Exhibit 1 CDRLs dated 4 June 2019
View the file
Other files for this federal contract opportunity
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM
DDHU Bldg 849 Conveyor Project
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Installation Schedule
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-S-SAT1
5. CONTRACT REFERENCE
SOW Paragraph 3.1.18
6. REQUIRING OFFICE
DM-FDI
7. DD 250 REQ
Yes
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Yes
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
** Draft
Final
Reg Repro
16. REMARKS
* 30 days after contract award.
** Approval required prior to commencement of work.
J7-AB 1 1
DM-FDI 1 1
DDHU-X 1 1
15. TOTAL 3 3 0
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Dwg. Eng. & Associated List
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-E-SAT2
5. CONTRACT REFERENCE
SOW Paragraph 3.1.18
6. REQUIRING OFFICE
DM-FDI
7. DD 250 REQ
Yes
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Yes
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
** Draft
Final
Reg Repro
16. REMARKS
* 30 days after contract award.
** For approval, submit final draft NLT 10 days prior to installation start date.
Reproduction copies shall be in AutoCad Release 2018 and submitted via e-mail .
J7-AB 1 1
DM-FDI 2 2
DDHU-X 2 2
15. TOTAL 5 5 0
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
Dwgs. Eng. & Associated List
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-E-SAT-2
5. CONTRACT REFERENCE
SOW Paragraph 3.1.18
6. REQUIRING OFFICE
DM-FDI
7. DD 250 REQ
Yes
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Yes
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
** Draft
Final
Reg Repro
16. REMARKS
* 15 days after installation completion date.
** Approval required prior to final acceptance.
Reproduction copies shall be in AutoCad Release 2018 and submitted via e-mail.
J7-AB 1 1
DM-FDI 2 2
DDHU-X 2 2
15. TOTAL 5 5 0
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
Commercial Manual
3. SUBTITLE
Operating Manual
4. AUTHORITY (Data Acquisition Document No.)
DI-E-SAT1
5. CONTRACT REFERENCE
SOW Paragraph 3.1.18
6. REQUIRING OFFICE
DM-FDI
7. DD 250 REQ
Yes
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Yes
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
** Draft
Final
Reg Repro
16. REMARKS
* 30 days prior to installation completion date.
**Approval required prior to preliminary testing start date.
J7-AB 1 1
DM-FDI 2 2
DDHU-X 2 2
15. TOTAL 5 5 0
G. PREPARED BY
Alex Dinh
H. DATE
3 June 2019
I. APPROVED BY
Frank Capuano
J. DATE
3 June 2019
DD FORM 1423, AUG 96 PREVIOUS EDITION MAY BE USED. Page 1 of 5 Pages Adobe Professional 7.0
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
Reset
Layout Drawings
AS-BUILT Drawings
The public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM
DDHU Bldg 849 Conveyor Project
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
Commercial Manual
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-E-SAT1
5. CONTRACT REFERENCE
SOW Paragraph 3.1.18
6. REQUIRING OFFICE
DM-FDI
7. DD 250 REQ
Yes
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Yes
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
** Draft
Final
Reg Repro
16. REMARKS
* 30 days prior to installation completion date.
** Approval required prior to preliminary testing start date.
J7-AB 1 1
DM-FDI 2 2
DDHU-X 2 2
15. TOTAL 5 5 0
1. DATA ITEM NO.
A006
2. TITLE OF DATA ITEM
Contracting Officer Representative List
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-E-SAT11
5. CONTRACT REFERENCE
SOW Paragraph 3.1.18
6. REQUIRING OFFICE
DM-FDI
7. DD 250 REQ
Yes
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Yes
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
** Draft
Final
Reg Repro
16. REMARKS
* 30 days prior to commencement of final operating test.
**Approval required prior to preliminary operating test.
J7-AB 1 1
DM-FDI 1 1
DDHU-X 1 1
15. TOTAL 3 3 0
1. DATA ITEM NO.
A007
2. TITLE OF DATA ITEM
Training Material and Schedules
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-E-SAT
5. CONTRACT REFERENCE
SOW Paragraph 3.1.18
6. REQUIRING OFFICE
DM-FDI
7. DD 250 REQ
Yes
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Yes
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION Draft Final
Reg Repro
16. REMARKS
* 30 days prior to installation completion.
