Question and Answers (round 3) 26Q0085.docx

DOCX document 18 KB Posted

Attached to
DDWG GROUNDS MAINTENANCE / LANDSCAPING SERVICES Federal contract opportunity
Solicitation number
SP330026Q0085
Issued by
Defense Logistics Agency Distribution

About this file

This is a Question and Answers document (Round 3) for solicitation SP330026Q0085, addressing clarifications on the DDWG Grounds Maintenance/Landscaping Services contract opportunity.

Key clarifications provided include: the period of performance is 12 months annually with services required March through October (8 months of active work); the incumbent contractor is ST Squared LLC (cage code 9TDF2) under contract SP330024P0516, which ended February 28, 2026; no significant scope changes from the previous contract cycle; and the scope has not fundamentally altered regarding grounds maintenance requirements. The government will not provide storage areas, fuel storage, pesticide storage, or a DoD SAFE drop-off link for PII submission during site visits. A Georgia Commercial Applicator Pesticide license remains required despite current statements that herbicide application may not be immediately needed, as future requirements may change. Contractors will receive keys to access areas if needed. Regarding maintenance frequency, services must be performed no more than once weekly and no less than once every two weeks. The government cannot provide estimated acreage, specific mowing cycle counts, linear footage for edging, or historical chemical spray usage information; offerors must reference Attachment 2 in the solicitation for property locations and service types. Tree limb clearing/removal debris will be priced according to the Performance Work Statement without amendments, and the Schedule of Services workbook should reflect the 8-month service period (March-October) within the 12-month contract period of performance.

View the file

Other files for this federal contract opportunity

Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question and Answers:

1. Is there an incumbent?

a. ST Squared LLC, cage code: 9TDF2 under SP330024P0516; ended 2/28/2026.

2. In the current Combined Synopsis/Solicitation, each Performance year is 12 months. However, in the Schedule of Services workbook, each Year has a QTY of 8 months. Can you verify how many months the Base and Option years are meant to have?

a. Period of Performance will be 12 months. Services required March through October.

3. Will USG be able to provide a DoD SAFE drop-off link for Offerors to submit PII for the site visit?

a. No.

4. Has the scope of work changed significantly from the previous contract cycle?

a. No.

5. Could you confirm the approximate acreage included in the scope of work?

a. We do not have that available.

6. Is there an estimated number of mowing cycles expected per year?

a. No.

7. How many Linear Feet to be Edged?

a. Unknown

8. Define Edging?

a. See the PWS within the solicitation.

9. Is application of Pesticide for weeds required?

a. No.

10. How many locations are to be maintained?

a. See Attachment 2 within the solicitation.

11. What are the locations of the properties to be maintained and what is their nature of service, parking lots, building areas, storage yards, etc.

a. See Attachment 2 within the solicitation.

12. Will government provide storage areas for our equipment? Will the storage area have electricity, Rest Rooms, water?

a. No storage areas will be provided.

13. Can we store fuel on site?

a. No.

14. Store pesticides on site?

a. No.

15. Will contractor have keys to access areas for maintenance?

a. If needed, yes.

16. During the site visit, it was stated that use of herbicide will not be required. If an offeror does not propose herbicide usage, will the GA Commercial Applicator Pesticide license be required as part of proposal admission?

a. Yes, the license is still required. At a later time, herbicide use may change, therefore, the need to have the license.

17. Can USG provide historical chemical spray usage information in accordance with PWS 4.3.6?

a. No history to provide.

18. During the site visit, it was stated that tree limbs do not have be cleared/removed as debris. Will an amendment to the PWS be provided to reflect such language in section 1.1.4?

a. There will be no amendment at this time. Price according to the PWS.

19. Will the site-visit check-in sheets be provided.

a. No.

20. Does USG have a preferred maintenance frequency?

a. No more than once a week. No less than once every two weeks.

21. We understand services are only needed from March-October, but since the PoP is 12 months each year, is the Schedule of Services workbook meant to state qty 8 or qty 12 for the Base/Option years?

a. The contract’s period of performance is twelve months. During those twelve months, DDWG requires services March through October.