Amendment 004 for Energy Savings Performance Contract (ESPC) - The Pentagon and Mark Center Campus, Arlington, VA
Solicitation number
SP0604-24-R-0416
Issued by

About this file

This document is an amendment to a solicitation for an Energy Savings Performance Contract (ESPC) at The Pentagon and Mark Center Campus in Arlington, VA.

The amendment addresses several requests for information (RFIs) from industry, including confirming the electricity and natural gas providers and rate schedules, clarifying details about a planned heat recovery heat pump system, and providing past performance requirements. The ESPC seeks to implement energy conservation measures at these facilities, with the ESCO privately financing the project and being paid back through the resulting energy cost savings over the contract term. Responses to the solicitation are due by August 13, 2024. The ESPC will be awarded through the Department of Energy's Super ESPC IDIQ contract, which was previously awarded to 20 ESCOs.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Previous Edition Unusable STANDARD FORM 30 (REV. 11-2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

J

PAGE OF PAGES

1 3

2. AMENDMENT/MODIFICATION NUMBER

3. EFFECTIVE DATE

26 July 2024

4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE SP0604 7. ADMINISTERED BY (If other than Item 6) CODE SP0604

DEFENSE LOGISTICS AGENCY ENERGY

DLA Energy–FEA

8725 JOHN J. KINGMAN ROAD, STE 3950

FORT BELVOIR, VA 22060-6222

BUYER/SYMBOL: Samuel Frankfort /DLA Energy- FEAGB

PHONE: (804) 920-8154

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code)

UEI# Cage Code:

(X) 9A. AMENDMENT OF SOLICITATION NUMBER

Notice of Opportunity/SP0604-24-R-0416

9B. DATED (SEE ITEM 11)

10 JUNE 2024

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

Choose an item

10B. DATED (SEE ITEM 13)

Click or tap to enter a date. CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

☒The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers ☐ is extended. ☒ is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required) See Section G

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A. ☐

☐ B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

☐ C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

☐ D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor ☒ is not ☐ is required to sign this document and return 01_ copies to the issuing office

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

THE PENTAGON AND MARK CENTER CAMPUS, ARLINGTON, VA

NOTICE OF OPPORTUNITY SP0604-24-R-0416

Amendment 0001 addresses questions from industry in response to the Notice of Opportunity.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Jacob H. Vigil

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

SP0604-24-R-0416

Amendment 0001

This amendment is issued to all 20 ESCOs addressing Requests for Information (RFI) from industry regarding the subject Notice of Opportunity for The Pentagon and Mark Center Campus, Arlington, VA.

FIRST: The following RFIs have been received from industry and are addressed as follows:

RFI 001: Please confirm the electricity provider to the Pentagon and the Mark Center and identify the electricity rate schedule [tariff] for each facility.

RFI 001 Response: The Pentagon and Mark Center both are on Dominion GS-4 rate (attached).

RFI 002: Please confirm the natural gas provider to the Pentagon and the Mark Center and identify the natural gas rate schedule [tariff] for each facility.

RFI 002 Response: The Pentagon and Mark Center both are on Washington Gas Interruptible Heating Delivery rate. In addition, both buildings receive a WGL Energy commodity charge bill monthly.

RFI 003: Will the solar PV project, for which WHS was awarded an AFFECT grant, be part of the ESCO's scope in this ESPC?

RFI 003 Response: This ESPC will investigate a solar PV project; however, the AFFECT grant awarded to WHS in January 2024 will support a separate project.

RFI 004: Please provide details of the heat recovery heat pump system planned for the Pentagon. Will this scope be available for ESCOs in the ESPC?

RFI 004 RESPONSE: The heat recovery heat pump system will take advantage of the Pentagon’s year-round cooling load and year-round heating load by capturing rejected heat from the cooling system and transferring it to the heating system. This scope will be included in the ESPC, where details such as technology options and system sizing will be evaluated.

RFI 005: Please provide utility rate tariffs for electricity and natural gas to better evaluate battery and thermal storage opportunities.

RFI 005 RESPONSE: The Pentagon and Mark Center both are on Dominion GS-4 rate (attached). The Pentagon and Mark Center both are on Washington Gas Interruptible Heating Delivery rate. In addition, both buildings receive a WGL Energy commodity charge bill monthly.

RFI 006: Does the Pentagon still use the Potomac River for building heat rejection?

RFI 006 RESPONSE: Yes

RFI 007: Does the Government want separate TO-4 schedules for the Pentagon and The Mark Center Campus?

RFI 007 RESPONSE: No

SP0604-24-R-0416

Amendment 0001

RFI 008: Please provide abbreviated scopes of work for the latest completed UESC project.

RFI 008 RESPONSE:

• LED lighting retrofit of approximately 96,000 fixtures throughout the Pentagon Campus

• Replacement of three legacy centrifugal chillers with new high-efficiency dual-compressor centrifugal chillers

• Replacement of sink aerators, showerheads, toilets, and urinals with high-efficiency low-flow equipment throughout the Pentagon Campus

• New weather-smart irrigation control system with moisture sensing

• Walk-in refrigerator upgrades with new EC-motor evaporator fans, door heater humidity-based controls, high-efficiency lighting, and new door seals

• Weatherstripping of exterior doors and replacement of sliding glass doors throughout the

Pentagon Campus.

RFI 009: Factor 2 – Past Performance - In addition to ESPC and UESC projects, can we use an Enhanced Use Lease (EUL) project to illustrate our past performance?

RFI 009 RESPONSE: As stated in the NOO, the ESCO’s response to this factor shall include four (4) references illustrating the ESCO’s past performance as the prime contractor or prime subcontractor on any ESPC or Utility Energy Service Contracting (UESC) project. EUL projects shall not be included to illustrate an ESCO's past performance.