Attachment_2_-_QA_Document_1-05-17.pdf

PDF 11 KB Posted

Attached to
East Coast Export Mission (ECEM)
Solicitation number
SP3300-17-R-5001
Issued by

About this file

Attachment 2 - Questions and Answers Document 1-05-17

View the file

Other files

File Type Posted
Attachment_2_-__ECEM_Quest_and_Gov_Resp_3-2-2017.pdf PDF
Attachment_1_-_Conformed_Attachment_7_-_TE-03_Products_and_Materials_3-2-17.pdf PDF
SP3300-17-R-5001_0005_03-03-17.pdf PDF
SP3300-17-R-5001_0004_02-14-17.pdf PDF
Schedule_-_SuppliesServices_MSWORD.docx DOCX document
Attachment_4_-_Conformed_Attachment_12_-_TE-08-PR_2-13-17_Rev.XLS XLS spreadsheet
Attachment_1_-_Conformed_SP330017R5001_pgs_3-43_2-13-17_Rev.pdf PDF
Attachment_3_-_Conformed_Attachment_7_-_TE-03__Products_and_Materials_2-13-17_Rev.pdf PDF
Attachment_2_-_Conformed_Attachment_1_-_ECEM_PWS_2-13-17_Rev.pdf PDF
SP3300-17-R-5001_0003_01-05-17.pdf PDF
Attachment_1_-_ECEM_PWS_Conformed_1-05-17.pdf PDF
SP3300-17-R-5001_0002_01-04-17.pdf PDF
SP3300-17-R-5001_0001_12-29-16.pdf PDF
Attachment_13_-_TE-09_Weekly_Workload_.pdf PDF
Attachment_12_-_TE-08_Projected_Workload.xlsx XLSX spreadsheet
Attachment_9_-_TE-05_Required_Shipping_Document.pdf PDF
Attachment_7_-_TE-03__Products_and_Materials.docx DOCX document
Attachment_4_-_ECEM_Past_Performance_Questionnaire.docx DOCX document
Attachment_5_-_TE-01_GAP_and_GHP_Audit_Checklist.pdf PDF
Attachment_14_-_CFSAN_Food_Safety_Hazards_for_FFV.pdf PDF
Attachment_18_-_sample_1384.pdf PDF
Attachment_17_-_Transportation_Control_and_Movement_Document_(TCMD).pdf PDF
Attachment_10_-_TE-06_Schedule_for_Embarkation_Points.docx DOCX document
Attachment_15_-_DD_1387-2_Special_Handling.pdf PDF
Attachment_8_-_TE-04_DLA_Troop_Support_Contractor_Integrated_Pest_Managment_Program.pdf PDF
Attachment_6_-_TE-02_Tri_Wall_Pack_Information.pdf PDF
Attachment_3_-_Checklist_Attachment__-_QASP_.xlsx XLSX spreadsheet
Attachment_16_-_dd1387.pdf PDF
Attachment_11_-_TE-07_Air_Lift_Billing.xls XLS spreadsheet
Attachment_1_-_ECEM_PWS_11-22-16.docx DOCX document
RFP_SP330017R5001.pdf PDF
Attachment_2_-_East_Coast_Export_Mission_QASP.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SP3300-17-R-5001 0003

Attachment 2

QUESTIONS & ANSWERS DOCUMENT

The following questions have been submitted from industry regarding solicitation SP3300-17-R-5001. Each question has been redacted to ensure anonymity. The Government response is provided in the far right-hand column for each question.

Question RFP Reference Government Response

1 Attachment 1 - 4.2.1 lists Charleston AFB and McGuire AFB in NJ but Attachment 10 also has GITMO via Norfolk AMC. So is it three drops or two drop locations?

Attachment 1 – Section 4.2.1;

Attachment 10

Three (3) drop locations. Reference Attachment 1 – Section 4.2.1, paragraph A which states “..and Norfolk Naval Station, Norfolk, VA – Export to Guantanamo Bay, Cuba.

2 Are there any limitations on the location of the Receiving, Cold, Freeze and Dry Storage facility that we would consolidate from?

N/A Yes. As stated in the synopsis - The competitive area is restricted - the Offeror's facility must be within the following geographical areas - Counties: Virginia Beach, Chesapeake, Suffolk, Isle of Wright, Southampton, Sussex, Surry, Prince George, Henrico, Richmond, Charles City, James City, Newport News, Hampton, Norfolk, Portsmouth, Poquoson, Gloucester, York, New Kent, Chesterfield, Norfolk, Virginia 23505 - United States

3 Please clarify: Are you required to have a degree in Distribution Management or Business Management (minimum Bachelor’s Degree) and at least three years of experience in Distribution Management or would it be acceptable to have at least five years of progressive management experience in distribution operations similar in size and complexity to the operation offered in this contract without a degree in Distribution Management or Business Management (minimum Bachelor’s Degree)

Attachment 1- Section 1.2B;

RFP Factor 1, para 1.2

To meet solicitation requirements. The Site Manager and Alternate Site Manager must have either the required Bachelor's degrees above and three years' experience or five years of progressive management experience in distribution operations similar in size and complexity to the operation offered in this contract without a degree.

4 The sizing of the 34 degree cooler of 40,000 Sq. Ft seems larger based on the volumes given, is there any flexibility in that requirement?

Attachment 1 – Section 3

No. Based on the history of changing flight schedules, all three drops may show up on the same day. The contractor must have space to adequately work all three if needed.

This will allow cross-docking space, room to allow contractors to come pick up rejected product, as well as space for surge.