Attachment_5_J.12_TRACKED_TE_3.1_GF.doc

DOC document 66 KB Posted

Attached to
DLA Distribution Richmond, VA Distribution and Warehouse Services
Solicitation number
SP330017R5004
Issued by

About this file

Amendment 0002 Attachment 5 Revised TE 3.1

View the file

Other files

File Type Posted
Attachment_3_-_Amend_0003_-_Conformed_Attachment_J.26_Proposed_Training_Hrs.xlsx XLSX spreadsheet
Attachment_1_-_Amend_0003_DDRV_Questions.docx DOCX document
Attachment_2_-_Amend_0003_RFP_SP3300-17-R-5004_SECTIONS_B-M.docx DOCX document
Amendment_0003_SF30_and_pg_2.pdf PDF
Attachment_11_J.26_Amendment_02_Proposed_Training_Hrs.xlsx XLSX spreadsheet
Attachment_8__J.15_TE_4.1_TRACKED_Contractor_Training_.docx DOCX document
Amendment_0002_SF30_and_pg_2.pdf PDF
Attachment_6_Revised_J.13_TE_3.2_TRACKED_Government_Training.docx DOCX document
Attachment_1_-_Amend_0002_DDRV_Questions.docx DOCX document
Amendment_0002_RFP_SP3300-17-R-5004_SECTIONS_B-M.docx DOCX document
Attachment_7_J.14_TE_3.3__TRACKED_Government_Data_Systems.doc DOC document
Attachment_4_J.5_TRACKED_Contractor_Furnished_Equipment.docx DOCX document
Attachment_3_-_Amend_0002_J.1_PWS.docx DOCX document
Attachment_10_Revised_J.25,_COMPLETE_DDRV_Proposed_Productive_Hours_a_4-14-17.xlsx XLSX spreadsheet
Attachment_9_J.16__NEW_TE_4.2_Amendment_02_Government_Provided_Equipment_.xlsx XLSX spreadsheet
Attachment_2_-_Amend_0002_Word_Table.docx DOCX document
Attachment_2_-_J.1_DDRV_-_PWS.docx DOCX document
Attachment_1_-_J.1_DDRV_PWS_-_Word_Table.docx DOCX document
Attachment_5_-_DDRV_CBA_01262017_A.pdf PDF
Attachment_6_-_CBA_WD_DOL_2017-0047_REV_1.txt TXT text file
Attachment_3_-_J.25_Proposed_Productive_Hours.xlsx XLSX spreadsheet
Attachment_4_-_J.14_TE_3.3__Government_Data_Systems.doc DOC document
Amendment_0001_SF30_and_pg_2.pdf PDF
PPC_DDRV_Attendee_List.pdf PDF
Notice_Regarding_Resticted_Access.docx DOCX document
SF33_17-R-5004.pdf PDF
Attachment_J8_A026_-_WPM_Report.pdf PDF
Attachment_J8_A029_-_Contractor_Labor_Hour_Report_(including_Subcontractor).pdf PDF
Attachment_J8_A004_-_SSDRP.pdf PDF
Attachment_J.9_TE_1.1_Contractor_Personnel_Security.docx DOCX document
Attachment_J.23_TE_5.9_DSS_Load_and_Maintain.docx DOCX document
Attachment_J8_A018_-_DOT_Exemption_Usage_Report.pdf PDF
Attachment_J.3_DD254_DDRV.pdf PDF
Attachment_J8_A003_-_ESD_Control_Program.pdf PDF
Attachment_J8_A032_-_Haradous_Material_Log.pdf PDF
Attachment_J8_A031_-_Hazardous_Materials_Management_Plan.pdf PDF
Attachment_J.24_TE_6.1_Government_Forms.docx DOCX document
Attachment_J.13_TE_3.2_Government_Training.docx DOCX document
Attachment_J8_A020_-_Shipment_to_Restricted_Country_-_Approval_Necessary.pdf PDF
Attachment_J.21_TE_5.4_Transshipment_of_Hazardous_Assets.docx DOCX document
Attachment_J.2_Wage_Determination.pdf PDF
Attachment_J8_A009_-_Contractor_Provided_Equipment_Report.pdf PDF
Attachment_J.5_Contractor_Furnished_Equipment.docx DOCX document
Attachment_J8_A007_-_Customer_Service_Support_Procedures-On-Call_Response_Roster.pdf PDF
Attachment_J8_A006_-Quality_Control_Plan.pdf PDF
Attachment_J8_A017_-_GOCARE_Program.pdf PDF
Attachment_J.17_TE_4.3_Gov_Miscellaneous_Equip_.xlsx XLSX spreadsheet
Attachment_J8_A014_-_Monthly_Cost_Report_for_Travel_and_Training_CLIN.pdf PDF
Attachment_J.15_TE_4.1_Contractor_Training_.docx DOCX document
Attachment_J.26_Proposed_Training_Hrs.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 89 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SP3300-17-R-5004

