Attachment 1 - The Pentagon and Mark Center Campus Building Data.xlsx
XLSX spreadsheet 32 KB Posted
- Solicitation number
- SP0604-24-R-0416
- Issued by
-
Defense Logistics Agency Energy
About this file
This document appears to be an attachment containing energy usage data for the Pentagon and Mark Center Campus buildings. It provides detailed information on the facilities, including their total gross area, energy consumption (electricity, natural gas, fuel oil), water/sewer usage, and associated costs for the 2023 fiscal year. The document also includes an overview of the total energy usage and utility costs for the entire complex.
The related federal contract opportunity is a Notice of Opportunity (NOO) for an Energy Savings Performance Contract (ESPC) project at the Pentagon and Mark Center Campus in Arlington, VA. The Defense Logistics Agency Energy intends to utilize the Department of Energy (DOE) Super ESPC Indefinite-Delivery/Indefinite-Quantity (IDIQ) contract to award a task order for this requirement. The ESCO will be responsible for conducting a comprehensive energy audit, identifying energy conservation measures, privately financing the project, and guaranteeing annual cost savings. Responses are due by August 13, 2024, 3:00 pm Fort Belvoir, VA time, and must be submitted via email.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Energy Summary
CURRENT ENERGY STATUS
Utility Consumption
| FY23 Totals | Area of Facilities Space (SF) |
| 8,823,863 |
| Commodity | Cost | Consumption | Units | Content | *MBTU | |
| /Conversion | ||||||
| Electric | $14,998,464.10 | 186,073,775 | kWh | 3,412.14 | 634,909.77 | 0.8719451818 |
| Natural Gas | $1,752,302.70 | 302,875 | decatherm | 1.00 | 302,875.45 | 0.101871224 |
| Water/Sewer | $3,718,567.80 | 755,786 | KGal | |||
| Fuel Oil | $450,388.06 | 36,502 | Mbtu | 1.00 | 36,502.44 | 0.0261835941 |
| Total | $20,919,722.66 | 187,168,939 | 974,288 |
| Mean/Blended Energy Rate | Rate | *1 MBTU = 1,000,000 BTU | |
| Electricity | $0.081 | /KWh | |
| Natural Gas | $5.786 | /MBTU | |
| Water/Sewer | $4.920 | /KGal | |
| Fuel Oil | $12.339 | /Mbtu |
Facilities
| DVP Number | Covered Building Name | Primary Building Type | Construct Year | Total Gross Area | |||||||||||
| (sf) | 2023 Elec Consumption | ||||||||||||||
| (kWh) | 2023 Elec Cost | ||||||||||||||
| ($) | 2023 Natural Gas Consumption | ||||||||||||||
| (DecaTherm) | 2023 Natural Gas Cost | ||||||||||||||
| ($) | 2023 Fuel Oil Consumption | ||||||||||||||
| (MMbtu) | 2023 Fuel Oil Cost | ||||||||||||||
| ($) | 2023 Water Consumption | ||||||||||||||
| (kGal) | 2023 Water Cost | ||||||||||||||
| ($) | 2023 Sewer Consumption | ||||||||||||||
| (kGal) | 2023 Sewer Cost | ||||||||||||||
| ($) | Annual Energy Usage Intensity | ||||||||||||||
| (KBtu/sf/yr) | Building Steam Consumption Quantity (BTU) | ||||||||||||||
| BARRETT, WILLIAM M JR CTR USAF AFCEC AFCEC/CNA: Metered or estimated values entered manually in units consistent with the "Utility Units of Measure" on the Installation Data tab. | Building High Temp Hot Water Consumption Quantity (BTU) | ||||||||||||||
