This Statement of Work (SOW) details the requirements for retrofitting an Aerobic Treatment Unit (ATU) into an existing sewer system and abandoning a failing septic tank at a property located at 1730 Diamond Springs Road in Highland, Kansas. The project involves installing a 1,250-gallon, two-compartment concrete ATU tank with 24-inch access risers, an effluent filter, aerator, linear septic air pump, outdoor aerobic alarm and control panel, and vented air pump housing. Additionally, the contractor must replace approximately 30 feet of existing sewer pipe, install a 2-way cleanout within 5 feet of the house foundation, and properly abandon the existing septic tank.
The work must be performed under the direction of licensed personnel, with a minimum one-year warranty on materials and labor. The contractor is required to contact the Engineering Technician three business days before starting work, leave all work exposed for inspection, and restore the site to its original condition. The installation includes specific technical requirements for pipe slope, cleanout placement, tank bedding, and tank components, with detailed specifications for electrical connections, air pump characteristics, and testing procedures. The project is part of a Request for Quotes (RFQ) 246-25-Q-0074, which is a 100% Indian Owned set-aside under NAICS code 237110, with a performance period of 60 calendar days from the Notice to Proceed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ks4.txt | TXT text file | |
| SR604_OEH-8P_W Keller-Tank Details.pdf | ||
| IHS IEE Representation Form_Jan 2022_508 Compliant.pdf | ||
| SR604_Bid Sheet_W Keller.pdf | ||
| SR604_OEH-8P_W Keller-OEH-8P.pdf | ||
| RFQ246-25-Q-0074-SF18 and Clauses.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Retrofit Aerobic Treatment Unit into Existing Sewer System and Abandon Failing Septic Tank Page 1 of 3
. April 2025
STATEMENT OF WORK
1.01 SUMMARY OF WORK TO BE DONE BY CONTRACTOR
A. Furnish and install an aerobic treatment unit and sewer line as shown on the drawings.
1. Install of an Aerobic Treatment Unit (ATU), including making all electrical connections.
a. 1,250-gallon, concrete tank,
b. 24” access risers and lids, and effluent filter
c. Aerator.
d. Linear septic air pump.
e. Outdoor aerobic alarm and control panel.
f. Vented air pump housing.
2. Replace approximately 30’ of existing sewer pipe with a 2-way cleanout within 5’ of the foundation of the house.
3. Abandon existing septic tank.
1.02 SITE LOCATION
Wesley Keller 1730 Diamond Springs Road Highland, Kansas 66035
1.03 CONSTRUCTION SCHEDULE
A. Contact the Engineering Technician three business days before the start of any work.
B. Failure to perform work on the date scheduled will require rescheduling the work 24-hours in advance.
C. Leave all work exposed until it is inspected and approved. Work not inspected before it is covered will be re-exposed at the Contractor’s expense.
1. Jim Shane, Engineering Technician, 785-224-7626 Donald.shane@ihs.gov
1.04 QUALITY ASSURANCE
A. Perform work under the direction of personnel licensed in the state including, but not limited to Plumbing.
1.05 WARRANTY
A. Provide a minimum one-year warranty for all materials and labor, covering defects in the materials or workmanship.
1.06 MATERIALS
A. 4” Schedule 40 PVC pipe.
B. 2-way cleanout.
C. 1,250 gallon, 2-compartment ATU tank with 24-inch access risers and lids
Retrofit Aerobic Treatment Unit into Existing Sewer System and Abandon Failing Septic Tank Page 2 of 3
D. Effluent filter rated for 800 gpd flow rate, maximum filter opening of 1/16 inch.
Provide lifting handle that extends with in 12” from the bottom of access lid.
E. Aerator
1. 1/4hp, 115VAC, 60Hz, 3.5Amps
F. Linear septic air pump
1. Capable of a flow rate of 600 gallons per day.
2. 4-5 CFM.
3. 120VAC, 60Hz, 1.6 amps.
4. 36 dBA at 1 meter distance.
G. Outdoor aerobic alarm and control panel.
1. 120VAC, 6amp push button mini breaker.
2. 1/8” barbed fitting.
3. 4” x 4” exterior alarm.
4. Run/test/mute toggle switch.
H. Vented air pump housing.
1. Inside dimensions of 18” L x 11.5” W x 12” H
2. Platform dimensions of 22” L x 17.5” W x 13” H.
1.07 INSTALLATION
A. Install sewer pipe
1. Minimum slope for sewer service lines is 1/8-inch per foot (1%) and maximum slope ½-inch per foot (4%).
2. Ninety-degree bends are not allowed between the house and the tank.
B. One-way Cleanouts: Install one-way cleanouts at a spacing not to exceed 100 feet.
C. Two-way Cleanouts: Install two-way cleanouts at a spacing not to exceed 200 feet.
1. Install risers, and cleanouts as show on the drawings.
2. Install a 2-way cleanout no more than 5ft from foundation of home.
3. Install riser pipe 90 degrees from horizontal.
4. Bed the bottom of riser, wye, and 45o bend in crushed rock or sand.
D. Remove rock from trench providing 4” of clearance for pipe.
E. In rock bottom and side trenches, provide imported bedding for 4” clearance.
F. Install 1,250-gallon, two compartment, aerobic treatment tank as shown on the drawings
1. Bed tank with 4” of 1 ½ inch gravel.
2. Install 24” tank access risers with lids over each compartment.
3. Install effluent filter in the outlet sanitary Tee of tank.
4. Incorporate aeration components to tank. Including electrical supply for aeration system.
G. Existing septic tank abandonment.
1. Pump tank prior to abandonment. Dispose of contents in accordance with state and federal requirements.
2. Break bottom and or sides so that water cannot be contained.
3. Crush lid inside of tank avoiding large voids.
4. Backfill interior of the tank with suitable, compactible soil material.
H. Finish grade excavated area.
I. Fertilize, seed and mulch all disturbed areas from installation and abandonment activities.
1.08 TESTING
A. Verify that ATU operates.
1. Add water to tank to verify that the ATU operates correctly.
Retrofit Aerobic Treatment Unit into Existing Sewer System and Abandon Failing Septic Tank Page 3 of 3
2. Test alarm on control panel.
B. Visually inspect each joint for leakage.
C. Repair all leaks before backfilling.
1.09 SITE RESTORATION
A. Restore site as close to original condition.
Creator’s Signature: ___________________
| STATEMENT OF WORK |
| A. PVC pipe and fittings SDR 35 or4” Schedule 40 as specified in the bid schedulePVC pipe. |
File details come from the government source that posted it. Updated .