These technical drawings from the U.S. Army Corps of Engineers document communications conduit and ductbank installation for the Outside Maintenance Building at Fort Peck Dam in Montana. The project involves installing a new 24-strand single-mode fiber optic cable through a communications ductbank from the Outside Maintenance Building to the Administration Building, with detailed site plans and installation specifications for horizontal directional drilling (HDD) of duct banks across multiple station locations.
The drawings include comprehensive technical details such as ductbank compositions (including 20x27mm 7-way ducts, 2" electrical conduits, and communication innerducts), installation sections for different project segments, and site-specific routing information. The project documentation includes notes about coiling a minimum of 50 feet of spare fiber optic cabling, coordinating final equipment locations, and ensuring proper conduit and cable installation techniques. The project is part of a communications infrastructure upgrade for the Fort Peck Dam facility, with design work completed in September 2020 and revision in November 2020.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S O
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S I Z
E
S U
B M
IT
T
E D
B Y
D A
T E
C O
N T
R A
C T
N O
C
H E
C K
E D
B Y
D R
A W
N B
Y
IS
S
U E
D A
T E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
%PRODUCTION DATA 4%%PRODUCTION DATA 3%%PRODUCTION DATA 2%
%PRODUCTION DATA 1%
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R
M
A H
A N
E B
R A
S K
A
F
IL
E N
A M
E
O M
A H
A N
E B
R A
S K
A
F
IL
E N
A M
E
F
IL
E
N U
M B
E R
F
IL
E
N U
M B
E
A H
A N
E B
R A
S K
A
F
IL
E N
U M
B E
R
F
IL
E N
A M
EP601
A N
S I
D A
N S
I D
N
S I
D M
F P
E
P O
M .d g n
H Y
D R
A U
L
IC
V E
R T
IC
A
L P
IV
O
T G
A T
U
T S
ID
E
M A
IN
T
E N
A N
C E
F O
R T
P E
C K
D A
M
M O
N T
A N
A
O M
A H
A D
IS
T
R
IC
R T
P E
C K
D A
M
M O
N T
A N
A
O M
A H
A D
IS
T
R
IC
R T
P E
C K
D A
M
M O
N T
A N
A
O M
A H
A D
IS
T
R
IC
T
P A
N E
L S
C H
E D
U L
P
N
E L
S C
H E
D U
L
-O M
S G
C A
P
IT
O L
A V
E
C A
P
IT
O L
A V
E
C A
P
IT
O L
A V
R C
H
FDP PANEL
AHU
WH
H2
PANEL
H1
PANEL
P2
PANEL
P1
PANEL
L1
PANEL MDPTR1
PANEL R1
PANEL R2
(NN1)
VESTIBULE
(109)
STORAGE
FLAMMABLE
(110)
STORAGE
(108)
STORAGE
BATTERY
(NN1)
VESTIBULE
(109)
STORAGE
FLAMMABLE
(110)
STORAGE
(108)
STORAGE
BATTERY
3 2
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
A H
A
N E
C
A P
IT
O L A
V E
F
IL
E N
U M
B E
R
F
IL
E N
A M
E
C O
M M
U N
IC
A T
IO
N S C
O N
D U
IT
F
O R A
D M
IN
B
U
IL
D
IN
G
F O
R T P
E C
K D
A M
M O
N T
A N
A
O M
A H
A D
IS
T R
IC
T
CANOPY
ENTRY
(122)
OPEN OFFICE
(121)
BREAK ROOM
(120)
WORKSHOP
(NN2)
CORRIDOR
(107)
SUPPLY
CONSOLIDATED (105)
MEN'S ROOM
(NN3)
WOMEN'S ROOM
(104)
MECH.
(116)
WELDING SHOP
(111)
STORAGE
PESTICIDE
(115)
MAINTENANCE AREA
(112)
WASH BAY
(114)
TIRE REPAIR SHOP
UP
CANOPY
ENTRY
(122)
OPEN OFFICE
(121)
BREAK ROOM
(120)
WORKSHOP
(NN2)
CORRIDOR
(107)
SUPPLY
CONSOLIDATED (105)
MEN'S ROOM
(NN3)
WOMEN'S ROOM
(104)
MECH.
(116)
WELDING SHOP
(111)
STORAGE
PESTICIDE
(115)
MAINTENANCE AREA
(112)
WASH BAY
(114)
TIRE REPAIR SHOP
UP
(106)
VEST.
(103)
JAN.
