14-R-0202_Attachment_B_Internal_Instructions.pdf

PDF 341 KB Posted

Attached to
JAPAN POSTS, CAMPS AND STATIONS Federal contract opportunity
Solicitation number
SP0600-14-R-0202
Issued by
Defense Logistics Agency Energy

About this file

INTERNAL INSTRUCTIONS

View the file

Other files for this federal contract opportunity

Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP SP0600-14-R-0202

ATTACHMENT B

B-1

SECTION C

DESCRIPTION/SPECIFICATION/STATEMENT OF WORK

C1 SPECIFICATIONS (DLA ENERGY JAN 2012)

Product to be supplied shall fully meet the requirements of the applicable specification(s) as indicated in the Supply Schedule, except as modified elsewhere in this contract. Unless otherwise indicated by the Contractor, prior to award and in accordance with the EVALUATION OF OFFERS contract provision, the product offered will be assumed to fully meet the applicable specification(s).

C16.18-6 GASOLINE, AUTOMOTIVE, UNLEADED (REGULAR/MIDGRADE/PREMIUM) (DLA ENERGY SEP 1998) Product shall conform to ASTM D 4814 with the following additional requirements:

(a) OCTANE REQUIREMENT. The Government's octane requirement is expressed by the Anti-Knock Index (AKI). The AKI is the average of the research octane number (RON) and the motor octane number (MON). The minimum AKI values are identified in (b) below. If the AKI value is not reported, then the RON value and the sensitivity of the fuel shall be reported. The sensitivity is the difference between the RON and the MON. The sensitivity of the fuel shall be 10 or less.

(b) PRODUCT CLASSIFICATION. The product shall be classified as described below:

NATIONAL STOCK NUMBER PRODUCT NOMENCLATURE AKI, MINIMUM

9130-00-148-7103 Gasoline, Regular, Unleaded 87 9130-01-272-0983 Gasoline, Midgrade, Unleaded 89 9130-00-148-7104 Gasoline, Premium, Unleaded 91

(c) VAPOR PRESSURE. The volatility class shall be as stated in the Schedule.

(d) ADDITIVES. Additives and additive concentration shall be as specified below. Application for approval of additives not listed below should be made to DLA Energy-BP.

(1) OXIDATION INHIBITORS. The gasoline shall contain not less than five pounds or more than 15 pounds of oxidation inhibitor (active ingredient) per 1,000 barrels of gasoline. Any one of a combination of the following oxidation inhibitors may be used:

(i) N,N' disecondary butyl-para-phenylenediamine

(ii) N,N' di-isopropyl-paraphyenylenediamine

(iii) N,N' dioctyl-para-phenylenediamine

(iv) N,N' -bis-(1,4-dimethylpentyl)-para-phenylenediamine

(v) N,N' disecondary butyl-ortho-phenylenediamine

(vi) 2,6-ditertiary-butyl phenol

(vii) 2,6-ditertiary-butyl-4-methylphenol

(viii) 2,4-dimethyl-6-tertiary butylphenol

(ix) Triethylene tetramine di(monononyphenolate)

(x) Mixed tertiary butylphenols

(xi) N, secondary butyl, N, pheny-ortho-phenylenediamine

(xii) Mixed 2,6-dialkyl and 2,4,6-trialkyl phenols (containing mixed hexyl and heptyl groups)

(xiii) 2,4-ditertiary-butylphenol (60 weight percent minimum) and mixed tertiary butylphenols (40 weight percent maximum)

(xiv) 2,4-ditertiary-butylphenol (containing mono tritertiary butylphenol)

(xv) Butylated ethyl phenols (55 weight percent minimum) and butylated methyl and dimethyl phenols (45 weight percent maximum)

(2) METAL DEACTIVATORS. The gasoline shall contain not less than one pound or more than three pounds of an approved metal deactivator (active ingredient) per 1,000 barrels of gasoline. Any one of the following metal deactivators may be added separately or in combination with an approved oxidation inhibitor:

(i) N,N' disalicylidene -1,2-ethanediamine

(ii) N,N' disalicylidene -1,2-propanediamine

(iii) N,N' disalicylidene -1,2-cyclohexanediamine

(iv) Disalicylidene-N-methyl-dipropylene-triamine

(3) CORROSION INHIBITOR. An approved corrosion inhibitor may be added. Any corrosion inhibitor used shall be a product that is qualified under MIL-I-25017. The quantity added shall not exceed the maximum approved in the qualified products list (QPL- 25017).

RFP SP0600-13-R-0229

B-2

(e) WATER TOLERANCE REQUIREMENT. The maximum temperature for phase separation as determined by the water tolerance test shall be 10oC.

C16.18-20 GASOLINE AUTOMOTIVE, KEROSENE, FUEL OIL BURNER (PC&S) (JAPAN) (DLA ENERGY APR 2012) For use in PC&S solicitations/contracts for Japan.

Supplies delivered under this contract shall conform to all in-country environmental requirements applicable to the geographic location of the receiving activity on the date of delivery. In the event the in-country environmental requirement is more stringent than the specification contained in this contract, the Contractor shall deliver product that complies with the more stringent requirement. Product that fails to meet the more stringent requirement will be considered to be a nonconforming supply.

(a) GASOLINE AUTOMOTIVE – Gasoline shall meet Japanese Standard JIS L 2202 (2007), Grade 1.

(1) CLASSIFICATION

NATIONAL STOCK NUMBER PRODUCT NOMENCLATURE RON, MINIMUM

9130-01-272-0983 Gasoline, Motor 96

(2) REID VAPOR PRESSURE (RVP). The contractor is expected to know and comply with the in-country RVP requirements of the area being supplied.

(b) KEROSENE – Kerosene shall meet Japanese Standard KOS L 2203(2009).

(1) CLASSIFICATION

NATIONAL STOCK NUMBER PRODUCT CODE PRODUCT GRADE

9140-01-408-7211 KJ1 Grade No1 or 1K 9140-01-408-7221 KSN Grade No 2 or 2K

(2) SPECIFICATION MODIFICATION

(i) Freezing point (ASTM D 2386 – latest revision) shall be minus 30°C maximum.

(ii) Viscosity at 40°C (ASTM D 445 – latest revision) shall be 1.0 -1.9 mm2/s.

( c) FUEL OIL, BURNER Burner fuel oil shall conform to Japanese Standard JIS K 2204(2007).

(1) CLASSIFICATION.

NATIONAL STOCK NUMBER PRODUCT

NOMENCLATURE

PRODUCT CODE POUR POINT

9140-01-408-7183 Burner Fuel Oil, No. 1 FJ1 -2.5oC maximum 9140-01-408-7198 Burner Fuel Oil, Special Class 3 FJ3 -30oC maximum

(2) SEASONAL REQUIREMENTS.

