaited comprehensive updates to the solicitation are posted today as well as question and answers noted in this amendment. There have been significant revisions to Attachment 1 PWS as well as deletions and additions to Attachment 2 Price Schedule. Both are dated 25 November 2026 and are included in the SAM.gov posting. (Previous editions will be removed.) Please review all updated documents in depth and make any changes to your offer accordingly for submission by the new due date/time. A summary of changes as well as a listing of the changes are included in this amendment. The changes in Attachments 1 and 2 are in RED. Further changes or extensions to the solicitation are not anticipated. This will be the final change before offers are due.
3. Some changes have been made to Attachment 13, Instructions to Offers starting at item (c) Minimum Content, through the end of the document.
4. Answers to Questions submitted regarding Attachment 15, Past Performance Questionnaire as follows:
a. Question: As a prime contractor that may rely on relevant past performance of a principal subcontractor, could you please clarify the following: Should Section 1 identify our company as the offeror while providing the principal subcontractor's contract details as the past performance reference?
Answer: Yes. The top of Section 1 page 1, will be where your company information as the offeror is prefilled. Use Section 1, page 2 blanks under the question: What work was performed by the offeror? to note the name of the subcontractor and tell about their work/past performance included on the contract listed. If you don’t have this information, then let your subcontractor fill out the rest of that page. (The main point is that DLA needs to understand what past performance makes your firm and/or subcontractor fit to do the work. It is also required (see instruction to Offers) to note which work the prime and subcontractor(s) will do in Volume 1 information, spelling out which past performance is from or for subcontractors, and how you intend to use the subcontracted company listed in the past performance, (i.e. as a TSDF, packing-special services, transport, etc.). Additionally, include past performance (the prime offeror) that makes your firm capable of handling hazardous waste management and working with US Government contracts.
b. Question: Should my company, as the prime offeror, complete Sectඈon 1 and forward the questඈonnaඈre to the prඈncඈpal subcontractor, whose reference customer
2 | P a g e would then complete Sectඈon 2 and submඈt the completed questඈonnaඈre dඈrectly to DLA? Or ඈs a dඈfferent procedure requඈred?Thank you for your guඈdance and assඈstance.
Answer: Attachment 15, Typically yes you would fill out page 1, Section 1, the subcontractor page 2 of section 1 describing the work. Then send it on to the customer to fill out section 2 (assessment/feedback) and they would return it to DLA.
Due to limited time constraints, I would ask that this still be done, but in case the customer is not timely with submitting the response by the due date, please also submit Attachment 15 with section 1 filled out your offer package so that we can understand what was to be received, should the customer not submit theirs in time.
The company filing out the assessment of your firm’s work should send those to Annette.Graham@dla.mil, subject: SP450026R0015 Turkey Hazardous Waste Questionaire, Respondant. These may be submitted by the reference completing the ratings at any time prior to the due date.
c. Question: For a Turkish company (or other country) not using a U.S. Employer Identඈfඈcatඈon Number (EIN), should the EIN fඈeld be marked "N/A" or completed usඈng the Turkඈsh Tax Identඈfඈcatඈon Number?
Answer: For the EIN, please fill this out to match whatever you have included in your SAM.gov registration. All offerors should already be registered in SAM.
5. List of changes to Attachments. Several Attachments have been significantly changed. Items are in red in both Attachment 1 PWS and Attachment 2 Price Schedule:
a. Changed Items, Attachment 1, PWS:
Title – renamed Table of Contents
Introduction – renamed
3.0 Special Services – Rental notes removed as well as reserved sections. All ICS items and previously numbered items moved up and renumbered. 3.11 renamed. 3.13 and 3.14 new sections added.
7.0 Renamed.
7.3 Expedited Services -Removed.
Introduction of The Performance Work Statement (body) items: a, c, g, h, i, j, k and m.
Section 1.1.1 b, and b (2) & (16).
Section 1.1.2 a, b, and d Section 1.1.3 b, c, i, j, k Section 1.1.4 e
3 | P a g e
Section 1.1.5 a, b (reserved)
Section 1.1.7 Federal Holiday Chart Turkish Holiday Chart
Section 1.1.10:
b, c, and d e (added)
Section 1.2 (paragraph)
Section 1.2.3 c
Section 1.2.7 a, e
Section 1.2.8.1 Reserved (with notes) Section 1.2.8.2 a & b re-written, c (removed)
Section 1.2.9 Reserved Section 1.2.10 Reserved Section 1.2.11 a, b, re-written c, d, &e removed (expedited CLINs removed)
Section 1.3.1 b
Section 2.0 c
Section 2.1 a & b
Section 2.3 (paragraph)
Section 2.4 a, & c
Section 2.6 a.
