Attachment 3 - QASP Checklist

View the file

Other files

File Type Posted
Attachment_1_-_Conformed_Attachment_7_-_TE-03_Products_and_Materials_3-2-17.pdf PDF
SP3300-17-R-5001_0005_03-03-17.pdf PDF
Attachment_2_-__ECEM_Quest_and_Gov_Resp_3-2-2017.pdf PDF
SP3300-17-R-5001_0004_02-14-17.pdf PDF
Schedule_-_SuppliesServices_MSWORD.docx DOCX document
Attachment_4_-_Conformed_Attachment_12_-_TE-08-PR_2-13-17_Rev.XLS XLS spreadsheet
Attachment_1_-_Conformed_SP330017R5001_pgs_3-43_2-13-17_Rev.pdf PDF
Attachment_3_-_Conformed_Attachment_7_-_TE-03__Products_and_Materials_2-13-17_Rev.pdf PDF
Attachment_2_-_Conformed_Attachment_1_-_ECEM_PWS_2-13-17_Rev.pdf PDF
Attachment_1_-_ECEM_PWS_Conformed_1-05-17.pdf PDF
SP3300-17-R-5001_0003_01-05-17.pdf PDF
Attachment_2_-_QA_Document_1-05-17.pdf PDF
SP3300-17-R-5001_0002_01-04-17.pdf PDF
SP3300-17-R-5001_0001_12-29-16.pdf PDF
Attachment_17_-_Transportation_Control_and_Movement_Document_(TCMD).pdf PDF
Attachment_10_-_TE-06_Schedule_for_Embarkation_Points.docx DOCX document
Attachment_15_-_DD_1387-2_Special_Handling.pdf PDF
Attachment_8_-_TE-04_DLA_Troop_Support_Contractor_Integrated_Pest_Managment_Program.pdf PDF
Attachment_5_-_TE-01_GAP_and_GHP_Audit_Checklist.pdf PDF
Attachment_14_-_CFSAN_Food_Safety_Hazards_for_FFV.pdf PDF
Attachment_18_-_sample_1384.pdf PDF
Attachment_13_-_TE-09_Weekly_Workload_.pdf PDF
Attachment_12_-_TE-08_Projected_Workload.xlsx XLSX spreadsheet
Attachment_9_-_TE-05_Required_Shipping_Document.pdf PDF
Attachment_7_-_TE-03__Products_and_Materials.docx DOCX document
Attachment_4_-_ECEM_Past_Performance_Questionnaire.docx DOCX document
Attachment_6_-_TE-02_Tri_Wall_Pack_Information.pdf PDF
Attachment_16_-_dd1387.pdf PDF
Attachment_11_-_TE-07_Air_Lift_Billing.xls XLS spreadsheet
Attachment_1_-_ECEM_PWS_11-22-16.docx DOCX document
RFP_SP330017R5001.pdf PDF
Attachment_2_-_East_Coast_Export_Mission_QASP.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P2S

Question #Financial Reporting ObjectiveFrequencyProcess AreaQuality Assurance ActivitySignificance LevelSurveillance Outcome
As neededAccess to the Contractors facilityThe Contractor shall provide the Government access to the facilities during operating hours as needed to perform quality assurance surveillance activities, audits and other operational/financial reviews, inventory verification and veterinary services and inspections. The Contractor shall provide an escort, if required, for veterinary inspections.Major
MonthlyPest ControlContractor submitted reports and certifications from a state licensed pest controller that the facility is free of insects, rodents, and other pests, no later than the 7th business day following the end of the previous month.Critical
As needed, minimum annual.Sanitary InspectionsAnnual USDA (GAP/GHP) and any unannounced (GAP/GHP) audits conducted by USDA officials. Additionally, any other audits conducted by the State of Virginia . Inspection report and audit documentation must be submitted no later than the 7th business day following the end of the previous month when the inspection or audit occurred . Contractor shall obtain and maintain a minimum compliance rating of 80% IAW the USDA Agricultural Practices and Good Handling Practices Audit documents (USDA GAP/GHP)Critical
As neededIntegrated Pest Management PlanContractor submitted the plan within 15 calendar days after any changes were made.Minor
As NeededMission Essential Contractor ServicesContractor submitted the plan within 15 calendar days after any changes were made.Minor
As neededPhysical Security PlanPhysical Security Plan within 15 calendar days after any changes made to include designated contractor personnel changes.Minor
As neededReceivingThe contractor shall report FF&V discrepancies via phone, fax, or email to the COR/COTR within 15 minutes after the carrier's truck is off-loaded.Critical
As neededReceivingDry, Freeze, Chill - Contractor prepared to receive commodities (12) to twenty-four hours and up to seventy-two (72) hours before delivery to the aerial port for Charleston and Norfolk Embaktaion Points.Critical
As neededReceivingFresh/Highly Perishable Fresh Fruit and Vegetable (FF&V), Market Ready Line Items and Other Line Items deemed as highly perishable.

Export Contractor should be prepared to receive these commodities twelve (12) and up to forty-eight (48) hours prior to designated time of arrival at the aerial port for Charleston and Norfolk Embaktaion Points..

Critical
As neededReceivingDry, Freeze, Chill - Export contractor should be prepared to receive these commodities on the previous day before delivery to the aerial port for McGuire AFB, NJ embarkation.Critical
As neededReceivingFresh/Highly Perishable FF&V and Market Ready Line Items and Other Line Items deemed as highly perishable.

Export Contractor should be prepared to receive these commodities twenty-four (24) and up seventy-two (72) hours prior to the designated time of arrival at the aerial port for McGuire AFB, NJ embarkation.

Critical
As neededReceivingAll product should be packed out and all documents shall be available two (2) hours after pack out.Critical
As neededReceivingThe Contractor shall provide the COR estimates of deliveries for each embarkation point no later than 48 hours prior to delivery at their receiving area.Critical
MonthlyTemporary StorageMonthly temperature report by the 10th working day of each month. Report shall include daily temperature (low-high) for each storage area in the facility. Support data shall include daily temperature and ranges (low-high) of each recording device located in each storage area.Major
MonthlyTemporary StorageIndividual temperature recording device’s calibration certificates for each calibration period by the 7th working day after receiving the certificate.Major
DailyPackaging and StagingExport Contractor should begin to pack tri walls immediately following inspection by authorized Military Food Inspectors, USDA Federal Inspectors or other qualified government personnel. Inspection of shipments may take thirty (30) minutes to two (2) hours.Critical
DailyPackaging and StagingThe Contractor shall provide a copy of the applicable invoices and shipping documents IAW (TE 05 Required Shipping Documents) for operational provisions to the designated DLA Troop Support POC with a copy to DLA Distribution COR with one hour after packaging of all Tri Walls for each shipping location.Critical
DailyShippingAll shipments are to be at the embarkation/aerial points between four (4) hours and up to sixteen (16) hours prior to aircraft departure.Critical
WeeklyShippingAirlift billing in accordance with TE 07; which is due by COB Friday weeklyMajor
WeeklyShippingAll operation provisions need to be maintained at 42 degrees Fahrenheit in transit.Critical
AnnuallyLabor Hour ReportingContractor completed the annual reporting for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, the Contractor completed all data inputted into http://www.ecmra.mil/ no later than October 31 of each calendar year.Minor
MonthlyInvoicesAn invoice should be submitted by the third (3rd) working day of the month for the preceding month.Minor

&"Arial,Regular"&18Attachment 3 QASP for East Coast Export Mission