This is a Request for Quotation (RFQ) for a hydraulic vertical pivot gate installation project for the U.S. Army Corps of Engineers at their Maintenance Facility in Fort Peck, Montana. The contract is a firm-fixed-price construction contract with a period of performance from August 29, 2025, to March 25, 2026. The primary scope involves furnishing and installing a new hydraulic vertical pivot gate to replace an existing double swing gate, including associated labor, equipment, mobilization, and demobilization.

The solicitation uses NAICS code 238990 with a small business size standard of $19,000,000. Quotations are due by September 9, 2025, and will be evaluated on three factors: Technical Capability (gate assembly specifications), Past Performance (references from similar projects), and Price. The government will award the contract to the responsible offeror providing the best value tradeoff, with technical and past performance factors weighted more heavily than price. The contractor must be registered in the System for Award Management (SAM) and will be required to provide various insurance coverages, including workers' compensation, general liability, and automobile liability insurance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATION

(THIS IS NOT AN ORDER)

THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE

15. DATE OF QUOTATION

16. SIGNER

a. NAME (Type or print)

c. TITLE (Type or print)

b. TELEPHONE

AREA CODE

NUMBER

STANDARD FORM 18 (REV. 6-95)

Prescribed by GSA-FAR (48 CFR) 53.215-1(a)

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition not usable

8. TO:

b. COMPANYa. NAME

c. STREET ADDRESS

d. CITY e. STATE f. ZIP CODE

9. DESTINATION

a. NAME OF CONSIGNEE

b. STREET ADDRESS

c. CITY

d. STATE e. ZIP CODE

7. DELIVERY

FOB DESTINATION

OTHER

(See Schedule)

10. PLEASE FURNISH QUOTATIONS TO THE

ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS (Date)

IMPORTANT: This is a request for information and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or service. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotation must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State and local taxes)

ITEM NO.

(a)

SUPPLIES/ SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

12. DISCOUNT FOR PROMPT PAYMENT

a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS

NUMBER PERCENTAGE

NOTE: Additional provisions and representations are are not attached.

13. NAME AND ADDRESS OF QUOTER

a. NAME OF QUOTER

b. STREET ADDRESS

c. COUNTY

d. CITY e. STATE f. ZIP CODE

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

PAGE OF PAGES

1. REQUEST NO. 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT. DEF.

UNDER BDSA REG. 2

AND/OR DMS REG. 1

RATING

5a. ISSUED BY 6. DELIVER BY (Date)

5b. FOR INFORMATION CALL (NO COLLECT CALLS)

NAME TELEPHONE NUMBER

AREA CODE NUMBER

Created On:

29 Aug 2025, 07:22 AM Central Daylight Time

Section A - Solicitation/Contract Form

FP - Outside Maintenance Hydraulic Vertical Pivot Gate

W9128F25QA094

Section B - Supplies or Services & Prices or Costs

Additional Information/Notes

Item Supplies/Service Quantity Unit Unit Price Amount

Furnish and Install Hydraulic Lift Gate

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Job

Labor / Equipment

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Job

Mobilization and Demobilization

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Job

Section C - Description/Specifications/Statement of Work

Construction Specification

Outside Maintenance Hydraulic Vertical Pivot Gate

Fort Peck, MT

July 2025

1.0 General Information

1.1 Background

There is an existing fence around a portion of the Outside Maintenance Facility. This project will consist of installing a new Hydraulic Vertical Pivot Gate to replace the existing Double Swing Gate.

1.2 Scope of Work

The work shall consist of furnishing and installing a Hydraulic Pivot Gate and associated appurtenances as indicated on the drawings and in accordance with Specification Section 32 31 13, HYDRUALIC VERTICAL PIVOT GATE SYSTEM.

1.3 Period of Performance

The period of Performance shall be 180 days after Notice to Proceed.

2.0 General

2.1 Standards and Regulations

The Contractor shall perform to the standards in the contract and comply with all Local, State, and Federal Regulations during the services performed.

The Contractor is responsible for ascertaining the extent to which these regulations affect the operations resulting from this contract. The Contractor shall comply will all applicable regulations. Applicable regulations include, but are not limited to the following:

a. Engineering Manual (EM) 385-1-1 (USACE - Safety and Health Requirements Manual), dated March

2025;

https://www.publications.usace.army.mil/Portals/76/EM%20385-1-1%20_EFFECTIVE%2015March2024.pdf

b. Occupational Safety and Health Standards (29 CFR 1910).

2.1.1 Activity Hazard Analysis (AHA)

The contractor shall prepare the AHA in accordance with Paragraph 01.A.14 or 01.A.15 of the EM 385-1-1. If using Paragraph 01.A.15, prepare the AHA IAW Figure 1-2.

Note: Contractors and other individual employer's typically use Job Safety Analyses (JSAs), Job Hazard Analyses (JHAs), or similar Risk Management assessment tools. The government considers equivalent to, and acceptable substitutes for, the USACE's AHA provided the data collected is the same as that required by the AHA, commensurate with the type of services the contractor is performing.