Section 3.0 – Completely re-written. Please review this section thoroughly.
Section 4.1
Chart, re-written to align with changes to 3.0.
Section 5.0 a, b.2, c Section 5.1 f, g, h re-lettered from g, h, i to follow previous paragraphs correctly Section 5.2
4 | P a g e h Section 7.0
Re-written as Sections 7.1 & 7.2. (Expedited items deleted) Section 8.2 a and d (changed wording to: within the Republic of Turkey) Section 12
Revamped to match changes in the PWS
b. Changes, Attachment 2, Price Schedule:
CLINs 1144RE and 1145RE (Bulk Container Rentals) and PL06B8, removed.
Transporation CLINs TR00TR, TR01TR, TR02TR, TR03TR and TR04TR re-worded and, added CLINs TR05TR, TR06TR, and TR07TR specific to removal sites.
CLINs 1010RE, 1020RE, 1040RE 1144RE, 1145RE, 1200RE Removed.
1001SA added reference
Container CLINs 1638SP, 1640SP, 1641SP, 1642SP, 1644SP, and 1645SP
Added.
1002SV, 1003SV, 1007SV, 1008SV, 1080SV, 1081SV, 1083SV, 1202SV, 1203SV,
1204SV, 1205SV, 1206SV, 1207SV, 1208SV, 1209SV, 1210SV, 1211SV, 1304SV
and 1305SV updated reference
Tab for EWC, name changed to AYK Waste Codes.
c. Changes, Attachment 9, Attach 9_DLA Form 2511 HWPS – Deleted.
(Attachments applicable to the contract will be re-ordered upon writing the final draft of the contract
6. Summary of Changes: Key Accomplishments & Changes in this Revision
a. Eliminated All Equipment Rental Liabilities (ROBs, Skips, FRAC Tanks):
Completely deleted all daily, weekly, and monthly Roll-OƯ Box (ROB) rental CLINs, placement CLINs, and on-site movement CLINs. This removes the unworkable “continuous accessibility” clause and prevents the Government from paying idle rental fees during gate-access vetting.
5 | P a g e
b. Transitioned to a Strictly Containerized Model (No Bulk Removals): Eliminated all bulk liquid vacuum tanker pumping, bulk solids, and CLIN SuƯix “B8” items. All waste streams are now billed exclusively under Containerized SuƯix “C8” (in KG).
c. Removed All Unworkable Expedited Service CLINs: Removed CLINs 1097SV and
1098SV due to the mandatory 15–20 business day Turkish Air Force (TurAF) KSL security vetting gauntlet.
d. Standardized on a 30-Business-Day Performance Baseline: Aligned all standard task orders to a uniform thirty (30) business day window, providing a safe operational window between Day 21 and Day 30 to execute physical pickups.
e. Restructured Testing & Characterization Timelines: Established a split timeline:
30 business days to collect the sample, and an additional 20 business days following collection to deliver the certified lab report and HWPS.
f. Eliminated Transboundary Shipments & Mandated In-Country Disposal (No
Basel Movements): Purged all transboundary shipment and Basel Convention procedures. All waste must be treated, recycled, or disposed of 100% in-country within the sovereign borders of the Republic of Turkey.
g. Decoupled Industrial Cleaning Residue Hauling: Clarified that ICS CLINs cover cleaning labor only; resultant residues are hauled under authorized Transportation (TR) series CLINs and disposed of under Containerized Disposal (C8) CLINs.
h. Updated Container Return and Exchange Program: Established a clear One-for-
One swap program for reusable large-capacity containers (>210 L) while ensuring direct-purchase supply CLINs remain brand new.
i. Added Bulk & Intermediate Container Supply CLINs (Section 3.13): Added direct-purchase supply CLINs for IBC Totes, Rigid Plastic Battery Boxes, and Military Tri- Wall Boxes to support the exchange program.
j. Added Dedicated Transportation Requirements (Section 3.14): Formalized the requirement to pair at least one TR CLIN per removal Task Order and authorize multiple truckloads for high-volume turn-ins.
k. Harmonized Turkish AYK Waste Codes & ADR Transport Rules: Aligned the PWS with Turkish domestic law (including AYK waste codes) and international ADR/IMDG standards, removing vague “EU law” references.
7. No other solicitation requirements have been changed at this time.
(Continues on next page.)
6 | P a g e
8. Please print your name, sign and date. Submit this page with your offer package to acknowledge receipt, and acceptance of Amendments 0001, 0002,0003,0004, 0005, 0006 and 0007. (Do not include previous pages from this amendment in your offer package.)
Thank you.
Printed Name: ___________________________
Signature:_______________________________ Date:_____________________
File details come from the government source that posted it. Updated .