Statement of Work Summary: Sphinx Café Foodservice Equipment
This is a Statement of Work (SOW) for the furnishing, delivery, and installation of a complete package of foodservice equipment for the Sphinx Café at Wright-Patterson Air Force Base (WPAFB), with a release date of 19 MAY 2026. The 88th Force Support Squadron requires all equipment, materials, and services necessary for complete procurement and installation as detailed in the attached facility design drawings. All equipment with electronic components must be NSA-approved TEMPEST equipment or capable of meeting TEMPEST compliance measures as evaluated by a Certified TEMPEST Technical Authority (CTTA).
The scope of work encompasses supplying commercial-grade kitchen equipment, coordinating delivery to the WPAFB project site, delivering and installing all buyout equipment and custom stainless-steel fabrications (including walk-in cooler and freezer units per design specifications), performing final electrical and plumbing tie-ins to previously capped service points, and executing final testing and authorized factory start-up. All personnel must be U.S. citizens with no personal electronics permitted inside the facility. Equipment must be delivered, installed, and tested within 60 calendar days of contract award, with completion required no later than 1 September 2026. Deliverables include complete installation and setup of all equipment, operational and tested systems following startup, and manufacturer warranty documentation. Project acceptance occurs upon successful completion of the "Startup & Punchout" process, final testing of all equipment, and mutual agreement on punch-list resolution. Payment terms are NET 30, with invoices submitted to ap.invoices@afsv.net and must include the award number and contract line-item numbers. The customer's General Contractor will provide necessary site support including forklift access, dumpsters, and clear pathways for installation activities.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI
Statement of Work (SOW)
Sphinx Café Foodservice Equipment
19 MAY 2026
1.0 Introduction & Background
The 88th Force Support Squadron has a requirement for the furnishing, delivery, and installation of a complete package of foodservice equipment for the Sphinx Cafe, located at Wright-Patterson Air Force Base (WPAFB).
2.0 Scope of Work
The contractor shall provide all equipment, materials, and services necessary for the complete procurement and installation of the food service equipment detailed below.
All equipment with electronic components shall be NSA-approved TEMPEST equipment or shall be able to meet TEMPEST compliance measures as evaluated by a Certified TEMPEST Technical Authority (CTTA).
The scope of work encompasses the following:
Supply a comprehensive range of commercial-grade kitchen equipment, specifically all items in the (redacted) facility design drawings attached.
Coordinate delivery of all equipment to the WPAFB project site.
Deliver, set and install all buyout equipment and custom stainless-steel fabrications, including the complete erection and installation of walk-in cooler and freezer units in accordance with the attached design specifications.
Perform final electrical and plumbing tie-ins to previously capped service points.
Execute final testing, punch-list completion, and authorized factory start-up for specified equipment to ensure fully operational systems.
3.0 Deliverables
1. Complete installation and setup of all equipment.
2. Operational and tested systems following startup.
3. Manufacturer warranty documentation for all installed equipment.
4.0 Assumptions
The customer's General Contractor will provide necessary site support, including forklift access, dumpsters, and clear pathways for all installation activities.
5.0 Delivery
All personnel shall be U.S. citizens. No personal electronics (phones, Bluetooth, etc.)
are permitted inside the facility.
Equipment shall be delivered, installed, and tested not later than 60 calendar days after contract award. All delivery and install must be completed NLT 1 September 2026.
Equipment shall be delivered to the following address:
Matthew Hawkins/Michael Leitz
4180 WATSON WAY BLDG 828
WPAFB, OH 45433
6.0 Acceptance
Project acceptance will occur upon the successful completion of the "Startup & Punchout" process, final testing of all equipment, and the mutual agreement that all items on the punch-list have been resolved.
7.0 Payment
Payment terms are NET 30.
