This document is a Marine Surveyor's Inspection Report for a state-owned steel spud utility deck barge called the "CAMBRIDGE" located in Cambridge, Maryland. The Maryland Department of Natural Resources, Engineering and Construction Division contracted the marine surveyor to inspect the barge for structural integrity and overall condition. The report details the surveyor's findings and provides 17 specific recommendations for repairs and maintenance, including replacing damaged deck components, repairing rusted and distorted interior framing, and addressing issues with the coaming, cleats, bitts, manholes, spud wells, and exterior. The recommended repairs appear to be part of a larger state and local contract opportunity for sand/steel grit/wet blasting, modifying, repairing, and restoring up to three steel spud utility deck barges.
The contract opportunity likely requires bidders to provide pricing and a timeline for completing the recommended repairs and restoration work on the barges. There may be small business or disadvantaged business enterprise set-asides, and the work may be funded through state and/or local government sources. The contract term and any renewal options are not specified in the documentation provided.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
“CAMBRIDGE”
Capt. Phineas T. McHenry, Ltd.
Marine Surveyor
38 Oak Hill Lane
Elkton, MD 21921
443-350-6168 www.kenhenrymarinesurvey.com khenry1492@verizon.net http://www.kenhenrymarinesurvey.com/
MARINE SURVEYOR ⬧ MARINE CONSULTANT
38 OAK HILL LANE ⬧ ELKTON, MD 21921
BARGE INSPECTION
REPORT NO. 5792 JULY 8, 2022
TO WHOM IT MAY CONCERN: This is to certify that the undersigned surveyor at the request of Kelly Wright, State of Maryland, Department of Natural Resources, Engineering and
Construction Division, 580 Taylor Avenue, D-3, Annapolis, Maryland, 21401, attended the barge out of the water at DNR E/C Terminal, 301 Cemetery Avenue, Cambridge, Maryland, 21613, on the 8th day of July in the year 2022, and did an inspection of the deck, hull sides, bottom, and interior to determine overall condition and establish areas of repair. As per contract, the barge was inspected for structural integrity. All accessible compartments were inspected for structural defects. Random ultrasonic readings were taken.
DESCRIPTION
The barge is a spud barge referred to as “CAMBRIDGE.” The approximate measurements are:
LOA 80’0”, BEAM 26’0”, and DEPTH 5’0”. The barge consists of 6 compartments. The barge was manufactured by Yacht Maintenance Company, in the year 1985.
EQUIPMENT AND PROCEDURE
The inspection was conducted using a Cygnus 1 heavy duty multiple echo ultrasonic thickness gauge and Check Line Wall thickness gauge TI-CMX calibrated for steel.
test block for instrument accuracy
MEMBER ABYC
SOCIETY OF ACCREDITED MARINE SURVEYORS
ASSOCIATION OF CERTIFIED MARINE SURVEYORS
Capt. Phineas McHenry, Ltd.
Marine Surveyor July 8, 2022
INSPECTION REPORT #5792 PAGE 2 of 26
FORWARD RAKE EXTERIOR
The forward rake has a considerable amount of heavy pitting on the head log. However, the readings for the steel thickness were found to be satisfactory.
There is pitting on the rake, which is hard to see from the pictures. The upper rub rail is dinged up, but still in usable condition.
Marine Surveyor July 8, 2022
INSPECTION REPORT #5792 PAGE 3 of 26
PORT SIDE EXTERIOR
Since the hull side below the water line was not pitted, random readings were taken at 10 foot intervals. I did note some light pitting above the water line and minor crevice pitting on the hull side. However, it is not a structural issue. For the ultrasound reading, .370” was used as a base line. The readings are:
DISTANCE FROM THE BOW IN FEET READING IN INCHES
1 .370
10 .365
20 .367
30 .368
40 .371
50 Below waterline .364/Above waterline .361
60 .367
70 .365
78 .345 / .351
Marine Surveyor July 8, 2022
INSPECTION REPORT #5792 PAGE 4 of 26
PORT SIDE EXTERIOR (cont.)
The corner was noted to be dented and rusted.