2.1.2 Abbreviated Accident Prevention Plan (APP)

EM 385-1-1 in its entirety may be too complex for the type of work performed under these contracts; contractors may reference Appendix A, for abbreviated Accident Prevention Plan (APP). The contractor shall only need to submit items in Appendix A that are pertinent to the contract. The contractor shall use a qualified person to prepare the site-specific abbreviated Accident Prevention Plan (APP). The contractor shall prepare the APP in accordance with the format and requirements of the EM 385-1-1 and supplemented herein. The contractor shall sign and submit the APP for approval prior to the start of work onsite.

2.2 Measurement and Payment

Payment items for the work under this contract for which contract job payments will be made are listed in the PRICE SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, are included in the listed job item most closely associated with the work involved. The job price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

2.2.1 CLINS

a. CLIN 0001 Furnish and Install Gate and all associated supplies and materials

b. CLIN 0002 Labor/Equipment

c. CLIN 0003 Mobilization/Demobilization

2.2.1.1 Payment

Payment will be made for costs associated with the installation of the Hydraulic Vertical Pivot Gate in accordance with the drawing and specifications.

2.2.1.2 Unit of Measure

Unit of Measure: Job.

2.3 Location

The project is located at the US Army Corps of Engineers Maintenance Facility, 30 Judith Road, Fort Peck MT, 59223.

2.4 Staging Area

The government will provide limited space for the contractor to stage equipment and materials; contact the Contracting Officers Representative (COR) for staging needs.

2.5 Delivery, Storage, and Handling

Deliver to the job site materials in good condition and properly protected against damage to factory-finished surfaces. In general, all materials shall be delivered, stored and handled in a manner that protects them from damage, moisture, dirt, and intrusion of foreign materials. Materials delivered shall be checked against the specifications and approved samples.

2.6 Work Hours and Work Limits

The contractor is responsible for conducting business, between the hours of 0630 to1700 Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. Working outside these work hours will need written permission from the COR.

The following Federal legal holidays are observed by this installation:

Veterans Day 11 November

Columbus Day Second Monday in October

Labor Day First Monday in September

Independence Day 4 July

Juneteenth 19 June

Memorial Day Last Monday in May

President's Day Third Monday in February

Martin Luther King's Birthday Third Monday in January

New Year's Day 1 January

If a wage determination applies the number of holidays specified on it, it has priority over this requirement.

2.7 Facilities

Toilet facilities will not be available for Contractor's use. The Contractor shall provide and maintain portable toilets for use by the Contractor's staff.

Toilet(s) shall be placed at the location directed by the Contracting Officer. To prevent overturning by high winds, all portable toilets shall be anchored down.

2.8 Protection of Existing Facilities and Works

The Contractor shall be responsible for the protection of the work area from damage and upon completion of the work shall leave existing works in a condition equal to that which existed when the work started. All work, storage of materials, and construction plant shall be kept within the limits of the areas assigned. Prior to construction operations, the Contractor shall confer with the Contracting Officer's representative to determine the proximity of any possible under-ground obstructions, pipe or equipment which could be damaged as a result of construction operations. Existing utility lines that are shown on the drawings or the locations are otherwise made known to the Contractor shall be protected from damage, and if damaged, shall be repaired by the Contractor at no additional expense to the Government. In the event that the Contractor damages any existing utility lines that are not shown or the locations of which have not been made known to the Contractor, report thereof shall be made immediately to the Contracting Officer. If the Contracting Officer determines that repairs shall be made by the Contractor, such repairs will be ordered under CONTRACT CLAUSES clause entitled "Changes." The Contractor will be responsible for the protection of structures from any structural damage during the construction operations. Roads and surfaces shall be protected from damage by the work or if damaged shall be repaired with equal materials at no additional expense to the Government. At all times the work areas shall be kept in a condition conducive to safety of workmen and the public and neat in appearance. Waste or surplus materials shall not be allowed to accumulate in the construction areas.

2.8.1 Location of Underground Utilities

Contact local utility locating service a minimum of 48 hours prior to excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Holiday. Verify existing utility locations indicated on contract drawings, within area of work.

2.9 Environmental Compliance

The contractor shall be responsible for ensuring that the project is in full environmental compliance with all applicable Federal, State, Local, and Regional environmental laws and regulations.

2.10 Physical Security and Antiterrorism/OPSEC requirements

2.10.1. General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor ("Contractor") and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as "RAMs"), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures--this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.

2.10.2. Antiterrorism (AT) Level I Training: All contract personnel requiring routine access to Army installations, facilities, and controlled access areas, or requiring network access shall complete initial and annual refresher AT Level I awareness training. Online AT Level I awareness training is available at https://jko.jten.mil/ (website subject to change).