Invoices shall be submitted to ap.invoices@afsv.net for payment. All invoices must include the award number and contract line-item number(s) for matching.
mailto:ap.invoices@afsv.net
D
C
B
0 � X w n
• A �
X
.5 � w
0 � 0
� ��� N
0 ':', � ro N 8" 0
N ro 0 �
1 2 3 4
ZHTV 255055 SPHINX CAFE F10828 INTERIOR
' I
Engineering Building Partnerships
LJBinc.com
(866) 552-3536 info@LJBinc.com
REMODEL
FOR
WRIGHT-PATTERSON AIR FORCE BASE
WRIGHT-PATTERSON AIR FORCE BASE
DAYTON, OHIO
GANA-A'YOO
CONSTRUCTION SERVICES
A GANA-A'YOO FAMILY COMPANY
Ganaayoo.com
(888) 656-1606 info@ganaayoo.com
PROJECT TEAM
HEAPY
Heapy.com
1400 W Dorothy Lane Dayton, OH 45409 Tel: 937-224-0861
) ENGINEERING, L TC,
Firelogix.com
215 N Broadway Street Lebanon, Ohio 45036
Ph. (513) 206-9651
NOTES:
GENERAL NOTES:
1 DO NOT SCALE DRAWINGS. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF
WORK
2 MAINTAIN ACCESSIBILITY TO ALL AREAS ADJACENT TO CONSTRUCTION ZONES ENSURE
COMPLIANCE WITH ALL APPLICABLE LIFE SAFETY CODES AND ADA ACCESSIBILITY REQUIREMENTS
THROUGHOUT DURATION OF PROJECT
3 PROVIDE AND INSTALL BARRIER PROTECTION, AS REQUIRED, FOR JOB PERFORMANCE AND SAFETY
4. ALL WORK TO BE DONE PER INSTALLATION FACILITY STANDARDS.
5 ALL MATERIALS SHALL BE INSTALLED PER MANUFACTURER'S RECOMMENDATIONS UNLESS
SPECIFIED OTHERWISE. ALL MATERIALS SHALL BE UTILIZED WITHIN THE MANUFACTURERS
LIMITATIONS AND INTENDED PURPOSES.
6. THE CONTRACTOR TO PROTECT AGAINST CONSTRUCTION DEBRIS, INCLUDING DUST, FROM
ENTERING NON-PROJECT AREAS.
7 IN THE EVENT OF DAMAGES OF ANY NATURE CAUSED BY THIS WORK DUE TO IMPROPER
PROTECTION, PRECAUTION OR SAFETY MEASURES, SUCH DAMAGES SHALL BE REPAIRED, OR SUCH
PROPERTY SHALL BE REPLACED BY THE CONTRACTOR AT NO COST TO THE GOVERNMENT IN THE
EVENT THE CONTRACTOR DOES NOT SATISFACTORILY REPAIR OR REPLACE SUCH DAMAGE CAUSED
BY THE WORK OF THIS CONTRACT, THE GOVERNMENT WILL MAKE THE NECESSARY CORRECTIONS
AND THE CONTRACTOR SHALL REIMBURSE THE GOVERNMENT FOR INCONVENIENCES, LABOR, AND
MATERIALS INVOLVED.
8 IF REQUIRED, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR WITH ASSISTANCE FROM
BASE PERSONNEL TO LOCATE ALL EXISTING UTILITY LINES IN THE FIELD BEFORE STARTING
EXCAVATION OF ANY KIND. THE CONTRACTOR WILL OBTAIN A SIGNED AF FORM 103, BASE CIVIL
ENGINEERING WORK CLEARANCE REQUEST PRIOR TO EXCAVATING. CONTRACTOR WILL NOTIFY
GOVERNMENT SABER REPRESENTATIVE 72 HOURS IN ADVANCE TO SCHEDULE AN ON-SITE
CLEARANCE
9 TO PREVENT DAMAGE, ALL DIGGING AROUND UTILITIES SHALL BE DONE BY HAND IF REQUIRED
10. ALL REQUIRED UTILITY OUTAGES SHALL BE APPROVED THROUGH GOVERNMENT SABER
REPRESENTATIVE, WITH NO LESS THAN 14 DAYS ADVANCED NOTICE.