Marine Surveyor July 8, 2022
INSPECTION REPORT #5792 PAGE 5 of 26
STARBOARD SIDE EXTERIOR
DISTANCE FROM THE BOW IN FEET READING IN INCHES
1 .367
10 .367 / .368
20 .369
30 .367
40 .367
50 .371
60 .372
70 .364
78 .302
Marine Surveyor July 8, 2022
INSPECTION REPORT #5792 PAGE 6 of 26
STARBOARD SIDE EXTERIOR (cont.)
The is a deep dent just above the 57 foot mark above the water line and about six inches above the lower rub rail. Also noted some dents and rusting on the rub rail.
Marine Surveyor July 8, 2022
INSPECTION REPORT #5792 PAGE 7 of 26
AFT RAKE EXTERIOR
The aft rake has very heavy pitting, mostly on the port side. A test reading was .375”. At the bow cutout, the fender supports are heavily rusted and scaling. There are rusted areas forward of the fenders.
The rake appears to be in satisfactory condition with no damages noted at the time of my inpsection.
Marine Surveyor July 8, 2022
INSPECTION REPORT #5792 PAGE 8 of 26
DECK
The deck has oil canning, and most of the paint has been worn away. On the forward end of the barge, about 10 feet aft, the deck is torn open for about 10 inches, as shown in the picture below.
I also noted very heavy pitting on the port forward corner around the forward section of the coaming, as shown in the below picture on the left.
The picture on the right show heavy paint loss with a considerable amount of surface scaling.
Since the deck was so rough, interior readings were taken to determine metal loss.
On the aft deck, from the coaming base, running approximately 4 feet aft, the deck is very heavily scaled. See pictures below.
Marine Surveyor July 8, 2022
INSPECTION REPORT #5792 PAGE 9 of 26
DECK (cont.)
Marine Surveyor July 8, 2022
INSPECTION REPORT #5792 PAGE 10 of 26
BOTTOM
The bottom was sitting on the rail way cart. However, when the barge was pushed up on the rail way, a large area of barnacle was scraped away. From what could be accessed for inspection, the bottom appears to be in good condition.
Marine Surveyor July 8, 2022
INSPECTION REPORT #5792 PAGE 11 of 26
BOTTOM (cont.)
The areas that were sitting over the water at the time of inspection was not accessible for inspection. However, there were interior ultrasound readings taken where accessible.
DECK HARDWARE
There are a total of six manholes. All covers appear to be in satisfactory condition. However, the flange on the forward #1 hatch has scaling. All other units appear to be in satisfactory condition.
Marine Surveyor July 8, 2022
INSPECTION REPORT #5792 PAGE 12 of 26
DECK HARDWARE (cont.)
The barge is equipped with six kevel cleats and six single bitts. I have noted the following:
The above picture on the left shows single bitt on the starboard side aft with a bent cross arm and damage to the underside of the cross arm and a broken weld on the top of the cross arm
The picture to the right shows bent cross arm aft on starboard side.
The above picture shows a cleat pulled on the forward end with cracked weld
Marine Surveyor July 8, 2022
INSPECTION REPORT #5792 PAGE 13 of 26
DECK HARDWARE (cont.)
The steel coaming is open in the front end of the barge. The coaming was poorly supported, and is twisted and distorted. The coaming is also rusted out on the bottom on both sides and aft section.
There are two hydraulic Pull Master winches. Cable and hydraulic hoses appear to be in satisfactory condition. Operation was not tested.
There are two I beam spuds install in the aft spud wells. The spud well flanges have heavy corrosion around the bases.
Marine Surveyor July 8, 2022
INSPECTION REPORT #5792 PAGE 14 of 26
INTERIOR
The side frames, deck frames, and bottom frames are 3” x 4”. The longitudinal trusses are 2” x 6” channel with 2” x 3” angle iron for the diagonals.
COMPARTMENT #1 FORWARD RAKE
The steel framing and bulkhead in compartment #1 are in good condition. The bottom frames and side frames, and the first 10” of the vertical stanchions are heavily rusted. The bottom has standing water. The underside of the deck and upper portion of the frames still holds its protective coating. The standing water needs to be removed, the areas of rust will need to be cleaned, and new protective coating applied to clean areas.
