Solicitation_No__140R4021R0020_Tyzack_Pumping_Plant_Regulating_Tank_Coating.pdf
PDF 828 KB Posted
- Attached to
- Tyzack Pumping Plant Regulating Tank Coating
- Solicitation number
- 140R4021R0020
About this file
This is a solicitation for Tyzack Pumping Plant Regulating Tank Coating services. The Bureau of Reclamation seeks to coat the interior and exterior of a steel regulating tank and associated features, as well as 380 linear feet of a 14-inch bypass pipe. The total small business set-aside contract will be awarded on a lowest price technically acceptable basis. Offerors must submit electronic proposals by 2:00 PM Mountain Time on November 18, 2021. The period of performance is scheduled from January 28, 2022 to July 29, 2022. The solicitation requires bid guarantees and site visits, and identifies evaluation criteria including past performance and technical approach.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NO. 140R4021R0020
TYZACK PUMPING PLANT
REGULATING TANK COATING
INTERIOR REGION 7 • UPPER COLORADO BASIN
SALT LAKE CITY REGIONAL OFFICE
ACQUISITION MANAGEMENT DIVISION
PROVO AREA OFFICE PROJECT
SOLICITATION NO: 140R4021R0020 TITLE: TYZACK PUMPING PLANT REGULATING TANK COATING
INFORMATIONAL PAGE
1. Solicitation No. 140R4021R0020 is a TOTAL SMALL BUSINESS SET-ASIDE (please see 52.219-6 for more information) and shall be procured in accordance with Parts 15 and 36 of the Federal Acquisition Regulation (FAR). The Solicitation document, as a whole, and the Attachments in Section J provide specific information for the work required under this solicitation.
Please thoroughly read 52.219-14 “Limitations on Subcontracting” to ensure that the Small Business Prime Contractor meets the performance of the contract percentage requirements as outlined within 52.219- 14(e)(3).
2. The associated NAICS Code is 237110 Water and Sewer Line and Related Structures Construction with a Size Standard of $39.5M to classify as a Small Business.
3. In accordance with FAR 36.204 and supplemented by WBR 1436.204 “Disclosure of the Magnitude of Construction Projects,” the magnitude of this project is between $250,000 and $500,000.
4. A Bid Guarantee is required for this Solicitation. Please see Standard Form 1442 Box 13 within Section A and 52.228-1 “Bid Guarantee” within Section L for more information.
5. A SITE VISIT for this solicitation is scheduled for:
Date: Tuesday, November 2, 2021 Time: By appointment only. Please contact Mr. Ben Kirk by phone at 801-379-1109 or by email at bkirk@usbr.gov for scheduling.
6. Technical and Contracting Questions are due no later than:
Date: Friday, November 5, 2021 Time: 1400 (2:00 PM) Mountain Time
Only questions in writing directly to the Contracting Officer at lrock@usbr.gov will be accepted. No questions will be accepted after the due date and time.
All answers will be posted via Amendment to the Solicitation no later than:
Date: Friday, November 12, 2021 Time: Close of Business (Approximately 6:00 PM)
7. Proposal Due Date: Thursday, November 18, 2021 Proposal Due Time: 1400 (2:00 PM) Mountain Time
ONLY ELECTRONIC SUBMISSIONS WILL BE ACCEPTED for this Solicitation directly to the Contracting Officer at lrock@usbr.gov. Please see WBR 1452.215-81 for submission information.
9. Please see WBR 1452.215-85 “Evaluation Factors for Award Lowest Price Technically Acceptable Source Selection Process – Bureau of Reclamation” in Section M for the relative importance of the factors and all Evaluation Factors and Subfactors with their commensurate evaluation standard.
10. Any inquiries regarding this Solicitation must be made directly to the following individual:
Name: Ms. Lynette H. Rock, Contracting Officer Email: lrock@usbr.gov Phone: 385-228-8535
All correspondence and voicemails must reference Solicitation No. 140R4021R0020 Tyzack Pumping Plant Regulating Tank Coating.