(i) Mainland Japan (except Hachinoe and Misawa AFB) requires FJ1 with the following seasonal pour point and cold filter plugging point (CFPP) limits:

MONTH POUR POINT COLD FILTER PLUGGING

POINT (CFPP)

June to August 5oC maximum Report November 16th to February 29th -7.5oC maximum -5oC maximum March to May; September to November 15th -2.5oC maximum -1oC maximum

(ii) Hachinoe and Misawa AFB require FJ1 from April 1st to November 14th and FJ3 from November 15th to March 31st of each year in a multiyear contract. The pour point for FJ3 during the months required shall be -30°C maximum and the CFPP shall be -19°C maximum.

C16.22-1 KEROSENE (PC&S) (JAPAN) (DLA ENERGY JAN 1987)

Kerosene shall meet Japanese Standard JIS K 2203 with the following additional requirements:

(a) Freeze point (ASTM D 2386 - latest revision) shall be minus 30oC maximum.

B-3

(b) Viscosity at 40oC (ASTM D 445 - latest revision) shall be 1.0-1.9 cst.

(c) Grade No. 1 shall be used for 1K; Grade No. 2 shall be used for 2K.

SECTION E

ACCEPTANCE AND INSPECTION

E1 CONTRACTOR INSPECTION RESPONSIBILITIES (DLA ENERGY SEP 2013)

(a) This contract provision applies to:

(1) All aviation fuel, lubricating oil, and additive shipments.

(2) All Bulk and Posts, Camps, and Stations non-aviation fuel shipments via pipeline or waterborne transport.

(b) QUALITY CONTROL PLAN.

(1) The Contractor is required to provide and maintain an inspection system, and a written description (Quality Control Plan

(QCP)) of that system, acceptable to the Government. The Contractor has the option to provide and maintain an inspection system that, as a minimum, incorporates the requirements of ISO9001, Quality Management Systems. If the Contractor chooses to comply with the ISO9001 quality system requirements and format, all the specific Quality Assurance Provisions of this contract must be included in the resulting ISO9001 document that will serve as the QCP. A copy of the QCP, in English, shall be presented to the Government Quality Assurance Representative (QAR) for their review and acceptance prior to commencement of production or services. An acceptable QCP is required prior to Government inspection and acceptance of supplies or services. The QCP shall be reviewed and updated when deemed necessary by the Contractor or the Government, to include changes necessary to prevent the recurrence of quality problems. The Contractor must sign and date the original QCP, as well as each subsequent revision. Revisions shall also be presented to the QAR for review and acceptance prior to implementation. When acceptable to the Government, the original QCP, and any revisions, shall be signed and dated by the QAR.

(2) The Contractor shall require subcontractors to provide and maintain inspection systems adhere to all the requirements in this contract provision.

(3) The QCP shall include the identification of key operational positions, a schematic diagram of plant facilities pertinent to the inspection system, indicating all inspection points, and a description of the following operations related to the supplies or services to be furnished under the contract:

(i) RECEIVING, BLENDING AND COMPOUNDING. Procedures used to ensure the quality of additives blended into product supplied under this contract. Procedures to identify and ensure the quality of component base stocks used to produce finished product. Procedures to be used for adding, prior to batching, all required additives at all locations. When procedures for in-line blending of non-aviation products in accordance with the IN-LINE BLENDING OF NON-AVIATION PETROLEUM PRODUCTS contract provision are used, the QCP will provide for establishing blend ratios, and identify the responsible personnel within the Contractor's organization authorized to establish the blend ratios. When line injection of additives is required by the contract, the QCP will provide procedures for proportionately injecting additives throughout the entire loading process to ensure the additive is homogeneously blended into the product, as well as procedures for maintaining records evidencing the homogeneous blending of all line injected additives. In addition to the testing in (iii) below, a laboratory hand blend of jet fuel with all additives required by the contract shall be tested, prior to shipment, to verify compliance with the specification;

(ii) SAMPLING. Procedures for sampling additives, blend tanks, shipping tanks, lines, and conveyances/containers in accordance with API Manual of Petroleum Measurement Standards (MPMS), Chapter 8, Section 1, (ASTM D 4057) Manual Sampling of Petroleum and Petroleum Products, and/or Section 2, (ASTM D 4177) Automatic Sampling of Liquid Petroleum and Petroleum Products.

Procedures include sample location, frequency, quantity, and retention. For all tanker, barge, and pipeline shipments, a flow-proportional sample taken in accordance with MPMS Chapter 8, Section 2, is preferred at the custody transfer point. However, manual samples taken in accordance with MPMS Chapter 8, Section 1 are acceptable provided that they are taken hourly throughout the shipment and that the quantity of the composite sample meets the requirements in Table II of this contract provision. See Table I, Minimum Sampling and Testing Requirements, and Table II, Sample Retention;

(iii) TESTING. Types of test series and individual test methods/procedures to be performed on samples taken from each location identified in (ii) above. See Table I, Minimum Sampling and Testing Requirements, and Table III, Definitions of Test Series;

(iv) CALIBRATION. Program for testing and measuring equipment in accordance with ISO 10012, Measurement Management Systems – Requirements for Measurement Processes and Measuring Equipment, or equivalent local regulation, as appropriate;

and, a program for meters used to determine quantity complying with the API MPMS, Chapters 4, 5, and 6, or equivalent foreign standard. For items not covered by API, ASTM, or IP publications, the applicable manufacturer's recommended calibration method(s), outlined in the applicable industry publication, shall be used if acceptable to the Government;

(v) STORAGE AND HANDLING. Procedures for quality/quantity determination. Includes a description of storage and handling equipment, such as tanks, lines, valves, and manifolds; identification of dedicated/common product systems, including description of

B-4 line segregation and controls to assure capability for proper gauging, sampling, draining of water, filtration, circulation, and drying; and identification of any other process/system used in maintaining product integrity during storage and handling;

(vi) LOADING AND SHIPPING – GENERAL. Procedures for product movement and related quality/quantity checks from shipping tank(s) to custody transfer point (CTP). Description of transfer system from shipping tank to CTP. A dedicated system, including lines, pumps, loading arms, and hoses, is preferred, but an isolated common system incorporating blind flanges, spectacle plates, or double valves between systems is acceptable. An isolated common system using single valves designed to ensure positive isolation, such as twin seal single valves, are also acceptable. Systems with single valve (other than twin seal) isolation require specific procedures be included in the QCP to ensure product integrity prior to the CTP. When single valves (other than twin seal) are present in the system, the Contractor shall provide their quality control procedures, from the first single valve to the CTP, at time of bid to the Contracting Officer for a determination of acceptability. Procedures for conditioning and testing of isolated systems that last carried a product other than that intended for movement under this contract. For in-line blending of non-aviation products, where approved in this contract, requirements must comply with the IN-LINE BLENDING OF NONAVIATION PETROLEUM PRODUCTS contract provision;

