This is a Questions and Answers document in response to inquiries regarding NAF Combined Synopsis/Solicitation FA8601-26-Q-0052 for Sphinx Cafe Foodservice Equipment, issued by the Department of the Air Force, Headquarters 88th Air Base Wing (AFMC) at Wright-Patterson Air Force Base, Ohio, dated 26 May 2026.

The procurement involves the procurement and installation of commercial off-the-shelf (COTS) kitchen equipment identified in café drawings. A CMMC Level 1 status (not Level 2) has been determined as sufficient for this effort. The solicitation is a nonappropriated fund (NAF) effort, meaning federal acquisition regulation (FAR) rules do not apply, and there are no small business set-aside requirements. Contractors must include all items shown on the A701-702 Equipment Schedule (Items #1-75), excluding those marked as "SABER Furnished" (items #44, 47, 48, 52, 56, 57, 57.1, 57.2, 73, and 78), which are provided by a separate contract. Contractor responsibilities include labor to deliver, unpack, and set-in-place (install except for utility hookups) items marked "Gov Install," while excluding utility hookup labor for items marked "SABER Install," as the general contractor on the Sphinx Cafe renovation contract will handle those connections. Quotes must be received no later than 04 June 2026 at 2:00 PM EDT, and all work must be completed by 01 September 2026.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

HEADQUARTERS 88TH AIR BASE WING (AFMC)

WRIGHT-PATTERSON AIR FORCE BASE OHIO

Strength Through Support

26 MAY 2026

SUBJECT: Response to Inquiries regarding NAF Combined Synopsis/Solicitation FA8601-26-Q-0052 - Sphinx Cafe Foodservice Equipment

QUESTIONS AND ANSWERS

1. QUESTION: Based on our review, the scope appears limited to the procurement and installation of commercial off-the-shelf (COTS) kitchen equipment identified in the café drawings, with items being sourced directly from the manufacturers. As such, we respectfully ask whether the CMMC Level 2 requirement may be reconsidered or deemed not applicable for this effort

ANSWER: The requirement owner has reviewed and determined a CMMC Level 1 status is sufficient for this procurement, The solicitation has been amended to reflect this change/update.

2. QUESTION: Is June 4th the drop-dead date for responses?

ANSWER: Yes, quotes must be received not later than 04 June 2026 at 2:00 PM EDT.

3. QUESTION: Is September 1st a drop-dead installation date?

ANSWER: Yes, work must be completed not later than 01 September 2026.

4. QUESTION: Who is responsible for installing the saber contractor mill work counters? Would that fall on our team?

ANSWER: Your team will not be responsible for installing the saber contractor mill work counters.

5. QUESTION: I would just like to confirm that this is not a small business set aside project.

ANSWER: There is no requirement for set-asides. This is a nonappropriated fund (NAF) effort, which means federal acquisition regulation (FAR) rules do not apply.

6. QUESTION: I would like to confirm we are to include all the stainless steel and millwork items per the foodservice plan and schedule.

ANSWER: Please refer to the equipment schedule included as part of the SOW. This identifies equipment required and installation responsibility. Specifically, please include all items shown on A701-702 Equipment Schedule Items #1-75, with the exception ‘SABER Furnished’ checked items: #’s 44, 47, 48, 52, 56, 57, 57.1, 57.2, 73, and 78, which are being provided by a separate contract.

- The 4th Column on the Equipment Schedule shows ‘Gov Install’ – Please include all labor to deliver, unpack, and set-in-place (install except for utility hookups) these checked items.

- Please exclude labor to hook-up the utilities for the following ‘SABER Install’ checked items, as these will be connected to utilities by the GC on the Sphinx Cafe renovation contract: #’s 3, 3.1, 3.2, 4, 4.1, 4.2, 8, 8.1, 8.3, 9, 9.2, 11, 12, 12.1, 12.2, 12.3, 16, 17, 17.1, 18, 24, 25, 25.1, 27.1, 34, 43, 44, 47, 48, 48.1, 48.2, 48.3, 48.4, 48.5, 52, 56, 57, 57.1, 57.2, 60, 61, 62, 73, 78.