FORWARD RAKE BOTTOM
FORWARD RAKE DECK
Noted below are areas of deck that has readings showing 12% to 20% of less metal loss.
a) Bay #2 at deck frame #4
b) Bay #4 at deck frame #4
c) Bay #6 at deck frame #4
d) Bay #9 at deck frame #4
F 1 2 3 4 5 6 7 8 9 10 11 12 13 F
HL 0.375 0.370 0.370 0.370 0.370 0.370 0.370 0.370 0.390 0.365 0.375 0.375 0.370 HL
1 0.370 0.365 0.365 0.370 0.370 0.370 0.370 0.370 0.370 0.375 0.370 0.370 0.370 0.370 1
2 Warer Water Water Water Water Water Water Water Water Water Water Water Water Water 2
3 Warer Water Water Water Water Water Water Water Water Water Water Water Water Water 3
4 Warer Water Water Water Water Water Water Water Water Water Water Water Water Water 4
BH Warer Water Water Water Water Water Water Water Water Water Water Water Water Water BH
S
T
A
R
P
O
R
T
F 1 2 3 4 5 6 7 8 9 10 11 12 13 F
HL HL
1 0.385 0.385 0.390 0.455 0.455 0.380 0.385 0.370 0.380 0.380 0.395 0.390 0.380 0.370 1
2 0.385 2
3 0.355 3
4 0.365 4
BH 0.380 0.250 0.320 0.250 0.325 0.265 0.345 0.360 0.275 0.300 0.385 0.340 0.385 0.380 BH
P
O
R
T
S
T
A
R
Marine Surveyor July 8, 2022
INSPECTION REPORT #5792 PAGE 15 of 26
COMPARTMENT #1 FORWARD RAKE (cont.)
Marine Surveyor July 8, 2022
INSPECTION REPORT #5792 PAGE 16 of 26
COMPARTMENT #2 INTERIOR
Compartment #2 is in good condition. The bulkhead is in good condition. The steel framing and plating still holds its protective coating. Note, there are areas throughout with light rust starting to form. There was no significant metal loss detected to the steel framing. However, both longitudinal trusses are heavily distorted. Due to the distortion, ultrasound readings were taken using a 2’ x 4’ pattern. The bottom appears to be in good condition from the ultrasound readings.
The deck was ultrasound using the same 2’ x 4’ pattern. Each area of replacement is 2’ x 4’. The areas of rust will need to be cleaned, and new protective coating applied to clean areas. The two longitudinal trusses are 16’ long and are constructed from 2” x 6” channel and 2” x 3” angle iron.
It’s recommended that vertical stanchion be added to the new trusses.
COMPARTMENT # 2 BOTTOM
COMPARTMENT # 2 DECK
Noted below are areas of deck that has readings showing 20% of less metal loss. The .280” readings are 10% metal loss.
a) Bay #1 at deck frame #1 a) Bay #2 at deck frame #1 a) Bay #3 at deck frame #1
b) Bay #1 at deck frame #3 b) Bay #2 at deck frame #2 b) Bay #3 at deck frame #2
c) Bay #1 at deck frame #5
d) Bay #1 at deck frame #6
e) Bay #1 at deck frame #7
BAY #1 BAY #2 Bay #3
B 0.365 0.375 0.375 0.380 0.365 0.375 B
1 0.365 0.370 0.370 0.375 0.375 0.365 1
2 0.370 0.370 0.370 0.37 0.370 0.370 2
3 0.370 0.370 0.370 0.365 0.375 0.365 3
4 0.365 0.365 0.365 0.34 0.365 0.365 4
5 0.380 0.375 0.375 0.375 0.375 0.375 5
6 0.375 0.380 0.380 0.380 0.380 0.375 6
7 Water Water Water 0.375 0.300 0.375 7
B B
P
O
R
T
S
T
A
R
BAY #1 BAY #2 Bay #3
B 0.385 0.250 0.330 0.175 0.350 0.240 B
1 0.380 0.365 0.280 0.300 0.225 0.325 1
2 0.325 0.380 0.340 0.285 0.295 0.375 2
3 0.245 0.245 0.345 0.340 0.370 0.370 3
4 0.325 0.220 0.340 0.340 0.365 0.370 4
5 0.240 0.240 0.350 0.370 0.370 0.370 5
6 0.280 0.295 0.315 0.290 0.380 0.370 6
7 0.380 0.255 0.350 0.370 0.300 0.385 7
B B
P
O
R
T
S
T
Marine Surveyor July 8, 2022
INSPECTION REPORT #5792 PAGE 17 of 26
COMPARTMENT #2 INTERIOR (cont.)
