Pages 2 of 3 - MFP70_OMGATE Drawings-2.pdf
PDF 2 MB Posted
- Solicitation number
- W9128F25QA094
About this file
These documents are detailed engineering drawings for a Hydraulic Vertical Pivot Gate installation at the Fort Peck Dam in Montana, prepared by the U.S. Army Corps of Engineers Omaha District in March 2025. The project involves installing a new 72-inch high vertical pivot gate with specific technical requirements, including construction options of either steel or aluminum gate materials, a concrete foundation dug to the frost line, and integration with existing chain-link security fencing. The gate will feature pressure sensors to detect obstructions, an automated operator with RF transmitter controls, and a yellow strobe light to indicate gate movement. Additional project elements include installing new conduits, handholes, equipment racks, entry/exit pedestals, and protective bollards around the gate area. The drawings provide comprehensive technical specifications for foundation, gate structure, electrical components, and installation details across multiple sheets (CS501, ES101, ES401, ES501, FA501, EY501).
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S O
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S I Z
E
S U
B M
IT
T
E D
B Y
D A
T E
C O
N T
R A
C T
N O
C
H E
C K
E D
B Y
D R
A W
N B
Y
IS
S
U E
D A
T E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
%PRODUCTION DATA 4%%PRODUCTION DATA 3%%PRODUCTION DATA 2%
%PRODUCTION DATA 1%
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
O M
A H
A N
E B
R A
S K
A
F
IL
E N
A M
E
F
IL
E N
U M
B E
R
O U
T S
ID
E
M A
IN
T
E N
A N
C E
F O
R T
P E
C K
D A
M
M O
N T
A N
A
O M
A H
A D
IS
T
R
IC
T
A N
S I
D
F E
N C
E G
A T
E D
E T
A
IL
H Y
D R
A U
L
IC
V E
R T
IC
A
L P
IV
O
T G
A T
E
A
A
VIEW A-A
Concrete Pad Dug to Frost Line.
Pilings Dug To Frost Line or Entire
Left Hand Installation
FOUNDATION, OPERATOR, AND BARRIER
TOP VIEW
SECURED SIDE
ROADWAY
FOUNDATION ONLY
TOP VIEW
25' 10'
1' TYPn
6"
23'-8"
24'-6"
1'-6"
1'-6"
8"
1'-6"
6"
10'
"2
1'-1
1'
7"7"
11'
ROADWAY
Frost Line
25'
LOOKING OUT
VIEW FROM SECURED SIDE
Stanchion Foundation Operator Foundation
#4 Rebar at 6" each way
Reinforced Control Conduit
Stub in Power & X 12" Studs or Equivalent4
Operator and Epoxy Four
Drill Four Holes After Placing
Door Swing
Clearance For
Provide 27" Minimum
Access Door Swing
Clearance For Maintenance
Provide 50" Minimum
Connection on Pedestal
Brass Grounding
REVERSING EDGE
OPTIONAL
This Side
Fence*
Existing
This Side
Fence*
Existing
Attachment
Fence
Foundation for to Stanchion
Add Fence Post
SEE SHEET CS502 FOR DETAILS.
*NOTE: EXISTING FENCE IS FE6-TR-72 SECURITY FENCE.
R E
B A
R
3-STRAND BARBED WIRE
BARBS SPACED NO MORE THAN 5 INCHES APART.
CLASS 3 WITH 12.5 GAUGE STRAND WIRE AND 14 GAUGE, ROUND, 4-POINT
BARBED WIRE SHALL CONFORM TO ASTM A121, ZINC-COATED, TYPE Z,
3. 3-STRAND BARBED WIRE SHALL BE ATTACHED TO THE TOP OF THE GATE.
TUBE. SWAY BRACES SHALL BE BOLTED TO LOWER FRAME MEMBER.
BRACES - 1 ¼ X 1 ¼ X 1/8 SQUARE TUBE UPRIGHTS - 2 X 2 X .188 SQUARE
LOWER FRAME MEMBER MINIMUM 4”SCHEDULE 40 ROUND TUBE, SWAY
SCREEN FABRIC WELDED BOTH SIDES COMPLETELY, WITH SWAY BRACING.