(vii) LOADING AND SHIPPING – TANK CARS, TANK TRUCKS, AND INTERMODAL CONTAINERS. For direct deliveries using Contractor-supplied tank cars and tank trucks in dedicated same grade aviation fuel service, refer to the section of API 1595 entitled “Loading of Road/Rail Cars” for loading and shipping procedures. All other tank car, tank truck, and intermodal container loadings shall be in accordance with the following procedures: Confirm all compartments have been prepared in accordance with Table IV, Conversion Chart for Tank Cars, Tank Trucks, and Intermodal Containers, below. Whenever possible, ensure the same preparation procedures used for compartments are applied to hoses, manifolds, etc. Ensure that conveyances carrying lubricating oil are dry and free from loose rust, scale, and dirt. Provide for investigation of discrepancies in either recorded quality or quantity. When required by the contract, seal conveyance and record seal numbers on the shipping document. Strainers and filters shall be located as near the loading or filling point as practicable and shall be used as outlined below for all deliveries except deliveries into tanker, barge, or pipeline.

(A) All aviation fuel shall be passed through strainers of 60 mesh or finer screen;

(B) All lubricating oil products, including preservatives, having a kinematic viscosity of 20.0 centistokes or less at

100 degrees Fahrenheit shall be passed through a 100 mesh or finer screen;

(C) All lubricating oil products, including preservatives, having a kinematic viscosity greater than 20.0 centistokes at

100 degrees Fahrenheit, but less than 22.0 centistokes at 210 degrees Fahrenheit, shall be passed through a 60 mesh or finer screen; and

(D) The Contractor shall furnish and periodically inspect strainers and filters pursuant to this paragraph to determine condition and perform maintenance as necessary, keeping a written record thereof.

(viii) LOADING AND SHIPPING – TANKERS AND BARGES.

(A) For f.o.b. destination Contractor-supplied tankers/barges. Procedures for the preparation of vessel cargo systems, in accordance with Energy Institute (EI) HM 50, Guidelines for the Cleaning of Tanks and Lines for Marine Tank Vessels Carrying Petroleum and Refined Products, that ensure the vessel is suitable to load the intended product(s).Particular attention should be given to vessels that previously carried a Fatty Acid Methyl Ester (FAME) cargo. As a minimum, f.o.b. destination Contractors must ensure that all cargo systems on the vessel intended for loading product under this contract, to include tanks, lines, manifolds, and pumps, are washed, gas freed, and inspected. In the event a solvent de-greaser is utilized in the tank preparation process, a minimum of two rinses must be performed by the vessel prior to loading Aviation Turbine Fuel. Vessels that will be carrying JP8 will be allowed to load without cleaning based upon the following criteria: the last cargo prior to loading JP-8 is Jet A/A1, and the second and third to last cargoes were clean middle distillate or lighter petroleum products (no black oils, lubricating oils, vegetable oils, palm oils, biodiesel with FAME content greater than or equal to 15 % or other similar products). The vessel will drop all lines and strip dry all cargo tanks of the previously carried Jet A/Jet A1 prior to loading JP-8. These procedures, and others deemed necessary by the Contractor, shall be included to ensure that the product meets the specification requirements at the CTP.

(B) For f.o.b. origin Government-supplied tankers/barges. Procedures for maintaining a time log of all significant events/delays including vessel notice of readiness, vessel arrival, mooring, vessel deballasting, inerting and conditioning of cargo tanks, inspections, hose connections and disconnections, starts, stops, vessel release, or any other event that affects laytime of the vessel.

Procedures for assuring condition of loading line (full of tested product, all air bled, and pressure packed) and gauging shore tanks, both before and after loading. In the event an automated metering system is to be used as the means of shore quantity determination, manual gauges of all storage tanks designated for shipment shall be taken prior to commencement of loading. Procedures for preload discussion between Contractor, vessel, and QAR to include, but not be limited to, prior two cargoes, cleaning procedures, loading plan, loading rates, sampling requirements, and after loading sampling and gauging. [Prior to loading - gauge, sample, and test intransit cargoes designated for load on top. Gauge and sample (1 gallon) any other product on board, except for JPTS, and retain those samples.] All cargo quantities shall be calculated and volume corrected both before and after loading. Procedures for commencement of loading into one tank (up to 3 feet), then switching to at most two other vessel tanks while first-in sampling and testing is being accomplished (Table I). Procedures for the transportation of samples from the vessel to the testing facility. Monitoring the loading (including line blending and additive injection) from source to vessel, investigating irregularities immediately and stopping loading, if necessary. Procedures for investigating discrepancies in quality (mandated if off-specification or out of testing tolerance) and quantity (mandated if shore to ship variance is in excess of the following: 0.2% (0.002) for cargos not requiring cleaning, gas freeing, or drop/strip; 0.3% (0.003) for cargos requiring drop/strip; or 0.5% (0.005) for cargos requiring cleaning and gas freeing, or figures are suspect) on loaded conveyance.

B-5

(C) For both f.o.b. origin and destination tankers/barges. Procedures for immediately notifying the QAR when irregularities occur or are suspected, and on all occasions when loading is interrupted. Authority to release a Government-furnished vessel rests with the Government QAR after compliance and completion by the Contractor of all required operations, including the preparation of the DD Form 250-1.

(ix) RECORDS AND REPORTS. Procedures for completing and distributing required documentation both prior to and after the release of the vessel. Documentation shall include, as a minimum, test reports for all products and additives, additive blending and/or injection records, vessel notice of readiness, customs documents, bills of lading, vessel ullage reports, and the DD Form 250/DD Form 250-1 and continuation sheet(s) (or the Paperless Ordering and Receipt Transaction System [PORTS] or equivalent). Other documentation may be required on an as needed basis, such as vessel port logs, calibration records, and results of quality or quantity discrepancy investigations. These records and reports will include by whom, where, and how they were prepared, as well as retention information. The DD Form 250-1 and DD Form 250-1 continuation sheet(s) will be signed by the Contractor and the vessel representative in the appropriate blocks before presenting them to the QAR for signature. The DD Form 250 and DD Form 250-1 shall identify the type, brand name, and amount of all additive(s).

(x) CORRECTIVE ACTION. Actions to be followed to effect correction of any deficiency affecting product quality or quantity, such as handling of off-specification product (waivers, conveyance rejections, etc.). The corrective action procedures shall include notification of the QAR.

(4) The QCP shall identify one individual to serve as a point of contact for quality/quantity matters relating to the inspection system description in the plan.

(5) The Contractor is responsible for all inspection systems, QCPs, and product quality and quantity.