(123)
WAITING
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg10:30:07 AM 8/12/2020
...\30500 - Construction E&D\FP76\30DA0 - Plans & Specs\CAD_BIM\_Sheets\30D
N
S I
D F P E
T
O M .d g n
B
A D
K
IN
S
F L
O O
R P
L A
N
O U
T S
ID
E M
A
IN
T E
N A
N C
E B
U
IL
D
IN
G
ET101OM
B
A D
K
IN
S
10' 20'0
NORTH
PLAN
KEYED NOTES:
3. EXISTING TELECOMMUNICATIONS RACK.
OPTIC CABLING WITHIN THE CONSOLIDATED SUPPLY ROOM (107).
2. CONTRACTOR SHALL CAP AND COIL A MINIMUM OF 50' OF SPARE FIBER
1. REFER TO SHEET ES101 FOR CONTINUATION.
OUTSIDE MAINTENANCE - FLOOR PLAN
GENERAL NOTES:
PEST INFILTRATION INTO THE BUILDING.
MAINTENANCE BUILDING SHALL BE SEALED TO PREVENT WATER AND
1. SPARE NEW COMMUNICATIONS CONDUIT ENTERING THE OUTSIDE
S L
IN
D G
R E
N
J
C H
A M
B E
R L
A
IN
W F
B
A U
G U
S T
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
A H
A
N E
C
A P
IT
O L A
V E
F
IL
E N
U M
B E
R
F
IL
E N
A M
E
C O
M M
U N
IC
A T
IO
N S C
O N
D U
IT
F
O R A
D M
IN
B
U
IL
D
IN
G
F O
R T P
E C
K D
A M
M O
N T
A N
A
O M
A H
A D
IS
T R
IC
T
CHH1
EHH1
EHH2
CHH2
CHH3
EHH3
CHH1
EHH4
CHH4
MAI
NTENANCE
BLDG.
DIAMETER = 6"
DIAMETER = 6"
DIAMETER = 12"
DIAMETER = 24"
DIAMETER = 24"
DIAMETER = 30"
DIAMETER = 8"
DIAMETER = 40"
ELEVATION = 2056.944
EASTING = 2715570.036
NORTHING = 1387122.876
MTDOT 613515
HEIGHT = 25.9
ELEVATION = 2082.92
POWER LINE LOW POINT
OTHER END OF PIPE
COULD NOT FIND
DIAMETER = 30"
MATERIAL = RCP
INVERT = 2052.528
W
TT
T
W
CP
W
CB
W
W
T
T
W W
W
W
Y E
L L
O W
S T
O N
E R
D
N . T
E T
O N R
D
J U
D
IT
H R
D
1+00
0+5
0+5
2+00
9+00
8+00
0+0
E
S .d g n
50' 100'0
N
MATCH LINE SEE SHEET ES102
LEGEND:
A N
S I
D
ES101
COMM
ES
CHH1
EHH1
KEYED NOTES:
GENERAL NOTES:
B
A D
K
IN
S
S
IT
E P
L A
N A
R E
A
B
A D
K
IN
S
E A
L E
C T
R
IC
A L
CHH1
W F
B
S L
IN
D G
R E
N
J
C H
A M
B E
R L
A
IN
S E
P T
E M
B E
R
W F
C
R
R
R -1
G E
N E
R A
L R
E V
IS
IO
N S
/2
/2
INFORMATION.
SHEET ET101OM FOR ADDITIONAL
TERMINATING TO GFGI EQUIPMENT. REFER TO
MAINTENANCE BUILDING PRIOR TO
OF SPARE FIBER OPTIC CABLING WITHIN THE
CONTRACTOR SHALL COIL A MINIMUM OF 50'
THE FINAL LOCATION OF GFGI EQUIPMENT.
EQUIPMENT. COORDINATE WITH THE COR FOR
TERMINATE THE NEW FIBER TO GFGI
BUILDING, THE CONTRACTOR SHALL
2. ONCE IN THE OUTSIDE MAINTENANCE
TO THE ADMINISTRATION BUILDING.
FROM THE OUTSIDE MAINTENANCE BUILDING
THROUGH NEW COMMUNICATIONS DUCTBANK
24-STRAND SINGLE-MODE FIBER OPTIC CABLE
1. CONTRACTOR SHALL INSTALL NEW
R
INTO THIS DOCUMENT AS A RESULT.
