Amendment 0004 to remove Contractor Manpower Reporting

View the file

Other files

File Type Posted
SF_30_Amendment_SP3300_15_R_0009_0003.pdf PDF
Attachment_9_Past_Performance_Questionnaire_DLA_Fire_Protection.docx DOCX document
Exhibit_3_-_Fire_Suppression_Systems _Inspection_ _Testing_Requirements_Rev1 _8-7-15.docx DOCX document
SF_30_Amendment_SP3300_15_R_0009_0001.pdf PDF
Building_750_-_Available_Contractor_Space _8-6-15.pdf PDF
Amendment_0001.pdf PDF
Exhibit_7_-_United_Facilities_Guide_Specifications_(UFGS)_Referenced_List.docx DOCX document
Exhibit_5_-_Impairment_Procedure.docx DOCX document
Exhibit_4_-_Fire_Alarm_Systems_Inspection_and_Testing_Requirements.docx DOCX document
Exhibit_6_-_Work_Authorization_Form.xlsx XLSX spreadsheet
Exhibit_8_-_Fire_Protection_Drawings_Schedule.docx DOCX document
Exhibit_2_-_Building-Systems_Fire_Alarm_Inventory.docx DOCX document
Exhibit_1_-_Building-Systems_Fire_Suppression_Inventory.docx DOCX document
Exhibit_3_-_Fire_Suppression_Systems_Inspection_and_Testing_Requirements.docx DOCX document
Attachment_L_-_SF25A_(Payment_Bond).pdf PDF
Attachment_J_-_SF24_-_Bid_Bond.pdf PDF
Attachment_I_-_DLA_SP_Camera_Pass_Request_Form.pdf PDF
Attachment_A_New_Personnel_Notification_Form.docm DOCM document
Attachment_B_-_Short_Form2.pdf PDF
Attachment_G_-_Combined_Modified_UFGS_Specifications _3-9-15.pdf PDF
Attachment_F_-_SOW_DES-SP_Fire_Systems_Maint.docx DOCX document
Attachment_K_-_SF25_(Performance_Bond).pdf PDF
Attachment_M_-_WD_PA150131_20150626.pdf PDF
Attachment_E_Deliv_Notification_Form.docm DOCM document
Attachment_C_-_Long_Form.pdf PDF
SP3300-15-R-0009.pdf PDF
Attachment_D_Badge_Renewal.doc DOC document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

SP3300

SEE CONTINUATION SHEET

SP3300

DLA DISTRIBUTION

OFFICE OF PROCUREMENT - EBS

2001 MISSION DRIVE

NEW CUMBERLAND PA 17070-5000

DLA DISTRIBUTION

OFFICE OF PROCUREMENT - EBS

2001 MISSION DRIVE

NEW CUMBERLAND PA 17070-5000

0058574773

SP3300-15-R-0009

08/24/2015

07/24/2015

SP3300-15-R-0009

Amendment 0004

Continuation Sheet Page 2 of 2

Request for Proposal (RFP) SP3300-15-R-0009 is hereby amended as follows:

Remove all reference to Contractor Manpower Reporting and delete the Contract Line Item Numbers (CLINs) listed below:

All other terms and conditions remain as originally stated.