11. ALL WORKERS ON SITE WILL BE REQUIRED TO BE UP TO DATE REGARDING LIFE SAFETY TRAINING, OSHA CERTIFICATION, ALONG WITH ANYTHING IN RELATION TO THE PROJECT REQUIREMENTS
12. SITE CONDITIONS ARE TO MEET OR EXCEED THE SAFETY REQUIREMENTS SET FORTH BY GCS AND
OSHA REGULATIONS
13. ALL WORKERS ON SITE MUST ALWAYS HAVE PROPER IDENTIFICATION VISIBLE
14. ALL WORKERS ARE REQUIRED TO ABIDE BY STRICT SAFETY PROTOCOL REGARDING SAFETY HARD
HATS, SAFETY GLASSES, PROPER WORK ATTIRE, SOS SHEETS, ETC
15. MAKE ALL SITE INVESTIGATIONS, SURVEYS, ANALYSIS, SAMPLING, TESTING AND VERIFICATION OF
EXISTING FIELD CONDITIONS AS REQUIRED TO ACCOMPLISH AND COMPLETE A 100% DESIGN FOR
CONSTRUCTION.
16. PROVIDE DESIGN FOR STEEL STRUCTURAL SUPPORT OF THE MECH AND ELECTRIC COMPONENTS
AND PROVIDE STRUCTURAL ENGINEER PE STAMPED DRAWINGS.
17. MAINTAIN PROJECT AREA IN A CLEAN, ORDERLY, AND SAFE CONDITION AT ALL TIMES. REMOVE
DEBRIS AND CONSTRUCTION WASTE DAILY AND AT THE END OF EACH WORK DAY. PROVIDE
CONTINUOUS HOUSEKEEPING TO PREVENT ACCUMULATION OF DEBRIS THROUGHOUT
CONSTRUCTION. PROVIDE TEMPORARY GYPSUM BOARD PARTITIONS AND/OR PLASTIC SHEETING
AS REQUIRED TO SECURE THE WORK AREA, PREVENT UNAUTHORIZED ENTRY, AND CONTAIN DUST
AND DEBRIS WITHIN THE CONSTRUCTION AREA
© 1985--2026 LJB Inc. This drawing contains information that is proprietary to and property of LJB Inc. and shall be kept confidential. No publication or distribution of this drawing may be made without the express written coosent of LJB Inc. except for the limited purposes set forth in the contract between LJB Inc. and party for whom this drawing was made .
,JID
Engineering
Building Partnerships
GANA-A'YOO
�r ;;, a
CONSTRUCTION SERVICES
A GANA•A'<OO fAMILS (OMSANV
0 >-� z w �w >- o, � 0� 0 oz m ow
� o, � m
0 wz � G m wmw� Or fo ota co w � w w
LL "0 w z
" w s a I Q
J w w ro "' N
Q ro w
C) w 0 � J " a, u
X I a.
<fl z ww w z a.
ww
I 0 0 z G >-z Oo � wo w a�w �n zw a. .
5> m�z< � -wz J 0 w >- � < N w 0� 0� � J-
� a. g �
I Jo � 0 �w z 0 >- Gw WO
5z .. �I w> WW �z w� J� oz a. < �· ro a.
C)
C) WM
z>M "' f- � w " w I
I z�o (3 0:: CCl z,: � w - "' J � a.
2� u
I ro ro
0 � J, N
> a 0 >- ww..- - - I g;i:_N I w
"<t O • :
:il:�O w a, z >
0 0 >- 0 � u w� "'a.
SHEET
IDENTIFICATION
G001
SHEET 1 OF 43
2026-04-24 IFC DESIGN SUBMISSION
FOR INFORMATION ONLY
UFC 1-200-01 - GENERAL BUILDING REQUIREMENTS, 01
SEPTEMBER 2022, CHANGE 4, DECEMBER 2024
UFC 3-600-01 - FIRE PROTECTION ENGINEERING FOR
FACILITIES, 8 AUG 2016, CHANGE 6 MAY 2021
UFC 4-021-01 - DESIGN AND O&M; MASS NOTIFICATION
SYSTEMS, 9 APR 2008, CHANGE 1, JANUARY 2010
INTERNATIONAL BUILDING CODE (IBC), 2024 ED.
NFPA 1 FIRE CODE, 2024 ED.
NFPA 101, THE LIFE SAFETY CODE, 2024 ED.
NFPA 13 - STANDARD FOR THE INSTALLATION OF SPRINKLER
SYSTEMS, 2025 ED.
NFPA 70 - NATIONAL ELECTRICAL CODE (NEC), 2026 ED.