(c) The Contractor shall perform all inspections and acceptance tests required by the specifications of the supplies to be furnished under this contract or, shall have such tests performed, in a laboratory acceptable to the Government. For f.o.b. destination Contractor-supplied tankers/barges, the Contractor shall provide the QAR, prior to the first shipment, with the name and location of the laboratory to be used for testing at each discharge point. The Contractor shall also notify the QAR of any subsequent laboratory changes prior to the affected shipments. If any laboratory is determined to be unacceptable to the Government, the Contractor must designate another laboratory that is acceptable, before acceptance testing can take place. Acceptance tests will normally be performed at the acceptance point.

However, when such tests are performed at origin on supplies to be accepted at destination, documentation that will enable verification of the original test results shall be provided to the Government prior to acceptance at destination. Regardless of the method of delivery, products furnished under this contract must meet all specification requirements at the CTP.

(d) Prior to loading, the Contractor shall inspect all shipping conveyances for suitability to load the supplies furnished under this contract, except for Government-furnished tankers and barges Authorization for the Contractor to participate in the inspection of Government-supplied tankers and barges rests with QAR. The QAR has the right to inspect any Government-supplied conveyance prior to loading and, in the event the Contractor and the QAR disagree on the suitability to load such a conveyance, the determination of the QAR shall govern. If the SHIPMENT AND ROUTING contract provision is included in the contract, Government-furnished transportation equipment that is unsatisfactory for loading shall be reported by the Contractor in accordance with the provisions contained in that contract provision. Procedures to determine suitability to load tank trucks and tank cars shall include, but not be limited to, visual inspection of interior compartments to assure cleanliness and dryness. Manifolds and hoses must be drained and be clean and dry for the intended product. If the Contractor intends to witness operations at any point up to, and including, government acceptance, the Contractor is responsible for contacting the facilities to be visited and obtaining the required access.

(e) When requested by the U.S. Government, the Contractor shall furnish no more than five (ten in the case of jet fuel) 1-gallon samples of liquid product from any individual batch or lot of the supplies to be furnished under this contract. Such samples shall be furnished without charge to the Government and shall be packed, marked, and shipped by the Contractor, at their expense.

(f) The Contractor shall keep all quality and quantity records related to the performance of this contract complete and available to the Government during the performance of this contract and for three years after final payment under this contract. These records shall include, but not be limited to, DD Form 250-series documents, documentation of internal inspections of all conveyances, laboratory certificates for all required testing (including those for the shipping tanks for f.o.b. destination tankers/barges), and documentation of quantity determinations.

(g) When a common system is to be used for shipment in accordance with paragraph (a)(3)(vi) above, the Contractor shall provide a list of all products carried by that system during the past year to the Contracting Officer, at the time of offer, for a determination of acceptability.

(h) The inspection system and related operations provided or performed pursuant to this provision shall be subject to surveillance by the QAR.

(i) The contractor may provide transportation to/from/between contractor facilities and operations to the QAR or DLA Energy representative performing official duties relating to the administration of the contract and the contract price shall include the cost of any such transportation.

B-6

TABLE I

MINIMUM SAMPLING AND TESTING REQUIREMENTS (1) (9)

LOCATION

WHEN SAMPLED TYPE OF SAMPLE TYPE OF TEST

(SERIES OR INDIVIDUAL)

1. Refinery/Terminal (Each Shipping Tank)

Each Batch Prior to Start of Shipment

All Level or Multi-Level Composite

A (2)

2. All Modes (Shipping Line)

a. Dedicated Line

b. Common Line

Prior to Loading/Shipping

Spot

C

B

3. All Modes (except Tank Car/Tank Truck)/Intermodal Container)

(Custody Transfer Point)

Immediately After Start of Loading/Shipping

Spot C

4. a. Tanker/Barge or Pipeline (F.O.B.

Origin) (Custody Transfer Point)

b. Tanker/Barge (F.O.B Destination) (Custody Transfer Point)

During Loading or Pipeline Shipping

During Discharge

Representative Line Sample [See Paragraph (b)(3) (ii)]

Representative Line Sample [See Paragraph (b)(3) (ii)]

Retain Only

Retain Only – Discard After Shore Tests are On-Specification

5. Tanker/Barge/Pipeline (Custody Transfer Point)

Hourly During Loading/Shipping

Spot Visual (3) plus additive analysis for FSII & SDA, if line injected

6. Tanker/Barge (First-In)

After loading 3 feet or the line displacement quantity, whichever is greater

Spot C (4) - plus additive analysis for FSII & SDA, if line injected

7. Tanker/Barge (F.O.B. Origin only)

a. Each Compartment

b. Composite

After Loading

All-Level or Multi-Level Composite

Multi-Tank Volumetric Composite (6) of Each Product Loaded

Sample to be retained in case composite fails. If composite fails perform Workmanship & Density on each compartment sample.

For JP5, flash point must also be performed.

B (except gum for Aviation Turbine Fuel) (except carbon residue for Diesel/Kerosene) (plus FAME (7))

8. Tanker/Barge (F.O.B. Destination only)

a. Origin (vessel) Composite

b. Destination (vessel) Composite

c. Destination (vessel) Each

After loading

Prior to Discharge

Prior to discharge

Multi-Tank Volumetric Composite (6) of Each Product Loaded

Multi-Tank Volumetric Composite (6) of Each Product to be Discharged

All-level or Multi-level

A (plus FAME (7))

A

For retain in case composite fails.

B-7

Compartment

(SEE NOTE 5 FOR ADDITIONAL

REQUIREMENTS)

composite

If composite fails perform Workmanship & Density on each compartment sample. For JP5 perform flash point also.

9. Tank Car/Tank Truck/Intermodal Container (Loading Rack)

After change of source tank.

Spot C plus additive analysis for FSII & SDA, if line injected

10. Tank Cars/Tank Truck/ Intermodal Container

After Loading/Filling All-Level or Low Point Drain/Bottom Line (10)

Workmanship (C - when loading lubes and FSII)

11. Drum After Filling Multi-drum Composite (8) C

NOTES FOR TABLE I:

(1) AT THE GOVERNMENT'S OPTION, FULL SPECIFICATION TESTING MAY BE REQUIRED AT THE CUSTODY

TRANSFER POINT. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FURNISH THE GOVERNMENT WITH

SATISFACTORY EVIDENCE OF SPECIFICATION COMPLIANCE.

(2) PRIOR TO PERFORMING A-LEVEL TESTING, THE HOMOGENEITY OF EACH BATCH SHALL BE DETERMINED.

