SOW BKS02 Furnace Replacement Requirements 2024 12 04.pdf
PDF 428 KB Posted
- Attached to
- Camp James A. Garfield BKS02 Furnace Replacement
- Solicitation number
- SRC0000026570
- Issued by
- Trumbull County, Ohio
About this file
This is a Scope of Work document from the Ohio Army National Guard's Directorate of Installation Maintenance and Repairs (DIMR) at Camp James A. Garfield seeking bids for replacing two aged 120,000 BTU furnaces in barracks building BKS02. The project requires installation of two new two-stage 96% efficient furnaces with the same heating and cooling capacity as the existing Luxaire model LM9M120D20MP11A units, to be installed in the exact same location. The furnaces must integrate with existing heat pump AC units and the Johnson Controls system. A mandatory site visit is scheduled for December 10 at 10am with Brett Oxley, Facility Maintenance Supervisor. All work will take place at 1438 SR 534 SW, Newton Falls Ohio 44444 in Trumbull County.
All quotes must be submitted on company letterhead with signed Bidder's Certification Form and compliance verification documents. The contractor is responsible for all labor, equipment, and materials needed to complete the work. The new units must come with full manufacturer warranty and documentation, and all installations must meet State and Federal boiler safety regulations. The contractor must maintain a clean work site and restore the area to normal operating conditions upon completion. No specific pricing terms, set-asides, or funding information are provided in the document.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF OHIO
The Adjutants Generals Department
2825 W. DUBLING-GRANVILLE RD
Columbus, Ohio 43235
Division 1 – General
The Ohio Army National Guard, Directorate of Installation Maintenance and Repairs, (DIMR) at Camp James A.
Garfield is seeking bids on the following furnace replacement. We are seeking bids for replacing two aged 120,000 BTU furnaces on the second floor of one of our barracks buildings BKS02.
SW – 1 Scope
Furnish all labor, equipment and materials to perform all work in strict accordance with the statement of Work and Specifications, as designated by the CJAGJMTC Facility Engineer Department. All Quotes must be on company letterhead and signed to be accepted by the state. Quotes must be accompanied by signed Bidder’s Certification Form and the compliance verification documents list in the Request for Quotes attachment.
SW – 2 Site of Work
Site 01. The site of the proposed work is in building 39430-BKS02, on the CJAGJMTC grounds located at, 1438 SR 534 SW, Newton Falls Ohio 44444. Located in Trumbull County. Replace two stage 96% efficient furnaces with at a minimum two more 120K BTU 2 stage 96% efficient furnaces.
SW – 3 Work to be Accomplished, Site 011
The work to be accomplished includes, but is not limited to the following items:
1. R&R Installation of two, 120k BTU, two stage furnaces. The current furnaces are Model # LM9M120D20MP11A Luxaire units. Their replacement must be sized to provide the same heating and cooling capacity of the replaced units. Replacement units shall be installed in the exact same location as the units being replaced. Existing unit spec sheet is pictured at the bottom of the document
2. Furnaces must be two stage and at least 96% efficient. The furnaces are connected to two heat pump, AC units located outside of the building.
3. The replacement furnaces will be wired back into the Johnson Controls system and made to work vis the programming in place.
4. Bidders shall state exactly what make and model of unit they propose to install. Unit will come with full manufacturer warranty and documentation for operators’ usage. Bidders are responsible for attending the scheduled site visit with this facility and taking all measurements as needed to properly bid this replacement tasking.
5. Furnished product will be inspected by CJAGJMTC Engineering staff. A written warranty (if applicable) must be provided as precondition to payment. All installations shall meet State and Federal boiler safety regulations, to include all safety codes, regarding installation, grounding, disconnects and remote shutoffs. Warranty of installed pumps is required in writing.
SW – 4 Site Visitations and Point of Contact
A site visit has been scheduled with Brett Oxley, Facility Maintenance Supervisor, on December 10 at 10am. Visits shall be arranged through CJAGJMTC, Facility Engineering Department, or representative, Building 1068, 8451 SR5 Ravenna Ohio 44266, Monday through Friday, between 7:00 a.m. and 3:00 p.m. at 614-336-6137.
SW – 5 Point of Contact
Questions concerning the specification should be directed to Mr. Oxley at 614-336-6137, Monday through Friday, between 7:00 a.m. and 3:00 p.m. All bid quotes must be submitted to Mr. Brett Oxley at;
Mr. Brett R. Oxley Camp James A. Garfield 8451 Sr 5 Ravenna Ohio 44266.
Contact phone number 614-336-6137
SW – 6 PERFORMANCES
01. Submittal of a bid by a Contractor shall be accepted as prime facie evidence that the Contractor has examined the Specifications and the Job Site, as necessary and has satisfied himself as to the nature and location of the work and all matters which can in any way affect the work or cost thereof, under the contract. Any failure of the Contractor to acquaint himself with all available information, including physical survey of the proposed work, will not relieve him from successfully performing all work to be done for a complete and successful job.
02. The above brief outline of principle features of work in no way limits the responsibility of the contractor to perform all work and furnish all labor and materials, required by the Specifications referred herein. Any omission from the Specification or misdescriptions thereof shall not relieve the Contractor from performing all work required, and furnishing the materials required to completely fulfill the intent of the Contract.
03. The Contractor shall confine operations at the site of area permitted by the Project Officer. He shall not unreasonably encumber the site with materials or equipment and shall assume full responsibility for the protection and safekeeping of products that interfere with the operations of the facility and, if necessary, obtain and pay for additional storage areas.
04. At the completion of each working day, the Contractor shall clean and clear away any excess supplies and debris from the site.
05. Upon completion and before final acceptance of the work, the Contractor is responsible for the removal of all rubbish generated by the project. All property shall be restored to safe normal operating conditions.
The area shall be in a neat, clean, presentable condition satisfactory to the Project Officer.
END OF SECTION