Attachment 9 - TE 1.2 CAC_Procedures.docx
DOCX document 23 KB Posted
- Attached to
- DDWG GROUNDS MAINTENANCE / LANDSCAPING SERVICES Federal contract opportunity
- Solicitation number
- SP330026Q0085
- Issued by
- Defense Logistics Agency Distribution
About this file
This is a Technical Exhibit detailing Common Access Card (CAC) procedures that contractors must follow when performance under the contract requires CAC issuance. The document establishes mandatory security protocols for obtaining, controlling, and accounting for government-issued CACs, applicable to the DDWG Grounds Maintenance/Landscaping Services contract with the Defense Logistics Agency Distribution. Contractor employees requiring CACs must complete DLAH Form 1728 and submit it to the Contracting Officer's Representative (COR) or Contracting Officer (KO). Employees then verify account information through the Trusted Associate Sponsorship System (TASS), receive approval notification, and obtain their CAC from a Real-Time Automated Personnel Identification System (RAPIDS) office. The contractor must notify the COR/KO within one business day of each CAC issuance, providing employee name, issuance date, and expiration date.
Contractors are responsible for establishing procedures to ensure CACs are used solely for contract performance, secured against unauthorized use, and protected from physical damage or public display. The document mandates specific protocols for lost or stolen CACs, requiring immediate notification to the COR/KO and local police, with replacement obtained through RAPIDS or the CAC office. CAC renewal must occur no less than ten business days before expiration if the employee continues working under the contract. Upon contract completion, employee termination, or reassignment, the contractor must collect all CACs and turn them in either in-person or via certified mail within one business day, completing a Government-Issued Contractor CAC Turn-In Receipt. Monthly reporting is required, validating the contractor CAC log with the COR and documenting all employees with active CACs and any additions or deletions. Non-compliance with these procedures may result in work stoppage, invoice disapproval, payment delays, withholding of final payment, and documentation in the Contractor Performance Assessment Reporting System (CPARS).
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Question and Answers (round 3) 26Q0085.docx | DOCX document | |
| Amendment 0003 SF30 SP330026Q0085.pdf | ||
| Amendment 0002 SF30 SP330026Q0085.pdf | ||
| Question and Answers (round 2) 26Q0085.docx | DOCX document | |
| Amendment 0001 SF30 SP330026Q0085.pdf | ||
| Question and Answers 26Q0085.docx | DOCX document | |
| Attachment 8 - QASP for DDWG Grounds Maintenance.docx | DOCX document | |
| Attachment 3 - Wage Determination 2015-4495 REV30.pdf | ||
| Attachment 5 - COSR DDWG Grounds Maint.pdf | ||
| Attachment 6 - DLA Distribution CAP DDWG Grounds Maint.pdf | ||
| Attachment 7 - Quality Pkg Attachment 1 POCs Listing_DDWG Grounds Maint.docx | DOCX document | |
| Combined Syn Sol 26Q0085 DDWG Grounds Maintenance.pdf | ||
| Attachment 1 - Performance Work Statement DDWG Grounds Maint 2026.pdf | ||
| Attachment 4 - Schedule of Services.xlsx | XLSX spreadsheet |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI
SOURCE SELECTION INFORMATION – SEE FAR 2.101 AND 3.104
TECHNICAL EXHIBIT 1.2
COMMON ACCESS CARD (CAC) PROCEDURES
Performance under this contract may require the contractor to obtain a Common Access Card (CAC). If CACs are issued under this contract, the contractor will complete and comply with the following steps to obtain, control, and turn-in Government-issued CACs, as well as establish procedures to always control and account for contractor CACs. This process is only for the issuance and accountability of CACs. Contractors may be required to provide additional forms and follow additional procedures for other forms of access and/or background/security checks depending on local site/installation requirements.
Common Access Card (CAC) Procedures
1. The contractor has each contractor employee requiring a CAC complete DLAH Form 1728 in accordance with Enclosure 3; 2a. Note: Contractors do not complete blocks 11, 14, 15.a. or 15.b.; these are completed by the COR.
2. The contractor hand carries the DLAH 1728 form(s) or sends via secure mail, or encrypted email to (NOTE: The contractor may forward these forms individually or as a group to):
a. The Contracting Officer’s Representative (COR) for the contract if a COR was designated.
b. The Contracting Officer (KO) for the contract if no COR was designated.
3. Each contractor employee must verify their account information upon receipt of an email from the Government containing a username and password for the Trusted Associate Sponsorship System (TASS). The web link for TASS is included in the email.
4. Each contractor employee will receive an email via TASS when their account has been approved. The email will notify the employee to obtain a government-issued CAC from the nearest Real-Time Automated Personnel Identification System (RAPIDS) office. The email will also provide a link that identifies the locations of RAPIDS offices.
5. Each contractor employee will obtain their issued CAC from the RAPIDS office.
6. The contractor, within one business day of issuance, provides written notice via email to the COR (or the KO, if no COR was designated) for each contractor CAC issued identifying the contractor employee’s name, the date of issuance, and the date of expiration of the CAC. This notification may be made individually for each contractor employee or together for a group of contractor employees. Note: This requirement is not applicable when the same person is performing both COR and TA roles.