ALUMINUM: NOMINAL 3.125” BY 2.875” DIAMOND 6063-T5 ALLOY ALUMINUM
TUBE. SWAY BRACES SHALL BE BOLTED TO LOWER FRAME MEMBER.
BRACES - 1 ¼ X 1 ¼ X .087 SQUARE TUBE, UPRIGHTS - 2 X 2 X .120 SQUARE
LOWER FRAME MEMBER MINIMUM 4” SCHEDULE 20 ROUND TUBE, SWAY
STEEL: 9 GAUGE, 2" MESH GALVANIZED CHAIN LINK FENCE FABRIC,
GATES SHALL BE CONSTRUCTED OF EITHER STEEL OR ALUMINUM.
VERTICAL PIVOT GATE AND EXISTING CHAIN-LINK FENCE SHALL BE 5".
NEW VERTICAL PIVOT GATE. MAXIMUM CLEARANCE BETWEEN NEW
REQUIRE RECONFIGURATION OR RESETTING TO ACCOMMODATE THE
6. EXISTING CHAIN-LINK FENCE ADJACENT TO THE GATE OPENING MAY
MATERIAL SHALL MATCH THAT OF LOWER GATE FRAME.
5. PROVIDE STANCHION TO CONTAIN FREE END OF GATE. STANCHION
AND APPROXIMATELY 25' IN LENGTH TO SPAN EXISTING ROADWAY.
4. GATE SHALL BE 72" IN HEIGHT TO MATCH EXISTING ADJACENT FENCE
2.
INTENDED TO LIMIT METHOD OF INSTALLATION TO ONE MANUFACTURER.
1. DETAILS SHOWN ARE TO CLARIFY REQUIREMENTS AND ARE NOT
VERTICAL PIVOT GATE NOTES:
F P
-O M
S G
C
A P
IT
O
L A
V
M A
R C
H
M F
P C
S O
M .d g n
CS501OM
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S I Z
E
S U
B M
IT
T
E D
B Y
D A
T E
C O
N T
R A
C T
N O
C
H E
C K
E D
B Y
D R
A W
N B
Y
IS
S
U E
D A
T E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
EHH3
HH3
EHH2
HH2
EHH1
HH1
BUILDING
MAINTENANCE
OUTSIDE
ISLAND
FUEL
HH4
EHH4
M
PP Y55
PP 16
FP18-06
FP18-07
2060.93
UG COMM
UG FIBER OPTIC
2061.21
PP 16
PP Y58
2061.49
UG FIBER OPTIC
PP Y59
BURI
ED
UTIL
ITY U
NKNOW
N
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R
A H
A N
E B
R A
S K
A
F
IL
E N
A M
E
O M
A H
A N
E B
R A
S K
A
F
IL
E N
A M
E
N U
M B
E R
F
IL
E
N U
M B
E
A H
A N
E B
R A
S K
A
F
IL
E N
U M
B E
R
F
IL
E N
A M
ES101
N
S I
D A
N S
N
S I
D
N
M F
P E
S O
M .d g
GENERAL NOTES:
KEYED NOTES:
H Y
D R
A U
L
IC
V E
R T
IC
A
L P
IV
O
T G
A T
IT
E P
L
N
30' 60'0
SHEET ES401
REFER TO
O U
T S
ID
E
M A
IN
T
E N
A N
C E
F O
R T
P E
C K
D A
M
M O
N T
A N
A
O M
A H
A D
IS
T
R
IC
R T
P E
C K
D A
M
M O
N T
A N
A
O M
A H
A D
IS
T
R
IC
T O
U T
S
ID
E M
A
IN
T E
N A
N C
E
F O
R T
P E
C K
D A
M
M O
N T
A N
A
O M
A H
A D
IS
T
R
IC
T
F P
-O M
S G
C A
P
IT
O L
A V
E
C A
P
IT
O L
A V
E
C A
P
IT
O L
A V
R C
H
REFER TO SHEET ES401 FOR CONDUIT CONTENTS.
CONDUIT EXISTS IN THE DUCTBANK FOR PULLING NEW CABLING.