J7-AB 1 1
DM-FDI 2 2
DDHU-X 2 2
15. TOTAL 5 5 0
1. DATA ITEM NO.
A008
2. TITLE OF DATA ITEM
Power Requirements
3. SUBTITLE
Operating Manual
4. AUTHORITY (Data Acquisition Document No.)
DI-P-SAT-1
5. CONTRACT REFERENCE
SOW Paragraph 3.1.18
6. REQUIRING OFFICE
DM-FDI
7. DD 250 REQ
Yes
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Yes
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
** Draft
Final
Reg Repro
16. REMARKS
* 30 days after award of contract.
**Approval required prior to commencement of work.
J7-AB 1 1
DM-FDI 1 1
DDHU-X 1 1
15. TOTAL 3 3 0
G. PREPARED BY
Alex Dinh
H. DATE
3 June 2019
I. APPROVED BY
Frank Capuano
J. DATE
3 June 2019
DD FORM 1423, AUG 96 PREVIOUS EDITION MAY BE USED. Page 2 of 5 Pages Adobe Professional 7.0
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
Reset
The public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM
DDHU Bldg 849 Conveyor Project
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A009
2. TITLE OF DATA ITEM
Design Data Calculations
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-E-2440A
5. CONTRACT REFERENCE
SOW Paragraph 3.1.18
6. REQUIRING OFFICE
DM-FDI
7. DD 250 REQ
Yes
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Yes
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
** Draft
Final
Reg Repro
16. REMARKS
* 30 days prior to installation completion date.
** Approval required prior to preliminary testing start date.
J7-AB 1 1
DM-FDI 1 1
DDHU-X 1 1
15. TOTAL 3 3 0
1. DATA ITEM NO.
A010
2. TITLE OF DATA ITEM
Certificate of Compliance
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-E-SAT14
5. CONTRACT REFERENCE
SOW Paragraph 3.1.18
6. REQUIRING OFFICE
DM-FDI
7. DD 250 REQ
Yes
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Yes
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
** Draft
Final
Reg Repro
16. REMARKS
* 5 days prior to installation completion.
** approval required prior to preliminary testing start date.
J7-AB 1 1
DM-FDI 1 1
DDHU-X 1 1
15. TOTAL 3 3 0
1. DATA ITEM NO.
A011
2. TITLE OF DATA ITEM
Test Plan
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-T-SAT1
5. CONTRACT REFERENCE
SOW Paragraph 3.1.18
6. REQUIRING OFFICE
DM-FDI
7. DD 250 REQ
Yes
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Yes
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION Draft Final
Reg Repro
16. REMARKS
* 30 days prior to installation completion.
J7-AB 1 1
DM-FDI & J62B 2 2
DDHU-X 1 1
15. TOTAL 4 4 0
1. DATA ITEM NO.
A012
2. TITLE OF DATA ITEM
Software Documentation Manual
3. SUBTITLE
Operating Manual
4. AUTHORITY (Data Acquisition Document No.)
DI-P-SAT-2
5. CONTRACT REFERENCE
SOW Paragraph 3.1.18
6. REQUIRING OFFICE
DM-FDI
7. DD 250 REQ
Yes
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Yes
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
** Draft
Final
Reg Repro
16. REMARKS
* 30 days prior to installation completion.
**Approval required prior to preliminary testing start date.
UNICOR 1 1
DM-FDI & J62B 2 2
DDHU-X 1 1
15. TOTAL 4 4 0
G. PREPARED BY
Alex Dinh
H. DATE
3 June 2019
I. APPROVED BY
Frank Capuano
J. DATE
3 June 2019
DD FORM 1423, AUG 96 PREVIOUS EDITION MAY BE USED. Page 3 of 5 Pages Adobe Professional 7.0
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
Reset
The public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM
DDHU Bldg 849 Conveyor Project
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A013
2. TITLE OF DATA ITEM
Hardware Baseline Inventory
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-IO-SAT-1
5. CONTRACT REFERENCE
SOW Paragraph 3.1.18
6. REQUIRING OFFICE
DM-FDI
7. DD 250 REQ
Yes
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Yes
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
** Draft
Final
Reg Repro
16. REMARKS
* 30 days prior to installation completion date.