TABLE OF CONTENTS
SECTION A – SOLICITATION/CONTRACT FORM
SECTION B – CONTINUATION OF SUPPLIES OR SERVICES AND PRICES/COSTS
SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
SECTION D – PACKAGING AND MARKING
SECTION E – INSPECTION AND ACCEPTANCE
Inspection of Construction
SECTION F – DELIVERIES OR PERFORMANCE
Clauses Incorporated by Reference Commencement, Prosecution, and Completion of Work
SECTION G – CONTRACT ADMINISTRATION DATA
Electronic Invoicing and Payment Requirements – Invoice Processing Platform (IPP) Post Award Conference – Bureau of Reclamation
SECTION H – SPECIAL CONTRACT REQUIREMENTS
Notice to Contractors – Contractor Performance Assessment Reporting System Intent to Incorporate Technical Proposal – Bureau of Reclamation (Provision)
SECTION I – CONTRACT CLAUSES
Clauses Incorporated by Reference Display of Hotline Poster(s) Notice of Total Small Business Set-Aside Limitations on Subcontracting Estimate of Percentage of Recovered Material Content for EPA-Designated Items Buy American-Construction Materials Under Trade Agreements Physical Data Authorized Deviations in Clauses Authorities and Delegations Restrictions on Endorsements Release of Claims Examination of Records by the Department of the Interior Liability Insurance Contracting Officer’s Representative’s Authorities and Limitations – Bureau of Reclamation Safety and Health – Bureau of Reclamation Protecting Federal Employees and the Public from Exposure to Tobacco Smoke in the Federal
Workplace – Bureau of Reclamation Certification of Representatives for Corporate Sureties – Bureau of Reclamation Equipment Ownership and Operating Expense – Bureau of Reclamation Other Invoice Requirements – Bureau of Reclamation Payment for Technical Data – Bureau of Reclamation Claims Accounting – Bureau of Reclamation Modification Proposals – Bureau of Reclamation (Alternate II) Security Requirements – Bureau of Reclamation
SECTION J – LIST OF ATTACHMENTS
SECTION K – REREPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFEORS
OR RESPONDENTS
Solicitation Provisions Incorporated by Reference Annual Representations and Certifications
Notice of Requirements for Affirmative Action to Ensure Equal Employment Opportunity for Construction
Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment
Certification Regarding Responsibility Matters Information Regarding Responsibility Matters Violation of Arms Control Treaties or Agreements - Certification
SECTION L – INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS
Solicitation Provisions Incorporated by Reference Type of Contract Construction Wage Rate Requirements – Secondary Site of the Work Bid Guarantee Site Visit (Construction) – Alternate I Authorized Deviations in Provisions Service of Protest Department of the Interior (July 1996) (Deviation) Use and Disclosure of Proposal Information – Department of the Interior Source Evaluation and Selection Procedures – Bureau of Reclamation Proposal Instructions – Bureau of Reclamation
SECTION M – EVALUATION FACTORS FOR AWARD
Evaluation Factors for Award – Lowest Price Technically Acceptable Source Selection Process –
Bureau of Reclamation
SECTION A – SOLICITATION/CONTRACT FORM
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
Bureau of Reclamation
Upper Colorado Region
Regional Office 125 South State Street, Room 8100
R40
Salt Lake City UT 84138
Ms. Lynette H. Rock lrock@usbr.gov 125 S. State St. Room 8100 (UC-850) Salt Lake City, UT 84138
Lynette Rock 801-524-3798
6x 10/18/2021
140R4021R0020
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Please see the "INFORMATIONAL PAGE" for information pertinent to this solicitation.
