Attach 15_PPI Questionnaire.pdf
PDF 811 KB Posted
- Attached to
- Turkey Hazardous Waste Solicitation
- Solicitation number
- SP450026R0015
- Issued by
-
Defense Logistics Agency
About this file
Past Performance Information (PPI) Questionnaire – Offeror
This is a template form used by the Defense Logistics Agency (DLA) Disposition Services to collect past performance references from offerors responding to Solicitation No. SP450026R0015 for hazardous waste removal, transportation, and disposal services at Turkey. The questionnaire is divided into two sections: Section 1 for offeror completion and Section 2 for reference completion.
Section 1 requires the offeror to provide firm details (name, address, EIN, email, phone, FAX) and identifies the solicitation number, service location, and the reference contact information to whom the form will be submitted. The offeror is solely responsible for ensuring references complete and return Section 2 to the Government by the proposal due date. Section 2, completed by the offeror's reference, evaluates contractor performance across five categories using a six-point adjectival scale (Not Applicable, Unsatisfactory, Marginal, Satisfactory, Very Good, Exceptional). Evaluation elements include: (I) Quality of Product/Service covering compliance, accuracy of documentation, manifesting, waste profiling, transportation law compliance, packaging/labeling, and regulatory knowledge; (II) Schedule addressing timeliness of transportation, waste removal, analysis, and documentation submission; (III) Management assessing customer orientation, staff professionalism, government interactions, problem notification, problem-solving, and corrective actions; (IV) Regulatory Compliance evaluating adherence to contract clauses, safety/environmental/EEO requirements, and hazardous waste law knowledge; and (V) Other Comments providing overall assessment and a recommendation for future awards. References must provide supporting examples for ratings of 1-2 or 4-5 and indicate whether they would definitely, probably, might, probably not, or definitely would not recommend the contractor.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
As of: 12/22/2021
Once this document has been completed, the information contained becomes Source Selection Sensitive.
SOURCE SELECTION INFORMATION - SEE FAR 2.101 and 3.104.
Attachment # Solicitation #
PAST PERFORMANCE INFORMATION (PPI) QUESTIONNAIRE – OFFEROR
The offeror is solely responsible for ensuring references complete and submit this questionnaire to the Government by the required due date.
Section 1
OFFEROR TO COMPLETE THIS SECTION:
Offeror Firm Name:
Offeror Firm Address:
Offeror Firm EIN:
Offeror Firm Email:
Offeror Firm Phone:
Offeror Firm FAX:
We are in the process of preparing our proposal for DLA Disposition Services’ Solicitation No.
_________________________, closing time and date ___________________________, to provide hazardous waste removal, transportation, & disposal services at _______________________________________. As part of our proposal we have listed you as a reference for work performed by our firm for your firm/Agency.
Your input on our performance is therefore requested. Please complete Section 2 of this document and then email the completed document (Sections 1 & 2) to ______________________________________________.
The Government must receive the completed document no later than the date offers are due. Thank you.
CUI
CUI
Controlled by: DLA Disposition Services (PH) CUI Category: SSEL Distribution/Dissemination Controls: FED ONLY
POC:
SOURCE SELECTION INFORMATION - SEE FAR 2.101 and 3.104.
Attachment # Solicitation #
Contract #:
Role/Title for the Contract:
Email: Phone:
Section 1
OFFEROR TO COMPLETE THIS SECTION:
Reference Contract Title:
Reference POC Name:
How Long in this Role:
Firm/Agency Reference Works for:
Contract Performance Location:
Performance Start Date:
Total Contract Dollar Value: $ Description of Contract Requirements:
Contract Completion Date:
Hazardous Material/ Waste Streams Involved and Quantities/Volumes Disposed and Recycled:
Location of Pickup Point(s) or Other Services:
Frequency of Pickup(s) or Other Services (e.g. once a month):
Allowable Response Time after Notification for Performance (e.g., 30 days):
Types of Documents Contractor was required to Provide/Process (i.e. manifests, waste profiles, permits, etc.):
Significant Risks in Performance of the Contract:
What work was performed by the offeror?
or Contract Value with other Currency ___________________
CUI
SOURCE SELECTION INFORMATION - SEE FAR 2.101 and 3.104.
Attachment # Solicitation #
Section 2
OFFEROR'S REFERENCE TO COMPLETE THIS SECTION:
Based on the following adjectival ratings scale, please evaluate the quality of the offeror’s performance by selecting the appropriate ratings and applying to elements I through V on the following pages.