** Approval required prior to preliminary testing start date.
J7-AB 1 1
DM-FDI & J62B 2 2
DDHU-X 1 1
15. TOTAL 4 4 0
1. DATA ITEM NO.
A014
2. TITLE OF DATA ITEM
Software Baseline Inventory
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-IO-SAT-2
5. CONTRACT REFERENCE
SOW Paragraph 3.1.18
6. REQUIRING OFFICE
DM-FDI
7. DD 250 REQ
Yes
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Yes
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
** Draft
Final
Reg Repro
16. REMARKS
* 30 days prior to installation completion.
** Approval required prior to preliminary testing start date.
J7-AB 1 1
DM-FDI & J62B 2 2
DDHU-X 1 1
15. TOTAL 4 4 0
1. DATA ITEM NO.
A015
2. TITLE OF DATA ITEM
List of all provisioned accounts by role
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-IO-SAT-3
5. CONTRACT REFERENCE
SOW Paragraph 3.1.18
6. REQUIRING OFFICE
DM-FDI
7. DD 250 REQ
Yes
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Yes
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION Draft Final
Reg Repro
16. REMARKS
* 30 days prior to installation start date.
J7-AB 1 1
DM-FDI & J62B 2 2
DDHU-X 1 1
15. TOTAL 4 4 0
1. DATA ITEM NO.
A016
2. TITLE OF DATA ITEM
Physical cyber security features of end devices
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-IO-SAT-4
5. CONTRACT REFERENCE
SOW Paragraph 3.1.18
6. REQUIRING OFFICE
DM-FDI
7. DD 250 REQ
Yes
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
Yes
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION Draft Final
Reg Repro
16. REMARKS
* 30 days prior to installation start date.
** Approval required prior to preliminary testing start date.
J7-AB 1 1
DM-FDI & J62B 2 2
DDHU-X 1 1
15. TOTAL 4 4 0
G. PREPARED BY
Alex Dinh
H. DATE
3 June 2019
I. APPROVED BY
Frank Capuano
J. DATE
3 June 2019
DD FORM 1423, AUG 96 PREVIOUS EDITION MAY BE USED. Page 4 of 4 Pages Adobe Professional 7.0
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
Reset
DATA ITEM DESCRIPTION Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS.
1. TITLE
Installation Schedule
2. IDENTIFICATION NUMBER
DI-S-SAT1
3. DESCRIPTION/PURPOSE
Contractor planned performance information to assist the government in timely project planning, and preliminary coordination actions at the installation site.
4. APPROVAL DATE
(YYYYMMDD)
2019/06/03
4. OFFICE OF PRIMARY RESPONSIBILITY (OPR)
DM-FDI
6a. DTIC APPLICABLE
N/A
6b. GIDEP APPLICABLE
N/A
7. APPLICATION/INTERRELATIONSHIP
This data is applicable to all contractor performance/work actions necessary to comply with specification for reference project and assure program continuity.
8. APPROVAL LIMITATION
N/A
9a. APPLICABLE FORMS
N/A
9b. AMSC NUMBER
N/A
10. PREPARATION INSTRUCTIONS
10.1 The schedule shall clearly identify the contractor, contract number, installation site and area(s) where work will be performed.
10.2 The schedule shall contain planned dates, days, or time periods for all design, engineering, purchasing, manufacturing, shipping, installation, testing, other work, and data submittals as applicable/required for compliance with the applicable specification and completion within the period of performance time specified in the contract.
11. DISTRIBUTION STATEMENT
A001
DD FORM 1664, AUG 96 (EG) PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages Designed using Perform Pro, WHS/DIOR, Aug 96
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS.
1. TITLE
Drawings, engineering and Associated Lists
2. IDENTIFICATION NUMBER
DI-E-SAT2
3. DESCRIPTION/PURPOSE
Preliminary engineering layout, equipment drawings, and material list for equipment to be supplied in accordance with referenced SOW, and as-built drawings of the equipment after installation. To provide data required for Government documentation and retention.
4. APPROVAL DATE
(YYYYMMDD)
2019/06/03
4. OFFICE OF PRIMARY RESPONSIBILITY (OPR)
DM-FDI
6a. DTIC APPLICABLE
N/A
6b. GIDEP APPLICABLE
N/A
7. APPLICATION/INTERRELATIONSHIP
This Data Item Description is applicable to all equipment items procured in accordance with referenced SOW.