Marine Surveyor July 8, 2022
INSPECTION REPORT #5792 PAGE 18 of 26
COMPARTMENT #3 INTERIOR
Compartment #3 is in good condition. The bulkhead is in good condition. The steel framing and plating still holds its protective coating. Note, there are areas throughout with light rust staring to form. There was no significant metal loss detected to the steel framing. However, both longitudinal trusses are heavily distorted. Due to the distortion ultrasound readings were taken using a 2’ x 4’ pattern. The bottom appears to be in good condition from the ultrasound reading.
The deck was ultrasound using the same 2’ x 4’ pattern. The deck appears to be in good condition from the ultrasound readings. The areas of rust will need to be cleaned, and new protective coating applied to clean areas. The two longitudinal trusses are 14’ long and are constructed from
2” x 6” channel and 2” x 3” angle iron. It is recommended that vertical stanchions be added to the new trusses.
COMPARTMENT # 3 BOTTOM
COMPARTMENT # 3 DECK
B 0.375 0.380 0.375 0.375 0.380 0.375 B
1 0.380 0.380 0.380 0.380 0.375 0.375 1
2 0.375 0.375 0.375 0.375 0.375 0.370 2
3 0.370 0.370 0.370 0.370 0.355 0.285 3
4 Water Water Water Water 0.370 0.370 4
5 Water Water Water Water Water Water 5
6 Water Water Water Water Water Water 6
B B
P
O
R
T
S
T
A
R
BAY #1 BAY #2 Bay #3
B 0.345 0.320 0.355 0.345 0.360 0.370 B
1 0.370 0.370 0.350 0.350 0.370 0.365 1
2 0.355 0.315 0.340 0.345 0.350 0.365 2
3 0.370 0.370 0.365 .0.350 0.365 0.370 3
4 0.370 0.390 0.355 0.355 0.315 0.380 4
5 0.370 0.315 0.300 0.325 0.295 0.360 5
6 0.365 0.320 0.335 0.330 0.380 0.360 6
B B
P
O
R
T
S
T
Marine Surveyor July 8, 2022
INSPECTION REPORT #5792 PAGE 19 of 26
COMPARTMENT #3 INTERIOR (cont.)
Marine Surveyor July 8, 2022
INSPECTION REPORT #5792 PAGE 20 of 26
COMPARTMENT #4 INTERIOR
Compartment #4 is in good condition. The bulkhead is in good condition. The steel framing and plating still holds its protective coating. Note, there are areas throughout with light rust staring to form. There was no significant metal loss detected to the steel framing. Ultrasound readings were taken every two feet in the center of each bay. The bottom appears to be in good condition from the ultrasound reading. The deck was ultrasound using the same pattern. The deck appears to be in good condition from the ultrasound readings. Note, deck frame #5 located on the starboard side truss has a weld, which is broken. The areas of rust will need to be cleaned, and new protective coating applied to clean areas. It is recommended that the vertical stanchion be added to the trusses.
COMPARTMENT #4 BOTTOM
COMPARTMENT #4 DECK
B 0.370 0.370 0.370 B
1 0.370 0.370 0.370 1
2 0.370 0.370 0.370 2
3 0.375 0.370 0.370 3
4 0.37 0.370 0.370 4
5 0.375 0.370 0.370 5
6 0.370 0.370 0.370 6
B B
P
O
R
T
S
T
A
R
BAY #1 BAY #2 Bay #3
B 0.370 0.360 0.365 B
1 0.370 0.365 0.365 1
2 0.370 0.365 0.365 2
3 0.305 0.365 0.350 3
4 0.365 0.385 0.380 4
5 0.370 0.385 0.385 5
6 0.360 0.380 0.385 6
B B
P
O
R
T
S
T
Marine Surveyor July 8, 2022
INSPECTION REPORT #5792 PAGE 21 of 26
COMPARTMENT #4 INTERIOR (cont.)