NFPA 72 - NATIONAL FIRE ALARM AND SIGNALING CODE, 2025
ED.
NFPA 90A - STANDARD FOR THE INSTALLATION OF AIR
CONDITIONING AND VENTILATING SYSTEMS, 2024 ED.
NFPA 96 - STANDRAD FOR VENTILATION CONTROL AND FIRE
PROTECTION OF COMMERCIAL COOKING OPERATIONS, 2024
ED.
NFPA 241, STANDARD FOR SAFEGUARDING CONSTRUCTION,
ALTERATION, AND DEMOLITION OPERATIONS, 2024 ED.
ECB 2018-17 - ENGINEERING AND CONSTRUCTION BULLETIN
(MASS NOTIFICATION)
MODIFICATIONS TO THE
INTERNATIONAL BUILDING
CODE
CHAPTER 1 - ADMINISTRATION USE SECTIONS 101, 102, 106, 109, AND 112 OF IBC
CHAPTER 1 (UFC 1-200-01 SECTION 2-1)
CHAPTER 3 - USE AND
OCCUPANCY
UFC 1-200-01 SECTION 2-3, USE CHAPTER 3 OF IBC AND UFC
3-600-01
IBC OCCUPANCY: BUSINESS (B) - MIXED USE
ASSEMBLY (A3) - SEPARATED
UFC 3-600-01 SECTION 2-1.1 REQUIRES CLASSIFICATION UNDER
NFPA 101
NFPA 101 (MULTIPLE MIXED): BUSINESS
ASSEMBLY - ORDINARY HAZARD
CHAPTER 4 - SPECIAL DETAILED
REQUIREMENTS
UFC 1-200-01 SECTION 2-4, USE UFC 3-600-01 IN LIEU OF IBC
CHAPTER 4.
CHAPTER 5 - GENERAL
BUILDING HEIGHT & AREA
THE EXISTING RENOVATION AREA APPEARS TO MOST CLOSELY
RESEMBLY TYPE II-B CONSTRUCTION.
INTERIOR RENOVATION OF AN EXISTING BUILDING.
NO INCREASE IN BUILDING HEIGHT, NUMBER OF STORIES, OR
GROSS BUILDING AREA.
CHAPTER 6 - TYPES OF
CONSTRUCTION
UFC 1-200-01 SECTION 2.6, USE IBC CHAPTER 5 AND
UFC 3-600-01.
CONSTRUCTION TYPE: IIB
CHAPTER 7 - FIRE RESISTANT
CONSTRUCTION
UFC 1-200-01, SECTION 2-7 USE CHAPTER 7 AND UFC 3-600-01.
UFC 3-600-01, SECTION 2-1.2 STRUCTURAL ELEMENTS ARE
SUBJECT TO RATINGS REQUIRED BY IBC. NON BEARING
PARTITIONS ARE SUBJECT TO NFPA 101 REQUIREMENTS.
CONCLUSION: IBC RATINGS ARE APPLIED FOR STRUCTURAL
ELEMENTS AND ELEMENTS RELATED TO BUILDING HEIGHT AND
AREA (E.G. OCCUPANCY SEPARATION UNDER IBC). NFPA 101
RATINGS ARE APPLIED FOR INTERIOR FIRE SEPARATION FOR LIFE
SAFETY PURPOSES.
IBC RATINGS
ELEMENT IBC REQUIREMENT
PRIMARY STRUCTURAL FRAME 0 HOURS
BEARING WALLS 0 HOURS
ROOF CONSTRUCTION 0 HOURS
NFPA 101 RATINGS
AREA HOURLY RATING
STORAGE (>100 SF) SMOKE PARTITION
ASSEMBLY* 2 HOUR FIRE WALL
FIRE BARRIER (FB) - NFPA 101 SECTION 8.3
SMOKE PARTITION - NFPA 101 SECTION 8.4
VERTICAL OPENINGS - NFPA 101 SECTION 8.6
*EXISTING DINING AREA HAS A 2 HOUR EXISTING FIRE WALL THAT
WILL BE MAINTAINED DURING CONSTRUCTION.
OPENING PROTECTION
OPENINGS IN FIRE BARRIERS WILL BE PROTECTED AS DESCRIBED
IN NFPA 101 8.3.4.