Amendment 0002

Attachment 5 Revised TE 3.1

Technical Exhibit 3.1

DLA RICHMOND GOVERNMENT FACILITIES (GF)

LEGEND

Type Construction*1
Facility Function*2
B = Brick
CB = Concrete Block
S = Storage
I = Issue
H = Heated
UH = Unheated
KO = Kitting Operation
R = Receiving
TB = Tin Building
D = Dehumidified
H = Hazardous
P = Packaging
OS = Open Storage
RMT = Round Metal Tank
C = Cold Storage
SPT = Support
W = Wood
PVC = PVC/Poly Cover
D = Detrash
SP = Shipping
TRCF = Tin Roof Concrete Floor
A = Asphalt
Building/Lot #
Type

Const.*1 Year

Const.

Gross

Sq. Ft.

(GSF)

SP Occupied.

(NSF)

Support Space

Sq Ft Facility

Function*2 Commodities

Bldg 44 (Bays A-B)
B
1941
36,000
36,000
R, S, I, P, SP
Central Shipping and Receiving
Open Shed 3
TRCF
1995
104,000
43,112
N/A
R, S, I, P, SP
Drum Storage
Open Shed 4
TRCF
1995
104,000
38,074
N/A
R, S, I, P, SP
Drum Storage. ODS Cylinder storage

Hazardous Material

Open Shed 5
TRCF
1995
104,000
42,775
N/A
R, S, I, P, SP
Drum Storage. ODS Cylinder storage

Hazardous Material

Open Shed 6
TRCF
1995
80,000
19,409
N/A
R, S, I, P, SP
Drum Storage Hazardous Material
Open Storage 75
A

8,000

N/A
R, S, I, P
Open Bulk Storage Compressed Gas Cylinders
Whse 11 (Bays A-L)
B
1942
222,480
46,730
21,600
R, S, I, P
Bulk Locations, Box Shop in Bay “L” -Heated, Dock Level, Unheated
Whse 12 (Bays A-E)
B
1941
102,960
38,986
30,550
R, S, I, P
Rack/.Bulk Locations, Dock Level, Unheated Hazardous Materials
Whse 13 (Bays A-E)
CB
1993
99,384
35,015
19,680
R, S, I, P
Rack/Bulk Locations, Dock Level, Unheated Hazardous Materials-Corrosives 1.4S & 1.4G explosives

Whse 14 (Bays A-L)

B
1942
222,750
148,427
21,600
R, S, I, P
Bulk Locations, Dock Level, Unheated Non - Hazardous Materials
Whse 8 (Bays A-E)
CB
1984
99,120
50,513
9,988
R, S, I, P
Rack/Bulk, locations, rated Class 1, Division 2 Explosive, Heated & Unheated, Dock Level, EE Rated MHE Required Hazardous Materials- Flammables, poisons, oxidizers
Whse 9 (Bays A-E)
B
1941
98,050
8035
44,356
R, S, I, P
Rack/Bulk locations, Unheated, Dock Level

ISO Tanks

32,760

TE 3.1 – GF

File details come from the government source that posted it. Updated .