OMISSIONS WHICH HAVE BEEN INCORPORATED
RESPONSIBLE FOR ANY ERRORS OR
OTHERS. THE ENGINEER WILL NOT BE
INFORMATION COMPILED AND FURNISHED BY
PREPARED, IN PART, ON THE BASIS OF
THESE RECORD DRAWINGS HAVE BEEN
SHOULD BE CONSIDERED IN PAST TENSE.
ETC. HAVE BEEN COMPLETED AS SHOWN AND
INSTRUCTIONS INSTALL, REMOVE, REPLACE,
THESE ARE RECORD DRAWINGS. ALL
RECORD DRAWING NOTE:
7-way Duct
20x27mm
7-way Duct
20x27mm
7-way Duct
20x27mm
2 - 2" Electrical
7-way Duct
20x27mm
2 Maxcell
2 - 2" Com
2 - 2" Electrical
7-way Duct
20x27mm
2 - 2" Electrical
2 Maxcell
2 - 2" Com 7-way Duct
20x27mm
ES501.
HANDHOLE. REFER TO SHEET
NEW COMMUNICATIONS
ES501.
HANDHOLE. REFER TO SHEET
NEW ELECTRICAL SECONDARY
HOLE. REFER TO SHEETS ES501
NEW COMMUNICATIONS HAND
ES501.
OTHERWISE. REFER TO SHEET
UNLESS INDICATED
PARALLEL 2 INCH CONDUIT,
DUCTBANK CONSISTING OF 2
ELECTRICAL SECONDARY
ES501.
INDICATED. REFER TO SHEET
NUMBER OF CONDUITS AS
COMMUNICATIONS DUCTBANK,
2 Maxcell
2 - 2" Com
CELL, 2" FABRIC INNERDUCT.
CONDUIT SHALL BE INSTALLED WITH A 2-3
4. DUCTBANK CONSISTS OF 1-6" CONDUIT.
3. DUCTBANK CONSISTS OF 2 - 2" MAXCELL.
CONDUITS.
2. DUCTBANK CONSISTS OF 2 PARALLEL 2"
7-WAY DUCT.
1. DUCTBANK CONSISTS OF 20x27mm
2'
O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
A H
A
N E
C
A P
IT
O L A
V E
F
IL
E N
U M
B E
R
F
IL
E N
A M
E
C O
M M
U N
IC
A T
IO
N S C
O N
D U
IT
F
O R A
D M
IN
B
U
IL
D
IN
G
F O
R T P
E C
K D
A M
M O
N T
A N
A
O M
A H
A D
IS
T R
IC
T
T -3
.d g n
N S I
D
T-301
T Y
P
IC
A L S
E C
T
IO
N S
W F
B
W F
C
S E
P T
E M
B E
R
20X27MM 7-WAY DUCT
20X27MM 7-WAY DUCT20X27MM 7-WAY DUCT 2-2" ELEC. INNERDUCT2-2" ELEC. INNERDUCT
INTO THIS DOCUMENT AS A RESULT.
OMISSIONS WHICH HAVE BEEN INCORPORATED
RESPONSIBLE FOR ANY ERRORS OR
OTHERS. THE ENGINEER WILL NOT BE
INFORMATION COMPILED AND FURNISHED BY
PREPARED, IN PART, ON THE BASIS OF
THESE RECORD DRAWINGS HAVE BEEN
SHOULD BE CONSIDERED IN PAST TENSE.
ETC. HAVE BEEN COMPLETED AS SHOWN AND
INSTRUCTIONS INSTALL, REMOVE, REPLACE,
THESE ARE RECORD DRAWINGS. ALL
RECORD DRAWING NOTE:
1 COMM. 1 ELEC.
2-2" COMM. INNERDUCT 2-2" COMM. INNERDUCT
EXISTING GROUND EXISTING GROUND EXISTING GROUND
STA. 0+00 TO STA. 6+70
DUCT BANKS - HDD INSTALLATION
SECTION A
FOR FOLLOWUP CONTRACT/WORK
STA. 6+70 BENEATH JUDITH RD.
DUCT BANKS - HDD INSTALLATION
SECTION B
DUCT BANK ALIGNMENT
ALIGNMENT
COMMUNICATIONS DUCT BANK
50+00 TO 52+65
6+70 TO 33+40
COMMUNICATIONS DUCT BANK - HDD INSTALLATION
SECTION C
EXISTING GROUND
SEE SECTIONS A AND B BELOW
CASING DUCK BANK - HDD INSTALLATION
TYPICAL SECTION
DUCT BANK ALIGNMENT
DUCT BANK ALIGNMENT
File details come from the government source that posted it. Updated .