5. CONTRACTOR SHALL ASSUME THAT A MINIMUM OF ONE SPARE
PROJECT AS NECESSARY TO AVOID EXISTING FENCE.
ROUTES OF NEW CONDUIT TO BE INSTALLED UNDER THIS
TO START OF CONSTRUCTION. CONTRACTOR SHALL MODIFY
CONTRACTOR SHALL FIELD VERIFY THE ACTUAL ROUTE PRIOR
FENCE LOCATIONS SHOWN ARE CONCEPTUAL ONLY,
BE ASSUMED TO BE EXISTING UPON START OF CONSTRUCTION.
4. SITE FENCE IS TO BE INSTALLED CONCURRENTLY AND SHALL
THIS PROJECT AS NECESSARY TO AVOID EXISTING CONDUIT.
MODIFY ROUTES OF NEW CONDUIT TO BE INSTALLED UNDER
PRIOR TO START OF CONSTRUCTION. CONTRACTOR SHALL
ONLY, CONTRACTOR SHALL FIELD VERIFY THE ACTUAL ROUTE
START OF CONSTRUCTION. ROUTE SHOWN IS CONCEPTUAL
CONCURRENTLY AND SHALL BE ASSUMED TO BE EXISTING UPON
3. EXISTING 2-2" CONDUIT. CONDUIT TO BE INSTALLED
THIS PROJECT AS NECESSARY TO AVOID EXISTING CONDUIT.
MODIFY ROUTES OF NEW CONDUIT TO BE INSTALLED UNDER
PRIOR TO START OF CONSTRUCTION. CONTRACTOR SHALL
ONLY, CONTRACTOR SHALL FIELD VERIFY THE ACTUAL ROUTE
START OF CONSTRUCTION. ROUTE SHOWN IS CONCEPTUAL
CONCURRENTLY AND SHALL BE ASSUMED TO BE EXISTING UPON
2. EXISTING 3-2" CONDUIT. CONDUIT TO BE INSTALLED
NECESSARY TO AVOID EXISTING CONDUIT.
CONDUIT TO BE INSTALLED UNDER THIS PROJECT AS
CONSTRUCTION. CONTRACTOR SHALL MODIFY ROUTES OF NEW
FIELD VERIFY THE ACTUAL ROUTE PRIOR TO START OF
ROUTE SHOWN IS CONCEPTUAL ONLY, CONTRACTOR SHALL
ASSUMED TO BE EXISTING UPON START OF CONSTRUCTION.
CABLING ARE TO BE INSTALLED CONCURRENTLY AND SHALL BE
BUILDING AND THE ADMINISTRATIVE BUILDING. CONDUIT AND
FIBER OPTIC CABLE BETWEEN THE OUTSIDE MAINTENANCE
1. EXISTING 4-2" CONDUIT CONTAINING 24 STRAND MULTI-MODE
NEW TAMPER SWITCHES.
AND EHH1) TO FACILITATE THE INSTALLATION AND WIRING OF
COMMUNICATIONS HANDHOLES (FOR EXAMPLE BETWEEN HH1
BETWEEN ALL ADJACENT EXISTING POWER AND
1" SCHEDULE 40 PVC CONDUIT SHALL BE ASSUMED TO EXIST
7. ALTHOUGH THEY ARE NOT SHOWN ON THE PLANS. EXISTING
SHEET ES501 FOR ADDITIONAL INFORMATION.
INSTALLED USING OPEN TRENCHING. REFER TO NOTE 2 AND
6. ALL NEW DUCTBANK SHOWN ON THIS SHEET SHALL BE
ACTUAL LOCATIONS PRIOR TO START OF CONSTRUCTION.
CONCEPTUAL ONLY. CONTRACTOR SHALL FIELD VERIFY THE
CONSTRUCTION. HANDHOLE LOCATIONS SHOWN ARE
SHALL BE ASSUMED TO BE EXISTING UPON START OF
EHH4 ARE TO BE INSTALLED CONCURRENTLY BY OTHERS AND
5. HANDHOLES HH1, HH2, HH3, HH4, EHH1, EHH2, EHH3, AND
ADDRESS SHALE IF IT IS ENCOUNTERED.
CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS TO
4. SHALE MAY EXIST ALONG THE NEW DUCTBANK ROUTES.
DUCTBANK ROUTES.
UNDERGROUND UTILITY CROSSINGS ALONG THE PROPOSED
START OF TRENCHING TO LOCATE ALL EXISTING
3. CONTRACTOR SHALL PERFORM A FIELD SURVEY PRIOR TO
BACK TO ORIGINAL CONDITION.
VEGETATION DISTURBED OR DAMAGED DURING CONSTRUCTION
2. CONTRACTOR SHALL REPAIR ALL SURFACES AND
OF UTILITIES MAY DIFFER FROM THAT SHOWN.
ARE APPROXIMATE ONLY. ACTUAL SIZE, TYPE, AND LOCATION
1. EXISTING UTILITY LOCATIONS SHOWN ON THE SITE PLANS
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S I Z
E
S U
B M
IT
T
E D
B Y
D A
T E
C O
N T
R A
C T
N O
C
H E
C K
E D
B Y
D R
A W
N B
Y
IS
S
U E
D A
T E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
HH3
EHH3
EHH4
HH4
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
A H
A N
E B
R A
S K
A
F
IL
E N
A M
E
O M
A H
A N
E B
R A
S K
A
F
IL
E N
A M
E
N U
M B
E R
F
IL
E
N U
M B
E
A H
A N
E B
R A
S K
A
F
IL
E N
U M
B E
R
F
IL
E N
A M
ES401
N
S I
D A
N S
N
S I
D
N
M F
P E
S O
M .d g
GENERAL NOTES:
KEYED NOTES:
H Y
D R
A U
L
IC
V E
R T
IC
A
L P
IV
O
T G
A
L A
R G
E D
S
IT
E P
L
SHEET ES101
REFER TO
10' 20'0
(TYP.)
R T
P E
C K
D A
M
M O
N T
A N
A
O M
A H
A D
IS
T
R
IC
T O
U T
S
ID
E M
A
IN
T E
N A
N C
E
F O
R T
P E
C K
D A
M
M O
N T
A N
A
O M
A H
A D
IS
T
R
IC
T
F O
R T
P E
C K
D A
M
M O
N T
A N
A
O M
A H
A D
IS
T
R
IC
T
F P
-O M
S G
C A
P
IT
O L
A V
E
C A
P
IT
O L
A V
E
C A
P
IT
O L
A V
R C
H
ADJACENT EXISTING HANDHOLES.
14. CONTRACTOR SHALL INSTALL NEW CONDUCTORS BETWEEN
13. PROTECTIVE BOLLARD.
12. NEW VERTICAL PIVOT GATE, REFER TO SHEET CS501.
11. NEW ENTRY PEDESTAL, REFER TO SHEET EY503.
10. NEW EXIT PEDESTAL, REFER TO SHEET EY503.
RECOMMENDATION.
OPERATOR SHALL BE PER GATE MANUFACTURER
AS INDICATED BY MANUFACTURER. FINAL LOCATION OF
AT 120VAC. FINAL OPERATOR POWER REQUIREMENTS SHALL BE
CONTRACTOR SHALL ASSUME A POWER CONSUMPTION OF 20A
TO KEYED NOTES 3 AND 5 FOR ADDITIONAL INFORMATION.
9. NEW HYDRAULIC VERTICAL PIVOT GATE OPERATOR. REFER
EY502 FOR ADDITIONAL INFORMATION.
8. NEW GATE ENTRY EQUIPMENT RACK, REFER TO SHEET
EHH1, EHH2, EHH3, AND EHH4.
MAINTENANCE BUILDING TO THE NEW GATE OPERATOR VIA,
FROM PANEL R2 CIRCUIT 9 IN ROOM 107 OF THE OUTSIDE
CONDUCTORS IN CONDUIT. CONDUCTORS SHALL BE ROUTED
INSTALL NEW 2-1/0AWG AND 1/0AWG GND COPPER
5. NEW 2" SCHEDULE 40 PVC CONDUIT. CONTRACTOR SHALL
REFER TO SHEET EY502 FOR ADDITIONAL INFORMATION.