OPENINGS IN SMOKE PARTITIONS WILL BE PROTECTED AS
DESCRIBED IN NFPA 101 8.4.3
FIRE DOORS: PROVIDE SELF OR AUTOMATIC CLOSING FIRE
DOORS WITH POSITIVE LATCHING HARDWARE (NFPA 101 8.3.3.1).
SMOKE PARTITION DOORS: PROVIDE SELF OR AUTOMATIC
CLOSING FIRE DOORS WITH POSITIVE LATCHING HARDWARE. NO
FIRE RATING REQUIRED. DOORS MUST NOT HAVE LOUVERS.
DOORS WILL BE RATED AS FOLLOWS:
2 HOUR FIRE BARRIERS - 90 MINUTE FIRE DOORS
1 HOUR FIRE BARRIERS - 45 MINUTE FIRE DOORS
SMOKE PARTITION - NO FIRE RATING REQUIRED
CHAPTER 8 - INTERIOR
FINISHES
UFC 1-200-01 SECTION 2-8, USE UFC 3-600-01 IN LIEU OF
CHAPTER 8. UFC 3-600-01 SECTION 2-6, REQUIRES
COMPLIANCE WITH NFPA 101.
NFPA 101 INTERIOR FINISH REQUIREMENTS
EXIT ENCLOSURES CLASS A OR CLASS B
LOBBIES AND CORRIDORS CLASS A OR B
OTHER CLASS A, B, OR C
FLOOR FINISH SHALL BE CLASS II IN EXIT ENCLOSURES AND
EXIT ACCESS CORRIDORS (AND SPACES NOT SEPARATED
FROM EXIT ACCESS CORRIDORS).
CHAPTER 9 - FIRE
PROTECTION SYSTEMS
UFC 1-200-01 SECTION 2-9, USE UFC 3-600-01 IN LIEU OF IBC
CHAPTER 9
FIRE SPRINKLER SYSTEMS: EXISTING BUILDING IS FULLY
SPRINKLERED.
FIRE ALARM AND MASS NOTIFICATION SYSTEMS. EXISTING
FA/MNS PROVIDED THROUGHOUT.
FIRE EXTINGUISHERS: REQUIRED PER NFPA 10. CLASS K
EXTINGUISHER WILL BE PROVIDED IN COMMERCIAL
COOKING AREAS.
CHAPTER 10 - MEANS
OF EGRESS
UFC 1-200-01 SECTION 2-10, IN LIEU OF IBC CHAPTER 10 USE NFPA 101
2024 EDITION AS DIRECTED BY UFC 3-600-01
TRAVEL DISTANCES
EXIT COMMON DEAD END
BUSINESS 300 FT 100 FT 50 FT
ASSEMBLY (<50 PERSONS) 250 FT 75 FT 20 FT
(FULLY SPRINKLERED)
EGRESS WIDTH PER PERSON
LEVEL COMPONENTS: .20 INCHES / OCCUPANT
RAMPS AND STAIRS: .30 INCHES / OCCUPANT
REMOTENESS OF MEANS OF EGRESS
WHERE TWO OR MORE EXITS ARE REQUIRED FROM A ROOM OR
SPACE, AT LEAST TWO OF THE EXITS WILL BE PLACED AT A DISTANCE
APART OF NOT LESS THAN 1/3 THE LENGTH OF THE MAXIMUM
OVERALL DIAGONAL DIMENSION OF THE AREA SERVED.
THE RENOVATION DOES NOT REDUCE THE NUMBER OR CAPACITY OF
REQUIRED EXITS. THERE IS NO INCREASE IN THE EXISTING
OCCUPANT LOAD OR REDUCTION IN THE NUMBER OR CAPACITY OF
THE EXITS AND EXIT ACCESS.
CODES AND STANDARDS
REFERENCED HEREIN
TWO UFC DOCUMENTS DESCRIBE HOW THE BUILDING AND LIFE
SAFETY CODES ARE TO BE APPLIED:
UFC 1-200-01, GENERAL BUILDING REQUIREMENTS , 01 SEPTEMBER
2022, CHANGE 4, 17 DECEMBER 2024
UFC 3-600-01, FIRE PROTECTION ENGINEERING FOR FACILITIES , 8
AUG 2016, CHANGE 6, MAY 2021
THE REQUIREMENTS ON THIS SHEET ARE BASED ON THESE TWO
DOCUMENTS. WHERE THE TWO UFC DOCUMENTS CONFLICT, THE
STRICTEST REQUIREMENT IS APPLIED. CHAPTERS LISTED (ON THE
LEFT SIDE) ARE BASED ON THE IBC CHAPTER.