Marine Surveyor July 8, 2022
INSPECTION REPORT #5792 PAGE 22 of 26
COMPARTMENT #5 INTERIOR
Compartment #5 is in fair condition. The bottom plating and the first 12” of the steel framing are losing its protective coating and showing signs of heavy rusting. There was no significant metal loss detected to the steel framing. However, the forward bulkhead framing is showing signs of rust damage. Due to the condition of compartment #5, ultrasound readings were not needed at time of inspection. The standing water needs to be removed, the areas of rust will need to be cleaned, and new protective coating applied to clean areas. It is recommended that the vertical stanchion be added to the trusses.
Marine Surveyor July 8, 2022
INSPECTION REPORT #5792 PAGE 23 of 26
COMPARTMENT #6 AFT RAKE
Compartment #6 is in good condition. The bulkhead is in good condition. The compartment’s protective coating is in good condition, with only light rusting starting to form. There was no significant metal loss detected to the steel framing. Due to the condition of compartment #6, ultrasound readings were not needed at time of inspection. The standing water needs to be removed, the areas of light rust will need to be cleaned, and new protective coating applied to clean areas. Note, two small holes located on the starboard side head log.
Marine Surveyor July 8, 2022
INSPECTION REPORT #5792 PAGE 24 of 26
RECOMMENDATIONS
1) Replace the #2 bitt on the starboard side.
2) Repair the aft #3 bitt on the starboard side.
3) Repair the #2 kevel cleat starboard side.
4) Replace the manhole flange for the #1 manhole.
5) Replace all the heavy scaling and pitted deck around the coaming.
6) Replace the coaming and modify the vertical bracing around the coaming.
7) Replace the deck around the crack located ten feet from the front and just off center to the starboard side.
8) Repair the two small holes in the head log on the aft rake.
9) Replace the steel supports for the bow fenders at the aft rake.
10) Replace the zincs ( if not already completed)
11) Run an overlay around the spud tubes to make up for the metal loss from the corrosion.
12) Remove the water, rust and dirt from the interior. Prime and paint the rusted areas.
13) In compartment #2, replace bent longitudinal trusses. Also, replace all the bent angle iron diagonals in compartment #2.
14) Replace the bent diagonals in compartment #3.
15) In compartment #4, the weld on the deck frame #5 on the starboard side needs well repaired.
16) Clean the rust from the exterior, prime, and paint.
17) Repair the dented rub rails and corners, if so desired.
Marine Surveyor July 8, 2022
INSPECTION REPORT #5792 PAGE 25 of 26
SURVEYOR’S COMMENTS
At the time of my inspection, there was still a few zincs remaining on the hull sides; thus, we did not see a lot of pitting of the hull.
I had a few concerns on the construction, such as the coaming was not properly supported on the sides. Also, drainage seemed to be a problem with a lack of properly placed limber holes.
The other concern I had was the light construction of the interior supports. It is my professional opinion that there should be more vertical stanchions and perhaps heavier transverse trusses.
The forward manhole cover is made of aluminum. Since the hatch is install on the forward end of the barge, it may be subjected to weight, which the hatch is not designed to handle. Since the ring needs replaced and deck area will also need to be replaced, it may be a good idea to relocate the hatch.
It would appear that a lot of the problem with said barge was lack of protective coatings and water in the interior.
MARINE SURVEYOR ⬧ MARINE CONSULTANT
38 OAK HILL LANE ⬧ ELKTON, MD 21921
INSPECTION REPORT #5792 PAGE 26 of 26
DISCLAIMER
My inspection of this barge represents reasonable care and skill, but does not include inspection of those sections requiring structural removals and disassembling. My conclusion does not constitute a guarantee or warranty of the barge’s condition or of its parts, but it is an expression of my opinion only. No liability is assumed by me for errors of judgment or omission, or for subsequent structural or mechanical weakness in the barge.
This report should be considered as an entire document. No single section is meant to be used, except as part of the whole. Subsequent updating and transfer of the report is solely the right of the surveyor.
The content of this report remains the sole property of said marine surveyor and may not be used without the author of the survey written permission. The use of this report shall constitute an acceptance of the above mentioned conditions.
SURVEY SIGNED AND SUBMITTED WITHOUT PREJUDICE
Kenneth E. Henry, Sr., AMS #370
Marine Surveyor
MEMBER ABYC
SOCIETY OF ACCREDITED MARINE SURVEYORS