8. APPROVAL LIMITATION
N/A
9a. APPLICABLE FORMS
N/A
9b. AMSC NUMBER
N/A
10. PREPARATION INSTRUCTIONS
10.1 Layout Drawings: The contractor shall provide drawings of the proposed system. Drawings shall be in AutoCad 2018 format, D Size Drawings (hard copy shall be provided also) and show equipment and location in relation to existing structural features, position, horsepower of all drive units, required utilities (air, electrical, water, etc.) connections and location of controls. In addition, the layout drawings shall be accompanied by schematics diagrams of each piece of equipment furnished, description of operation of the system, available manufacturer’s descriptive literature, performance characteristics, test data and drawings or photographs of all externally visible components of the equipment proposed including operator’s consoles. In the event that special installation adjustments or additional equipment components not supplied by the contractor are required for continuing operation of the equipment, these items shall be explicitly identified in accordance with paragraph 3 at this time. The contractor shall furnish the Government a listing and electrical load diagram of all electrical equipment being furnished for approval prior to start of installation. This listing shall include wire size, voltage drop calculations, size of conduit, circuit breakers and power disconnects in accordance with
CDRL A002.
10.2 As-built drawings: The as-built drawings shall in AutoCad 2018 format D Size drawings (hard copy shall be provided also) supplied and will show installed system in relation to structural features of the building, routing of utility lines ad connections, location of controls, process schematics and electrical diagrams. Any changes to the system configuration as depicted by any data submitted as part of the layout drawings shall be marked to the attention of the Government. (Continued)
11. DISTRIBUTION STATEMENT
A002 & A003
DD FORM 1664, AUG 96 (EG) PREVIOUS EDITION MAY BE USED. Page 1 of 2 Pages
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS.
1. TITLE
Drawings, engineering and Associated Lists (Continued)
2. IDENTIFICATION NUMBER
DI-E-SAT2
3. DESCRIPTION/PURPOSE
Preliminary engineering layout, equipment drawings, and material list for equipment to be supplied in accordance with referenced SOW, and as-built drawings of the equipment after installation. To provide data required for Government documentation and retention.
4. APPROVAL DATE
(YYYYMMDD)
2019/06/03
4. OFFICE OF PRIMARY RESPONSIBILITY (OPR)
DM-FDI
6a. DTIC APPLICABLE
N/A
6b. GIDEP APPLICABLE
N/A
7. APPLICATION/INTERRELATIONSHIP
This Data Item Description is applicable to all equipment items procured in accordance with referenced SOW.
8. APPROVAL LIMITATION
N/A
9a. APPLICABLE FORMS
N/A
9b. AMSC NUMBER
N/A
10. PREPARATION INSTRUCTIONS
10.3 Variation in Drawing Data: If any drawing or data submitted includes a variation from the Government’s requirements, including equipment proposed for brand name products referenced in the SOW, or contractor furnished drawings, or data previously approved by the Government under the contract, the contractor shall describe each such variation(s) in writing, separate from the drawings or data, at the time of submission. Any change(s) to related portions of the project due to variations(s) shall also be included.
11. DISTRIBUTION STATEMENT
A002 & A003
DD FORM 1664, AUG 96 (EG) PREVIOUS EDITION MAY BE USED. Page 2 of 2 Pages
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS.
1. TITLE
Commercial Manuals
2. IDENTIFICATION NUMBER
DI-E-SAT1
3. DESCRIPTION/PURPOSE
Preliminary engineering layout, equipment drawings, and material list for equipment to be supplied in accordance with referenced SOW, and as-built drawings of the equipment after installation. To provide data required for Government documentation and retention.
4. APPROVAL DATE
(YYYYMMDD)
2019/06/03
4. OFFICE OF PRIMARY RESPONSIBILITY (OPR)
DM-FDI
6a. DTIC APPLICABLE
N/A
6b. GIDEP APPLICABLE
N/A
7. APPLICATION/INTERRELATIONSHIP
This Data Item Description is applicable to all equipment items procured in accordance with referenced SOW.
