ATTCH C Sample Project Rates 12 Mar 12.doc

DOC document 35 KB Posted

Attached to
Energy Savings Performance Contract (ESPC) efforts at Defense Commissary Agency, Fort Lee VA
Solicitation number
SP0600-12-R-0412
Issued by

About this file

Attachment C - Sample Project Rates

View the file

Other files

File Type Posted
Amend 0003.pdf PDF
Amendment 0002.pdf PDF
amend 0001.pdf PDF
SECTION L 12 Mar Final2.docx DOCX document
Attch E - cost spreadsheet 12 Mar 12.xlsx XLSX spreadsheet
Attch A - indivl-site-descip 12 mar 12.xlsx XLSX spreadsheet
Notice of Opportunity 12 Mar 12.docx DOCX document
Section M 12 Mar.docx DOCX document
Attch G - SCA 12 Mar 12.xlsx XLSX spreadsheet
Attch E - Instrs for Compl of Cost Spdsht Mar 12.docx DOCX document
Attch D - past performance 12 Mar 12.docx DOCX document
Attach F - DB wage determination 12 Mar 12.xlsx XLSX spreadsheet
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT C

SAMPLE PROJECT RATES

Instructions: In the preparation of the response to the Notice of Opportunity, the Energy Service Company (ESCO) shall utilize the following index, escalation and utility rates in the development of their sample project strategy.

Index Rate: The ESCO shall utilize an index rate of 2.71%.

Escalation Rates:

Electricity - Nominal electricity escalation rate: 4.35% (based on Energy Escalation Rate Calculator 2.0-10, 2012 start date, and 24 year duration)

Natural Gas - Nominal natural gas escalation rate: 4.76% (based on Energy Escalation Rate Calculator 2.0-10, 2012 start date, and 24 year duration)

Water - Escalation rate: 3.4% (based on inflation rate per Energy Escalation Rate Calculator 2.0- 10, 2012 start date, and 24 year duration)

Sewer - Escalation rate: 3.4% (based on inflation rate per Energy Escalation Rate Calculator 2.0- 10, 2012 start date, and 24 year duration Utility Energy Rates: Energy rates to be utilized in the sample project are as follows:

Table 10: Sample Project Scenario Utility Rates

Utility
Rates
Electricity
$0.1116/kWh
Natural Gas
$0.3180/therm
Purchased Steam
N/A
LPG/Propane
N/A
Fuel Oil
N/A
Potable Water
$6.60/kgal
Sewer
$8.06/kgal