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
5 181 calendar days and complete it within ________________ ________________ calendar days after receiving
11/18/2021
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
PAGE 7 OF
Bureau of Reclamation Upper Colorado Region
Regional Office 125 South State Street, Room 8100
R40
Salt Lake City UT 84138
Lynette H. Rock
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
8 190
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140R4021R0020
Legacy Doc #: BOR
Period of Performance: 01/28/2022 to 07/29/2022
00010 Tyzack Pumping Plant Regulating Tank Coating
Product/Service Code: Z2NE
Product/Service Description: REPAIR OR ALTERATION
OF WATER SUPPLY FACILITIES
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
SECTION B – CONTINUATION OF SUPPLIES OR SERVICES AND PRICES/COSTS
Continuation of Section B Construction Price Schedule
(a) Offers will be considered for award on the following schedule, but no offer will be considered for award on only a part of the schedule.
(b) Offers are subject to the terms and conditions of this solicitation.
(c) Definitions
(1) CLIN – Contract Line Item Number
CLIN Section Supplies or Services Quantity Unit Unit Price
Amount
00010-01 09 96 20
Remove and dispose of existing coatings from interior and exterior of steel tank and associated features as described in the specifications.
For the Lump Sum of $
00010-02 09 96 20 Interior coats of Regulating Tank and associated features to as described in the specifications.
For the Lump Sum of $
00010-03 09 96 20 Exterior coats of Regulating Tank and associated features as described in the specifications.
For the Lump Sum of $
00010-04 09 96 20
Remove and dispose of existing coatings from exterior of 14-inch bypass pipe (380 LF) as described in the specifications.
For the Lump Sum of $
00010-05 09 96 20 Exterior coats of 14-inch bypass pipe (380 LF) as described in the specifications.
For the Lump Sum of $
TOTAL FOR PRICE SCHEDULE $
SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
Please see Section J Attachment 1 titled “140R4021R0020 Specifications”
SECTION D – PACKAGING AND MARKING
This Section Intentionally Left Blank
SECTION E – INSPECTION AND ACCEPTANCE
52.246-12 INSPECTION OF CONSTRUCTION AUGUST 1996
(a) Definition. “Work” includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
(c) Government inspections and tests are for the sole benefit of the Government and do not-
(1) Relieve the Contractor of responsibility for providing adequate quality control measures;
(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
(3) Constitute or imply acceptance; or
(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this- section.
(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer’s written authorization.
(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer.
The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary.
The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work.
Special, full size, and performance tests shall be performed as described in the contract.
(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
(g) If the Contractor does not promptly replace or correct rejected work, the Government may-
(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or
(2) Terminate for default the Contractor’s right to proceed.
(h) If, before acceptance of the entire work, the Government Decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction.
However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted Separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.
SECTION F – DELIVERIES OR PERFORMANCE
52.252-2 CLAUSES INCORPORATED BY REFERENCE FEBRUARY 1998
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): https://www.acquisition.gov/browse/index/far
52.211-13 Time Extensions September 2000 52.236-15 Schedules for Construction Contracts April 1984 52.242-14 Suspension of Work April 1984
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK APRIL 1984
The Contractor shall be required to (a) commence work under this contract within 5 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than July 29, 2022. The time stated for completion shall include final cleanup of the premises.
SECTION G – CONTRACT ADMINISTRATION DATA
DOI-AAAP-0028 V3
ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS
INVOICE PROCESSING PLATFORM (IPP)
APRIL 2013
Payment requests must be submitted electronically through the U.S. Department of the Treasury's Internet Payment Platform System (IPP).
"Payment requests" means any request for contract financing payment or invoicing payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions-Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
The Contractor shall submit an electronic copy of each invoice to Mr. Mike Talbot the Contracting Officer’s Representative (COR), by electronic mail (e-mail) at mtalbot@usbr.gov. Mr. Talbot will evaluate the submitted invoice and will provide an approval by emailing the contractor with an attached signed invoice. The COR may also reject the invoice; in this case, an email will be provided to the contractor with detailed information to revise the invoice as needed for approval.