AT A MINIMUM, UPPER, MIDDLE, AND LOWER SAMPLES SHALL BE TESTED FOR DENSITY/API GRAVITY AND COMPARED TO THE SPECIFICATION REQUIREMENT FOR HOMOGENEITY. IF NO SPECIFICATION REQUIREMENT EXISTS, HOMOGENEITY SHALL BE DEFINED AS WHEN THE TEST RESULTS FOR THE UPPER, MIDDLE, AND LOWER SAMPLES ALL FALL WITHIN THE REPEATABILITY LIMIT(S) OF THE TEST METHOD USED TO DETERMINE DENSITY/API GRAVITY. IN ANY CASE, WHEN DEEMED NECESSARY BY THE GOVERNMENT, TESTS IN ADDITION TO DENSITY/API

GRAVITYMAY BE REQUIRED TO CONFIRM BATCH HOMOGENEITY.

(3) CONTINUOUS IN-LINE ANALYZERS (I.E., DENSITY AND/OR FLASH POINT) ARE ACCEPTABLE, IN LIEU OF

HOURLY EVALUATIONS, IF QUALITY IS ASSURED. WHEN CONTINUOUS IN-LINE ANALYZERS ARE PRESENT IN THE SYSTEM, THE CONTRACTOR SHALL PROVIDE ITS QUALITY CONTROL PROCEDURES AT TIME OF

OFFER TO THE CONTRACTING OFFICER FOR DETERMINATION OF ACCEPTABILITY.

(4) TESTING FOR PARTICULATE CONTAMINATION SHALL BE REQUIRED BY THE GOVERNMENT IF VISUAL

EXAMINATION OF THE SAMPLE FAILS WORKMANSHIP FOR SEDIMENT/SUSPENDED MATTER.

(5) FOR FOB DESTINATION SHIPMENTS DESTINED FOR MULTIPLE LOCATIONS IN CLOSE PROXIMITY TO ONE

ANOTHER (WITHIN 24 HOURS SAILING TIME BETWEEN LOCATIONS) THE A-TYPE TESTING REQUIRED PRIOR TO DISCHARGE SHALL ONLY BE REQUIRED AT THE INITIAL DISCHARGE POINT, WITH ONLY C-TYPE TESTING REQUIRED PRIOR TO DISCHARGE AT SUBSEQUENT DISCHARGE POINTS. HOWEVER, IF CARGO INTEGIRTY CHANGES BETWEEN DISCHARGE POINTS, SUCH AS THROUGH CARGO TRANSFERS, CONTAMINATION, ETC., THEN A-TYPE TESTING SHALL BE REQUIRED AT THE NEXT DISCHARGE POINT. A COPY OF THE FULL SPECIFICATION TEST REPORT FOR THE VESSEL, AFTER LOADING, SHALL BE PROVIDED TO THE RECEIVING ACTIVITY AT EACH DISCHARGE POINT, PRIOR TO

DISCHARGE.

(6) COMPRISED OF ALL-LEVEL OR MULTI-LEVEL COMPOSITES FROM EACH COMPARTMENT.

(7) CONTRACTORS DELIVERING INTO THE GPSS,CEPS, NIPS, AND DFSP ATHENS (MOH) SHALL PERFORM FAME CONTENT TESTING IN ACCORDANCE WITH TEST METHOD IP 585 OR IP 590, AND REPORT THE RESULTS TO THE

DESTINATION CONSIGNEE PRIOR TO VESSEL ARRIVAL.

(8) A ONE LITER COMPOSITE SAMPLE OF EACH LOT OF PRODUCT SHALL BE TAKEN FROM A PREDETERMINED NUMBER OF RANDOMLY SELECTED DRUMS. THE TOTAL NUMBER OF DRUMS SAMPLED PER LOT SHALL, AT A MINIMUM, BE THAT CITED IN TABLE III OF API MPMS CHAPTER 8.1 (ASTM D 4057), BUT MAY BE INCREASED AT THE

GOVERNMENT’S OPTION.

(9) THE SIZE OF ALL THE SAMPLES REQUIRED IN THIS TABLE, EXCEPT FOR THOSE DESIGNATED “RETAIN ONLY”, B-8

SHALL BE DETERMINED BY THE CONTRACTOR AND SHALL BE OF SUFFICIENT QUANTITY TO PERFORM ALL THE TESTS REQUIRED BY THIS TABLE. THE SIZE REQUIREMENTS FOR RETAIN SAMPLES CAN BE FOUND IN TABLE II, SAMPLE RETENTION.

(10) THE LOW POINT DRAIN/ BOTTOM LINE OPTION ONLY APPLIES TO TANK CAR AND TANK TRUCK SHIPMENTS OF FUEL – SHIPMENTS OF LUBRICATING OILS AND ADDITIVES MUST UTILIZE ALL-LEVEL SAMPLING PROCEDURES.

IF INITIAL FUEL SAMPLES USING THE LOW POINT DRAIN/BOTTOM LINE OPTION ARE NOT CLEAR AND BRIGHT, ADDITIONAL SAMPLES SHALL BE TAKEN UNTIL A CLEAR AND BRIGHT SAMPLE IS OBTAINED.

B-9

TABLE II

SAMPLE RETENTION (1)

LOCATION

MINIMUM QUANTITY RETENTION PERIOD(1)

1. Bulk Tank Cars/Tank Trucks/Intermodal Containers

Additives

Fuels and Lubricating Oils

2 Liters (2)

1 Liter (2)

Until Receipt and Quality Verification of Each Lot/Batch

15 Days – 45 Days for Lubricating Oils

2. Drums

Avgas

1 Liter – multi-drum composite (3)

45 Days

3. Shipping Tank(s) 20 Liters - for Aviation Turbine Fuels

10 Liters - for all other Fuels, Lubricating

Oils, and Additives

45 Days

4. Tanker/Barge/Pipeline (Composite Line at Custody Transfer Point)

20 Liters - for Aviation Turbine Fuels

10 Liters - for all other Fuels

5. Tanker/Barge (Composite)

F.O.B. Origin

F.O.B. Destination

20 Liters - for Aviation Turbine Fuels

10 Liters - for all other Fuels

20 Liters

Until Shore Tests On-Specification

6. Tanker/Barge (Each Compartment)

F.O.B. Origin

F.O.B. Destination

0.5 Liter

1 Liter

45 days

Until Shore Tests On-Specification

NOTES FOR TABLE II:

(1) UNLESS OTHERWISE NOTED, THE RETENTION PERIOD SHALL BE FOR THE STATED NUMBER OF DAYS AFTER

THE SAMPLE HAS BEEN TAKEN FROM THE LOCATION INDICATED.

(2) IF THE CONVEYANCE IS COMPARTMENTALIZED, A PROPORTIONAL SAMPLE SHALL BE TAKEN FROM EACH

COMPARTMENT SUCH THAT A TOTAL OF ONE LITER IS COLLECTED FROM THE CONVEYANCE.