2.10.3. Physical security and access control requirements: All contract personnel requiring physical access to a federal installation or facility shall comply with the access control procedures of that location. Contract personnel requiring unescorted access to meet contract performance requirements on a DoD installation in the US shall be vetted by the installation/facility Provost Marshal/Directorate of Emergency Services/Security Office using the National Crime Information Center-Interstate Identification Index (commonly referred to as "NCIC-III") and Terrorist Screening Database (commonly referred to as "TSDB"). Contract personnel shall comply with all personal identity verification requirements specified in installation /facility policies and procedures. Contract personnel who do not meet requirements for unescorted access to USACE facilities shall coordinate escorted access with the Government representative, as needed. Contract personnel who receive keys, access cards, or lock combinations that provide access to government-owned property shall comply with key and lock control procedures of the RA.

2.10.6. Suspicious Activity Reporting training (e.g. iWATCH, CorpsWatch, or See Something, Say Something): All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.

2.10.14. Pre-screen candidates using E-Verify Program: Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements. Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR 22.102-1(i). An initial list of verified/eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.

3.0 Submittals

Prior to commencement of work, the Contractor shall submit the following documents to the COR for review and approval:

a. Abbreviated Accident Prevention Plan (APP)

b. List of who will perform work on this contract;

c. Proof of Insurance for Contractors and Subcontractors;

d. Any additional submittals required by the specifications

4.0 Contractor Quality Control (CQC)

CQC is the means by which the Contractor ensures that the construction, to include that of subcontractors and suppliers, complies with the requirements of the contract. At least three phases of control are required to be conducted by the CQC System Manager for each definable feature of the construction work as follows:

4.1 Preparatory Phase

This phase is performed prior to beginning work on each definable feature of work, after all required plans/documents/materials are approved /accepted, and after copies are at the work site. This phase includes:

a. A review of each paragraph of applicable specifications, reference codes, and standards. Make available during the preparatory inspection a copy of those sections of referenced codes and standards applicable to that portion of the work to be accomplished in the field. Maintain and make available in the field for use by Government personnel until final acceptance of the work.

b. Review of the Contract drawings.

c. Check to assure that all materials and/or equipment have been tested, submitted, and approved.

d. Review of provisions that have been made to provide required control inspection and testing.

e. Examination of the work area to assure that all required preliminary work has been completed and is in compliance with the Contract.

f. Examination of required materials, equipment, and sample work to assure that they are on hand, conform to approved shop drawings or submitted data, and are properly stored.

g. Review of the appropriate activity hazard analysis to assure safety requirements are met.

h. Discussion of procedures for controlling quality of the work including repetitive deficiencies. Document construction tolerances and workmanship standards for that feature of work.

i. Check to ensure that the portion of the plan for the work to be performed has been accepted by the Contracting Officer.

j. Discussion of the initial control phase.

k. The Government needs to be notified at least 48 hours in advance of beginning the preparatory control phase. Include a meeting conducted by the CQC System Manager and attended by the superintendent, other CQC personnel (as applicable), and the foreman responsible for the definable feature. Document the results of the preparatory phase actions by separate minutes prepared by the CQC System Manager and attach to the daily CQC report. Instruct applicable workers as to the acceptable level of workmanship required in order to meet contract specifications.

4.2 Initial Phase

This phase is accomplished at the beginning of a definable feature of work. Accomplish the following:

a. Check work to ensure that it is in full compliance with contract requirements. Review minutes of the preparatory meeting.

b. Verify adequacy of controls to ensure full contract compliance. Verify required control inspection and testing are in compliance with the contract.

c. Establish level of workmanship and verify that it meets minimum acceptable workmanship standards. Compare with required sample panels as appropriate.

d. Resolve all differences.

e. Check safety to include compliance with and upgrading of the safety plan and activity hazard analysis. Review the activity analysis with each worker.

f. The Government needs to be notified at least 48 hours in advance of beginning the initial phase for definable feature of work. Prepare separate minutes of this phase by the CQC System Manager and attach to the daily CQC report. Indicate the exact location of initial phase for definable feature of work for future reference and comparison with follow-up phases.

g. The initial phase for each definable feature of work is repeated for each new crew to work onsite, or any time acceptable specified quality standards are not being met.

4.3 Follow-up Phase

Perform daily checks to assure control activities, including control testing, are providing continued compliance with contract requirements, until completion of the particular feature of work. Record the checks in the CQC documentation. Conduct final follow-up checks and correct all deficiencies prior to the start of additional features of work which may be affected by the deficient work. Do not build upon nor conceal non-conforming work.

5.0 Materials

All materials shall be in a new unused condition meeting the requirements of the specification.

6.0 Execution

Perform work in accordance with the drawings and Specification Section 32 31 13, HYDRUALIC VERTICAL PIVOT GATE SYSTEM. Work includes furnishing and installation of a Hydraulic Vertical Lift Gate, and removal of existing 24 ft double swing gate. Contractor shall remove and reinstall an existing entrance gate to the location shown on the drawings to include any additional new hardware or materials required for the installation.

7.0 Inspection and Tests

The government will provide inspection of all work in accordance with FAR 52.213-4 - Terms and Conditions - Simplified Acquisitions (Other Than Commercial Items). Contractor shall perform specified or required tests to verify that control measures are adequate to provide a product which conforms to contract requirements.