SCALE:
NOT
APPLICABLE UNSATISFACTORY MARGINAL SATISFACTORY VERY GOOD EXCEPTIONAL
N/A 1 2 3 4 5
DEFINITIONS:
EXCEPTIONAL: Performance met and exceeded many contractual requirements. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
VERY GOOD: Performance met and exceeded some contractual requirements. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
SATISFACTORY: Performance met contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
MARGINAL: Performance did not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions.
The contractor’s proposed actions appear only marginally effective or were not fully implemented.
UNSATISFACTORY: Performance did not meet most contractual requirements and recovery in a timely manner is not likely. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor’s corrective action(s) appear or was/were ineffective.
NOT APPLICABLE: Self-explanatory.
SOURCE SELECTION INFORMATION - SEE FAR 2.101 and 3.104.
Attachment #
I. QUALITY OF PRODUCT/SERVICE
a. Compliance with contract requirements (to include regulatory compliance)
b. Accuracy of reports and documentation (e.g. manifests, bills of lading)
c. Manifesting and land disposal notifications (includes basal notifications)
d. Waste profiling
e. Compliance with transportation laws and regulations (DOT, maritime, foreign)
f. Packaging, labeling, and disposal
g. Demonstrated knowledge of hazardous waste laws and regulations
N/A 1 2 3 4 5
If assigning a rating of 2 or 1, please provide examples of how the contractor did not meet contract requirements:
If assigning a rating of 4 or 5, please provide examples of how the contractor exceeded contract requirements:
II. SCHEDULE
a. Adherence to transportation scheduling
b. Adherence to performance timeframes (removal of waste/Mgt services)
c. Adherence to performance timeframes (analysis)
d. Timeliness in submission of initial documentation/reports
e. Timeliness in submission of final documentation/reports
f. Advance notice and scheduling/receipt of correct and complete documents
N/A 1 2 3 4 5
If assigning a rating of 2 or 1, please provide examples of how the contractor did not meet contract requirements:
If assigning a rating of 4 or 5, please provide examples of how the contractor exceeded contract requirements:
Solicitation #
SOURCE SELECTION INFORMATION - SEE FAR 2.101 and 3.104.
Attachment # Solicitation #
III. MANAGEMENT
a. Orientation toward the customer
b. Professionalism of staff
c. Interactions with the Government
d. Promptness in making notifications of problems encountered during performance
e. Flexibility and productiveness in problem solving
f. Effectiveness of corrective actions taken
N/A 1 2 3 4 5
If assigning a rating of 2 or 1, please provide examples of how the contractor did not meet contract requirements:
If assigning a rating of 4 or 5, please provide examples of how the contractor exceeded contract requirements:
SOURCE SELECTION INFORMATION - SEE FAR 2.101 and 3.104.
Solicitation #
IV. REGULATORY COMPLIANCE
a. Compliance with all contract clauses and reporting requirements (e.g., safety, environmental, EEO, trafficking in persons, etc.)
b. Compliance with transportation laws and regulations (DOT, maritime, foreign)
c. Demonstrated knowledge of hazardous waste laws and regulations
Attachment #
N/A 1 2 3 4 5
If assigning a rating of 2 or 1, please provide examples of how the contractor did not meet contract requirements:
If assigning a rating of 4 or 5, please provide examples of how the contractor exceeded contract requirements:
V. OTHER COMMENTS (Include overall comments regarding highly rated or poorly rated performance):
Would you recommend this contractor for potential future awards? (Please check one of the following)
DEFINITELY WOULD
PROBABLY WOULD
MIGHT OR MIGHT NOT
PROBABLY WOULD NOT
DEFINITELY WOULD NOT
If you have checked anything other than DEFINITELY WOULD recommend, please explain why:
| PAST PERFORMANCE INFORMATION (PPI) COLLECTION DOCUMENT PAST |
| PERFORMANCE INFORMATION QUESTIONNAIRE – OFFEROR |
| Section 1 |
| OFFEROR TO COMPLETE THIS SECTION: |
| Section 3 |
| OFFEROR REFERENCE TO COMPLETE THIS SECTION: |
| DEFINITIONS: |
| I. QUALITY OF PRODUCT/SERVICE |