(3) A ONE LITER COMPOSITE SAMPLE OF EACH LOT OF PRODUCT SHALL BE TAKEN FROM A PREDETERMINED NUMBER OF RANDOMLY SELECTED DRUMS IN ACCORDANCE WITH TABLE III OF API MPMS CHAPTER 8.1 (ASTM D 4057).

B-10

TABLE III

DEFINITIONS OF TEST SERIES

I. TYPE A: Includes all specification quality conformance tests plus any additional contractual requirements.

II. TYPE B & C: As shown in the table below for each product. Properties and test methods will be in accordance with the product specification for each grade identified in the solicitation/contract.

AVGAS TURBINE

FUEL

MOGAS DIESEL/

KEROSENE

BURNER

FUEL

LUBE OIL FSII

TEST PROPERTIES B C B C B C B C B C B C C

Workmanship * * * * * * * * * * * Particulate content * * * (1) * Filtration Time * Color * * * * * * * * * * Density or API Gravity or Specific Gravity

* * * * * * * * * (2) * (2) *

Distillation * * * * Corrosion, Copper Strip * * Existent Gum * * Carbon Residue * * Lean or Rich Ratings * Reid Vapor Pressure * * (3) * Water Reaction * * Lead Content * Freeze Point * Flash Point * * * * * * * * FSII Content * Microseparometer * Conductivity * Sediment & Water * * Viscosity * * * Water Content * * * * Water Tolerance * Foam Test * *

* THE PROCEDURE TO BE USED FOR CONDUCTING THESE TESTS WILL BE AS STATED IN THE APPROPRIATE

PRODUCT SPECIFICATION AND/OR CONTRACT.

NOTES FOR TABLE III:

(1) F76 ONLY.

(2) GRADES 1, 2, AND 4 (L) ONLY.

(3) JP4 ONLY.

B-11

TABLE IV

CONVERSION CHART FOR TANK CARS, TANK TRUCKS, AND INTERMODAL CONTAINERS (1)

PRODUCT TO BE LOADED (6)

LAST

PRODUCT

CARRIED (2)

JP-4

JET B

AVGAS

JP-5, JP-8

TS-1

JET A/A1

JPTS (7)

RP1/RP2 JP-10/PF-1 F76 FSII LUBRICATING

OILS

JP-4, JET-B

MOGASE85, AVGAS

DRAIN

EMPTY

STEAM

DRY

STEAM

DRY

STEAM

DRY

STEAM

DRY

STEAM

DRY

STEAM

DRY

STEAM DRY

JP-5, JP-8, TS-1

JET A/A1, KS1/R/N

DRAIN

EMPTY

DRAIN

EMPTY (4)

STEAM

DRY

STEAM

DRY

STEAM

DRY

DRAIN

EMPTY (4)

STEAM

DRY

STEAM DRY

JPTS DRAIN

EMPTY

DRAIN

EMPTY

DRAIN

EMPTY

DRAIN

EMPTY

STEAM

DRY

DRAIN

EMPTY

STEAM

DRY

STEAM DRY

RP1/RP2 STEAM

DRY

STEAM

DRY

STEAM

DRY

DRAIN

EMPTY

STEAM

DRY

STEAM DRY STEAM

DRY

STEAM DRY

JP-10/PF-1 STEAM

DRY

STEAM

DRY

STEAM

DRY

STEAM

DRY

DRAIN

EMPTY

STEAM DRY STEAM

DRY

STEAM DRY

F-76, MGO

LS-1/2/S/W,

DS-1/2/S/W, DF-2

HS-1/2, FS-1/2

FL-2/4

STEAM

DRY

STEAM

DRY

STEAM

DRY

DRAIN

EMPTY (4)

STEAM

DRY

STEAM DRY

FSII DRAIN

EMPTY

DRAIN

EMPTY

STEAM

DRY

STEAM

DRY

STEAM

DRY

DRAIN

EMPTY

DRAIN

EMPTY

STEAM

DRY

LUBRICATING

OILS

NO LOAD NO LOAD NO LOAD NO LOAD NO LOAD STEAM DRY NO LOAD DRAIN

EMPTY (3)

BIODIESEL BLENDS

<B15

STEAM

DRY (4)

STEAM

DRY (4)

STEAM

DRY (4)

STEAM

DRY (4)

STEAM

DRY (4)

STEAM DRY

(4)

STEAM

DRY (4)

STEAM

DRY (4)

BIODIESEL BLENDS

>B15

STEAM

DRY(4) (5)

STEAM

DRY (4) (5)

NO LOAD NO LOAD NO LOAD STEAM

DRY (4)

STEAM

DRY (4)

STEAM

DRY (4)

FS-4/5/6, FL-5

RF-4/5/6, R5L

IFO

NO LOAD NO LOAD NO LOAD NO LOAD NO LOAD NO LOAD NO LOAD NO LOAD

NAPTHA DRAIN

EMPTY

STEAM

DRY

STEAM

DRY

STEAM

DRY

STEAM

DRY

STEAM DRY STEAM

DRY

STEAM DRY

PETROLEUM

SOLVENT/PAINT

THINNER

STEAM

DRY

STEAM

DRY

STEAM

DRY

STEAM

DRY

STEAM

DRY

STEAM DRY STEAM

STEAM DRY

NOTES FOR TABLE IV:

(1) WHEN REQUIRED, “DRAIN EMPTY” INCLUDES THE PUMP(S), FILTER(S), METER(S), AND HOSE(S), AS APPLICABLE.

(2) IF A PRODUCT IS NOT LISTED IN THIS COLUMN, PERMISSION TO LOAD AND CONVEYANCE PREPARATIONS REQUIRE A

WAIVER FROM THE DLA ENERGY CONTRACTING OFFICER.

(3) APPLICABLE ONLY WHEN LOADING THE SAME SPECIFICATION LUBRICATING OILS; OTHERWISE, STEAM CLEAN AND

DRY.

(4) IF PREVIOUS CARGO CONTAINED A DYE MARKER AND PRODUCT TO BE LOADED DOES NOT, ALL VISIBLE TRACES OF

COLOR FROM THE DYE MUST BE REMOVED.

B-12

(5) PRIOR TO LOADING THE AVIATION FUELS LISTED, THE CONVEYANCE MUST CARRY A NON-FAME CARGO AND THEN

BE STEAM CLEANED AND DRIED.

(6) CONVEYANCES THAT ARE EPOXY COATED OR SARAN LINED SHOULD NOT BE STEAM CLEANED – WASHING WITH HOT FRESH WATER, NOT EXCEEDING 58OC (136OF), AND DRYING THOROUGHLY IS RECOMMENDED.

(7) TO BE LOADED ONLY IN ALUMINUM OR STAINLESS STEEL CONVEYANCES, OR CONVEYANCES LINED WITH AN

APPROVED EPOXY COATING.