8.0 Point of Contact

Contracting Officer:

Marc Proietto; 402-995-2313 or marc.proietto@usace.army.mil

Contract Specialist:

Lynne Reed; 402-995-2039 or lynne.d.reed@usace.army.mil

Project Manager:

Jason Molstad; 406-526-3806 or jason.r.molstad@usace.army.mil

9.0 Drawings

Drawings may not reflect actual site conditions or show all equipment installed. Therefore, field verification by the Contractor is highly recommended to determine actual site-specific conditions.

Requirements FP - Outside Maintenance Hydraulic Vertical Pivot Gate Fort Peck, Montana

Section E - Inspection and Acceptance

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.246-12 Inspection of Construction. Aug 1996

Overall Contract Inspection/Acceptance Locations

Inspection and Acceptance Location

Both Destination Instructions: Please follow to SOW and Specification Package.

DoDAAC: 968609 CountryCode: USA

COE FT PECK PROJECT OFFICE

USAED OMAHACENWO-OD-FP, BOX 208

FORT PECK, MT 59223-0208

UNITED STATES

Section F - Deliveries or Performance

From 29 Aug 2025 to 25 Mar 2026

Ship To DoDAAC: W9128F CountryCode: USA

W071 ENDIST OMAHA

KO CONTRACTING OFFICE, 1616 CAPITOL AVENUE

OMAHA, NE 68102-4901

UNITED STATES

Lynne D. Reed Email: lynne.d.reed@usace.army.mil Telephone: 402-995-2039

Party to Pay Transportation Cost: Contractor

Point Type: Destination

Line Item Delivery Schedule Quantity Address and POC

Delivery Period From 19 Sep 2025 to 25 Mar 2026

Period of Performance From 19 Sep 2025 To 25 Mar 2026

1 Job Place of Performance DoDAAC: 968609 CountryCode: USA

COE FT PECK PROJECT OFFICE

USAED OMAHACENWO-OD-FP, BOX 208

FORT PECK, MT 59223-0208

UNITED STATES

Period of Performance From 19 Sep 2025 To 25 Mar 2026

1 Job

Period of Performance From 29 Aug 2025 To 25 Mar 2026

1 Job

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.247-34 F.o.b. Destination. Jan 1991

Section G - Contract Administration Data

DFARS Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

252.201-7000 Contracting Officer's Representative. Dec 1991 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018 252.236-7000 Modification Proposals--Price Breakdown. Dec 1991

Section H - Special Contract Requirements

SPECIFICATION

SECTION 32 31 13

HYDRAULIC VERTICAL PIVOT GATE SYSTEM

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Location of Gate; G, PO

Gate Assembly; G, PO

Gate Hardware and Accessories; G, PO Erection/Installation Drawings; G, PO

SD-03 Product Data

Gate Assembly; G, PO

Gate Hardware and Accessories; G, PO

Wiring Diagrams; G,PO Concrete; G, PO

SD-07 Certificates Certificates of Compliance

SD-08 Manufacturer's Instructions

Manufacturers Operating Manual

Manufacturers Part Diagram

1.3 QUALITY CONTROL

1.3.1 Certificates of Compliance

Submit certificates of compliance indicating system provided is in accordance with the applicable reference standards and descriptions of this section.

1.3.2 Installer Qualifications

Installer shall be approved by manufacturer or have a minimum of five year's experience installing vertical pivot gates similar to that required.

1.3.3 Project Site Conditions

Verify dimensions and component layout by field measurements prior to beginning installation.

1.4 DELIVERY, STORAGE, AND HANDLING

Deliver materials to site in an undamaged condition. Store materials off the ground to provide protection against oxidation caused by ground contact.

PART 2 PRODUCTS

2.1 SYSTEM DESCRIPTION

2.1.1 Performance Requirements

Provide manufacturer's standard safety devices as follows:

a. Provide pressure relief valve to avoid crushing obstruction encountered in either direction of travel.

b. Provide shut off power device if balance system fails.

Provide a manual bypass system which allows barrier to be opened and closed in event of power failure. Design system to all for a minimum 2900 open and close operations per day. Gate Height: Gate height shall match fence height as indicated on the drawings.

Gate Width: Gate width shall be as indicated on the drawings.

2.1.2 Additional Features

The following addition features shall be provided:

a. Cold Weather Package

b. Stanchion

c. Radio Controls - Provide standard open-close-stop commercial transmitters/receivers systems.

d. Provide detector system to allow free exit/safety, safety or close gate operation; system to be factory wired inside electrical box and tested.

e. Reversing Edge - Provide manufacturers standard reversing edge system.

f. Locks - Provide magnetic lock to secure gate in closed position

g. Photo Eye

h. Stainless steel fasteners

i. Heater for Electrical Box

j. Ice Scrappers

k. Weather Guard Package

2.2.3 Access Control Systems

The following access control shall be incorporated into the system:

a. Key switches

b. Pedestals

2.2 COMPONENTS

2.2.1 Hydraulic Power Unit

Hydraulic pump, motor, and reservoir will be all as one unit with fluid thermometer and fluid level sight gauge. The hydraulic system shall be designed to keep the gate locked in the closed position preventing a person from lifting the gate open when it's in the closed position.

