This document is an amendment to a solicitation for an Energy Savings Performance Contract (ESPC) project at The Pentagon and Mark Center Campus in Arlington, VA. The amendment addresses several questions received from industry during an Industry Day event held on July 22, 2024. Key details include:
The ESPC will only cover The Pentagon facility, not the Mark Center campus. There is a second phase planned for the project. The baseline energy reduction is from FY 2021. The Pentagon has multiple electrical feeds and ESCOs can propose Energy Savings Agreements (ESAs) as part of their comprehensive approach. HVAC equipment upgrades and electric vehicle charging infrastructure are in scope, with a focus on fleet rather than personal vehicles. Solar panels must be placed far enough away from The Pentagon. The government will fund commissioning and monitoring/control software improvements. Responses to the solicitation are due by August 13, 2024 at 3:00pm.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Previous Edition Unusable STANDARD FORM 30 (REV. 11-2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
J
PAGE OF PAGES
1 3
2. AMENDMENT/MODIFICATION NUMBER
3. EFFECTIVE DATE
26 July 2024
4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE SP0604 7. ADMINISTERED BY (If other than Item 6) CODE SP0604
DEFENSE LOGISTICS AGENCY ENERGY
DLA Energy–FEA
8725 JOHN J. KINGMAN ROAD, STE 3950
FORT BELVOIR, VA 22060-6222
BUYER/SYMBOL: Samuel Frankfort /DLA Energy- FEAGB
PHONE: (804) 920-8154
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code)
UEI# Cage Code:
(X) 9A. AMENDMENT OF SOLICITATION NUMBER
Notice of Opportunity/SP0604-24-R-0416
9B. DATED (SEE ITEM 11)
10 JUNE 2024
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
Choose an item
10B. DATED (SEE ITEM 13)
Click or tap to enter a date. CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
☒The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers ☐ is extended. ☒ is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required) See Section G
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A. ☐
☐ B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
☐ C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
☐ D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor ☐ is not ☒ is required to sign this document and return 01_ copies to the issuing office
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
THE PENTAGON AND MARK CENTER CAMPUS, ARLINGTON, VA
NOTICE OF OPPORTUNITY SP0604-24-R-0416
Amendment 0002 addresses questions addressed during the Industry Day on 22 July 2024.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Jacob H. Vigil
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
SP0604-24-R-0416
Amendment 0002
This amendment is issued to all 20 ESCOs addressing Requests for Information (RFI) from industry regarding the subject Notice of Opportunity for The Pentagon and Mark Center Campus, Arlington, VA.
FIRST: The following RFIs have been received from industry and are addressed as follows:
RFI 010: Does the UESC include both the Pentagon and Mark Center?
RFI 010 Response: The UESC only includes The Pentagon.
RFI 011: Is there a 2nd phase to UESC?
RFI 011 Response: Yes.
RFI 012: The Baseline Reduction is from what year?
RFI 012 Response: FY 2021.
RFI 013: Is there only one feed to The Pentagon?
RFI 013 RESPONSE: Multiple feeds to The Pentagon substation and Freedom substation.
RFI 014: Are we allowing ESA option?
RFI 014 RESPONSE: While the NOO did not specific address it, ESCOs are free to evaluate an ESA if feasible as part of a comprehensive approach.
RFI 015: Any CRAC units an option?
RFI 015 RESPONSE: Yes.
RFI 016: As it relates to EV charging, is the priority Fleet or personal?
RFI 016 RESPONSE: Fleet is the priority.
RFI 017: Objection to car port solar?
RFI 017 RESPONSE: Solar panels need to be far away enough from The Pentagon.
RFI 018: How is water utilized? Seems to be high usage
RFI 018 RESPONSE: Majority is water used in the building, central plant, steam system, chilled water system.
RFI 019: Is there a preference in M&V Option?
RFI 019 RESPONSE: It is up to the ESCO to propose an option that accurately validates proposed savings.
SP0604-24-R-0416
Amendment 0002
RFI 020: Are there meters? How are they read? Submetering?
RFI 020 RESPONSE: Facility to facility, electricity submetering by wedge, meters on equipment.
RFI 021: Funding commissioning, software?
RFI 021 RESPONSE: Yes, there's a system and network monitoring and controlling monitor.
Pentagon electrical system is good, mechanical needs improvement.
RFI 022: Is the Mark Center on the same Utility rate as the Pentagon?
RFI 022 RESPONSE: Yes.