E21.01 POINT OF INSPECTION (DLA ENERGY APR 2010)

(a) When Government inspection is deemed necessary, it shall be performed, prior to acceptance, by the office specified in the LIST OF INSPECTION OFFICES FOR DLA ENERGY CONTRACTS or the QUALITY REPRESENTATIVE clause of this contract, whichever is applicable.

(1) For f.o.b. origin contract items, inspection will be performed at origin.

(2) For f.o.b. destination contract items, inspection will be performed at destination.

(3) For f.o.b. destination contract items for bulk aviation fuels delivered via tank truck and tank wagon, a preliminary inspection for quality will be performed at origin.

(4) On contract items for delivery of drummed or packaged products, f.o.b. origin or f.o.b. destination, preliminary inspection for product quality will be performed at the point of manufacturing or blending. If the point of blending is different from the point of manufacturing of component stocks, inspection of component stocks may be performed at their point of manufacturing. Inspection for product quality, and for proper filling and packaging, may be performed at the point of filling. Final inspection will be at the f.o.b. point.

(b) When Government inspection is to be performed, the Contractor shall ensure that the responsible Inspection Office is provided with sufficient advance notification and information to facilitate such inspection. After initial notification, the Contractor shall keep the Inspection Office informed of any changes that may affect that inspection.

E22 LIST OF INSPECTION OFFICES FOR DLA ENERGY CONTRACTS (DLA ENERGY JUL 2013)

The following lists shall be used to identify the Government inspection office assigned inspection responsibility for DLA Energy contracts in a particular geographic area. These contracts include, but are not limited to, those for bulk petroleum products and additives, into-plane refueling, petroleum storage and laboratory services, coal, aerospace energy (including compressed gases), and posts, camps, and stations. The area of inspection responsibility and corresponding office code are assigned in paragraphs (a) and (b). The address and phone number of each inspection office by office code is provided in paragraph (c). Unless a particular inspection office is identified in another part of the contract, the assignments in this contract provision shall apply.

(a) AREAS OF RESPONSIBILITY AND OFFICE CODES WITHIN THE CONTINENTAL UNITED STATES

(CONUS):

Alabama 110 Maine 110 Oklahoma 110 Arizona 120 Maryland 110 Oregon 120 Arkansas 110 Massachusetts 110 Pennsylvania 110 California 120 Michigan 110 Rhode Island 110 Colorado 120 Minnesota 110 South Carolina 110 Connecticut 110 Mississippi 110 South Dakota 110 Delaware 110 Missouri 110 Tennessee 110 District of Columbia 110 Montana 120 Texas 110 Florida 110 Nebraska 110 Utah 120 Georgia 110 Nevada 120 Vermont 110 Idaho 120 New Hampshire 110 Virginia 110 Illinois 110 New Jersey 110 Washington 120 Indiana 110 New Mexico 120 West Virginia 110 Iowa 110 New York 110 Wisconsin 110 Kansas 110 North Carolina 110 Wyoming 120 Kentucky 110 North Dakota 110 Louisiana 110 Ohio 110

B-13

EXCEPTIONS:

(1) The El Paso, Texas, area is assigned to Code 120 (DLA Energy Americas – West).

(2) The Newcastle, Wyoming, area is assigned to Code 110 (DLA Energy Americas – East).

(b) AREAS OF RESPONSIBILITY AND OFFICE CODES OUTSIDE THE CONTINENTAL UNITED STATES

(OCONUS) (INCLUDING ALASKA AND HAWAII):

Afghanistan 400 Cyprus 200 Malaysia 300 Singapore 300 Africa 200 1 Egypt 4001 Maldives 300 South America 110 Alaska 300 Europe (Continental) 200 Malta 200 South Korea 300 Antarctica 300 Georgia 200 Mauritius 200 Sri Lanka 300 Armenia 200 Greenland 200 Mexico 110 Syria 400 Ascension Island 110 Hawaiian Islands 300 Midway Island 300 Taiwan 300 Australia 300 Hong Kong 300 Mongolia 300 Tajikistan 400 Azerbaijan 200 Iceland 200 Myanmar 300 Thailand 300 Azores 200 India 300 Nepal 300 Turkey 200 Bahrain 400 Indonesia 300 New Zealand 300 Turkmenistan 400 Bangladesh 300 Ireland 200 North Korea 300 United Arab Bermuda 110 Iran 400 Oman 400 Emirates 400 Bhutan 300 Iraq 400 Pacific Islands United Kingdom 200 Brunei 300 Israel 200 (Central & South) 300 Uzbekistan 400 Cambodia 300 Japan 300 Pakistan 400 Vietnam 300 Canada 110/120 2 Jordan 400 Papua New Guinea 300 Wake Island 300 Canary Island 200 Kazakhstan 400 Philippines 300 Yemen 400 Caribbean Islands 110 Kuwait 400 Qatar 400 Central America 110 Kyrgyzstan 400 Russia 200 Chagos Archipelago 300 Laos 300 Ryukus Islands, Japan 300 China 300 Lebanon 400 Saudi Arabia 400 Comoros 200 Madagascar 200 Seychelles Is. 420

1 Except for Egypt, which is assigned to DLA Energy Middle East (Code 400), all other countries in Africa fall under DLA Energy Europe (Code 200).

2 The provinces of Manitoba, Ontario, Quebec, Newfoundland and Labrador, New Brunswick, Nova Scotia, and Prince Edward Island are assigned to DLA Energy Americas East (Code 110). The rest of Canada falls under DLA Energy Americas West (Code 120).

(c) INSPECTION OFFICES AND CODES.

110. DLA Energy Americas East ATTN: Quality Manager 3

Federal Building, Room 1005 2320 LaBranch Street Houston, TX 77004-1091 Phone: (713) 718-3883, ext. 162/161/160

FAX: (713) 718-3891

120. DLA Energy Americas West ATTN: Quality Manager 3

3171 N Gaffey Street San Pedro, CA 90731-1099 Phone: (310) 241-2806/2807

FAX: (310) 241-2836

200. DLA Energy Europe and Africa

B-14

Military Mailing Address:

DLA Energy Petroleum Lab ATTN: Quality Manager 3

CMR 422

APO AE 09067-0422

Phone: 49-631-3406-2285/2286 4

FAX: 49-631-3406-2289 4

Commercial Shipping Address:

DLA Energy Petroleum Lab ATTN: Quality Manager Bldg. 320, Rhine Ordinance Barracks Am Opelkreisel 67663 Kaiserslautern, Germany

300. DLA Energy Pacific

1025 Quincy Avenue, Building 479, Suite 2000 Pearl Harbor, HI 96860-4512 Phone: (808) 473-4307/4287

FAX: (808) 473-4232

400. DLA Energy Middle East

PSC 851, Box 180

FPO AP 09834-2800

Phone: 973-17-85-6493 4

FAX: 973-17-85-4650 4

[Location: Bahrain]

3 Designated location of the DLA Energy Regional Quality Manager/Pre-Award Survey Monitor.

4 Dial 011 before these numbers when calling from the U.S. When calling these numbers from outside the U.S., use the appropriate international long distance prefix for the country where the call originates.