8. APPROVAL LIMITATION
N/A
9a. APPLICABLE FORMS
N/A
9b. AMSC NUMBER
N/A
10. PREPARATION INSTRUCTIONS
10.1 The manual shall contain all information and data normally supplied with the hardware items.
10.2 The manual shall be supplemented with existing data to comply with the contract.
10.3 The manual and supplements shall be legible and on paper of sufficient quality for long term use. A CD of the manual shall also be supplied.
10.4 Manuals to be furnished must include sufficient information to satisfy all technical segments indicated in the “Description/Purpose” of block 3 and the following additional information.
a. The manual shall contain and index of the contents, section, markers or dividers where appropriate, and each manual shall be affixed or placed in a protective cover or binder or durable material, so as to provide a reasonable life under normal handling conditions. Minimum identification marking requirements for the manual cover or binder.
b. The Operation or Operator’s Manual (CDRL A0004) shall include in detail all actions required to activate, direct, operate and control the installed system/equipment. All aspects of material flow, push button station(s), console operation, panel view operation, other pertinent functions and visual aids to the extent necessary for clarity, shall be included.
c. The Parts and Maintenance Manual (CDRL A0005) shall contain the part name and identification, such as stock numbers, quantity required, sources of supply, and whether parts are manufactured by the contractor and/or sub-contractors, or are standard components purchased from other manufacturers identified in the data. Also, include a separate list identifying support items and applicable quantities which are recommended by the contractor for system maintenance for one year.
11. DISTRIBUTION STATEMENT
A004 & A005
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS.
1. TITLE
Technical Representatives List
2. IDENTIFICATION NUMBER
DI-E-SAT11
3. DESCRIPTION/PURPOSE
The purpose of this DID is to ensure that the government has availability of technical representative service/support.
4. APPROVAL DATE
(YYYYMMDD)
2019/06/03
4. OFFICE OF PRIMARY RESPONSIBILITY (OPR)
DM-FDI
6a. DTIC APPLICABLE
N/A
6b. GIDEP APPLICABLE
N/A
7. APPLICATION/INTERRELATIONSHIP
This DID should be applied to contracts where the Government requires Contractor technical representative services and support of Contractor furnished equipment/systems for an extended period after final acceptance.
8. APPROVAL LIMITATION
N/A
9a. APPLICABLE FORMS
N/A
9b. AMSC NUMBER
N/A
10. PREPARATION INSTRUCTIONS
Unless otherwise specified, the DID shall be in the Contractor’s/Supplier’s standard format and shall contain:
Business Firm/Individual Consultant Name Mailing Address Telephone Number E-mail address
11. DISTRIBUTION STATEMENT
A006
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS.
1. TITLE
Training Material
2. IDENTIFICATION NUMBER
DI-E-SAT
3. DESCRIPTION/PURPOSE
This data consists of graphs, mathematical curves, analysis tables, drawings, and empirical data which reflects quantitatively and qualitatively the operating and maintenance requirements of the furnished equipment/system. The purpose of this data is to enable the Government to verify the personnel requirements of the items being furnished.
4. APPROVAL DATE
(YYYYMMDD)
2019/06/03
4. OFFICE OF PRIMARY RESPONSIBILITY (OPR)
DM-FDI
6a. DTIC APPLICABLE
N/A
6b. GIDEP APPLICABLE
N/A
7. APPLICATION/INTERRELATIONSHIP
This DID should be applied to contracts when the Government requires evaluation of the training requirements of the items/systems furnished under the contract.
8. APPROVAL LIMITATION
N/A
9a. APPLICABLE FORMS
N/A
9b. AMSC NUMBER
N/A
10. PREPARATION INSTRUCTIONS
10.1 Unless otherwise specified, the DID shall be in the Contractor’s/Supplier’s standard format and shall provide complete narrative, graphs, mathematical curves, analysis, tables, drawings and empirical data required to evaluate the items as specified in the contract.
10.2 Unless otherwise indicated by revision and date, the document cited herein, of the issue in effect on the date of invitation for bid or request for proposals, form a part of this DID to the extent specified herein.
11. DISTRIBUTION STATEMENT
A007
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS.
1. TITLE
Power Requirements
2. IDENTIFICATION NUMBER
DI-P-SAT1
3. DESCRIPTION/PURPOSE
This item provides a comprehensive list of power requirements for all equipment to be furnished and installed by the contractor.
