A031 - MHE Corrosion Control Program.pdf

PDF 187 KB Posted

Attached to
Distribution and Warehouse Services Federal contract opportunity
Solicitation number
SP3300-18-R-5004
Issued by
Defense Logistics Agency Distribution

About this file

CDRL A031

View the file

Other files for this federal contract opportunity

Other files attached to Distribution and Warehouse Services, newest first.
File Type Posted
SP3300-18-R-5004-A002.docx DOCX document
Attachment_J.1_Section_C_(2-12-18)_TRACKED.docx DOCX document
RFP_SP3300-18-R-5004_Sections_B_-_M_(2-14-18)_TRACKED.docx DOCX document
Attachment J.9, Contractor Equipment List —
Attachment J.24, TE 5.1 DDGM Historical Workload XLS spreadsheet
A034 - MPC and Local Delivery Refusal Log.pdf PDF
Attachment J.1, Section C —
Attachment J.1, Section C —
RFP_SP3300-18-R-5004_Sections_B_-_M_(1-22-18)_TRACKED.docx DOCX document
A014 - Monthly Cost Report for Travel and Training CLIN.pdf PDF
Attachment J.33, Proposed Productive Hours —
Attachment J.37, TE 5.12N Air TCSP Customer Listing.pdf PDF
Attachment J.6, TE 3.4 GE-MHE —
Attachment_J.14,_TE_2.1_Definitions_Acronyms_and_Abbreviations.docx DOCX document
CDRL_A017_-_Government_Cargo_Recovery_Effort_Program.pdf PDF
Attachment_J.25,_TE_5.2_Projected_Workload_20_Dec_17.xlsx XLSX spreadsheet
Attachment_J.31,_TE_5.7N_Local_Delivery.doc DOC document
Attachment_J.13,_TE_1.2_CAC_Procedures.docx DOCX document
CDRL_A026_-_Wood_Packaging_Material.pdf PDF
CDRL_A028_-_Floor_to_Book_Report.pdf PDF
CDRL_A005_-_Internal_Order_Number_Reporting.pdf PDF
Attachment_J.17,_TE_3.3_Government_Data_Systems.doc DOC document
Attachment_J.33_Proposed_Productive_Hours.xlsx XLSX spreadsheet
CDRL_A035_-_MPC_Non-Delivery_Log.pdf PDF
Attachment_J.12,_TE_1.1_Contractor_Personnel_Security.docx DOCX document
CDRL_A014_-_Cost_Report_for_Travel_and_Training_CLIN.pdf PDF
CDRL_A024_-_Physical_Security_Plan.pdf PDF
Attachment_J.3,_Wage_Determination.pdf PDF
CDRL_A020_-_Shipment_to_Restricted_Country_-_Approval_Necessary.pdf PDF
CDRL_A030_-_Phase-Out_Plan.pdf PDF
Attachment_J.20,_TE_4.3_MHE_PM_Task_Codes.xlsx XLSX spreadsheet
Attachment_J.15,_TE_3.1_Government_Facilities.doc DOC document
Attachment_J.5,_CLIN_X006_Labor_Rate_Table.xlsx XLSX spreadsheet
Attachment_J.13,_TE_1.2_CAC_Procedures.docx DOCX document
Attachment_J.5,_CLIN_X006_Labor_Rate_Table.xlsx XLSX spreadsheet
Attachment_J.22,_TE_4.5_Other_Equipment_PM_Task_Codes.xlsx XLSX spreadsheet
Attachment_J.12,_TE_1.1_Contractor_Personnel_Security.docx DOCX document
Attachment_J.27,_TE_5.5_Type_Physical_Inventory_Code_Matrix.docx DOCX document
Attachment_J.10,_Past_Performance_Questionnaire.docx DOCX document
Attachment_J.15,_TE_3.1_Government_Facilities.doc DOC document
Attachment_J.32,_TE_5.8N_Leak_Monitoring_Detection_and_Transfer_Procdures.docx DOCX document
Attachment_J.19,_TE_4.2_Gov_Operated_Equipment_for_Contractor_Maintenance.xlsx XLSX spreadsheet
Attachment_J.3,_Wage_Determination.pdf PDF
Attachment_J.3,_Collective_Bargaining_Agreement.pdf PDF
Attachment_J.29,_TE_6.1_Government_Forms.docx DOCX document
Attachment_J.31,_TE_5.7N_Local_Delivery.doc DOC document
Attachment_J.28,_TE_5.9_DSS_Load_and_Maintain.docx DOCX document
Attachment_J.23,_TE_5.0_Acceptable_Performance_Levels.doc DOC document
Attachment_J.17,_TE_3.3_Government_Data_Systems.doc DOC document
DDGM_Preproposal_Conference_Instructions.docx DOCX document
Show all 50

Distribution and Warehouse Services has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

WASH DATE VEHICLE or MHE TYPE VEHICLE or MHE BRAND/MODEL VEH/MHE ID # LOCATION OF WASH METHOD OF WASH WASHER NAME VERIFIED BY NAME

ADP489E.tmp
Sheet1
1_DATA_ITEM_NO: A031
2_TITLE_OF_DATA_ITEM: MHE Corrosion Control Program
3_SUBTITLE:
4_AUTHORITY_Data_Acquisit: N/A
5_CONTRACT_REFERENCE: Attachment J.2, Para 3.6.5N
6_REQUIRING_OFFICE: DLA Distribution J-7
7_DID_250_REQ: See Block 16
8_APP_CODE:
DIST_STATEMENT: C
10_FREQUENCY: See Block 16
11_AS_OF_DATE: N/A
12_DATE_OF_FIRST_SUBMISSI: See Block 16
13_DATE_OF_SUBSEQUENT_SUB: See Block 16
addressee1: J-7 Contract Spec
draft1:
reg1: 1
repro1:
addressee2: COR
draft2:
reg2:
repro2: 1
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_repro: 1
16_REMARKS: Tailored to permit Contractor's format. Submit electronically

Submit NLT 30 calendar days prior to the end of the phase-in period a maintenance program that details the Contractor's methodology and processes for executing a MHE Corrosion Control Plan for good fleet management practices IAW PWS Paragraph C-3.6.5N. Shall be submitted when the Contractor updates or revises the MHE Corrosion Maintenance Plan within 30 calendar days of the change.

The Contractor shall establish and execute a MHE corrosion control program The Corrosion Control Program should incorporate at a minimum:

1. Weekly wash down schedule for all equipment exposed to outside corrosive weather conditions recorded IAW the attached log.

2. Monthly inspection for rust and damaged paint.

3. Process/procedures for scheduling equipment for corrosion control (e.g., sand blasting/painting).

Block 7 - Inspection and acceptance requirements:

The COR will review and accept the MHE Corrosion Control Plan and updates after coordination with Installation Support Equipment Office and J-3 Depot Operations review and comments.

Block 14 - Distribution - Contractor to submit original to Contract Specialist and copy to the COR.

17_PRICE_GROUP:
ESTIMATED_TOTAL_PRICE:
G_PREPARED_BY:
H_DATE:
1_APPROVED_BY:
J_DATE:
Page: 1
reg38t: 1
A_CONTRACT_LINE_ITEM_NO: X007
B_EXHIBIT: Attachment J.11
TDP:
TM:
OTHER:
DSYSTEMITEM:
E_CONTRACTPR_NO:
FCONTRACTOR:
of_pages: 1
Reset:
2018-01-19T16:29:40-0500
CRUSEY.SHANE.M.1287981151
2018-01-20T16:05:44-0500
FLICK.CLIFFORD.C.1032268311

File details come from the government source that posted it.