PRICE SCHEDULE.pdf

PDF 88 KB Posted

Attached to
Fort Peck Outside Maintenance Hydraulic Pivot Gate
Solicitation number
W9128F25QA094
Issued by

About this file

This document is a Price Schedule for a contract involving a Hydraulic Lift Gate. The schedule contains three line items: (1) Furnishing a Hydraulic Lift Gate with associated supplies and materials, (2) Labor/Equipment, and (3) Mobilization/Demobilization. Each line item has a quantity of 1 Job and is priced on a per-job basis. The document provides a template for bidders to complete their pricing for each line item, with a space to calculate the total contract cost at the bottom of the form.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICE SCHEDULE

Item No. Description Quantity Unit Bid Price

0001 Furnish Hydraulic Lift Gate and all associated supplies and materials 1 Job

0002 Labor/Equipment 1 Job

0003 Mobilization/Demobilization 1 Job

TOTAL CONTRACT COST

File details come from the government source that posted it. Updated .