4. APPROVAL DATE
(YYYYMMDD)
2019/06/03
4. OFFICE OF PRIMARY RESPONSIBILITY (OPR)
DM-FDI
6a. DTIC APPLICABLE
N/A
6b. GIDEP APPLICABLE
N/A
7. APPLICATION/INTERRELATIONSHIP
This DID should be applied to contracts where the Government requires evaluation of power requirements to determine if sufficient power is available.
8. APPROVAL LIMITATION
N/A
9a. APPLICABLE FORMS
N/A
9b. AMSC NUMBER
N/A
10. PREPARATION INSTRUCTIONS
10.1 Unless otherwise specified, the DID shall be in the Contractor’s/Supplier’s standard format.
10.2 Power requirements shall be listed by total for each warehouse section in addition to each piece of equipment.
11. DISTRIBUTION STATEMENT
A008
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS.
1. TITLE
Design Data and Calculations
2. IDENTIFICATION NUMBER
DI-E-24040A
3. DESCRIPTION/PURPOSE
This data consists of graphs, mathematical curves, analysis tables, drawings, and empirical data which reflects quantitatively and qualitatively the items to be furnished. The purpose of this data is to enable the Government to verify the items being furnished are in accordance with the contract.
4. APPROVAL DATE
(YYYYMMDD)
2019/06/03
4. OFFICE OF PRIMARY RESPONSIBILITY (OPR)
DM-FDI
6a. DTIC APPLICABLE
N/A
6b. GIDEP APPLICABLE
N/A
7. APPLICATION/INTERRELATIONSHIP
This DID should be applied to contracts when the Government requires evaluation of the design capabilities of the items furnished under the contract.
8. APPROVAL LIMITATION
N/A
9a. APPLICABLE FORMS
N/A
9b. AMSC NUMBER
N/A
10. PREPARATION INSTRUCTIONS
10.1 Unless otherwise specified, the DID shall be in the Contractor’s/Supplier’s standard format and shall provide complete narrative, graphs, mathematical curves, analysis, tables, drawings and empirical data required to evaluate the items as specified in the contract.
10.2 Unless otherwise indicated by revision and date, the document cited herein, of the issue in effect on the date of invitation for bid or request for proposals, form a part of this DID to the extent specified herein.
10.3 Design data and calculations shall be signed and sealed by a person as an engineer in the United States.
10.4 If structural calculations are required for approval by the host, the contractor shall supply this information to the host command with a PE stamp at no additional cost after award of the contract.
11. DISTRIBUTION STATEMENT
A009
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS.
1. TITLE
Certificate of compliance
2. IDENTIFICATION NUMBER
DI-E-SAT14
3. DESCRIPTION/PURPOSE
This document is to provide certification that all contractual requirements have been met by the contractor.
4. APPROVAL DATE
(YYYYMMDD)
2019/06/03
4. OFFICE OF PRIMARY RESPONSIBILITY (OPR)
DM-FDI
6a. DTIC APPLICABLE
N/A
6b. GIDEP APPLICABLE
N/A
7. APPLICATION/INTERRELATIONSHIP
This DID should be applied to contracts when the Government requires evaluation of the design capabilities of the items furnished under the contract.
8. APPROVAL LIMITATION
N/A
9a. APPLICABLE FORMS
N/A
9b. AMSC NUMBER
N/A
10. PREPARATION INSTRUCTIONS
1. Contractor shall provide a certificate of compliance at project completion in the form of a letter to the Contracting Officer at J7-AB that states that all contract specifications, technical requirements and services of the contract have been satisfied.
11. DISTRIBUTION STATEMENT
A010
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS.
1. TITLE
Test Plan
2. IDENTIFICATION NUMBER
DI-T-SAT1
3. DESCRIPTION/PURPOSE
Provide an overall plan for verification of technical requirements defined in the SOW.
4. APPROVAL DATE
(YYYYMMDD)
2019/06/03
4. OFFICE OF PRIMARY RESPONSIBILITY (OPR)
DM-FDI
6a. DTIC APPLICABLE
N/A
6b. GIDEP APPLICABLE
N/A
7. APPLICATION/INTERRELATIONSHIP
7.1 This DID specifies format and content of data developed from the specified task requirements of the
SOW.
7.2 Applicable to a system procurement when a general overall system test and verification plan is required.
8. APPROVAL LIMITATION
N/A
9a. APPLICABLE FORMS
N/A
9b. AMSC NUMBER
N/A
10. PREPARATION INSTRUCTIONS
10.1 Reference documents: None.
10.2 The System Test and Verification Plan shall contain general planning information of the system verification program. This plan identifies requirements which are to be satisfied and the method by which such work will be accomplished in accordance with this SOW.
10.3 Test and Verification Plan.
a. Introduction - Describe the plan and its relationship to the entire project.
10.4 Verification Objectives:
a. Verification – Describe how the process yields the specified performance.
b. Confidence - Describe how defects, marginal designs, marginal components are detected in the early testing sequence.
c. Compatibility – Describe how the contract manufactured product and all of its subsystems, as built and installed are compatible and integrated with each other and are capable of performing the required function.
d. Buy-off Basis – Describe the procedure for acceptance of the system(s).
10.5 Concept Verification - Provide a combination of analyses or simulation to enable early verification.
10.6 Equipment Verification at Contractor’s Site – This shall include how the equipment is to be verified and the standards to be used. (Continued)
11. DISTRIBUTION STATEMENT
A011
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS.
1. TITLE
Software Documentation Manual
2. IDENTIFICATION NUMBER
DI-S-SAT-2
3. DESCRIPTION/PURPOSE
This document is to ensue all source code, programming, software and PLC Code is turned over to the Government prior to acceptance of the system for purposes of the Government maintaining the system after acceptance.
4. APPROVAL DATE
(YYYYMMDD)
2019/06/03
4. OFFICE OF PRIMARY RESPONSIBILITY (OPR)
DM-FDI
6a. DTIC APPLICABLE
N/A
6b. GIDEP APPLICABLE
N/A
7. APPLICATION/INTERRELATIONSHIP
This DID should be applied to contracts when the Government requires system programming for new systems and/or controls modifications for existing systems.
8. APPROVAL LIMITATION
N/A
9a. APPLICABLE FORMS
N/A
9b. AMSC NUMBER
N/A
10. PREPARATION INSTRUCTIONS
10.1 Software documentation shall be provided for all contractor supplied software and firmware logic, and shall include, but not limited to: narrative flow charts, definitions, special notes, instructions, and cross reference lists. In addition to this documentation, a complete library of compiled source programs and compiled object programs shall be provided. All software documentation shall be IAW DOD Standard 7935. Automated Data Systems Documentation, and DLAH 4730.1, volume VIII Part 3, DLA Automated Data Life Cycle Management specifications.
11. DISTRIBUTION STATEMENT
A012
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS.
1. TITLE
Hardware Baseline Inventory
2. IDENTIFICATION NUMBER
DI-IO-SAT-1
3. DESCRIPTION/PURPOSE
3.1 This documentation provides information on all Contractor supplied hardware to perform proper asset management of the system and equipment. This information is necessary to provide data required for Government documentation and retention.
4. APPROVAL DATE
(YYYYMMDD)
2019/06/03
5. OFFICE OF PRIMARY RESPONSIBILITY (OPR)
DM-FDI
6a. DTIC APPLICABLE
N/A
6b. GIDEP APPLICABLE
N/A
7. APPLICATION/INTERRELATIONSHIP
7.1 This Data Item Description (DID) specifies format and content of data developed from the specified task of the procurement document.
7.2 This DID may be applied to programs or projects during Material Solution Analysis (MSA), Technology Maturation & Risk Reduction (TMRR), Engineering & Manufacturing Development (EMD), Production & Deployment (P&D), and Operations & Support (O&S) phases of the Defense Acquisition Life Cycle.
8. APPROVAL LIMITATION 9a. APPLICABLE FORMS 9b. AMSC NUMBER
10. PREPARATION INSTRUCTIONS
10.1 Format: The documentation must in the Contractor's design unless otherwise specified on the Contract Data Requirements List (CDRL / DD Form 1423). Unless stated otherwise on the CDRL, the deliverable to the Government must be provided in digital format and viewable using the latest version of Microsoft Office or Adobe software products as applicable.
10.2 Content: At a minimum, the documentation must identify a complete hardware configuration and asset inventory (including model # and serial # of deployed equipment) for deployed control system components.