MASTER GATE CONTROL BOX VIA HH1, HH2, HH3, AND HH4.
EQUIPMENT RACK TO THE GATE OPERATOR VIA HH3 AND HH4.
3. CABLE SHALL BE ROUTED FROM THE GATE ENTRY
REFER TO SHEET EY502 FOR ADDITIONAL INFORMATION.
EQUIPMENT RACK TO THE EXIT PEDESTAL VIA HH3 AND HH4.
2. CABLES SHALL BE ROUTED FROM THE GATE ENTRY
SHEET EY502 FOR ADDITIONAL INFORMATION.
EQUIPMENT RACK TO THE ENTRY PEDESTAL VIA HH3. REFER TO
1. NEW CABLES SHALL BE ROUTED FROM THE GATE ENTRY
CONDUIT AND HANDHOLES.
UNDER THIS PROJECT AS NECESSARY TO AVOID EXISTING
AND THE LOCATIONS OF NEW EQUIPMENT TO BE INSTALLED
10. CONTRACTOR SHALL MODIFY ROUTES OF NEW CONDUIT
EXISTING HANDHOLES AND CONDUIT.
CONSTRUCTION TO VERIFY THE LOCATION AND ROUTE OF
PERFORM A FIELD SURVEY PRIOR TO START OF
THIS SHEET ARE APPROXIMATE. THE CONTRACTOR SHALL
ROUTES OF EXISTING UNDERGROUND CONDUIT SHOWN ON
9. THE LOCATIONS OF EXISTING HANDHOLES AND THE
IS TO BE INSTALLED.
SENSOR SHALL BE RATED FOR THE ENVIRONMENT IN WHICH IT
CAUSE THE GATE TO REVERSE DIRECTION. PRESSURE
END OF THE GATE. DETECTION OF AN OBSTRUCTION SHALL
EDGE MOUNTED PRESSURE SENSORS ON THE BOTTOM AND
8. THE NEW VERTICAL PIVOT GATE SHALL BE EQUIPPED WITH
SIGNAL FROM THE FIELD DISTRIBUTION BOX.
CLOSE THE GATE 1 MINUTE AFTER RECEIVING AN 'OPEN'
OPERATOR. THE GATE OPERATOR SHALL AUTOMATICALLY
PANEL SHALL SEND AN 'OPEN' SIGNAL TO THE NEW GATE
THE ENTRY OR EXIT PEDESTAL, THE FIELD DISTRIBUTION
7. UPON INSERTING KEY OR USING TRANSMITTER AT EITHER
VIA MOMENTARY PUSHBUTTONS TO THE NEW GATE OPERATOR.
THE MASTER GATE CONTROL BOX SHALL TRANSMIT SIGNALS
MAINTENANCE BUILDING, REFER TO SHEET FA101 AND EY502.
GATE CONTROL BOX LOCATED WITHIN THE OUTSIDE
OPERATOR SHALL ALSO BE CONTROLLED FROM A MASTER
AND WITH THE NEW RF TRANSMITTERS, THE NEW GATE
ELECTRONIC SWITCH LOCK THE ENTRY AND EXIT PEDESTALS
6. IN ADDITION TO BEING CONTROLLED USING THE NEW
THE GATE OPERATOR.
PAD SHALL EXTEND A MINIMUM OF 6" BEYOND THE EDGES OF
PLACING THE GATE OPERATOR. NEW CONCRETE EQUIPMENT
COHESIVE FILL AND 95% FOR COHESIONLESS FILL PRIOR TO
BACKFILL SHALL BE COMPACTED TO AT LEAST 90% FOR
THE GRADE PRIOR TO INSTALLING NEW EQUIPMENT PAD.
CONTRACTOR SHALL PLACE SELECT SOIL BACKFILL TO LEVEL
OPERATOR. PRIOR TO INSTALLING THE GATE OPERATOR, THE
EQUIPMENT PAD UNDER THE NEW VERTICAL PIVOT GATE
5. CONTRACTOR SHALL INSTALL A NEW 6" THICK CONCRETE
POWER PLANT.