Once an approved invoice is received, the contractor is encouraged to upload, as an attachment, a copy of the approved invoice with the COR’s signature, PRIOR to clicking “submit” in IPP. Please send an e-mail copy to the Contracting Officer, Ms. Lynette H. Rock at lrock@usbr.gov. Failure to follow this process may cause significant delay or possible rejection of your payment request.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
WBR 1452.242-80
POSTAWARD CONFERENCE
BUREAU OF RECLAMATION
JULY 1993
(a) Prior to the Contractor starting work, a postaward conference (as described in FAR Subpart 42.5), will be convened by the contracting activity or contract administration office. The Contractor's Project Manager shall attend the conference. If the contract involves subcontractors, a representative of each major subcontractor is also required to attend.
(b) The conference will be held at the following location:
Provo Area Office 302 East 1860 South Provo, UT 84606
The conference may be held virtually; if so, information will be shared with the contractor after award.
(c) The Contracting Officer and the Contractor will agree to the date and time of the conference after award of the contract. In event of a conflict in schedules, the Contracting Officer shall establish the date for the conference.
(d) The Contractor shall include any associated costs for attendance at the conference, in its offer.
SECTION H – SPECIAL CONTRACT REQUIREMENTS
DOI-AAAP-0050 V2
NOTICE TO CONTRACTORS
CONTRACTOR PERFORMANCE ASSESSMENT
REPORTING SYSTEM
DECEMBER 2015
1) FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of the
Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.
2) The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.
3) We request that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official (AO). Information in the report must be protected as source selection sensitive information not releasable to the public.
4) When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/.
5) Within 60 days after the end of a performance period, the AO will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/.
a) Contractor Representatives may then provide comments in response to the evaluation or return the evaluation without comment.
b) Your comments should focus on objective facts in the AO's narrative and should provide your views on the causes and ramifications of the assessed performance.
c) All information provided should be reviewed for accuracy prior to submission.
d) If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in the space provided, and then selecting “Accept the Ratings and Close the Evaluation”.
e) Your response is due within 60 calendar days after receipt of the CPAR. On day 15, the evaluation will become available in PPIRS-RC marked as “Pending” with or without comments and whether or not it has been closed.
f) If you do not sign and submit the CPAR within 60 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment."
6) The following guidelines apply concerning your use of the past performance evaluation:
a) Protect the evaluation as source selection information. After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the CO for instructions.
b) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.
c) Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.
7) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the CO no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 60-day review period.
8) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.
WBR 1452.215-89
INTENT TO INCORPORATE TECHNICAL PROPOSAL
BUREAU OF RECLAMATION
(PROVISION)
SEPTEMBER 2011
(a) Portions of the successful offeror's technical proposal shall be incorporated, physically or by reference, in any contract resulting from this solicitation.
(b) The successful offeror may be asked to provide an updated technical proposal after negotiations for incorporation into the awarded contract.
(c) At award this provision will be removed from Section H and replaced by the following clause and language:
(1) WBR 1452.215-90 Incorporation of Technical Proposal – Bureau of Reclamation (Clause) (September 2011)
Portions of the successful offeror's technical proposal are hereby incorporated, either physically or by reference, into this contract. The portions and their location in the contract are as follows:
Location in Contract and Description/Information
SECTION I – CONTRACT CLAUSES
52.252-2 CLAUSES INCORPORATED BY REFERENCE FEBRUARY 1998
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text.
Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): https://www.acquisition.gov/browse/index/far
52.202-1 Definitions June 2020 52.203-3 Gratuities April 1984 52.203-5 Covenant Against Contingent Fees May 2014 52.203-6 Restrictions on Subcontractor Sales to the Government June 2020 52.203-7 Anti-Kickback Procedures June 2020 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity May 2014 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity May 2014 52.203-12 Limitation on Payments to Influence Certain Federal Transactions June 2020 52.203-13 Contractor Code of Business Ethics and Conduct June 2020
52.203-17 Contractor Employee Whistleblower Rights and Requirement to Inform Employees of Whistleblower Rights
June 2020
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements January 2017 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper May 2011 52.204-9 Personal Identity Verification of Contractor Personnel January 2011 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards June 2020 52.204-13 System for Award Management Maintenance October 2018 52.204-14 Service Contract Reporting Requirements October 2016 52.204-18 Commercial and Government Entity Code Maintenance August 2020 52.204-19 Incorporation by Reference of Representations and Certifications December 2014
52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities
July 2018
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment
August 2020
52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment
June 2020
52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters October 2018 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations November 2015 52.210-1 Market Research June 2020 52.215-2 Audit and Records-Negotiation June 2020 52.215-8 Order of Precedence-Uniform Contract Format October 1997 52.215-10 Price Reduction for Defective Certified Cost or Pricing Data August 2011 52.215-11 Price Reduction for Defective Certified Cost or Pricing Data – Modifications June 2020 52.215-12 Subcontractor Certified Cost or Pricing Data June 2020 52.215-13 Subcontractor Certified Cost or Pricing Data-Modifications June 2020
52.215-21 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data-Modifications
June 2020
52.219-8 Utilization of Small Business Concerns October 2018 52.219-28 Post-Award Small Business Program Rerepresentation September 2021 52.222-1 Notice to the Government of Labor Disputes February 1997 52.222-3 Convict Labor June 2003 52.222-4 Contract Work Hours and Safety Standards -Overtime Compensation May 2018 52.222-6 Construction Wage Rate Requirements August 2018
52.222-7 Withholding of Funds May 2014 52.222-8 Payrolls and Basic Records July 2021 52.222-9 Apprentices and Trainees July 2005 52.222-10 Compliance with Copeland Act Requirements February 1988 52.222-11 Subcontracts (Labor Standards) May 2014 52.222-12 Contract Termination-Debarment May 2014 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations May 2014 52.222-14 Disputes Concerning Labor Standards February 1988 52.222-15 Certification of Eligibility May 2014 52.222-21 Prohibition of Segregated Facilities April 2015 52.222-26 Equal Opportunity September 2016 52.222-27 Affirmative Action Compliance Requirements for Construction April 2015 52.222-35 Equal Opportunity for Veterans June 2020 52.222-36 Equal Opportunity for Workers with Disabilities June 2020 52.222-37 Employment Reports on Veterans June 2020 52.222-40 Notification of Employee Rights Under the National Labor Relations Act December 2010 52.222-50 Combating Trafficking in Persons October 2020 52.222-54 Employment Eligibility Verification October 2015 52.222-55 Minimum Wages Under Executive Order 13658 November 2020 52.222-62 Paid Sick Leave Under Executive Order 13706 January 2017 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts September 2013 52.223-5 Pollution Prevention and Right-to-Know Information May 2011 52.223-6 Drug Free Workplace May 2001 52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction Contracts August 2018 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving June 2020 52.225-12 Notice of Buy American Requirement-Construction Materials Under Trade Agreements May 2014 52.225-13 Restrictions on Certain Foreign Purchases February 2021 52.226-1 Utilization of Indian Organizations and Indian-Owned Economic Enterprises June 2000 52.227-1 Authorization and Consent June 2020 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement June 2020 52.227-4 Patent Indemnity – Construction Contracts December 2007 52.227-14 Rights in Data – General May 2014 52.228-2 Additional Bond Security October 1997 52.228-5 Insurance – Work on a