2.2.2 Hydraulic System

The hydraulic system shall consist of a 3000 psi hydraulic cylinder, limit switches and cushioned slow down on each end of travel, and adjustable stops with lock down in any position. Hydraulic fluid shall be the manufacturers standard fluid, factory checked, filled, and tested.

2.2.3 Balance System

Balance system shall be designed to allow barrier to be hand raised and to be hand lowered with 12 to 15 pounds of pressure.

Provide built-in safety control switch capable of stopping barrier in any position should the balance system fails. Factory test and adjust the balance system to ensure gate may be manually raised and lowered with specified pressure. Signage to be added to the gate barrier must be declared at the time of order so the manufacturer can add the signs on the barrier to ensure the manufacturer can balance the operator correctly at the time of manufacturing.

2.2.4 Electrical System

Wire shall be oil and gas resistant. Provide Overload Protection relay to protect motor. Provide a Reversing Controller as required to operate motor and solenoid valves. Limit Switches shall be adjustable snap action style capable of stopping barrier at each end of travel. Provide a programmable logic board with manufacturer's full range of available functions. All gates shall be equipped with a dry contactor to accommodate all types of access equipment.

2.2.5 Barrier System (Gates)

The gate system shall be designed to resist twist and sway. Type: Manufacturer's standard steel barrier (up to 20-foot-wide opening per gate leaf); minimum 9 gage galvanized chain link fence fabric, with sway bracing. Leading member of a steel barrier 4" schedule 20 round tube, sway braces- 1 1/4 x 1 1/4 x .087 square tube, uprights- 2 x 2 x .120 square tube. Sway braces bolted to barrier.

Type: Manufacturer's standard aluminum barrier (up to 25-foot-wide opening per gate leaf), nominal 3.125" by 2.875" diamond 6063-T5 alloy aluminum screen fabric (amplimesh) welded both sides completely, with sway bracing. Leading member of an aluminum barrier 4" schedule 40 round tube, sway braces- 1 1/4 x 1 1/4 x 1/8 square tube uprights- 2 x 2 x .188 square tube.

Sway braces bolted to barrier.

Type: Custom barrier as indicated on Drawings, with sway bracing.

Options: Provide stanchion to contain free end for severe crash applications; match barrier.

2.2.6 Accessories

Provide any additional accessories as required for a complete operational installation.

2.3 MATERIALS

2.3.1 Finishes

Finish shall be factory applied using a DTM epoxy prime coat and acrylic urethane topcoat.

2.3.2 Concrete

Provide concrete conforming to ASTM C94/C94M and obtaining a minimum 28-day compressive strength of 4,000 psi.

PART 3 EXECUTION

Submit manufacturer's erection/installation drawings and instructions that detail proper assembly and materials in the design for fence, gate, hardware and accessories.

3.1 PREPARATION

Verify concrete support slab complies with requirements and verify anchors and conduits are properly installed. Ensure alignment with adjacent construction, fencing, and paving meets installation requirements.

3.2 INSTALLATION

Installation shall be in accordance with manufacturer's recommendations and installation instructions. Install vertical pivot gate system to provide rigid and secure installation as indicated, straight and true to lines and grades indicated, for free, easy operation. Install components square and level, accurately fitted and free from distortion and free from defects.

3.3 PROTECTION

Protect vertical pivot gate system form damage during all construction operations, replace components damaged by subsequent construction operations. Touch up minor scratched and/or damaged surfaces using the same primer and finish system applied by the manufacturer.

3.4 TRAINING

Provide training to owner personnel regarding programmable features and controls and preset controls according to Owner requirements. Provide training on proper operation, maintenance, and reprogramming of system.

3.5 WARRANTY

Provide manufacturer's standard warranty for system and system components against failure resulting from normal use.

Warranty period shall be a minimum of three years.

-- End of Section --

Section I - Contract Clauses

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.203-12 Limitation on Payments to Influence Certain Federal Transactions. Jun 2020 52.204-12 Unique Entity Identifier Maintenance. Oct 2016 52.204-13 System for Award Management Maintenance. Oct 2018 52.204-18 Commercial and Government Entity Code Maintenance. Aug 2020 52.204-19 Incorporation by Reference of Representations and Certifications. Dec 2014 52.204-21 Basic Safeguarding of Covered Contractor Information Systems. Nov 2021 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations. Nov 2015 52.219-6 Notice of Total Small Business Set-Aside. Nov 2020 52.222-6 Construction Wage Rate Requirements. Aug 2018 52.222-7 Withholding of Funds. May 2014 52.222-8 Payrolls and Basic Records. Jul 2021 52.222-9 Apprentices and Trainees. Jul 2005 52.222-10 Compliance with Copeland Act Requirements. Feb 1988 52.222-11 Subcontracts (Labor Standards). May 2014 52.222-12 Contract Termination-Debarment. May 2014 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations. May 2014 52.222-14 Disputes Concerning Labor Standards. Feb 1988 52.222-15 Certification of Eligibility. May 2014

52.222-30 Construction Wage Rate Requirements-Price Adjustment (None or Separately Specified Method).

