This document is Addendum No. 5 to Solicitation K00R2600137 from the State of Maryland Department of Natural Resources (DNR). The solicitation requests sand/steel, grit/wet blasting, modification, repair, and restoration services for three steel spud utility deck barges. Key details include:
The solicitation provides responses to questions received, including information about the barge weights, drafts, work scope, delivery location, project duration, and welding certifications. It confirms that containment with dry blast is acceptable, that DNR is responsible for inspections, and that alternate paint manufacturers may be approved. The solicitation is for all three barges combined, with the "Chesapeake" barge as the first project to serve as a benchmark. The total project duration is not to exceed 365 days.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
eMaryland Marketplace
SOLICITATION K00R2600137
ADDENDUM NO. 5
December 22, 2022
Responses to Questions Received
1. What is the weight of each barge?
RESPONSE: After a thorough research of all documents archived, which included the original
U.S. Coast Guard Form CG-1261 of the Builder’s Certification, dated March 10, 1999 and the original American Bureau of Shipping Certification of Classification, dated March 31, 1999, which are attached in color scanned document form for review, as example the barge “Chesapeake”, a weight for each barge is not officially known.
2. What is the draft on each barge?
RESPONSE: 5-foot draft
3. (a) Is all work to be included specific to the reports?
RESPONSE: Yes. Addendums have been issued for this solicitation. Refer to eMMA Public Solicitation #K00R2600137 for the updated postings.
(b) If any other conditions are found after work starts will they be handled as a change order?
RESPONSE: DNR will determine on case-by-case scenario.
4. Is Stevensville Md. OK for delivery for the barges by DNR?
RESPONSE: Yes.
5. (a) What is the duration of the Project?
RESPONSE: The duration, in total, to complete all three (3) barges is not to exceed 365 days.
(b) Is there a duration for the completion of each barge?
RESPONSE: It is imperative that the barge “Chesapeake” be the first project of this award, which will serve as a benchmark to some extent for each barge’s project length. Weather and temperature will need to sync to the best of the contractor’s schedule for steel preparation and painting/coatings per the manufacture’s specifications, quality control/quality assurance.
6. Are we bidding on all 3 barges or each one individually?
RESPONSE: The bidding of this “Public Solicitation” is for all three (3) barges combined, however bidder should refer to the Bid Form as to how the project will be awarded.
7. Is containment with dry blast acceptable?
RESPONSE: Yes.
8. Is DNR responsible for all inspections?
RESPONSE: Yes and its contracted agents.
9. What specific certifications do you need from the Welder?
RESPONSE: The top three (3) Welding Societies of North America, such as AWS and ABS, etc.
shall be recognized.
10. Are other paint manufacturers acceptable with comparable paint?
RESPONSE: Yes, but will require DNR approval as a Submittal.