Government Installation January 1997 52.228-11 Individual Surety – Pledge of Assets February 2021 52.228-12 Prospective Subcontractor Requests for Bonds May 2014 52.228-14 Irrevocable Letter of Credit November 2014 52.228-15 Performance and Payment Bonds – Construction June 2020 52.229-3 Federal, State, and Local Taxes February 2013 52.232-5 Payments under Fixed-Price Construction Contracts May 2014 52.232-16 AI Progress Payments – Alternate I (March 2000) June 2020 52.232-17 Interest May 2014 52.232-23 Assignment of Claims May 2014 52.232-27 Prompt Payment for Construction Contracts January2017 52.232-33 Payment by Electronic Funds Transfer – System for Award Management October 2018 52.232-39 Unenforceability of Unauthorized Obligations June 2013 52.232-40 Providing Accelerated Payments to Small Business Subcontractors December 2013 52.233-1 Disputes May 2014 52.233-3 Protest After Award August 1996 52.233-4 Applicable Law for Breach of Contract Claim October 2004 52.236-2 Differing Site Conditions April 1984 52.236-3 Site Investigation and Conditions Affecting the Work April 1984 52.236-5 Material and Workmanship April 1984
52.236-6 Superintendence by the Contractor April 1984 52.236-7 Permits and Responsibilities November 1991 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements April 1984 52.236-10 Operations and Storage Areas April 1984 52.236-11 Use and Possession Prior to Completion April 1984 52.236-12 Cleaning Up April 1984 52.236-13 Accident Prevention November 1991 52.236-16 Quantity Surveys April 1984 52.236-17 Layout of Work April 1984 52.236-21 AI Specifications and Drawings for Construction – Alternate I (April 1984) February1997 52.236-26 Preconstruction Conference February1995 52.242-13 Bankruptcy July 1995 52.243-4 Changes June 2007 52.243-6 Change Order Accounting April 1984 52.244-6 Subcontracts for Commercial Items July 2021 52.245-1 Government Property September 2021 52.245-9 Use and Charges April 2012 52.246-21 Warranty of Construction March 1994 52.248-3 Value Engineering-Construction October 2020 52.249-2 AI Termination for Convenience of the Government (Fixed-Price) – Alternate I (September 1996) April 2012 52.249-10 Default (Fixed-Price Construction) April 1984 52.253-1 Computer Generated Forms January1991
52.203-14 DISPLAY OF HOTLINE POSTER(S) JUNE 2020
(a) Definition.
United States, as used in this clause, means the 50 States, the District of Columbia, and outlying areas.
(b) Display of fraud hotline poster(s). Except as provided in paragraph (c)—
(1) During contract performance in the United States, the Contractor shall prominently display in common work areas within business segments performing work under this contract and at contract work sites-
(i) Any agency fraud hotline poster or Department of Homeland Security (DHS) fraud hotline poster identified in paragraph (b)(3) of this clause; and
(ii) Any DHS fraud hotline poster subsequently identified by the Contracting Officer.
(2) Additionally, if the Contractor maintains a company website as a method of providing information to employees, the Contractor shall display an electronic version of the poster(s) at the website.
(3) Any required posters may be obtained as follows:
Poster(s) Obtain from
DHS OIG Hotline Poster https://www.doioig.gov/site-page/complaint-hotline
(c) If the Contractor has implemented a business ethics and conduct awareness program, including a reporting mechanism, such as a hotline poster, then the Contractor need not display any agency fraud hotline posters as required in paragraph (b) of this clause, other than any required DHS posters.
(d) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (d), in all subcontracts that exceed the threshold specified in Federal Acquisition Regulation 3.1004(b)(1) on the date of subcontract award, except when the subcontract—
(1) Is for the acquisition of a commercial item; or
(2) Is performed entirely outside the United States.
52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE NOVEMBER 2020
(a) Definition. Small business concern, as used in this clause—
(1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the size standards in this solicitation.
(2) Affiliates, as used in paragraph (a)(1) of this clause, means business concerns, one of whom directly or indirectly controls or has the power to control the others, or a third party or parties control or have the power to control the others. In determining whether affiliation exists, consideration is given to all appropriate factors including common ownership, common management, and contractual relationships. SBA determines affiliation based on the factors set forth at 13 CFR 121.103.