Aug 2018

52.223-23 Sustainable Products and Services. May 2024 52.226-7 Drug-Free Workplace. May 2024 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving. May 2024 52.228-2 Additional Bond Security. Oct 1997 52.228-11 Individual Surety-Pledge of Assets. Feb 2021 52.228-14 Irrevocable Letter of Credit. Nov 2014 52.228-15 Performance and Payment Bonds-Construction. Jun 2020 52.229-4 Federal, State, and Local Taxes (State and Local Adjustments). Feb 2013 52.229-12 Tax on Certain Foreign Procurements. Feb 2021 52.232-8 Discounts for Prompt Payment. Feb 2002 52.232-27 Prompt Payment for Construction Contracts. Jan 2017 52.232-33 Payment by Electronic Funds Transfer-System for Award Management. Oct 2018 52.232-39 Unenforceability of Unauthorized Obligations. Jun 2013 52.233-1 Disputes. May 2014 52.233-3 Protest after Award. Aug 1996 52.236-2 Differing Site Conditions. Apr 1984 52.236-3 Site Investigation and Conditions Affecting the Work. Apr 1984 52.236-5 Material and Workmanship. Apr 1984 52.236-6 Superintendence by the Contractor. Apr 1984 52.236-7 Permits and Responsibilities. Nov 1991 52.236-13 Accident Prevention. Nov 1991 52.236-14 Availability and Use of Utility Services. Apr 1984 52.236-21 Specifications and Drawings for Construction. Feb 1997

52.240-1 Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act-Covered Foreign Entities.

Nov 2024

52.242-14 Suspension of Work. Apr 1984 52.243-5 Changes and Changed Conditions. Apr 1984 52.244-6 Subcontracts for Commercial Products and Commercial Services. Jan 2025 52.246-21 Warranty of Construction. Mar 1994 52.247-15 Contractor Responsibility for Loading and Unloading. Apr 1984 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form). Apr 1984 52.249-4 Termination for Convenience of the Government (Services) (Short Form). Apr 1984 52.249-10 Default (Fixed-Price Construction). Apr 1984

DFARS Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

252.203-7000 Requirements Relating to Compensation of Former DoD Officials. Sep 2011 252.203-7002 Requirement to Inform Employees of Whistleblower Rights. Dec 2022 252.204-7003 Control of Government Personnel Work Product. Apr 1992 252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting. May 2024

252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services.

Jan 2023

252.204-7020 NIST SP 800-171 DoD Assessment Requirements. Nov 2023 252.204-7022 Expediting Contract Closeout. May 2021 252.223-7008 Prohibition of Hexavalent Chromium. Jan 2023 252.225-7048 Export-Controlled Items. Jun 2013 252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime. Jan 2023 252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region. Jun 2023 252.232-7004 DoD Progress Payment Rates. Oct 2014 252.232-7010 Levies on Contract Payments. Dec 2006 252.243-7001 Pricing of Contract Modifications. Dec 1991 252.244-7000 Subcontracts for Commercial Products or Commercial Services. Nov 2023 252.247-7023 Transportation of Supplies by Sea. Oct 2024

FAR Clauses Incorporated by Full Text

52.204-1 Approval of Contract. (Dec 1989)

Approval of Contract (Dec 1989)

This contract is subject to the written approval of the Contracting Officer[identify title of designated agency official here] and shall not be binding until so approved.

(End of clause)

52.211-10 Commencement, Prosecution, and Completion of Work. (Apr 1984)

Commencement, Prosecution, and Completion of Work (Apr 1984)

The Contractor shall be required to (a) commence work under this contract within 10[Contracting Officer insert number] calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 25 March 2026.* The time stated for completion shall include final cleanup of the premises.

* The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.

(End of clause)

52.213-4 Terms and Conditions--Simplified Acquisitions (Other Than Commercial Products and Commercial Services). (DEVIATION 2025-O0003 and 2025-O0004)

(Jan 2025) Deviation 2025-O0004 (Mar 2025)

Terms and Conditions-Simplified Acquisitions (Other Than Commercial Products and Commercial Services) (MAR 2025) (DEVIATION 2025- O0003 )and 2025-O0004

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses that are incorporated by reference:

(1) The clauses listed below implement provisions of law or Executive order:

(i) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (section 743 of Division E, Title VII, of (Jan 2017) the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(ii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (Dec (Section 1634 of Pub. L. 115-91).2023)

(iii) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Section 889(Nov 2021) (a)(1)(A) of Pub. L. 115-232).

(iv) 52.204-27, Prohibition on a ByteDance Covered Application (Section 102 of Division R of Pub. L. 117-328), unless the agency grants (Jun 2023) an exception - see paragraph (b) of 52.204-27.

