Attachment_3_-_Schedule_of_Supplies.xlsx
XLSX spreadsheet 29 KB Posted
- Attached to
- Conveyor System Upgrade Project Building 849 DLA Distribution Hill, UT Federal contract opportunity
- Solicitation number
- SP330019Q0069
- Issued by
- Defense Logistics Agency Distribution
About this file
Attachment 3 - Schedule of Supplies
View the file
Other files for this federal contract opportunity
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
ATTACHMENT 3 - SCHEDULE OF SUPPLIES SP3300-19-Q-0069
| CLIN | DESCRIPTION | QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL PRICE |
| 0001 | RECEIVING AREA in accordance with Attachment 1, Statement of Work - Firm-Fixed Price - Labor, materials, equipment, and control components required to remove old and provide, install, test and make operable new upgrades to the receiving area. | 1 | LOT | ||
| Breakdown of CLIN 0001 - Not Separately Priced (NSP) | |||||
| Traversing Extendible Belt Conveyor (36”W x 66’L) | 2 | ea | NSP | NSP | |
| 36 in. Roller Accumulation Conveyor | 550 | ft | NSP | NSP | |
| 45 Degree Merge | 14 | ea | NSP | NSP | |
| 90 Degree Power Roller Curve | 12 | ea | NSP | NSP | |
| Powered Lift Gate | 1 | ea | NSP | NSP | |
| Incline Conveyor | 200 | ft | NSP | NSP | |
| Decline Conveyor | 50 | ft | NSP | NSP | |
| Sorter Conveyor | 125 | ft | NSP | NSP | |
| Divert for Sorter System | 8 | ea | NSP | NSP | |
| Ergonomic Workstation | 17 | ea | NSP | NSP | |
| Omni-Directional Scanner | 2 | ea | NSP | NSP | |
| Swing-arm Divert | 1 | ea | NSP | NSP | |
| 42 in. Gravity Roller Conveyor | 90 | ft | NSP | NSP | |
| Controls & Programming | 1 | LOT | NSP | NSP | |
| 10 HP Compressor | 1 | ea | NSP | NSP | |
| Labor and Other Direct Cost for demolition of existing conveyor/sytem and insallation of new system inclusive of power connection. | 1 | LOT | NSP | NSP | |
| Period of Performance: 545 Days (18 Months) After Date of Contract Award | |||||
| Total Price for CLIN 0001 | $ - 0 | $ - 0 |
| 0002 | OPTIONAL - Preservation, Packing, Packaging of Material (PPP&M) Area in accordance with Attachment 1, Statement of Work - Firm-Fixed Price (OPTION CLIN) - Labor, materials, equipment, and control components required to remove old and provide, install, test and make operable new upgrades to the PPP&M area. | 1 | LOT | ||
| Breakdown of CLIN 0002 - Not Separately Priced (NSP) | |||||
| 36 in. Roller Accumulation Conveyor | 1000 | ft | NSP | NSP | |
| Incline Conveyor | 75 | ft | NSP | NSP | |
| 45 Degree Merge | 8 | ea | NSP | NSP | |
| 90 Degree Power Curve | 9 | ea | NSP | NSP | |
| Powered Lift Gate | 4 | ea | NSP | NSP | |
| Sorter Conveyor | 85 | ft | NSP | NSP | |
| Divert for Sorter System | 7 | ea | NSP | NSP | |
| Spiral Conveyor | 1 | ea | NSP | NSP | |
| Right Angle Transfer | 1 | ea | NSP | NSP | |
| Ergonomic Workstation | 13 | ea | NSP | NSP | |
| Omni-Directional Scanner | 4 | ea | NSP | NSP | |
| DAWS – In-line Scale | 1 | ea | NSP | NSP | |
| DAWS – Dimensioner | 1 | ea | NSP | NSP | |
| DAWS - Scanner | 1 | ea | NSP | NSP | |
| Controls & Programming | 1 | ea | NSP | NSP | |
| 10 HP Compressor | 1 | ea | NSP | NSP | |
| Labor and Other Direct Cost for demolition of existing conveyor/sytem and insallation of new system inclusive of power connection. | 1 | LOT | NSP | NSP | |
| Period of Performance: 545 Days (18 months) After Date of Contract/CLIN Award. | |||||
| The Government reserves the right to award each OPTION CLIN up to 180 days from the initial contract award. | |||||
| Total Price for CLIN 0002 | $ - 0 | $ - 0 |