(b) Applicability. This clause applies only to-
(1) Contracts that have been totally set aside for small business concerns; and
(2) Orders set aside for small business concerns under multiple-award contracts as described in 8.405- 5 and 16.505(b)(2)(i)(F).
(c) General. (1) Offers are solicited only from small business concerns. Offers received from concerns that are not small business concerns shall be considered nonresponsive and will be rejected.
(2) Any award resulting from this solicitation will be made to a small business concern.
52.219-14
LIMITATIONS ON SUBCONTRACTING
SEPTEMBER 2021
(a) This clause does not apply to the unrestricted portion of a partial set-aside.
(b) Definition. Similarly situated entity, as used in this clause, means a first-tier subcontractor, including an independent contractor, that—
(1) Has the same small business program status as that which qualified the prime contractor for the award
(e.g., for a small business set-aside contract, any small business concern, without regard to its socioeconomic status); and
(2) Is considered small for the size standard under the North American Industry Classification System (NAICS) code the prime contractor assigned to the subcontract.
(c) Applicability. This clause applies only to—
(1) Contracts that have been set aside for any of the small business concerns identified in 19.000(a)(3);
(2) Part or parts of a multiple-award contract that have been set aside for any of the small business concerns identified in 19.000(a)(3);
(3) Contracts that have been awarded on a sole-source basis in accordance with subparts 19.8, 19.13, 19.14, and 19.15;
(4) Orders expected to exceed the simplified acquisition threshold and that are—
(i) Set aside for small business concerns under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F); or
(ii) Issued directly to small business concerns under multiple-award contracts as described in 19.504(c)(1)(ii);
(5) Orders, regardless of dollar value, that are—
(i) Set aside in accordance with subparts 19.8, 19.13, 19.14, or 19.15 under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F); or
(ii) Issued directly to concerns that qualify for the programs described in subparts 19.8, 19.13, 19.14, or 19.15 under multiple-award contracts, as described in 19.504(c)(1)(ii); and
(6) Contracts using the HUBZone price evaluation preference to award to a HUBZone small business concern unless the concern waived the evaluation preference.
(d) Independent contractors. An independent contractor shall be considered a subcontractor.
(e) Limitations on subcontracting. By submission of an offer and execution of a contract, the Contractor agrees that in performance of a contract assigned a North American Industry Classification System (NAICS) code for—
(1) Services (except construction), it will not pay more than 50 percent of the amount paid by the
Government for contract performance to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract;
(2) Supplies (other than procurement from a nonmanufacturer of such supplies), it will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both supplies and services, the 50 percent limitation shall apply only to the supply portion of the contract;
(3) General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 85 percent subcontract amount that cannot be exceeded; or
(4) Construction by special trade contractors, it will not pay more than 75 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 75 percent subcontract amount that cannot be exceeded.
(f) The Contractor shall comply with the limitations on subcontracting as follows:
(1) For contracts, in accordance with paragraphs (c)(1), (2), (3) and (6) of this clause—
[Contracting Officer check as appropriate.]
□ By the end of the base term of the contract and then by the end of each subsequent option period; or
□ By the end of the performance period for each order issued under the contract.
(2) For orders, in accordance with paragraphs (c)(4) and (5) of this clause, by the end of the performance period for the order.
(g) A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph
(e) of this clause will be performed by the aggregate of the joint venture participants.
52.223-9
ESTIMATE OF PERCENTAGE OF RECOVERED
MATERIAL CONTENT FOR EPA-DESIGNATED ITEMS
MAY 2008
(a) Definitions. As used in this clause-
Postconsumer material means a material or finished product that has served its intended use and has been discarded for disposal or recovery, having completed its life as a consumer item. Postconsumer material is a part of the broader category of “recovered material.”
“Recovered material” means waste materials and by-products recovered or diverted from solid waste, but the term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.