RECEIVER WITHIN THE GATE OPERATOR AT THE FORT PECK
THE OPEN AND CLOSE CHANNELS OF THE EXISTING RF
TRANSMITTERS SHALL BE PROGRAMMED TO CORRESPOND TO
GATE OPERATOR. THE REMAINING CHANNELS OF THE NEW
CHANNELS OF THE NEW RF RECEIVER INSTALLED WITHIN THE
THE CHANNELS CORRESPOND TO THE OPEN AND CLOSE
TRANSMITTERS SHALL BE PROGRAMMED SUCH THAT TWO OF
RECEIVER INSTALLED WITHIN THE GATE OPERATOR. THE
CHANNEL RF TRANSMITTERS COMPATIBLE WITH THE RF
4. THE CONTRACTOR SHALL PROVIDE A MINIMUM OF THREE 4-
WITHIN THE GATE OPERATOR ENCLOSURE.
SIGNAL CONDUCTORS. THE RF RECEIVER SHALL BE INSTALLED
CONNECTED IN PARALLEL WITH ANY OTHER GATE OPEN/CLOSE
GATE TO CLOSE. THE RF RECEIVER OUTPUTS SHALL BE
TRIGGERS THE GATE TO OPEN AND THE OTHER TRIGGERS THE
CHANNEL RF RECEIVER WIRED SUCH THAT ONE CHANNEL
3. THE NEW GATE OPERATOR SHALL BE INSTALLED WITH A 2-
60 AND 90 FLASHES PER MINUTE.
IS IN MOTION. STROBE SHALL HAVE A FLASH RATE OF BETWEEN
YELLOW (AMBER) STROBE WHICH OPERATES WHEN THE GATE
2. NEW GATE OPERATOR SHALL BE EQUIPPED WITH A FLASHING
BE PER MANUFACTURE RECOMMENDATION.
CONCEPTUAL ONLY. FINAL CABLE TYPES AND NUMBER SHALL
1. NEW CABLES LISTED ON THIS PAGE FOR INSTALLATION ARE
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S I Z
E
S U
B M
IT
T
E D
B Y
D A
T E
C O
N T
R A
C T
N O
C
H E
C K
E D
B Y
D R
A W
N B
Y
IS
S
U E
D A
T E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
A H
A N
E B
R A
S K
A
F
IL
E N
A M
E
O M
A H
A N
E B
R A
S K
A
F
IL
E N
A M
E
N U
M B
E R
F
IL
E
N U
M B
E
A H
A N
E B
R A
S K
A
F
IL
E N
U M
B E
R
F
IL
E N
A M
ES501
N
S I
D A
N S
N
S I
D F
P
E
S
O M
.d g n F
P
E
S
O M
.d g n F
P
E
S
O M
.d g n D
E T
A
IL
S D
E T
A
IL
S D
E T
A
IL
S
H Y
D R
A U
L
IC
V E
R T
IC
A
L P
IV
O
T G
A
IT
E S
IT
E
S
IT
E
O U
T S
ID
E
M A
IN
T
E N
A N
C E
F O
R T
P E
C K
D A
M
M O
N T
A N
A
O M
A H
A D
IS
T
R
R T
P E
C K
D A
M
M O
N T
A N
A
O M
A H
A D
IS
T
R
R T
P E
C K
D A
M
M O
N T
A N
A
O M
A H
A D
IS
T
R
R C
H
P
D -4
F P
D -4
F P
D -4
C A
P
IT
O L
A V
E
C A
P
IT
O L
A V
E
C A
P
IT
O L
A V
E
NO SCALE
PROTECTIVE BOLLARD DETAIL
CONCRETE TOP
ROUND
WITH CONCRETE
STEEL PIPE FILLED
8" DIAMETER
OR PAVEMENT
FINISHED GRADE
FOUNDATION
CONCRETE
8" 8"
NOTES:
PAVEMENT ONLY)
INSTALLED IN CONCRETE
FILLER (WHERE
BITUMINOUS JOINT
2. NEW BOLLARDS SHALL BE PAINTED YELLOW.
AND HAVE A MINIMUM WALL THICKNESS OF 0.322".
1. STEEL PIPE SHALL BE GALVANIZED (2.0 OZ. ZINC/SQFT)
File details come from the government source that posted it. Updated .