| BARRETT, WILLIAM M JR CTR USAF AFCEC AFCEC/CNA: Metered or estimated values entered manually in units consistent with the "Utility Units of Measure" on the Installation Data tab. | Building Chilled Water Consumption Quantity (BTU) | ||||||||||||||
| BARRETT, WILLIAM M JR CTR USAF AFCEC AFCEC/CNA: Metered or estimated values entered manually in units consistent with the "Utility Units of Measure" on the Installation Data tab. | Building Fuel Oil Consumption Quantity (BTU) | ||||||||||||||
| BARRETT, WILLIAM M JR CTR USAF AFCEC AFCEC/CNA: Metered or estimated values entered manually in units consistent with the "Utility Units of Measure" on the Installation Data tab. | Building Propane Consumption Quantity (BTU) | ||||||||||||||
| BARRETT, WILLIAM M JR CTR USAF AFCEC AFCEC/CNA: Metered or estimated values entered manually in units consistent with the "Utility Units of Measure" on the Installation Data tab. | Building Coal Consumption Quantity (BTU) | ||||||||||||||
| BARRETT, WILLIAM M JR CTR USAF AFCEC AFCEC/CNA: Metered or estimated values entered manually in units consistent with the "Utility Units of Measure" on the Installation Data tab. | Building Other Consumption (Btu) | ||||||||||||||
| BARRETT, WILLIAM M JR CTR USAF AFCEC AFCEC/CNA: Measured or estimated energy consumption in BTUs from other non-traditional sources not already listed in the EEW. | Electric Meter | Water Meter | Gas meter | ||||||||||||
| Pentagon | 6,947,751 | 162,381,057 | $12,856,665.14 | 662,341 | $2,781,607.47 | 70,718 | $679,693.83 | ||||||||
| Hayes Parking | 21,600 | $4,075.12 | |||||||||||||
| Eads Parking | 11,547 | $1,511.88 | |||||||||||||
| Lift Station | - 0 | $0.00 | |||||||||||||
| Corridor 4.25 | 5,312.16 | $54,580.65 | |||||||||||||
| CDC (CLEB) | - 0 | $81.59 | |||||||||||||
| CDC (CLEB) Supply | - 0 | $0.00 | |||||||||||||
| PLCC | 112.10 | $1,289.97 | |||||||||||||
| PERC | 194.01 | $1,263.41 | 471 | $4,612.50 | |||||||||||
| PERC Supply | 205.30 | $1,279.54 | |||||||||||||
| Incinerator Heat | 2,040.67 | $9,045.82 | |||||||||||||
| Incinerator Heat Supply | 2,076.30 | $12,442.19 | |||||||||||||
| Incinerator Distribution | 8,550.41 | $17,100.17 | - 0 | $0.00 | |||||||||||
| Incinerator Supply | 9,058.70 | $24,150.31 | |||||||||||||
| HRP Distribution | 263,640.35 | $369,540.42 | 31,738.03 | $386,786.88 | 1009.5 | $5,332.38 | 10,164 | $97,770.87 | |||||||
| HRP Supply | 279,059.90 | $1,128,046.68 | |||||||||||||
| RDF | 3,311.37 | $40,357.42 | |||||||||||||
| PENTAGON TOTAL | 6,947,751 | 162,414,204 | $12,862,252.14 | 279,850 | $1,618,820.75 | 35,049 | $427,144.31 | 663,350 | $2,786,939.85 | 81,353 | $782,077.20 | ||||
| Mark Center | 1,876,112 | 23,659,571 | $2,136,211.96 | 1,453.04 | $23,243.75 | 7120 | $62,657.82 | 3,963 | $86,892.93 | ||||||
| Mark Center Gas 3" Line | 218.85 | $2,254.73 | |||||||||||||
| Mark Center Gas 8" Line | 22,806.90 | $131,227.22 | |||||||||||||
| MARK CENTER TOTAL | 1,876,112 | 23,659,571 | $2,136,211.96 | 23,026 | $133,481.95 | 1,453 | $23,243.75 | 7,120 | $62,657.82 | 3,963 | $86,892.93 |