Attachment_1_-_Amend_0003_DDRV_Questions.docx
DOCX document 23 KB Posted
- Solicitation number
- SP330017R5004
- Issued by
-
Defense Logistics Agency Distribution
About this file
Attachment 1 - Amend 0003 - Questions and Answers
View the file
Other files
Show 40 more
Latest 50 of 89 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SP3300-17-R-5004
Amendment 0003 Attachment 1: Questions and Answers
| Question |
| RFP Page OR |
Pre-Proposal Conference OR Site Visit/GFP/GFE Review/Inspection
| RFP Para Reference (if question relates to the RFP) |
| Government Response |
| 1 |
| Can the Government provide guidance as to how Offerors should account for indirect labor within the J.25 template? |
| Attachment_3_-_J.25_Proposed_Productive_Hours |
The purpose of Attachment J.25 is to capture all direct productive hours. Indirect labor should be accounted for in the cost proposal as an indirect rate e.g. G&A, Overhead, etc.
1) Are offerors required to add hours to each Subject Matter Expert row for each period of performance?
2) If the answer to question 2 is yes, are offerors required to include these SME hours in the calculation of total productive hours and total FTEs for each J.25 section?
Attachment_3_-_J.25_Proposed_Productive_Hours
1. Yes, and include the labor category that will be identified as the SME.
2. Yes
| 3 |
| At the Pre-Proposal Conference, a requirement to provide information runners was presented. Is there available workload associated with this requirement? |
| Pre-Proposal Conference |
Work load is not available.
| 4 |
| Is the HMMP submitted as part of the Volume III Technical proposal per C-4.6.3 and does the plan count against page count? |
| Page C-55 |
| C-4.6.3 Hazardous Material Management Plan (HMMP) |
A. The Contractor shall submit a plan for managing HM as part of the technical proposal.
Yes, the HMMP falls under volume III Technical proposal, tab 2 and is included in the page count.
To account for the HMMP, the page limit has been increased from 100 to 175. Please see Attachment 2 of Amendment 0003.
| 5 |
| Rows 33, 67, and 98 reference “Attachment J.33.” Is this a typographical error? |
| Attachment_11_J.26_Amendment_02_Proposed_Training_Hrs.xlsx |
Attachment J 26 Rows 33, 67 and 98, (J33) changed to (J26). Please see Attachment 3 to Amendment 0003.
| 6 |
| Can the government confirm that the workload data provided in “Section C-5.6 Packaging” of the revised Attachment J.25 is complete and correct? For example, it would appear that only 2 transactions per year take place in “C-5.6.3 Container Fabrication Support-” 1 x Medium and 1 x Large container, and that no transactions are forecast during the life of the contract for Small or Extra Large containers. |
Attachment_10_Revised_J.25,_COMPLETE_DDRV_Proposed_Productive_Hours_a_4-14-17.xlsx
Attachment J 25 work load for C-5.6.3 Container Fabrication Support is correct.