Attch E - cost spreadsheet 12 Mar 12.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
Energy Savings Performance Contract (ESPC) efforts at Defense Commissary Agency, Fort Lee VA
Solicitation number
SP0600-12-R-0412
Issued by

About this file

Attachment E - Cost/Price Spreadsheet

View the file

Other files

File Type Posted
Amend 0003.pdf PDF
Amendment 0002.pdf PDF
amend 0001.pdf PDF
SECTION L 12 Mar Final2.docx DOCX document
Attch A - indivl-site-descip 12 mar 12.xlsx XLSX spreadsheet
Notice of Opportunity 12 Mar 12.docx DOCX document
Section M 12 Mar.docx DOCX document
Attch G - SCA 12 Mar 12.xlsx XLSX spreadsheet
Attch E - Instrs for Compl of Cost Spdsht Mar 12.docx DOCX document
Attch D - past performance 12 Mar 12.docx DOCX document
Attach F - DB wage determination 12 Mar 12.xlsx XLSX spreadsheet
ATTCH C Sample Project Rates 12 Mar 12.doc DOC document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT E
COST ESTIMATE BREAKDOWN

CONTRACTOR:

DEFENSE COMMISARY AGENCY
SOLICITATION: SPO600-12-R-0412
MATERIAL COSTSLABOR COSTS
Category NO.ITEM DESCRIPTIONUNIT OF MEASUREQTYUNIT PRICEMATERIAL TOTALMAN-HOURSAverage RateLABOR TOTALOTHER DIRECT COSTSTOTAL
1PROJECT DEVELOPMENT COSTS

Category 1 Subtotal

2ECM 0001
Site Preparation - Demolition
Site Preparation - Earthwork
Site Improvements - Aggregate Base and Concrete Pavement
Site Improvements - Pavement Striping Removal and Restriping
Site Improvements - Erosion Control and Landscaping
Site Utilities - Storm Sewer
Site Utilities - Electrical

Category 2 Subtotal

3ECM 0002
Site Preparation - Demolition
Site Preparation - Earthwork
Site Improvements - Aggregate Base and Concrete Pavement
Site Improvements - Pavement Striping Removal and Restriping
Site Improvements - Erosion Control and Landscaping
Site Utilities - Storm Sewer
Site Utilities - Electrical

Category 3 Subtotal

4 ECM 0003, etc

Category 4 Subtotal

5M&V costs per ECM
ECM 0001
ECM 0002
ECM 0003, etc

Category 5 Subtotal

6 Post Installation Costs

Category 6 Subtotal

TOTAL Direct Costs

$0.00$0.00
Overheadxx%$0.00
Subtotal$0.00
Profitxx%$0.00
Subtotal$0.00
Performance and Payment Bondsxx%$0.00
Total Project Costs:

Notice of Opportunity DeCA Attachment E

Notice of Opportunity DeCA Attachment E

INSTRUCTIONS FOR COMPLETING AF FORM 3052

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples-square yards-SY, cubic yards-CY, square feet-SF, linear feet-LF, board feet-BF, each-EA, pound-LB).

Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract and of significant dollar value.

Col 10 Line Total. Self-explanatory.

NOTE: In addition to other totals entered onvarious pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

TOTAL MATERIAL COSTS $______________________
TOTAL LABOR COSTS $______________________
TOTAL OTHER DIRECT COSTS $__________________
TOTAL DIRECT COSTS $_________________________
OVERHEAD ________________ __% $____ _________________
SUBTOTAL $_ ____________________
PROFIT ____________________ ___% $__ __________________
SUBTOTAL $_ ____________________
BONDING________________________% $___ __________________
TOTAL PRICE $ _____________________
DATE ______________ FIRM NAME _________________________________________
TITLE _ _________________________ SIGNED BY ___________________________________________

INSTRUCTIONS TO OFFERORS

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a
2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substantiation which are reasonably required for the condu

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from known data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate), and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books,documents and other supporting data whic

&"-,Bold"Attachment G Page &P

Sheet3

File details come from the government source that posted it. Updated .