| 0003 | OPTIONAL - Autolabel System Area in accordance with Attachment 1 - Statement of Work; Firm-Fixed Price (OPTION CLIN) - Labor, material, equipment, and control components required to remove old and provide, install, test and make operable new upgrades to the Autolabel area. | 1 | LOT | ||
| Breakdown of CLIN 0003- Not Separately Priced (NSP) | |||||
| Auto-labeler, scanner, conveyors, miscellaneous equipment | 1 | LOT | NSP | NSP | |
| Controls & Programming | 1 | LOT | NSP | NSP | |
| Labor and Other Direct Cost for demolition of existing conveyor/sytem and insallation of new conveyor/system inclusive of power connection. | 1 | LOT | NSP | NSP | |
| Period of Performance: 545 Days (18 months) After Date of Contract/CLIN Award. | |||||
| The Government reserves the right to award each OPTION CLIN up to 180 days from the initial contract award. | |||||
| Total Price for CLIN 0003 | $ - 0 | $ - 0 |
| 0004 | OPTIONAL - Off-Base Shipping are in accordance with Attachment 1 - Statement of Work; Firm-Fixed Price (OPTION CLIN) - Labor, material, equipment, and control components required to remove old and provide, install, test and make operable new upgrades to the Off-Base Shipping area. | 1 | LOT | ||
| Breakdown of CLIN 0004 - Not Separately Priced (NSP) | |||||
| Spiral Conveyor | 1 | ea | NSP | NSP | |
| 36 in. Roller Accumulation Conveyor | 500 | ft | NSP | NSP | |
| 45 Degree Merge | 1 | ea | NSP | NSP | |
| 90 Degree Power Roller Curves | 5 | ea | NSP | NSP | |
| Powered Lift Gates | 1 | ea | NSP | NSP | |
| Sorter Conveyor | 65 | ft | NSP | NSP | |
| Divert for Sorter System | 9 | ea | NSP | NSP | |
| Ergonomic Workstation | 5 | ea | NSP | NSP | |
| Omni-Directional Scanner | 1 | ea | NSP | NSP | |
| Tippers | 8 | ea | NSP | NSP | |
| Controls & Programming | 1 | ea | NSP | NSP | |
| 10 HP Compressor | 1 | ea | NSP | NSP | |
| Labor and Other Direct Cost for demolition of existing conveyor/sytem and insallation of new conveyor/system inclusive of power connection. | 1 | LOT | NSP | NSP | |
| Period of Performance: 545 Days (18 months) After Date of Contract/CLIN Award. | |||||
| The Government reserves the right to award each OPTION CLIN up to 180 days from the initial contract award. | |||||
| Total Price for CLIN 0004 | $ - 0 | $ - 0 |
| 0005 | OPTIONAL - 49A Walk & Pick Storage Area; 49B/49C Package/Pallet Rack Storage Area; Overhead Conveyor Area in accordance with Attachment 1 - Statement of Work; Firm-Fixed Price (OPTION CLIN) - Labor, material, equipment, and control components required to remove old and provide, install, test and make operable new upgrades to the 49A Walk & Pick Storage Area; 49B/49C Package/Pallet Rack Storage Area; Overhead Conveyor area. | 1 | LOT | ||
| Breakdown of CLIN 0005 - Not Separately Priced (NSP) | |||||
| 49A Walk & Pick Storage Area: | |||||
| Decline Conveyor | 75 | ft | NSP | NSP | |
| Incline Conveyor | 150 | ft | NSP | NSP | |
| 36 in. Roller Accumulation Conveyor | 75 | ft | NSP | NSP | |
| 45 Degree Merge | 3 | ea | NSP | NSP | |
| Ergonomic Workstations | 2 | ea | NSP | NSP | |
| Omni-Directional Scanner | 1 | ea | NSP | NSP | |
| Labor and Other Direct Cost for demolition of existing conveyor/sytem and insallation of new system inclusive of power connection. | 1 | LOT | NSP | NSP | |
| 49B/49C Package/Pallet Rack Storage Area: | |||||
| Decline Conveyor | 75 | ft | NSP | NSP | |
| Incline Conveyor | 75 | ft | NSP | NSP | |
| 90 Degree Power Roller Curve | 4 | ea | NSP | NSP | |
| 36 in. Accumulation Roller Converyor | 60 | ft | NSP | NSP | |
| 45 Degree Merge | 2 | ea | NSP | NSP | |
| Ergonomic Workstation | 2 | ea | NSP | NSP | |
| Omni-Directional Scanner | 2 | ea | NSP | NSP | |