(v) 52.204-30, Federal Acquisition Supply Chain Security Act Orders-Prohibition. (Pub. L. 115-390, title II).(Dec 2023)

(vi) 52.222-3, Convict Labor (E.O.11755).(Jun 2003)

(vii) [Reserved]

(viii) [Reserved]

(ix) 52.225-13, Restrictions on Certain Foreign Purchases ( ) (E.O.s, proclamations, and statutes administered by the Office of Foreign Assets Feb 2021 Control of the Department of the Treasury).

(x) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (31 U.S.C. 3903 and 10 U.S.C. 3801).(Mar 2023)

(xi) 52.233-3, Protest After Award (31 U.S.C. 3553).(Aug 1996)

(xii) 52.233-4, Applicable Law for Breach of Contract Claim (Pub. L. 108-77 and 108-78 (19 U.S.C. 3805 note)).(Oct 2004)

(2) Listed below are additional clauses that apply:

(i) 52.232-1, Payments .(Apr 1984)

(ii) 52.232-8, Discounts for Prompt Payment .(Feb 2002)

(iii) 52.232-11, Extras .(Apr 1984)

(iv) 52.232-25, Prompt Payment (Jan 2017).

(v) 52.232-39, Unenforceability of Unauthorized Obligations .(Jun 2013)

(vi) 52.233-1, Disputes .(May 2014)

(vii) 52.244-6, Subcontracts for Commercial Products and Commercial Services .(Jan 2025)

(viii) 52.253-1, Computer Generated Forms .(Jan 1991)

(b) The Contractor shall comply with the following FAR clauses, incorporated by reference, unless the circumstances do not apply:

(1) The clauses listed below implement provisions of law or Executive order:

(i) 52.203-17, Contractor Employee Whistleblower Rights (41 U.S.C. 4712); this clause does not apply to contracts of DoD, NASA, the (Nov 2023) Coast Guard, or applicable elements of the intelligence community-see FAR 3.900(a).

(ii) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Pub. L. 109-282) (31 U.S.C. 6101 note) (Applies to (Jun 2020) contracts valued at or above the threshold specified in FAR 4.1403(a) on the date of award of this contract).

(iii) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (E.O. 13126) (Applies to contracts for supplies exceeding the (Jan 2025) micro-purchase threshold, as defined in 2.101 on the date of award of this contract).

(iv) 52.222-20, Contracts for Materials, Supplies, Articles, and Equipment., Contracts for Materials, Supplies, Articles, and Equipment (41 (Jun 2020) U.S.C. chapter 65) (Applies to supply contracts over the threshold specified in FAR 22.602 on the date of award of this contract, in the United States, Puerto Rico, or the U.S. Virgin Islands).

(v) 52.222-35, Equal Opportunity for Veterans (38 U.S.C. 4212) (Applies to contracts valued at or above the threshold specified in FAR (Jun 2020) 22.1303(a) on the date of award of this contract).

(vi) 52.222-36, Equal Employment for Workers with Disabilities (29 U.S.C. 793) (Applies to contracts over the threshold specified in (Jun 2020) FAR 22.1408(a) on the date of award of this contract, unless the work is to be performed outside the United States by employees recruited outside the United States). (For purposes of this clause, "United States" includes the 50 States, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, and Wake Island.)

(vii) 52.222-37, Employment Reports on Veterans (38 U.S.C. 4212) (Applies to contracts valued at or above the threshold specified in (Jun 2020) FAR 22.1303(a) on the date of award of this contract).

(viii) 52.222-41, Service Contract Labor Standards (41 U.S.C. chapter 67) (Applies to service contracts over $2,500 that are subject to the (Aug 2018) Service Contract Labor Standards statute and will be performed in the United States, District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, Johnston Island, Wake Island, or the outer Continental Shelf).

(ix)

(A) 52.222-50, Combating Trafficking in Persons (22 U.S.C. chapter 78 and E.O. 13627) (Applies to all solicitations and contracts).(Nov 2021)

(B) Alternate I (Applies if the Contracting Officer has filled in the following information with regard to applicable directives or notices: (Mar 2015) Document title(s), source for obtaining document(s), and contract performance location outside the United States to which the document applies).

(x) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (Applies when 52.222-6 or 52.222-41 are in the (Jan 2022) contract and performance in whole or in part is in the United States (the 50 States, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, Johnston Island, Wake Island, and the outer Continental Shelf as defined in the Outer Continental Shelf Lands Act (43 U.S.C. 1331, ))).et seq.

(xi) 52.222-62, Paid Sick Leave Under Executive Order 13706 (E.O. 13706) (Applies when 52.222-6 or 52.222-41 are in the contract and (Jan 2022) performance in whole or in part is in the United States (the 50 States and the District of Columbia.))

(xii) 52.223-5, Pollution Prevention and Right-to-Know Information (42 U.S.C. 11001-11050 and 13101-13109) (Applies to services (May 2024) performed on Federal facilities).