BUILDING CODE VERSION INTERNATIONAL BUILDING CODE, 2024 EDITION
THIS FACILITY CONTAINS ORDINARY HAZARD CONTENTS (NFPA
101:6:2). THE CONTENTS WILL BURN WITH MODERATE RAPIDITY AND
WILL GIVE OFF SIGNIFICANT AMOUNTS OF SMOKE. THE CONTENTS
WILL NOT BURN WITH EXTREME RAPIDITY OR CREATE EXPLOSIONS.
THE CAFE CONTAINS ORDINARY HAZARD CONTENTS CONSITENT
WITH THE ORIGINAL DESIGN.
HAZARD OF CONTENTS
(NFPA 101)
CHAPTER 7 - FIRE RESISTANT
CONSTRUCTION (CONTINUED)
PENETRATION PROTECTION - DAMPERS
FIRE DAMPERS WILL BE PROVIDED AT ALL RATED SHAFT
PENETRATIONS (NFPA 90A:5.3.4.6) EXCEPT WHERE
PERMITTED OTHERWISE UNDER NFPA 90A. FIRE DAMPERS
WILL BE PROVIDED WHERE AIR DUCTS PENETRATE OR
TERMINATE AT OPENINGS IN WALLS OR PARTITIONS RATED 2
HOURS OR MORE. FIRE DAMPERS WILL BE PROVIDED IN ALL
AIR TRANSFER OPENINGS IN PARTITIONS THAT ARE
REQUIRED TO HAVE A FIRE RESISTANCE RATING.
PROVIDE SMOKE DAMPERS IN AIR TRANSFER OPENINGS IN
SMOKE PARTITIONS (NFPA 101:8.4.6.2). SMOKE DAMPERS ARE
NOT REQUIRED AT DUCTED PENETRATIONS OR
TERMINATIONS IN SMOKE PARTITIONS.
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
TH
C
IV
IL
E
N G
IN
EE
R
IN
G G
R O
U P
W
PA
FB
O
H
W R
IG
H
T
AV
E.
LJ
B
PR
O
JE
C T
N O
FI
LE
N
AM
E:
D W
N B
Y:
C
KD
B
Y:
D
ES
IG
N
ED
B
Y:
D
2 3
C
4 5
A
B
D
AT
E:
SI
ZE
C O
O R
D
IN
AT
O
R
PL
O
T
SC
AL
E:
PL
O
T D
AT
E:
SHEET
IDENTIFICATION
SHEET OF
W P A
FB
W
R
IG
H T-
PA
TT
ER
SO
N A
IR
F
O R
C E
BA
SE
EN
G
IN
EE
R
IN
G C
H
IE
F:
D
ES
IG
N C
H
IE
F:
BL
D
G
: 1
A N
SI
_D
A S
N O
TE
D
JO
B
T.
O
PR
O
JE
C T
N O
ZH
TV
5-
© 1985-2026 LJB Inc. This drawing contains information that is proprietary to and property of LJB Inc. and shall be kept confidential. No publication or distribution of this drawing may be made without the express written consent of LJB Inc. except for the limited purposes set forth in the contract between LJB Inc. and party for whom this drawing was made.
2026-04-24 IFC DESIGN SUBMISSION
/2
4/
N
AM
E
N
AM
E N
AM
E
4 43
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
Au to de sk
D oc s:
//2
R en ov at e
Sp hi nx C af e/
9A
.0 0_
Sp hi nx C af e_
F2 4.
rv t
4/
/2
:3 3:
A
M
F-100
D es ig ne r
C he ck er
Au th or
C O
D E
SU
M
M
AR
Y
9A .0
SP
H
IN
X
C
AF
E
IN
TE
R
IO
R
R
EM
O D
EL
4/24/2026
FOR INFORMATION AND
COORDINATION
FOR INFORMATION