This document appears to be an attachment containing energy usage data for the Pentagon and Mark Center Campus buildings. It provides detailed information on the facilities, including their total gross area, energy consumption (electricity, natural gas, fuel oil), water/sewer usage, and associated costs for the 2023 fiscal year. The document also includes an overview of the total energy usage and utility costs for the entire complex.

The related federal contract opportunity is a Notice of Opportunity (NOO) for an Energy Savings Performance Contract (ESPC) project at the Pentagon and Mark Center Campus in Arlington, VA. The Defense Logistics Agency Energy intends to utilize the Department of Energy (DOE) Super ESPC Indefinite-Delivery/Indefinite-Quantity (IDIQ) contract to award a task order for this requirement. The ESCO will be responsible for conducting a comprehensive energy audit, identifying energy conservation measures, privately financing the project, and guaranteeing annual cost savings. Responses are due by August 13, 2024, 3:00 pm Fort Belvoir, VA time, and must be submitted via email.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Energy Summary

CURRENT ENERGY STATUS

Utility Consumption

FY23 TotalsArea of Facilities Space (SF)
8,823,863
CommodityCostConsumptionUnitsContent*MBTU
/Conversion
Electric$14,998,464.10186,073,775kWh3,412.14634,909.770.8719451818
Natural Gas$1,752,302.70302,875decatherm1.00302,875.450.101871224
Water/Sewer$3,718,567.80755,786KGal
Fuel Oil$450,388.0636,502Mbtu1.0036,502.440.0261835941
Total$20,919,722.66187,168,939974,288
Mean/Blended Energy RateRate*1 MBTU = 1,000,000 BTU
Electricity$0.081/KWh
Natural Gas$5.786/MBTU
Water/Sewer$4.920/KGal
Fuel Oil$12.339/Mbtu

Facilities

DVP NumberCovered Building NamePrimary Building TypeConstruct YearTotal Gross Area
(sf)2023 Elec Consumption
(kWh)2023 Elec Cost
($)2023 Natural Gas Consumption
(DecaTherm)2023 Natural Gas Cost
($)2023 Fuel Oil Consumption
(MMbtu)2023 Fuel Oil Cost
($)2023 Water Consumption
(kGal)2023 Water Cost
($)2023 Sewer Consumption
(kGal)2023 Sewer Cost
($)Annual Energy Usage Intensity
(KBtu/sf/yr)Building Steam Consumption Quantity (BTU)
BARRETT, WILLIAM M JR CTR USAF AFCEC AFCEC/CNA: Metered or estimated values entered manually in units consistent with the "Utility Units of Measure" on the Installation Data tab.Building High Temp Hot Water Consumption Quantity (BTU)
BARRETT, WILLIAM M JR CTR USAF AFCEC AFCEC/CNA: Metered or estimated values entered manually in units consistent with the "Utility Units of Measure" on the Installation Data tab.Building Chilled Water Consumption Quantity (BTU)
BARRETT, WILLIAM M JR CTR USAF AFCEC AFCEC/CNA: Metered or estimated values entered manually in units consistent with the "Utility Units of Measure" on the Installation Data tab.Building Fuel Oil Consumption Quantity (BTU)
BARRETT, WILLIAM M JR CTR USAF AFCEC AFCEC/CNA: Metered or estimated values entered manually in units consistent with the "Utility Units of Measure" on the Installation Data tab.Building Propane Consumption Quantity (BTU)
BARRETT, WILLIAM M JR CTR USAF AFCEC AFCEC/CNA: Metered or estimated values entered manually in units consistent with the "Utility Units of Measure" on the Installation Data tab.Building Coal Consumption Quantity (BTU)
BARRETT, WILLIAM M JR CTR USAF AFCEC AFCEC/CNA: Metered or estimated values entered manually in units consistent with the "Utility Units of Measure" on the Installation Data tab.Building Other Consumption (Btu)
BARRETT, WILLIAM M JR CTR USAF AFCEC AFCEC/CNA: Measured or estimated energy consumption in BTUs from other non-traditional sources not already listed in the EEW.Electric MeterWater MeterGas meter
Pentagon6,947,751162,381,057$12,856,665.14662,341$2,781,607.4770,718$679,693.83
Hayes Parking21,600$4,075.12
Eads Parking11,547$1,511.88
Lift Station- 0$0.00
Corridor 4.255,312.16$54,580.65
CDC (CLEB)- 0$81.59
CDC (CLEB) Supply- 0$0.00
PLCC112.10$1,289.97
PERC194.01$1,263.41471$4,612.50
PERC Supply205.30$1,279.54
Incinerator Heat2,040.67$9,045.82
Incinerator Heat Supply2,076.30$12,442.19
Incinerator Distribution8,550.41$17,100.17- 0$0.00
Incinerator Supply9,058.70$24,150.31
HRP Distribution263,640.35$369,540.4231,738.03$386,786.881009.5$5,332.3810,164$97,770.87
HRP Supply279,059.90$1,128,046.68
RDF3,311.37$40,357.42
PENTAGON TOTAL6,947,751162,414,204$12,862,252.14279,850$1,618,820.7535,049$427,144.31663,350$2,786,939.8581,353$782,077.20
Mark Center1,876,11223,659,571$2,136,211.961,453.04$23,243.757120$62,657.823,963$86,892.93
Mark Center Gas 3" Line218.85$2,254.73
Mark Center Gas 8" Line22,806.90$131,227.22
MARK CENTER TOTAL1,876,11223,659,571$2,136,211.9623,026$133,481.951,453$23,243.757,120$62,657.823,963$86,892.93