10.3 Revisions: Unless otherwise indicated by revision and date, the documentation submitted by the Contractor to the Government as cited within this DID will be considered the most up to date iteration.
Revisions to documentation must be provided by the Contractor with an accompanying summary that clearly identifies to the Government all changes at the time of submission.
11. DISTRIBUTION STATEMENT
A013
DD FORM 1664, AUG 96 (EG) PREVIOUS EDITION MAY BE USED. Page of Pages
1 1
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS.
1. TITLE
Software Baseline Coding Information and Inventory
2. IDENTIFICATION NUMBER
DI-IO-SAT-2
3. DESCRIPTION/PURPOSE
3.1 This documentation provides information on all Contractor supplied software to perform proper asset management of the system and equipment. This information is necessary to provide data required for Government documentation and retention.
4. APPROVAL DATE
(YYYYMMDD)
2019/06/03
5. OFFICE OF PRIMARY RESPONSIBILITY (OPR)
DM-FDI
6a. DTIC APPLICABLE
N/A
6b. GIDEP APPLICABLE
N/A
7. APPLICATION/INTERRELATIONSHIP
7.1 This Data Item Description (DID) specifies format and content of data developed from the specified task of the procurement document.
7.2 This DID may be applied to programs or projects during Material Solution Analysis (MSA), Technology Maturation & Risk Reduction (TMRR), Engineering & Manufacturing Development (EMD), Production & Deployment (P&D), and Operations & Support (O&S) phases of the Defense Acquisition Life Cycle.
8. APPROVAL LIMITATION 9a. APPLICABLE FORMS 9b. AMSC NUMBER
10. PREPARATION INSTRUCTIONS
10.1 Format: The documentation must in the Contractor's design unless otherwise specified on the Contract Data Requirements List (CDRL / DD Form 1423). Unless stated otherwise on the CDRL, the deliverable to the Government must be provided in digital format and viewable using the latest version of Microsoft Office or Adobe software products as applicable.
10.2 Content: The documentation must identify a complete software configuration and inventory for control system components. This documentation must include any "as built" drawings for Information Technology (IT) deployed within the system and applicable connection information. The documentation must also provide complete copies of configurations or code (such as ladder logic for PLCs) written for the deployed system / equipment.
10.3 Revisions: Unless otherwise indicated by revision and date, the documentation submitted by the Contractor to the Government as cited within this DID will be considered the most up to date iteration.
Revisions to documentation must be provided by the Contractor with an accompanying summary that clearly identifies to the Government all changes at the time of submission.
11. DISTRIBUTION STATEMENT
A014
DD FORM 1664, AUG 96 (EG) PREVIOUS EDITION MAY BE USED. Page of Pages
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS.
1. TITLE
List of Provisioned Accounts by Role, with Confirmation of Removal for Unneeded Accounts
2. IDENTIFICATION NUMBER
DI-IO-SAT-3
3. DESCRIPTION/PURPOSE
3.1 This documentation provides information on access accounts for the Contractor supplied software. This information is necessary to provide data required for Government documentation and retention.
4. APPROVAL DATE
(YYYYMMDD)
2019/06/03
5. OFFICE OF PRIMARY RESPONSIBILITY (OPR)
DM-FDI
6a. DTIC APPLICABLE
N/A
6b. GIDEP APPLICABLE
N/A
7. APPLICATION/INTERRELATIONSHIP
7.1 This Data Item Description (DID) specifies format and content of data developed from the specified task of the procurement document.
7.2 This DID may be applied to programs or projects during Material Solution Analysis (MSA), Technology Maturation & Risk Reduction (TMRR), Engineering & Manufacturing Development (EMD), Production & Deployment (P&D), and Operations & Support (O&S) phases of the Defense Acquisition Life Cycle.
8. APPROVAL LIMITATION 9a. APPLICABLE FORMS 9b. AMSC NUMBER
10. PREPARATION INSTRUCTIONS
10.1 Format: The documentation must in the Contractor's design unless otherwise specified on the Contract Data Requirements List (CDRL / DD Form 1423). Unless stated otherwise on the CDRL, the deliverable to the Government must be provided in digital format and viewable using the latest version of Microsoft Office or Adobe software products as applicable.
10.2 Content: The documentation must include a complete list of all administrator and user accounts with password…