| Labor and Other Direct Cost for demolition of existing conveyor/sytem and insallation of new system inclusive of power connection. | 1 | LOT | NSP | NSP | |
| Overhead Conveyor Area: | |||||
| 90 Degree Power Roller Curve | 4 | ea | NSP | NSP | |
| 36 in. Accumulation Roller Conveyor | 800 | ft | NSP | NSP | |
| Omni-Directional Scanner | 1 | ea | NSP | NSP | |
| Fire Damper & Wall Penetration | 2 | ea | NSP | NSP | |
| Controls & Programming | 1 | LOT | NSP | NSP | |
| Air Compressor | 1 | ea | NSP | NSP | |
| Labor and Other Direct Cost for demolition of existing conveyor/sytem and insallation of new system inclusive of power connection. | 1 | LOT | NSP | NSP | |
| Period of Performance: 545 Days (18 months) After Date of Contract/CLIN Award. | |||||
| The Government reserves the right to award each OPTION CLIN up to 180 days from the initial contract award. | |||||
| Total Price for CLIN 0005 | $ - 0 | $ - 0 |
| 0006 | OPTIONAL - On-Base Shipping System; ASM Storage Area in accordance with Attachment 1 - Statement of Work; Firm-Fixed Price (OPTION CLIN) - Labor, material, equipment, and control components required to remove old and provide, install, test and make operable new upgrades to the On-Base Shipping System; ASM Storage Area. | 1 | LOT | ||
| Breakdown of CLIN 0006 - Not Separately Priced (NSP) | |||||
| On-Base Shipping System: | |||||
| 36 in. Roller Accumulation Conveyor | 400 | ft | NSP | NSP | |
| Decline Conveyor | 75 | ft | NSP | NSP | |
| 90 Degree Power Roller Curve | 3 | ea | NSP | NSP | |
| 45 Degree Merge | 3 | ea | NSP | NSP | |
| Sorter Conveyor | 100 | ft | NSP | NSP | |
| Sorter Divert | 17 | ea | NSP | NSP | |
| Ergonomic Workstation | 2 | ea | NSP | NSP | |
| Omni-Directional Scanner | 2 | ea | NSP | NSP | |
| Labor and Other Direct Cost for demolition of existing conveyor/sytem and insallation of new system inclusive of power connection. | 1 | LOT | NSP | NSP | |
| ASM Storage Area: | |||||
| 36 in. Roller Accumulation Conveyor | 330 | ft | NSP | NSP | |
| Decline Conveyor | 75 | ft | NSP | NSP | |
| 90 Degree Power Roller Curve | 5 | ea | NSP | NSP | |
| 45 Degree Merge | 1 | ea | NSP | NSP | |
| Sorter Conveyor | 250 | ft | NSP | NSP | |
| Omni-Directional Scanner | 1 | ea | NSP | NSP | |
| 10 HP Compressor | 1 | ea | NSP | NSP | |
| Controls & Programming | 1 | LOT | NSP | NSP | |
| Labor and Other Direct Cost for demolition of existing conveyor/sytem and insallation of new system inclusive of power connection. | 1 | LOT | NSP | NSP | |
| Period of Performance: 545 Days (18 months) After Date of Contract/CLIN Award. | |||||
| The Government reserves the right to award each OPTION CLIN up to 180 days from the initial contract award. | |||||
| Total Price for CLIN 0006 | $ - 0 | $ - 0 |
| 0007 | One (1) Year Mainentance Contract in accordance with Attachment 1 - Statement of Work; Firm-Fixed Price (OPTION CLIN) | 1 | LOT | ||
| Breakdown of OPTION CLIN 0007 - Not Separately Priced (NSP) | |||||
| Preventative and Corrective Maintenance Contract for Entire System | 1 | YR | |||
| Delivery: One Year after the Government acceptance of the entire system. For Quoting purposes, vendors should price CLIN 0007 as if CLINs 0001-0006 are all awarded at time of contract award. | |||||
| The Government reserves the right to award each OPTION CLIN up to 180 days from the initial contract award. | |||||
| Total Price for CLIN 0007 | $ - 0 | $ - 0 |
0008 Contract Data Requirements List (CDRL) In accordance with DD Form 1423, A001-A012; Data Item Descriptions (DIDs), DD Form 1664, in accordance with Attachment 1 - Statement of Work. Firm-Fixed Price. Not Separately Priced (NSP) 1 LOT NSP NSP
TOTAL PRICE FOR ALL CLINS (0001-0008) $ - 0 $ - 0