7. The contractor always establishes procedures to control and account for Government issued contractor CACs – to include the following:
a. Ensure contractor CACs issued for this contract are only used for the purpose of performing under this contract.
b. Ensure contractor CACs are secured in a manner that precludes unauthorized use and that recognizes the CAC is the property of the U.S. Government.
c. Ensure contractor employees do not abuse or place holes in their CACs. d. Ensure contractor employees do not display their CACs in public.
8. If a contractor CAC is lost or stolen:
a. The contractor employee will immediately notify the contractor that the contractor CAC has been lost or stolen.
b. The contractor will immediately notify the COR (or the KO, if no COR was designated), detailing the circumstances regarding the lost or stolen contractor CAC, as follows:
(1) Face-to-face, followed within one business day by a written notice via email, or
(2) In writing, via email, or
(3) By telephone, followed within one business day by a written notice via email.
c. The contractor will report the lost or stolen CAC card to the local DLA Police/host installation police, who will provide the contractor with a police report. If there are no local DLA Police/host installation police, or no police report is provided, the contractor will provide information to the COR/KO, as applicable, detailing the circumstances of how the CAC was lost or stolen. The COR/KO will provide a memorandum for the contractor employee to support issuance of new CAC.
d. The contractor has the contractor employee bring the report/memorandum to the nearest RAPIDS office. If the CAC can be reissued within 24 hours, bring the report/memorandum to the nearest CAC office for reissue. If the CAC cannot be reissued in 24 hours, follow the steps for a new CAC, beginning at Step 1.
9. If the expiration date for a contractor CAC is before the completion of the contract and the contractor employee is to continue working under the contract and still requires a CAC, the contractor:
a. Notifies the COR as follows:
(1) Face-to-face, followed within one business day by a written notice via email, or
(2) In writing, via email, or
(3) By telephone, followed within one business day by a written notice via email.
b. No less than 10 business days before the current CAC’s expiration date, completes and complies with the steps above beginning with Step 2 for issuance of a new contractor CAC for the employee.
c. Brings the expiring CAC to the RAPIDS office for turn-in and receives new CAC. d. Notifies the COR once a new CAC has been issued.
10. The contractor/contractor employee turns in any found CACs immediately, via hand carry, to the nearest Federal law enforcement office.
11. The contractor immediately collects all contractor CAC(s) from the contractor employee(s) at:
a. Contract completion or termination
b. Termination/Reassignment of an employee (this includes any reason the employee is no longer working for the contractor under the contract or otherwise no longer requires a CAC)
12. For contract completion or termination – within one business day after collecting the contractor CAC(s), arranges for turn-in via one of the below methods: a. If the COR/KO is co-located or near enough that in-person transfer of CACs can be arranged, the contractor:
(1) Arranges to meet the COR (or the KO, if no COR was designated) to turn-in the collected contractor CAC(s).
(2) Hand-carries all collected contractor CACs for turn-in to meet the COR (or the KO, if no COR was designated).
(3) Completes and signs the Government-Issued Contractor CAC Turn-In Receipt with the COR (or the KO if no COR was designated). The contractor is provided with a copy of the receipt.
b. If in-person transfer of CAC cannot be arranged, the contractor:
(1) Sends, via certified mail, the CACs to the COR/KO. The contractor includes in the package the Government-Issued Contractor CAC Turn-In Receipt, with signed acknowledgement of contractor turn-in.
(2) Notifies COR/KO that CACs have been sent via certified mail.
(3) Receives a completed copy of the receipt from the COR/KO once the COR/KO has received the CACs.
13. For termination/reassignment of an employee:
a. Immediately notifies the COR (or the KO, if no COR was designated) that the employee is no longer working for the contractor under the contract or otherwise no longer requires a CAC, as follows:
(1) Face-to-face, followed within one business day by a written notice via email, or
(2) In writing, via email, or
(3) By telephone, followed within one business day by a written notice via email.
b. Follows the turn-in procedures above for contract completion or termination, as applicable.
14. Contractor Reporting Requirements: Every month, validate the contractor CAC log with the COR for accuracy. The contractor is required to submit, monthly, to the COR (or the KO, if no COR was designated) a report of all employees working on the contract who have been issued CAC cards and a verification of whether each listed employee still requires a CAC. The report must note where changes have occurred (additions or deletions) since the previous month. Contractor employees who already have a CAC related to another DLA or DoD contract must be included in the monthly report. Contractor will note the issuing organization and the CAC expiration date. Contractor is still responsible for notifying the COR/KO when the individual is no longer working under the subject contract.
15. The above procedures have been established as a DLA security measure. Contractors are advised that failure to comply with any of the above requirements will be considered a violation of the terms and conditions of the contract and the Contracting Officer may take action to remedy such violations. Specifically, failure to safeguard, follow these procedures, including reporting requirements, or turn-in CACs within the established timeframes may result in the following actions, which are in addition to other actions the Contracting Officer may take under governing law and regulation and the terms and conditions of the contract:
a. Immediate work stoppage (issuance of a stop work order), not to be lifted until resolution of CAC issue
b. Disapproval of invoices and delay of payment
c. Withholding of final payment (in accordance with FAR 52.204-9)
d. Documentation of CAC Non-Compliance in the Contractor Performance Assessment Reporting System (CPARS) TE 1.2 – CAC Procedures Page 4 of 4 Controlled By: DLA Distribution J7-AF CUI Category(s): PROCURE; SSEL Distribution / Dissemination Controls: FEDCON POC: J.S. Stewart, james.stewart2@dla.mil
File details come from the government source that posted it. Updated .