| N/A 1 2 3 4 5 |
| II. SCHEDULE |
| N/A 1 2 3 4 5 |
| III. MANAGEMENT |
| N/A 1 2 3 4 5 |
| IV. REGULATORY COMPLIANCE |
| N/A 1 2 3 4 5 |
| --------------------------------------------------------------------------------------------------------------------------------------------------------------- |
| V. OTHER COMMENTS (Include overall comments regarding highly rated or poorly rated performance): |
| OFFEROR TO COMPLETE THIS SECTION: |
| Offeror Firm Address 1: |
| Offeror Firm Address 2: |
| Offeror Firm Address 3: |
| Offeror Firm Address 4: |
| Offeror Firm Phone 1: |
| Offeror Firm Phone 2: |
| We are in the process of preparing our proposal for DLA Disposition Services Solicitation No: SP450026R0015 |
| closing time and date: |
| services at: Turkey |
| undefined: Annette.Graham@dla.mil |
| Reference Contract Title: |
| Contract: |
| Reference POC Name: |
| RoleTitle for the Contract: |
| How Long in this Role: |
| Email: |
| Phone: |
| FirmAgency Reference Works for: |
| Contract Performance Location: |
| Performance Start Date: |
| Contract Completion Date: |
| Location of Pickup Points or Other Services: |
| Frequency of Pickups or Other Services eg once a month: |
| Allowable Response Time after Notification for Performance eg30 days: |
| Types of Documents Contractor was required to ProvideProcess ie manifests waste profiles permits etc: |
| If assigning a rating of 4 or 5 please provide examples of how the contractor exceeded contract requirements: |
| If assigning a rating of 4 or 5 please provide examples of how the contractor exceeded contract requirements_2: |
| If assigning a rating of 4 or 5 please provide examples of how the contractor exceeded contract requirements_3: |
| If assigning a rating of 4 or 5 please provide examples of how the contractor exceeded contract requirements_4: |
| Text6: 15 |
| Text7: SP450026R0015 |
| Group8: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| 3: Off |
| 4: Off |
| 5: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: Off |
| 3: Off |
| 4: Off |
| 5: Off |
| 2: |
| 0: Off |
| 1: Off |
| 2: Off |
| 3: Off |
| 4: Off |
| 5: Off |
| 3: |
| 0: Off |
| 1: Off |
| 2: Off |
| 3: Off |
| 4: Off |
| 5: Off |
| 4: |
| 0: Off |
| 1: Off |
| 2: Off |
| 3: Off |
| 4: Off |
| 5: Off |
| 5: |
| 0: Off |
| 1: Off |
| 2: Off |
| 3: Off |
| 4: Off |
| 5: Off |
| 6: |
| 0: Off |
| 1: Off |
| 2: Off |
| 3: Off |
| 4: Off |
| 5: Off |
| Group9: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| 3: Off |
| 4: Off |
| 5: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: Off |
| 3: Off |
| 4: Off |
| 5: Off |
| 2: |
| 0: Off |
| 1: Off |
| 2: Off |
| 3: Off |
| 4: Off |
| 5: Off |
| 3: |
| 0: Off |
| 1: Off |
| 2: Off |
| 3: Off |
| 4: Off |
| 5: Off |
| 4: |
| 0: Off |
| 1: Off |
| 2: Off |
| 3: Off |
| 4: Off |
| 5: Off |
| 5: |
| 0: Off |
| 1: Off |
| 2: Off |
| 3: Off |
| 4: Off |
| 5: Off |
| Group10: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| 3: Off |
| 4: Off |
| 5: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: Off |
| 3: Off |
| 4: Off |
| 5: Off |
| 2: |
| 0: Off |
| 1: Off |
| 2: Off |
| 3: Off |
| 4: Off |
| 5: Off |
| 3: |
| 0: Off |
| 1: Off |
| 2: Off |
| 3: Off |
| 4: Off |
| 5: Off |
| 4: |
| 0: Off |
| 1: Off |
| 2: Off |
| 3: Off |
| 4: Off |
| 5: Off |
| 5: |
| 0: Off |
| 1: Off |
| 2: Off |
| 3: Off |
| 4: Off |
| 5: Off |
| Group11: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| 3: Off |
| 4: Off |
| 5: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: Off |
| 3: Off |
| 4: Off |
| 5: Off |
| 2: |
| 0: Off |
| 1: Off |
| 2: Off |
| 3: Off |
| 4: Off |
| 5: Off |
| Check Box22: |
| 0: Off |
| 1: Off |
| 2: Off |
| 3: Off |
| 4: Off |
| Text1: 15 |
| Text2: SP450026R0015 |
| Text3: 15 |
| Text4: SP450026R0015 |
| Text5: |
| Text9: |
| Text11: |
| Text12: |
| Text13: |
| Text14: |
| Text15: |
| Text16: |
| Text17: |
| Text10: 15 |
| Text18: SP450026R0015 |
| Text19: 15 |
| Text20: SP450026R0015 |
| Text21: 15 |
| Text22: SP450026R0015 |
| Text8: |
| Total Contract Dollar Value: |
| Total Contract Value with other Currency: |
| Text23: Hazardous Waste Disposition East |
File details come from the government source that posted it. Updated .