E35 NONCONFORMING SUPPLIES AND SERVICES (DLA ENERGY DEC 2011)

(a) DEFINITION: As used in this contract provision:

Deviation is defined as a written authorization granted after contract award and prior to manufacture of an item, to depart from a particular performance or design requirement of a contract, specification, or referenced document, for a specific number of units or specific period of time, normally the duration of the contract.

Extraordinary situation means the matter cannot await resolution until the next DLA Energy business day (0800 to 1630 hours EST, Monday through Friday, Federal Holidays excluded).

Waiver is defined as a written authorization granted after contract award to accept a configuration item or other designated item which, during production or after having been submitted for inspection, is found to depart from specified requirements, but nevertheless is considered suitable for use “as is” or after repair by an approved method. Approval is on a case-by-case basis and is normally for a set period of time.

(b) The Government may, at its discretion, accept nonconforming supplies or services. In such cases, the Contractor must obtain a deviation or waiver from the Contracting Officer prior to acceptance.

(c) The following procedures shall be used to request a deviation or waiver.

(1) Requests for deviations and waivers shall be submitted by the Contractor to the Contracting Officer with a copy to the appropriate Inspection Office referenced in the LIST OF INSPECTION OFFICES FOR DLA ENERGY CONTRACTS or QUALITY REPRESENTATIVE contract provision of this contract. Each request shall provide the following information: Contractor name; name and

B-15 contact information of the contractor’s authorized negotiator; contract number; contract line item number and product nomenclature, clause or contract provision number, paragraph and subparagraph, as appropriate; the nature of the request; the reason for the request; the corrective action being taken by the Contractor to correct and prevent recurrence of the condition(s) causing the nonconformance; and an agreement to pay an equitable price reduction, estimated and proposed by DLA Energy, over and above the administrative fee, contingent on the impact of the specific circumstances on DLA Energy relative to approval of the deviation or waiver.

(2) In extraordinary situations, the Contractor may initially submit a verbal request for a waiver, but not a deviation, to the Contracting Officer. Written requests shall be submitted to the Contracting Officer by the next DLA Energy business day (0800 to 1630 hours EST, Monday through Friday, Federal Holidays excluded). If the Contracting Officer cannot be reached, the Duty Officer shall be contacted to provide the necessary information to the proper individuals as soon as possible. The Duty Officer's telephone number is (800) 286-7633 or

(703) 767-8420.

(3) If a deviation or waiver is granted, the contract will be modified to accept the nonconforming supplies or services and to require the Contractor to provide an equitable price reduction or other adequate consideration commensurate with the deviation or waiver being granted. If the situation warrants, a deviation or waiver may be granted without prior agreement on price reduction or other consideration, subject to agreement by the Contractor, or its representative, to subsequent negotiation. Such an agreement, in addition to a brief description of the terms of the deviation or waiver, shall be documented on the shipping document or other appropriate correspondence. After negotiations, failure to agree on adequate consideration shall be a dispute concerning a question of fact within the meaning of the Disputes paragraph of the CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS contract provision of this contract.

(4) If a deviation or waiver is granted and the nonconforming supplies are accepted, then in no event will consideration be less than $500, which covers administrative costs, plus any additional cost of Government reinspection or retest, if necessary.

(5) If a deviation or waiver is granted modifying this contract, but the supplies accepted are subsequently determined to be in conformity with contract specifications, the Contractor shall still be obligated to pay the consideration originally agreed upon in support of the deviation or waiver. If, however, this consideration exceeds $1000, a second contract modification shall be issued reducing the Contractor's obligation to $1000 (the administrative cost of issuing the two required modifications), plus, if appropriate, any cost of Government reinspection or retest performed as a result of the deviation or waiver being granted.

(d) When notification of nonconforming supplies is received after the supplies have been accepted, and the Government determines not to exercise its right to reject or to require correction under the INSPECTION OF SUPPLIES – FIXED-PRICE, INSPECTION OF SERVICES – FIXED PRICE, or CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS contract provision, then in no event will consideration be less than $500 to cover administrative costs. This $500 fee is in addition to—

(1) Consideration commensurate with the extent of nonconforming supplies; and

(2) Cost of Government reinspection or retest, if necessary.

The administrative fee will apply to each claim letter issued for off-specification product delivered to an activity.

(e) Contractors shall be held responsible for payment of any fines or penalties imposed on a receiving activity by an environmental enforcement agency, resulting from the delivery of nonconforming supplies under a DLA Energy contract.

(f) Repeated tender of nonconforming supplies or services, including those with only minor defects, will be discouraged by appropriate actions, including, but not limited to, rejecting the supplies or services whenever feasible and documenting the Contractor's performance records.

E40.05 MATERIAL INSPECTION AND RECEIVING REPORT (DLA ENERGY MAR 2000)

(a) One copy of the documents and reports listed below shall be mailed to--

ATTN: DLA ENERGY-QT, ROOM 2843

DEFENSE LOGISTICS AGENCY ENERGY

8725 JOHN J. KINGMAN ROAD

FORT BELVOIR VA 22060-6222

(b) Laboratory reports shall be in the Standard Report Format given in Attachment ____ for the Standardized Format for Use in Preparation of Product Test Reports. Include, where applicable, information on any intermediate shipping or holding tanks with batch number designations used to define the product movement. Use the guidelines below to determine when to submit the laboratory reports.

(1) MARINE SHIPMENTS. Submit a completed DD Form 250-1, test reports, and vessel ullage reports for all products shipped. If more than one shipping tank was used for the lift, include a complete analysis of each shipment tank and clearly indicate the quantity of product drawn from each tank.

(2) PIPELINE SHIPMENTS. Submit a completed DD Form 250, copy of order (DD Form 1155), and complete laboratory results for total quantity of product shipped from each shipping tank used to fill the order. Insure test methods or test codes as defined in the Attachment are specified on the test report.

B-16

(3) TRUCK AND RAIL CAR SHIPMENTS. When loading from source tank has finished, submit one copy of the complete laboratory analysis for the source tank and attach all DD Forms 250 for product received from that source tank. Insure test methods or test codes as defined in the Attachment are specified on the test report.

(c) If only one shipment is made from a shipping tank, then the quantity of the Standard Report Format should represent the quantity shipped and not the tank capacity or the quantity in the tank at the time of sampling.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .