Attachment_3_-_Conformed_Attachment_7_-_TE-03__Products_and_Materials_2-13-17_Rev.pdf

PDF 93 KB Posted

Attached to
East Coast Export Mission (ECEM)
Solicitation number
SP3300-17-R-5001
Issued by

About this file

Attachment 3 - Conformed Attachment 7 (to Sp330017R5001) -TE 03 Products and Materials

View the file

Other files

File Type Posted
Attachment_2_-__ECEM_Quest_and_Gov_Resp_3-2-2017.pdf PDF
SP3300-17-R-5001_0005_03-03-17.pdf PDF
Attachment_1_-_Conformed_Attachment_7_-_TE-03_Products_and_Materials_3-2-17.pdf PDF
SP3300-17-R-5001_0004_02-14-17.pdf PDF
Schedule_-_SuppliesServices_MSWORD.docx DOCX document
Attachment_2_-_Conformed_Attachment_1_-_ECEM_PWS_2-13-17_Rev.pdf PDF
Attachment_4_-_Conformed_Attachment_12_-_TE-08-PR_2-13-17_Rev.XLS XLS spreadsheet
Attachment_1_-_Conformed_SP330017R5001_pgs_3-43_2-13-17_Rev.pdf PDF
Attachment_1_-_ECEM_PWS_Conformed_1-05-17.pdf PDF
SP3300-17-R-5001_0003_01-05-17.pdf PDF
Attachment_2_-_QA_Document_1-05-17.pdf PDF
SP3300-17-R-5001_0002_01-04-17.pdf PDF
SP3300-17-R-5001_0001_12-29-16.pdf PDF
Attachment_18_-_sample_1384.pdf PDF
Attachment_4_-_ECEM_Past_Performance_Questionnaire.docx DOCX document
Attachment_12_-_TE-08_Projected_Workload.xlsx XLSX spreadsheet
Attachment_13_-_TE-09_Weekly_Workload_.pdf PDF
Attachment_6_-_TE-02_Tri_Wall_Pack_Information.pdf PDF
Attachment_9_-_TE-05_Required_Shipping_Document.pdf PDF
Attachment_3_-_Checklist_Attachment__-_QASP_.xlsx XLSX spreadsheet
Attachment_11_-_TE-07_Air_Lift_Billing.xls XLS spreadsheet
Attachment_16_-_dd1387.pdf PDF
Attachment_1_-_ECEM_PWS_11-22-16.docx DOCX document
Attachment_14_-_CFSAN_Food_Safety_Hazards_for_FFV.pdf PDF
Attachment_5_-_TE-01_GAP_and_GHP_Audit_Checklist.pdf PDF
Attachment_7_-_TE-03__Products_and_Materials.docx DOCX document
RFP_SP330017R5001.pdf PDF
Attachment_2_-_East_Coast_Export_Mission_QASP.docx DOCX document
Attachment_10_-_TE-06_Schedule_for_Embarkation_Points.docx DOCX document
Attachment_17_-_Transportation_Control_and_Movement_Document_(TCMD).pdf PDF
Attachment_15_-_DD_1387-2_Special_Handling.pdf PDF
Attachment_8_-_TE-04_DLA_Troop_Support_Contractor_Integrated_Pest_Managment_Program.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SP3300‐17‐R‐5001 0004‐Attachment 3 Conformed Attachment 7 – TE‐03 Products and Materials through Amend 0004

The contractor shall line containers with Styrofoam liners, pack the containers, maximizing space while allowing room for boxed ice, and then close and seal the container.

Specific equipment as follows:

1. Tri‐Wall Containers: Box, Corrugated Fiberboard, High Compression Strength, Weather Resistant, Wax‐Resin Impregnated and triple wall dimensions (Soft Parameters) 46.75 X 38.75 X 32 inches.

Commercial/Industry best practice packing solution desired.

2. Set of styrofoam liners/pads – (Soft Parameters): Example (six (6) EA Configuration) – Top/Bottom =

46 5/8 x 38 ¾ x ½, 2 Sides = 31 x 37 x ½, 2 Sides 31 x 46 ¼ x ½. Commercial/Industry best practice packing solution desired.

3. Box, Corrugated Fiberboard, High Compression Strength, Weather Resistant, Wax‐Resin Impregnated and double wall dimensions 9.5 X 9.5 X 13.75 inches.

4. Plastic sealable bag for wet ice blocks, dimensions: 9 X 9 X 12.5 2 mil thickness and leak‐proof

5. Pallet wood, heat treated export 47 X 32 inches weight capacity 5000 lbs.

6. When packing provisions, the contractor shall ensure the appropriate type of ice is utilized. Listed below are the packing requirement based on type of product.

Description Lbs. Ice Type Nbr of boxes

FFV 176 WET ICE 4

DAIRY/CHEESE 352 WET ICE 8

MILK 352 WET ICE 8

50 DRY 1

CHILL 264 WET ICE 6

EGGS 132 WET ICE 3

ICE CREAM 200 DRY 4

FROZEN GOODS 200 DRY 4

BREAD 50 DRY 1

The Government may direct the Contractor to procure disposable temperature data recorders for insertion into a designated number of Tri Wall packages for shipment to a specific mission site. The contractor shall place a disposable temperature monitor in selected tri‐walls. Monitors should meet the following minimum specifications:

Temperature Range:

Standard ‐29°C to 38°C

SP3300‐17‐R‐5001 0004‐Attachment 3 Conformed Attachment 7 – TE‐03 Products and Materials through Amend 0004

(‐20°F to 100°F)

High Temp ‐9°C to 58°C

(16°F to 136°F)

Operating Accuracy:

±1.1°C (±2.0°F) full range

Day Spans:

10 day (°C & °F)

20 day (°C & °F)

40 day (°C & °F)

75 day (°C & °F)

90 day (°C & °F)

Average Chart Resolution:

10 day = 2.83 inches per day

20 day = 3.08 inches per day

40 day = 0.86 inches per day

75 day = 0.95 inches per day

90 day = 0.82 inches per day

Calibration:

NIST® Traceable

Power/Shelf Life:

1.5 V AA carbon zinc, heavy duty battery

One year from date of purchase

Tamper‐Proof Security Seal:

Pre‐sealed at the factory

Notice of shipment:

Three‐part water resistant notice attached to CR‐1

Enclosure:

ABS plastic

Weight/Dimensions:

209.2 grams (7.38 ounces)

13.21cm x 6.50cm x 8.89cm

(5.2" L x 2.56" H ” x 3.50" W)

File details come from the government source that posted it. Updated .