(b) The Contractor, on completion of this contract, shall-
(1) Estimate the percentage of the total recovered material content for EPA-designated item(s) delivered and/or used in contract performance, including, if applicable, the percentage of post-consumer material content; and
(2) Submit this estimate to Bureau of Reclamation, ATTN: Mr. Michael Talbot (Contracting Officer’s
Representative), mtalbot@usbr.gov
52.225-11
BUY AMERICAN-CONSTRUCTION MATERIALS
UNDER TRADE AGREEMENTS
JANUARY 2021
(a) Definitions. As used in this clause—
Caribbean Basin country construction material means a construction material that—
(1) Is wholly the growth, product, or manufacture of a Caribbean Basin country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a Caribbean Basin country into a new and different construction material distinct from the materials from which it was transformed.
Commercially available off-the-shelf (COTS) item—
(1) Means any item of supply (including construction material) that is–
(i) A commercial item (as defined in paragraph (1) of the definition at Federal Acquisition Regulation (FAR) 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C.40102(4), such as agricultural products and petroleum products.
Component means an article, material, or supply incorporated directly into a construction material.
Construction material means an article, material, or supply brought to the construction site by the Contractor or subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Cost of components means—
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Designated country means any of the following countries:
(1) A World Trade Organization Government Procurement Agreement (WTO GPA) country (Armenia, Aruba, Australia, Austria, Belgium, Bulgaria, Canada, Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hong Kong, Hungary, Iceland, Ireland, Israel, Italy, Japan, Korea (Republic of), Latvia, Liechtenstein, Lithuania, Luxembourg, Malta, Moldova, Montenegro, Netherlands, New Zealand, Norway, Poland, Portugal, Romania, Singapore, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, Taiwan, Ukraine, or United Kingdom);
(2) A Free Trade Agreement (FTA) country (Australia, Bahrain, Canada, Chile, Colombia, Costa Rica, Dominican Republic, El Salvador, Guatemala, Honduras, Korea (Republic of), Mexico, Morocco, Nicaragua, Oman, Panama, Peru, or Singapore);
(3) A least developed country (Afghanistan, Angola, Bangladesh, Benin, Bhutan, Burkina Faso, Burundi, Cambodia, Central African Republic, Chad, Comoros, Democratic Republic of Congo, Djibouti, Equatorial Guinea, Eritrea, Ethiopia, Gambia, Guinea, Guinea-Bissau, Haiti, Kiribati, Laos, Lesotho, Liberia, Madagascar, Malawi, Mali, Mauritania, Mozambique, Nepal, Niger, Rwanda, Samoa, Sao Tome and Principe, Senegal, Sierra Leone, Solomon Islands, Somalia, South Sudan, Tanzania, Timor-Leste, Togo, Tuvalu, Uganda, Vanuatu, Yemen, or Zambia); or
(4) A Caribbean Basin country (Antigua and Barbuda, Aruba, Bahamas, Barbados, Belize, Bonaire, British Virgin Islands, Curacao, Dominica, Grenada, Guyana, Haiti, Jamaica, Montserrat, Saba, St. Kitts and Nevis, St. Lucia, St.
Vincent and the Grenadines, Sint Eustatius, Sint Maarten, or Trinidad and Tobago).
"Designated country construction material" means a construction material that is a WTO GPA country construction material, an FTA country construction material, a least developed country construction material, or a Caribbean Basin country construction material.
Domestic construction material means—
(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-
(i) An unmanufactured construction material mined or produced in the United States; or
(ii) A construction material manufactured in the United States, if—
(A) The cost of its components mined, produced, or manufactured in the United States exceeds 55 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or
(B) The construction material is a COTS item; or
(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".
Fastener means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.
Foreign construction material means a construction material other than a domestic construction material.
Foreign iron and steel means iron or steel products not produced in the United States. Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.
Free Trade Agreement country construction material means a construction material that-
(1) Is wholly the growth, product, or manufacture…