(xiii) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (42 U.S.C. 7671, ) (May 2024) et seq.

(Applies to contracts for products as prescribed at FAR 23.109(d)(1)).

(xiv) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (42 U.S.C. 7671, ) (May 2024) et seq.

(Applies to maintenance, service, repair, or disposal of refrigeration equipment and air conditioners).

(xv) 52.223-20, Aerosols (42 U.S.C. 7671, ) (Applies to contracts for products that may contain high global warming potential (May 2024) et seq.

hydrofluorocarbons as a propellant or as a solvent; or contracts for maintenance or repair of electronic or mechanical devices).

(xvi) 52.223-21, Foams (42 U.S.C. 7671, ) (Applies to contracts for products that may contain high global warming potential (May 2024) et seq.

hydrofluorocarbons or refrigerant blends containing hydrofluorocarbons as a foam blowing agent; or contracts for construction of buildings or facilities.

(xvii) 52.223-23, Sustainable Products and Services (MAR 2025) (DEVIATION 2025-O0004)) (7 U.S.C. 8102, 42 U.S.C. 6962, 42 U.S.C. 8259b, and 42 U.S.C. 7671l) (Applies to contracts when the agency identifies in the statement of work, or elsewhere in the contract, the sustainable products and services that apply to the acquisition).

(xviii)

(A) 52.225-1, Buy American-Supplies (41 U.S.C. chapter 67) (Applies to contracts for supplies, and to contracts for services involving the (Oct 2022) furnishing of supplies, for use in the United States or its outlying areas, if the value of the supply contract or supply portion of a service contract exceeds the micro-purchase threshold, as defined in 2.101 on the date of award of this contract, and the acquisition-

(1) Is set aside for small business concerns; or

(2) Cannot be set aside for small business concerns (see 19.502-2), and does not exceed $50,000).

(B) (OCT 2022) (Applies if the Contracting Officer has filled in the domestic content threshold below, which will apply to the entire Alternate I contract period of performance. Substitute the following sentence for the first sentence of paragraph (1)(ii)(A) of the definition of domestic end in paragraph (a) of 52.225-1: (A) The cost of its components mined, produced, or manufactured in the United States exceeds percent of the product 65 cost of all its components. [ ])Contracting officer to insert the percentage per instructions at 13.302-5(d)(4).

(xix) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations., Promoting Excess Food Donation to Nonprofit Organizations (Jun (42 U.S.C. 1792) (Applies to contracts greater than the threshold specified in FAR 26.404 on the date of award of this contract, that provide for 2020) the provision, the service, or the sale of food in the United States).

(xx) 52.232-33, Payment by Electronic Funds Transfer-System for Award Management (Applies when the payment will be made by (Oct 2013) electronic funds transfer (EFT) and the payment office uses the System for Award Management (SAM) as its source of EFT information).

(xxi) 52.232-34, Payment by Electronic Funds Transfer-Other than System for Award Management (Applies when the payment will be (Jul 2013) made by EFT and the payment office does not use the SAM database as its source of EFT information).

(xxii) 52.240-1, Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act-Covered Foreign Entities (Sections 1821-1826, Pub. L. 118-31, 41 U.S.C. 3901 note prec.).(Nov 2024)

(xxiii) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (46 U.S.C. 55305)(Applies to supplies transported by (Nov 2021) ocean vessels (except for the types of subcontracts listed at 47.504(d)).

(xxiv) 52.247-69, Reporting Requirement for U.S.-Flag Air Carriers Regarding Training to Prevent Human Trafficking (49 U.S.C. 40118(Jan 2025) (g)). (Applies to contracts with a U.S.-flag carrier for the transportation by air of passengers; does not apply to contracts awarded by the Department of Defense or contracts for commercial products).

(2) Listed below are additional clauses that may apply:

(i) 52.204-21, Basic Safeguarding of Covered Contractor Information Systems (Applies to contracts when the contractor or a (Nov 2021) subcontractor at any tier may have Federal contract information residing in or transiting through its information system.)

(ii) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded (Applies to contracts over the threshold specified in FAR 9.405-2(b) on the date of award of this contract).(Jan 2025)

(iii) 52.211-17, Delivery of Excess Quantities ( ) (Applies to fixed-price supplies).Sept 1989

(iv) 52.247-29, F.o.b. Origin (Applies to supplies if delivery is f.o.b. origin).(Feb 2006)

(v) 52.247-34, F.o.b. Destination ( ) (Applies to supplies if delivery is f.o.b. destination).Jan 1991

(c) . This contract incorporates one or more clauses by reference, with the same force FAR 52.252-2, Clauses Incorporated by Reference (Feb 1998) and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

____[Insert one or more Internet addresses]

(d) . The Contractor shall tender for acceptance only those items that conform to the requirements of this contract. The Inspection/Acceptance Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. The Government must exercise its postacceptance rights-

(1) Within a reasonable period of time after the defect was discovered or should have been discovered; and

(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.

(e) . The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of Excusable delays the Contractor and without its fault or negligence, such as acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .