Att_1_140R4021R0020_Specifications.pdf

PDF 1011 KB Posted

Attached to
Tyzack Pumping Plant Regulating Tank Coating
Solicitation number
140R4021R0020
Issued by

About this file

This document includes specifications for coating work on the Tyzack Pumping Plant Regulating Tank. The Bureau of Reclamation is soliciting bids to remove existing coatings containing heavy metals from the interior and exterior of the steel regulating tank and 14-inch bypass pipe. Bids are also required to apply new coatings to the interior of the regulating tank, exterior of the regulating tank, and exterior of the bypass pipe. The existing interior coating of the regulating tank is coal tar epoxy and the existing exterior coating may contain lead. The existing coating on the bypass pipe is coal tar enamel. Bids should include lump sum pricing for removing and disposing of existing coatings, applying new interior and exterior coatings to the regulating tank, and applying new coatings to the bypass pipe. The specifications require submittals on worker safety plans, waste disposal plans, testing results, and coating qualifications.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION NO. 140R4021R0020

TYZACK PUMPING PLANT

REGULATING TANK COATING

ATTACHMENT 1

SPECIFICATIONS

INTERIOR REGION 7 • UPPER COLORADO BASIN

SALT LAKE CITY REGIONAL OFFICE

ACQUISITION MANAGEMENT DIVISION

PROVO AREA OFFICE PROJECT

Tyzack Regulating Tank Coating Uintah Water Conservancy District Solicitation No. 140R4021R0020

Table of Contents

00 01 10 - 1

DESCRIPTION / SPECIFICATIONS

TABLE OF CONTENTS

DIVISION 00 - PROCURMENT AND CONTRACTING REQUIREMENTS

Section B Unit Price Schedule

DIVISION 01 - GENERAL REQUIREMENTS

00 01 10 Table of Contents 01 11 00 Summary of Work 01 14 10 Use of Site 01 32 20 Construction Program 01 33 00 Submittals 01 35 10 Safety Data Sheets 01 35 20 Safety and Health 01 42 10 Reference Standards 01 46 00 Quality Procedures 01 51 00 Temporary Utilities 01 55 00 Vehicular Access and Parking 01 56 10 Protection of Existing Installations 01 56 15 Protection of Existing Utilities 01 56 20 Existing Fences 01 57 20 Environmental Controls 01 57 50 Tree and Plant Protection 01 60 00 Product Requirements 01 74 00 Cleaning and Waste Management 01 77 00 Closeout Procedures

DIVISION 02 - EXISTING CONDITIONS

02 83 30 Removal and Disposal of Coatings Containing Heavy Metals

DIVISION 09 – FINISHES

09 96 20 Coatings

DIVISION 51 - INFORMATION AVAILABLE TO OFFERORS

51 00 00 Information Available to Offerors 51 00 10 Climatic Conditions

DIVISION 52 - DRAWINGS

52 00 00 Drawings

Table of Contents

00 01 10 - 2

END OF SECTION

Summary of Work

01 11 00 - 1

SECTION 01 11 00

SUMMARY OF WORK

TYZACK REGULATING TANK COATING

PART 1 GENERAL

1.01 LOCATION

A. Red Fleet Dam (Also known as Tyzack Dam) is approximately 10 miles northeast of Vernal, Utah. The Control Structure for the Red Fleet Outlet Works Tunnel is located immediately downstream (south) of the Red Fleet Dam, to the east of the Right Abutment at 40° 34’ 23.50” North Latitude; 109° 25’ 18.76” West Longitude, at an elevation of 5,494 feet. The Tyzack Pumping Plant is 150-feet southeast of the Outlet Works Control Structure. The Tyzack Aqueduct Steel Regulating Tank is located about 1.9 miles west of the Tyzack Pumping Plant at 40° 34’ 17.88” North Latitude; 109° 27’ 24.86” West Longitude, at an elevation of 6,046 feet.

1.02 SPECIFICATIONS REQUIREMENTS

A. Requirements in Division 1, General Requirements, apply to Divisions 2 through 53.

B. Imperative statements in these specifications are Contractor requirements, unless otherwise stated.

C. Where specifications are written in streamlined form, words “shall be” are included by inference where a colon (:) is used within sentence or phrase.

1.03 DEFINITIONS

A. When specifications use a word or term defined in Federal Acquisition Regulations (FAR), definition of the word or term shall be in accordance with FAR sections in effect at the time solicitation was issued.

B. Furnish: To supply products to the project site, including delivering ready for unloading and replacing damaged and rejected products.

C. Install: To put products in place in the work ready for the intended use, including unloading, unpacking, handling, storing, assembling, installing, erecting, placing, applying, anchoring, working, finishing, curing, protecting, cleaning, and similar operations.

D. Provide: To furnish and install products.

E. Indicated: Shown, noted, scheduled, specified, or drawn, somewhere in the contract documents.

01 11 00 - 2

F. Demonstrate: To show product performance or compliance in the presence of the Government Inspector.

G. Government: When the term Government is used in the technical specifications (Divisions 1 through 52) it shall be construed to mean the United States Government.

The United States Bureau of Reclamation has furnished the drawings and technical specification and is providing construction oversight and inspection.

1.04 ACRONYMS

A. The following acronyms apply to specifications Divisions 1 through 53.

1. PAO : Provo Area Office

2. CO : Contracting Officer

3. COR : Contracting Officer’s Representative

4. SOW : Statement of Work

5. NTP : Notice to Proceed

6. OW : Outlet Works

7. TDFT : Total Dry Film Thickness

8. MIL : One-Thousandth of an Inch

9. VOC : Volatile Organic Compound

1.05 HISTORY

A. The Jensen Unit is in Uintah County, Utah and was authorized under the 1956 Colorado River Storage Project Act.

B. Red Fleet Dam (Tyzack Dam) was constructed on Big Brush Creek from 1977 to 1980 to create the Red Fleet Reservoir.

C. The Tyzack Aqueduct includes a pipeline crossing under The Red Fleet Reservoir as part of the Aqueduct Distribution System.

D. The Tyzack Pumping Plant was built from 1980 until 1983. The Tyzack Pumping Plant elevates water from the reservoir into Tyzack Aqueduct Reach 1. The water then flows to the Ashley Creek Water Treatment Plant and continues through Tyzack Aqueduct Reach 2 to Vernal City and the Jensen Water Districts.

E. Title to the Jensen Unit facilities was transferred to the Uintah Water Conservancy District October 1, 1988.

01 11 00 - 3

1.06 SCOPE OF WORK:

A. The Steel Regulating Tank:

1. Remove coatings from the interior (coal tar epoxy) and the exterior (lead-based paint) of the steel regulating tank and associated features.

a. Removal of the paint may be accomplished with media blasting, or other methods approved by the COR.

b. Removal shall be accomplished in an environmentally safe manner observing all Federal, State and Local Requirements.

c. Coating material removed shall be tested for hazardous waste. Any hazardous waste must be treated and disposed of observing all laws and regulations, including disposing at a facility licensed to receive hazardous waste.

d. Employees shall be protected to Reclamation and OSHA Standards, both inside and outside of the regulating tank.

e. Test and treat metal for soluble salts. If salts are present, test after treatment to verify soluble salts have been removed.

2. Recoat the interior and exterior of the steel regulating tank and associated features.

a. For the exterior coating materials and preparation methods, refer to Coatings Tabulation AE-08 (see Section 09 96 20).

b. For the interior coating materials and preparation methods, refer to Coatings Tabulation IE-03 (see Section 09 96 20).

B. 14-inch Bypass Pipe:

1. Remove coatings (coal tar enamel) from the exterior of the pipe and associated features.

a. Removal of the paint may be accomplished with media blasting, or other methods approved by the COR.

b. Protect 42” pipe, airduct, and other features in the outlet works tunnel from damage during paint removal and recoating.

c. Removal shall be accomplished in an environmentally safe manner observing all Federal, State and Local Requirements.

d. Bypass Pipe is in a confined space. Employees shall be protected to

Reclamation and OSHA Standards.

e. Test and treat metal for soluble salts. If salts are present, test after treatment to verify soluble salts have been removed.

2. Recoat exterior of pipe and associated features.

a. Coating materials and preparation methods for the 14-inch Bypass Pipe are detailed in Coatings Tabulation AE-08 (see Section 09 96 20).

C. Provide Price Schedule for work. The selected Contractor shall propose a fixed cost to supply all labor, material, equipment, tools, transportation, supervision, and expertise necessary to complete this work.

D. Schedule of work:

01 11 00 - 4

1. All exterior work shall be completed no later than July 29, 2022 but can be completed earlier if desired.

2. Work on the interior of the regulating tank can begin on March 8, 2022 and must be completed by March 28, 2022. It is during this time that the pumping plant will be shutdown and the tank emptied due to another project.

a. It is possible that these dates could change slightly by a few days depending on delivery times for the new pumping plant electrical equipment.

Figure 1: Outside of Regulating Tank

01 11 00 - 5

Figure 2: Example photo of Inside of Regulating Tank.

Figure 3: Example photo of 14” bypass pipe.

01 11 00 - 6

PART 2 MATERIALS

Not Used

PART 3 EXECUTION

Use of Site 01 14 10 - 1

SECTION 01 14 10

USE OF SITE

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the Price Schedule for other items of work.

1.02 REFERENCE STANDARDS

A. Bureau of Reclamation (USBR)

1. Cleaning Manual-2012 Inspection and Cleaning Manual for

Equipment and Vehicles to Prevent the Spread of Invasive Species (Technical memorandum No. 86-68220-07-05) 2012 Edition. Available online at:

http://www.usbr.gov/mussels/prevention

1.03 REQUIREMENTS:

A. Land Use and Landscape Rehabilitation Plan, as applicable:

1. For each Contractor use site on Government land.

a. Show use location and extent of impact. Uses include but are not limited to the following:

1) Buildings and service areas.

2) Parking areas, temporary roads, and haul routes.

3) Utilities.

4) First-aid and medical facilities.

5) Areas for processing, storing, and disposing of waste materials from construction operations.

6) Temporary fences.

b. Describe methods to preserve, protect, and repair, vegetation and other landscape features on or adjacent to jobsite, which are not to be removed and which do not interfere with work required under this contract. Include methods to mark work area limits, protect disturbed areas, and prevent erosion.

c. Describe methods to protect, and repair if damaged, existing improvements and utilities at or near jobsite.

http://www.usbr.gov/mussels/prevention

Use of Site 01 14 10 - 2

d. Describe methods for removing temporary structures and facilities, cleanup, and rehabilitating site after completion of construction activities.

2. Retain drawings of changes in use of Government land made during design and erection stages or after use for Government review as appropriate.

1.04 PROJECT CONDITIONS

A. Government land as shown on drawings may be used for required construction facilities.

B. Location, construction, operation, maintenance, and removal of construction facilities on Government land will be subject to approval.

C. Do not interfere with work of other contractors or the Government in the vicinity.

D. Housing for construction personnel will not be permitted on Government land.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

3.01 CLEANING

A. Construction equipment:

1. Before bringing on site, clean construction equipment to remove dirt, vegetation, and other organic material to prevent introduction of noxious weeds, and invasive plant and animal species.

2. Contractor cleaning procedures shall result in equipment being cleaned as well or better than the procedures described in Cleaning Manual.

3. Government Inspector will inspect construction equipment following procedures described in Cleaning Manual before allowing equipment onsite.

3.02 RESTORATION

A. Restore Contractor use areas to pre-construction condition.

Construction Program

01 32 20 - 1

SECTION 01 32 20

CONSTRUCTION PROGRAM

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Developing Baseline Schedule: Include in lump sum price offered in the Price

Schedule for mobilization and preparatory work.

2. Updating and Using Construction Program: Include as an element of Contractor’s overhead.

1.02 DEFINITIONS

A. Schedule: The Critical Path Method (CPM) of planning and scheduling a construction project where activities are arranged based on activity relationships and network calculations determine when activities can be performed and the critical path of the project.

B. Project Calendar(s): Cross reference of numerical work days with calendar days. The project calendar serves as the basis for the day/date conversion and assigns work days and non-workdays.

1.03 REFERENCE STANDARDS

A. Associated General Contractors of America (AGC)

1. AGC Manual-04 Construction Planning and Scheduling Manual

1.04 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 - Submittals.

1. Furnish database files in format compatible with Oracle Primavera P6

Professional Project Management (release 6.2 or newer) or Microsoft Project (release 2010 or newer).

2. Upon request, provide information and data used to develop and maintain the Construction Program to the CO.

B. RSN 01 32 20-1, Baseline Schedule:

1. Include:

a. Construction Program/Schedule database.

b. Definition of project calendars.

c. Gantt chart (Bar chart) for project.

01 32 20 - 2

d. Activity report including all logic constraints consisting of predecessors, successors, and constraint dates.

C. RSN 01 32 20-2, Updated Schedule:

1. Include:

a. Construction Program database with updated activity and milestone data.

b. Definition of project calendars if revised from baseline calendars.

c. Gantt chart for project.

d. Narrative report specifically stating status of project.

1) If negative float exists, cite specific actions and conditions which caused the "behind schedule" condition and provide proposed course of action to complete the project within the specified delivery time.

2) List of Contractor-initiated changes to the current schedule stating the reason for the action taken and any unresolved issues relating to the Construction Program. Government reserves the right to reject Contractor-initiated changes to the current schedule which negatively impact any Government action which was initiated on the basis of the current schedule.

1.05 SCHEDULE

A. Develop, maintain, and use approved Construction Program to plan, monitor, report, and evaluate accomplishment of work.

B. Prepare construction schedules using Critical Path Method outlined in AGC Manual.

C. Failure to include any element of the work will not release Contractor from completing all required work under the contract.

D. Construction Program:

1. Prepare detailed activity network for accomplishing required work organized by work breakdown structure.

2. Prepare schedule based on required sequence and interdependence of activities.

3. Include work of subcontractors, Government interfaces, and contract milestones.

4. Include contract title, contract number, and Contractor's name on each sheet.

5. Adjust Construction Program/schedule for seasonal weather conditions.

6. Define activities to a level of detail resulting in their durations being no greater than 20 workdays unless otherwise accepted by CO.

a. Durations for administrative activities (e.g., submittals and reviews, fabrication, manufacturing), or other specific activities identified in the contract will not be subject to the workday limitation.

01 32 20 - 3

7. Use durations in units of whole workdays.

8. Include activities for Government reviews and approvals of submittals that are critical to the project completion data.

9. Update schedule with changes directed by contract modifications or approved changes to sequencing.

E. Baseline Schedule:

1. Represents Contractor’s as-planned approach to accomplishing the work.

2. Include planned start and completion dates for features of work.

F. Updated Schedule:

1. Enter actual progress.

2. Assign a unique project file name for each schedule update.

G. Contract Change or Delay:

1. Submit a time impact evaluation within 14 days of contract change or delay, showing effects of change order or delay on the progress schedule.

2. Time extensions for performance will be considered only to the extent that the

Contractor’s current scheduled milestone dates exceed the contract milestone dates.

H. Float is not for the exclusive use by or benefit of either the Government or the Contractor.

I. If in the opinion of the CO, the Contractor falls behind the approved schedule, the Contractor shall take steps necessary to improve its progress, including those that may be required by the CO.

1. The CO may require the Contractor to increase the number of shifts, overtime operations, days of work, and/or the amount of construction plant, and to submit for approval any supplementary schedule or schedules in chart form as the Contracting Officer deems necessary to demonstrate how the approved rate of progress will be regained.

2. Costs for actions required to improve progress will be the responsibility of the Contractor.

1.06 FAILURE TO COMPLY

A. Failure to comply with the requirements of this section shall be grounds for a determination by the CO that the Contractor is not prosecuting the work with sufficient diligence to ensure completion within the specified time.

B. The CO may terminate the Contractor’s right to proceed with the work, or any separable part of it, in accordance with the default terms of this contract.

01 32 20 - 4

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Submittals

01 33 00 - 1

SECTION 01 33 00

SUBMITTALS

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the Price Schedule for other items of work.

1.02 REFERENCE STANDARDS

A. American Society of Mechanical Engineers (ASME)

1. ASME Y14.1-12 Decimal Inch Drawing Sheet Size and

Format

B. National Institute of Building Sciences (NIBS)

1. NIBS NCS-14 United States National CAD Standards, Version 6

1.03 DEFINITIONS

A. Days: Calendar days

B. Required Submittal Number (RSN): Identifies items to be submitted together as a complete submittal.

C. Submittals as listed in Table 01 33 00A - List of Submittals:

1. Government will respond as to adequacy of submittal.

2. Drawing submittals are to be “shop drawings” within terms of clause

Specifications and Drawings for Construction.

1.04 SUBMITTAL REQUIREMENTS

A. In case of conflict between requirements of this section and requirements included elsewhere in these specifications, requirements included elsewhere take precedence.

B. General:

1. Prepare in English.

2. Label with contract number, title and RSN.

3. Measurement Units: US Customary Units

4. Provide a unique transmittal number for each submittal.

01 33 00 - 2

C. Drawings:

1. Minimum Identification in Title Block:

a. Contract number and title.

b. Contractor’s or supplier’s title and drawing number.

c. Date.

2. Reserve 3- by 3-inch space next to title block for review stamps.

3. Size: D size (22 inches by 34 inches) as defined by ASME Y14.1.

4. Draw to scale using computer drafting or drafting equipment, unless otherwise specified.

a. Computer drafted drawings:

1) In accordance with NIBS NCS.

2) Electronic file format: Compatible with AUTOCAD, Version

2016 or later.

3) Compile using “eTransmit” utility in AUTOCAD.

b. Drawing prepared with drafting equipment, when allowed: Lettering shall be neat.

5. Drawings Designated as “Government Format” in Specifications:

a. Computer drafted.

b. Title block and sheet format:

1) As shown on standard drawing 40-D-7102.

2) Government will supply specific title block information to be used.

6. Final Drawings:

a. Computer drafted.

b. Show as-built changes, including revision dates, made during installation.

Indicate changes by clouding.

7. Electronic Files: Send all drawings as both .dwg and .pdf formats.

D. Product Data:

1. Mark manufacturer's data for commercial products or equipment, such as catalog cut sheets.

a. Identify manufacturer's name, type, model, size, and characteristics.

b. Illustrate that product or equipment meets requirements of specifications.

c. Mark items to be furnished in a manner that will photocopy (no highlighter).

d. Strike through items that do not apply.

01 33 00 - 3

E. Certifications:

1. Certifications by a registered professional: Signed and sealed by registered professional.

2. Manufacturer’s certifications: Signed by authorized representative of manufacturer.

F. Manuals:

1. Copies: Bound and indexed.

2. Copies:

a. Printed copies: Bound and indexed.

b. Electronic copies: Adobe pdf.

1) Bookmark longer files to assist in navigating file.

3. Contents:

a. Parts identification lists, lists of special tools, and accessories.

b. Schematics and wiring diagrams.

c. Detailed instructions for installing, operating, lubricating, and maintaining equipment.

d. As-built drawings, photographs, and test records or reports if required by the specifications.

G. Photographs:

1. Prints: Professional quality 8-inch by 10-inch color for each listed view.

a. Identify with adhesive labels on back.

1) Include contract number, name of equipment and view title.

2) Do not type directly on back of photograph.

2. Include negatives, or digital files as .jpeg or .pdf or similar format.

H. Samples and Color Selection Submittals:

1. Label with complete manufacturer's product and color identification.

2. Include type and quantity of materials specified in the referenced section in each

“set” of samples.

3. Samples: Representative of product to be installed. Black and White copy sheets for color selection are not acceptable.

4. Color Chips: Sample paint chips. Ink color reproductions are not acceptable.

5. Label each sample, sample kit, set of color chips, or color chart with contract number and title.

6. The Government will select architectural color and pattern after product approval.

01 33 00 - 4

1.05 SUBMITTALS PROCEDURES

A. Submit only checked submittals. Submittals without evidence of Contractor's approval will be returned for resubmission.

B. Submit complete sets of required materials for each RSN as specified in “Submittals Required” column in Table 01 33 00A - List of Submittals. A complete set includes all listed items for RSNs with multiple parts.

C. Include the following information in transmittal letters:

1. Contract number and title.

2. RSN for each attached submittal.

3. Responsible code.

4. Identify submittal as initial or resubmittal.

D. Resubmittal of submittals not approved:

1. Mark changes such that they are readily identifiable and show revision date.

2. Describe reasons for significant changes in transmittal letter.

3. Resubmit returned submittals within 7 days after receiving comments, unless otherwise directed.

4. Requirements for initial submittals apply to resubmittals.

1.06 REVIEW OF SUBMITTALS

A. Time Required:

1. Submittal review will require 21 days for review of each submittal or resubmittal, unless otherwise specified.

2. Time required for review of each submittal or resubmittal begins when complete sets of materials required for a particular RSN are received during working hours and extends through return mailing postmark or email date.

B. Time in Excess of Specified:

1. Government may extend contract completion date to allow additional time for completing work affected by excess review time.

a. Time extension will be to the extent excess review time caused delay to contract completion date.

b. Time extension will not exceed time used in excess of specified number of days for review of submittals or resubmittals.

c. Concurrent days of excess review time resulting from review of 2 or more separate submittals or resubmittals will be counted only once in extending contract completion date.

01 33 00 - 5

2. No time extension will be allowed if Contractor fails to make complete action submittals in sequence and within time periods specified.

3. Adjustment for delay will be made only to extent that:

a. Approval was required under contract, and

b. Requests for approval were properly and timely submitted and were approved.

C. Return of Submittals:

1. Action Submittals: One set of submittals required for action will be returned either approved, approved with comments, or not approved.

a. Revise and resubmit submittals not approved.

b. Do not change designs without approval of Government after drawings, documentation, and technical data have been approved.

2. Informational Submittals: Government will acknowledge Informational submittals.

a. Informational submittals will not be returned when they satisfy contract requirements.

b. Informational submittals that do not satisfy contract requirements may be returned for resubmittal or additional information may be requested.

1.07 TRANSMITTAL

A. Addresses for codes listed in Table 01 33 00A - List of Submittals:

1. COR, Bureau of Reclamation, Provo Area Office, 302 East Lakeview Parkway, Provo, UT 84606-7317 or email (preferred method).

B. Send original electronic transmittal as listed in “Responsible Code” column in Table 01 33 00A - List of Submittals.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

01 33 00 - 6

Table 01 33 00A. - List of Submittals Submit using email with attachments to Contracting Officer’s Representative (COR).

RSN Section Title Submittals required Due date or delivery time

01 32 20-1 Construction Program Baseline Schedule Within 21 days after receipt of NTP 01 32 20-2 Construction Program Schedule Update When Applicable 01 35 20-1 Safety and Health Safety Program Submitted and approved before start of onsite operations 01 35 20-2 Safety and Health Job Hazard Analysis Submitted and approved before start of onsite operations 01 35 20-3 Safety and Health Monthly Reports Within 10 days of the end of each month.

01 57 20-1 Environmental Controls Copy of Applicable Air Quality Permit At least 14 days prior to start of work 01 77 00-1 Closeout Procedures As-Built Records 15 Days after completion

02 83 30-1 Removal & disposal coating containing heavy metals

Resume for onsite supervisor and industrial hygienist for stripping lead based paint.

7 days prior to stripping

02 83 30-2 Removal of coatings containing heavy metals

Plans: Worker protection, Containment, and Disposal

7 days prior to work

02 83 30-3 Removal of coatings containing heavy metals

Heavy metal exposure certifications and test results

14 days after completion

02 83 30-4 Removal of coatings containing heavy metals

Preconstruction test results 14 days after completion

02 83 30-5 Removal of coatings containing heavy metals

Working level test results 14 days after completion

02 83 30-6 Removal of coatings containing heavy metals

Post-Construction test results 14 days after completion

02 83 30-7 Removal of coatings containing heavy metals

Certificates of disposal 14 days after disposal

09 96 20-1 Coatings Approval Data for each coating material 14 days before coating 09 96 20-2 Coatings Final Approval Data 7 days before coating 09 96 20-3 Coatings Paint Chip Samples 7 days before coating 09 96 20-4 Coatings Qualifications 7 days before coating 09 96 20-5 Coatings Quality Control Plan 7 days before coating 09 96 20-6 Coatings Final Report of Quality Testing with DFT report 14 days after coating

Safety Data Sheets

01 35 10 - 1

SECTION 01 35 10

SAFETY DATA SHEETS

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the Price Schedule for other items of work.

1.02 DEFINITIONS

A. LHM: List of Hazardous Materials.

B. SDS: Safety Data Sheet.

1.03 APPLICATION

A. For the purposes of this contract, “delivered under this contract” in paragraph (b) of the clause at FAR 52.223-3, Hazardous Material Identification and Material Safety Data - Alternate 1, includes:

1. Materials delivered to Government.

2. Materials incorporated into work.

3. Materials used by the Contractor during contract performance at the jobsite.

1.04 DELIVERY

A. Do not deliver hazardous materials to the jobsite not included on original or previously updated LHM and SDS before receipt of updated LHM, SDS by, and MSDS by the Government.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Safety Data Sheets

01 35 10 - 2

This page intentionally left blank.

Safety and Health

01 35 20 - 1

SECTION 01 35 20

SAFETY AND HEALTH

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in the prices offered in the Price Schedule for other items of work.

1.02 REFERENCE STANDARDS

A. Bureau of Reclamation (USBR)

1. RSHS Reclamation Safety and Health Standards including revisions posted at https://www.usbr.gov/safety/rshs/index.html

2. OSHA Regulations (Standards – 29 CFR) https://www.osha.gov/laws-regs/regulations/standardnumber/1926

3. FAR 52.236-13 Accident Prevention.

https://www.govinfo.gov/content/pkg/CFR- 2010-title48-vol2/pdf/CFR-2010-title48-vol2-sec52-236-13.pdf

1.03 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 - Submittals.

B. RSN 01 35 20-1, Safety Program:

1. Written safety program in accordance with RSHS Section 3.

2. Job Specific. Generic company safety program will not be accepted.

a. Confined Space considerations.

1) Removing existing coatings.

2) Applying new coatings.

b. Removing lead-based coatings.

c. Replacing electrical equipment in congested areas.

3. Comprehensive, detailed information on safe work practices, training, engineering controls and personal protective equipment to be used for this job.

4. Cover aspects of on site and applicable off-site operations and activities associated with this contract.

https://www.usbr.gov/safety/rshs/index.html https://www.osha.gov/laws-regs/regulations/standardnumber/1926 https://www.osha.gov/laws-regs/regulations/standardnumber/1926 https://www.govinfo.gov/content/pkg/CFR-2010-title48-vol2/pdf/CFR-2010-title48-vol2-sec52-236-13.pdf https://www.govinfo.gov/content/pkg/CFR-2010-title48-vol2/pdf/CFR-2010-title48-vol2-sec52-236-13.pdf https://www.govinfo.gov/content/pkg/CFR-2010-title48-vol2/pdf/CFR-2010-title48-vol2-sec52-236-13.pdf

01 35 20 - 2

5. Follow the outline in Appendix B of RSHS

6. Will not be accepted for review by the COR unless it addresses, in order, lettered and numbered per Appendix B, a narrative for each applicable item in the outline.

For items in the outline that do not apply to this contract write “Not applicable to Contract” next to the number/letter.

7. Submitted and accepted prior to commencing onsite work, including mobilization.

C. RSN 01 35 20-2, Job Hazard Analysis (JHA) List:

1. Provide a list of JHA’s that shall be submitted throughout the project.

D. RSN 01 35 20-3, Monthly Accident Summary Report:

1. In accordance with RSHS.

1.04 QUALIFICATIONS

A. Contractor’s Onsite Safety Representative(s):

1. Competent supervisory employee with appropriate level of safety related training and experience.

2. Completed OSHA authorized 30-hour training course for Construction. Course completion shall be within last 5 years.

3. Holds current certificates for first aid and adult CPR.

1.05 DOCUMENTATION AND RECORDS

Prepare and retain all safety plans, programs, training content, and training records that are applicable to the scope of the work and make them available to the COR unless they are already included in the written safety program. Some examples include but are not limited to:

1. Forklifts and Other Industrial Trucks Training Records.

2. Emergency Action Plans Written Program and Training Records.

3. Fall Protection Written Program and Training Records.

4. Flammable and Combustible Liquids Written Spill Control Plan.

5. General Safety and Health Provisions, Written Safety Program, and Regular

Safety Inspection Records.

6. Hazard Communication Written Program and Training Records.

7. Bloodborne Pathogens Exposure Control Plan, Training Records.

8. Occupational Noise Exposure Written Program and Training Audiometric Testing

Records.

9. Personal Protective Equipment (PPE) Hazard Assessments and Training Records.

10. Power Operated Hand Tools Training Records.

11. Respiratory Protection Written Program and Training Records.

01 35 20 - 3

12. Safety Training and Education Written Program and Training Records.

1.06 SAFETY AND HEALTH

A. Provide and maintain a work environment and procedures that:

1. Safeguard the public and Government's personnel, and Contractor employees exposed to Contractor operations and activities.

2. Avoid interruptions of site operations and delays in project completion dates.

3. Control costs in contract performance.

B. Do not begin on site work, including mobilization, until the COR accepts the Safety Program.

C. Participate in Contractor Safety Program Review meeting prior to mobilization.

D. Minimum work crew shall consist of no less than two (2) people, unless approved by

COR.

E. Develop Job Hazard Analyses for each distinct phase of work under the contract.

1. Do not begin a phase of work until a JHA is acceptable to COR and shared with construction employees.

2. Activities involving hazardous materials shall have the appropriate Safety Data

Sheet(s) attached to the JHA.

F. Comply with RSHS, 29 CFR 1926, and FAR 52.236-13.

1. A link to a copy of RSHS in digital format is provided for use in connection with the specifications.

2. A link to Construction Safety and Health Standards promulgated by the Secretary of Labor is provided or may be obtained from any regional or area office of the Occupational Safety and Health Administration of the U.S. Department of Labor.

G. Correct safety and health violations identified by the CO or the COR.

H. When the Contractor fails or refuses to correct a compliance directive, the CO may issue an order to stop all or part of the work.

1. When satisfactory corrective action is taken, an order to resume work will be issued.

2. The Contractor shall not be entitled to extension of time or to claim for damage or to additional compensation by reason of either the directive or stop order.

3. Failure of the CO to order discontinuance of the Contractor’s operations shall not relieve the Contractor of the responsibility for the safety of personnel and property.

01 35 20 - 4

I. Maintain accurate record of and report to the CO the following occurrences during performance of this contract:

1. Death.

2. Occupational disease.

3. Traumatic injury to employees or the public.

4. Property damage in excess of $2,500.

J. The rights and remedies of the Government provided in this section are in addition to any other rights and remedies provided by law or under this contract.

1. In the event there is a conflict between requirements contained in RSHS, specification paragraphs, Contractor’s approved Safety Program, referenced safety and health codes, and standards, or the U.S. Department of Labor Construction Safety and Health Standards, promulgated under Section 107 of the Contract Work Hours and Safety Standards Act (40 U.S.C. 327 et seq.), as amended, the more stringent requirement shall prevail.

K. Provide appropriate safety barricades, signs, and warnings.

L. The Contractor shall be responsible for providing medical and emergency assistance in a timely manner consistent with recognized emergency protocols.

M. In instances where local emergency responders are not readily available, the responsibility to provide emergency services shall default back to the Contractor.

N. Perform all training as required by federal, state, and local regulations prior to any activity that requires it.

1. Training records must be submitted to the COR upon request.

2. In no case shall an employee perform work until all required training is complete.

1.07 QUALITY ASSURANCE

A. Contractor’s Onsite Safety Representative(s):

1. The effectiveness of Contractor’s Onsite Safety Representative(s) in prosecuting the safety program will be subject to continual review by the Government.

2. Should the Contractor’s safety effort be considered inadequate, the Government has the option to require the Contractor to employ a Certified Safety Professional.

B. Safety Program:

1. The effectiveness of the Safety Program will be subject to continual review by the

Government.

PART 2 PRODUCTS

01 35 20 - 5

PART 3 EXECUTION

01 35 20 - 6

Reference Standards

01 42 10 - 1

SECTION 01 42 10

REFERENCE STANDARDS

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the Price Schedule for other items of work.

1.02 REFERENCE STANDARDS

A. Referenced editions of standard specifications, codes, and manuals form a part of this specification to the extent referenced.

B. These specifications take precedence when conflicting requirements occur between specifications and referenced standard.

1.03 JOBSITE REFERENCE STANDARDS

A. Maintain at fabrication site, access to referenced standard specifications, codes, and manuals required for work in progress at fabrication site. Make available for use by the Government.

B. Maintain onsite, access to referenced standard specifications, codes, and manuals required for onsite work in progress. Make available for use by the Government.

1.04 AVAILABILITY

A. Code of Federal Regulations (CFR):

1. Available online, authorized by the National Archives and Records

Administration (NARA) and the Government Printing Office (GPO), at http://www.gpo.gov/fdsys/search/home.action

B. Federal Specifications, Standards, and Commercial Item Descriptions; and Military Specifications:

1. Copies of Federal Specifications, Standards, and Commercial Item Descriptions may be obtained from GSA Federal Supply Service, see the provision at FAR 52.211-1, Availability of Specifications Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-29.

2. Copies of Military Specifications may be obtained from Department of Defense, see the provision at FAR 52.211-2, Availability of Specifications, Standards, and Data Item Descriptions Listed in the Acquisition Streamlining and Standardization Information System (ASSIST).

http://www.gpo.gov/fdsys/search/home.action

01 42 10 - 2

C. Bureau of Reclamation Documents:

1. Reclamation Safety and Health Standards (RSHS) may be downloaded at www.usbr.gov/ssle/safety/RSHS/rshs.html.

a. Hard copies of RSHS, stock number 024-003-00204-6, may be purchased from The Superintendent of Documents at the U.S. Government Printing Office (GPO), phone number 202-512-1800. Hard copies of RSHS are subject to revisions posted on the site shown above.

1) GPO online bookstore:

http://bookstore.gpo.gov/actions/GetPublication.do?stocknumber= 024-003-00204-6.

2. Bureau of Reclamation manuals and other publications including significant scientific, technical, and engineering works are available from the National Technical Information Service (NTIS). Information regarding availability and pricing may be obtained by contacting NTIS at the following address:

United States Department of Commerce National Technical Information Service 5285 Port Royal Road Springfield, VA 22161 Telephone: 703-487-4650 or 1-800-553-6847

D. Industrial and Governmental Documents:

1. When a reference has a joint designation (e.g. ANSI/IEEE) these specifications generally cite the proponent organization (e.g. IEEE).

2. Addresses for obtaining industrial and governmental (other than Federal and

Bureau of Reclamation specifications and standards) specifications, standards, and codes are listed in Table 01 42 10A - Addresses for Specifications, Standards, and Codes.

Table 01 42 10A – Address for Specifications, Standards and Codes Acronym Name and Address Telephone

AGC Associated General Contractors of America 333 John Carlyle Street, Suite 200 Alexandria, VA 22314 www.agc.org

703-548-3118

ASME American Society of Mechanical Engineers 3 Park Avenue New York, NY 10016-5990 www.asme.org

800-843-2763 http://www.usbr.gov/ssle/safety/RSHS/rshs.html http://bookstore.gpo.gov/actions/GetPublication.do?stocknumber=024-003-00204-6 http://bookstore.gpo.gov/actions/GetPublication.do?stocknumber=024-003-00204-6 http://www.agc.org/

01 42 10 - 3

Acronym Name and Address Telephone

ASTM ASTM International P.O. Box C700 100 Barr Harbor Drive West Conshohocken, PA 19428-2959 www.astm.org

610-832-9585

AWWA American Water Works Association 6666 W. Quincy Ave Denver, CO 80235 www.awwa.org

303-794-7711 800-926-7337

CFR Code of Federal Regulations NA

Fed Std Federal Standards NA

FS Federal Specification Unit General Services Admin Federal Supply Service FSS Acquisition Management Center Environmental Programs and Engineering Policy Division Washington, DC 20406 www.pub.fss.gsa.gov

(703) 305-5682

ISO International Organization for Standardization ISO Central Secretariat Chemin de Blandonnet 8

CP 401

1214 Vernier, Geneva Switzerland www.iso.gov

+41 22 749 01 11

MIL Military Specifications NA

NACE NACE International 1440 South Creek Drive Houston, TX 77084 www.nace.org

281-228-6200

NIBS National Institute of Building Sciences 1090 Vermont Avenue, NW., Suite 700 Washington, DC 20005-4905 www.nibs.org

202-289-7800

NSF NSF International 789 N. Dixboro Road Ann Arbor, MI 48105 www.nsf.org

800-679-6815 734-769-8010 http://www.astm.org/ http://www.awwa.org/ http://www.iso.gov/ http://www.nace.org/ http://www.nibs.org/ http://www.nsf.org/

01 42 10 - 4

Acronym Name and Address Telephone

NFPA National Fire Protection Association One Batterymarch Park P.O. Box 9101 Quincy, MA 02269-9101 www.nfpa.org

800-344-3555 617-770-3000

OSHA Occupational Safety and Health Administration U.S. Department of Labor 200 Constitution Avenue, NW Room Number N3626 Washington, D.C. 20210 www.osha.gov

800-321-6742

SSPC SSPC: The Society for Protective Coatings 40 24th Street, 6th Floor Pittsburgh, PA 15222-4656 www.sspc.org

800-837-8303 412-281-2331

UDOT Utah Department of Transportation 4501 South 2700 West Salt Lake City, Ut 84114 https://www.udot.utah.gov/main

(801) 965-4000

USBR Bureau of Reclamation 7201 W Mansfield Ave Lakewood, Co 80235 http://www.usbr.gov/ssle/safety/RSHS/rshs.html

303-445-6379

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

http://www.nfpa.org/ http://www.osha.gov/ http://www.sspc.org/ https://www.udot.utah.gov/main http://www.usbr.gov/ssle/safety/RSHS/rshs.html

Quality Procedures

01 46 00 - 1

SECTION 01 46 00

QUALITY PROCEDURES

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the Price Schedule for other items of work.

1.02 DEFINITIONS

A. Government Contract Quality Assurance: Various functions, including inspection, performed by the Government to determine whether a contractor has fulfilled the contract obligations pertaining to quality and quantity.

B. Contractor Quality Assurance / Quality Control (QA/QC): Activities performed by the Contractor to ensure work conforms to contract requirements.

1. Inspection of Construction requires the Contractor to establish an inspection system to ensure quality.

2. Contractor QA/QC includes activities in addition to specified Contractor Quality

Testing to ensure work conforms to contract requirements.

C. Contractor Quality Testing: Specified tests shall be performed by the Contractor.

1. The Government will evaluate results of these tests when determining acceptability of work.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Quality Procedures

01 46 00 - 2

Temporary Utilities

01 51 00 - 1

SECTION 01 51 00

TEMPORARY UTILITIES

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the price schedule for other items of work.

1.02 TEMPORARY ELECTRICITY

A. There are four 120 Volt outlets at the regulating tank that can be used off of secondary power when the main power is shut down.

B. If any additional power is required, the Contractor shall provide generators and other equipment needed to distribute power to points of use.

C. Comply with IEEE C2 clearances and spacing as needed.

1.03 TEMPORARY WATER

A. If water is used, it shall meet specified requirements for stripping existing coatings on Outlet Works pipes and Steel Regulating Tank.

B. Provide means of conveying water to points of use.

1.04 SANITARY FACILITIES

A. Restroom facilities will not be available to Contractor personnel.

B. Contractor shall provide sanitary facilities in all locations.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

3.01 REMOVAL

A. Remove temporary equipment and facilities upon completion of work under this contract.

Temporary Utilities

01 51 00 - 2

Vehicular Access and Parking

01 55 00 - 1

SECTION 01 55 00

VEHICULAR ACCESS AND PARKING

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the Price Schedule for other items of work.

1.02 REGULATORY REQUIREMENTS

A. Meet requirements established by jurisdictional authority for use of existing roadways and haul routes; including seasonal or other limitations or restrictions, payment of excess size and weight fees, and posting of bonds conditioned upon repair of damage.

B. Comply with applicable regulations for haul routes over public highways, roads, or bridges.

1.03 SITE CONDITIONS

A. Rights-of-way for access to work from existing roads.

1. Use only established roadways, parking areas, and haul routes.

PART 2 PRODUCTS

2.01 MATERIALS

A. Materials to maintain and repair existing roadways, parking areas, and haul routes: In accordance with requirements of jurisdictional authority.

PART 3 EXECUTION

3.01 EXAMINATION

A. Investigate condition of available public or private roads for clearances, restrictions, bridge-load limits, bond requirements, and other limitations that affect or may affect access and transportation operations to and from jobsites.

3.02 ESTABLISHED ROADWAYS AND PARKING AREAS

A. Established roadways and parking areas are available for Contractor's use subject to existing restrictions and approval of the Government.

Vehicular Access and Parking

01 55 00 - 2

3.03 MAINTENANCE

A. Maintain roadways, parking areas, and haul routes in a sound, smooth condition.

B. Maintain roadbed, side slopes, structures, and surfacing of roads and parking areas until completion and acceptance of all work under this contract.

3.04 REPAIR

A. Promptly repair ruts, broken pavement, potholes, low areas with standing water, and other deficiencies to maintain road surfacing and drainage in original condition.

3.05 REMOVAL

A. Remove materials used to construct temporary roadways, parking areas, and haul routes prior to contract completion. Recycle salvageable materials as approved by Government.

Protection of Existing Installations

01 56 10 - 1

SECTION 01 56 10

PROTECTION OF EXISTING INSTALLATIONS

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the Price Schedule for other items of work.

2. Costs for repair of installations damaged by the Contractor's operations are the

Contractor's responsibility.

1.02 PROJECT CONDITIONS

A. Drawings included in these specifications show items of existing materials and equipment but may not show all equipment and materials existing at the jobsite.

B. Obtain the location of embedded conduit, pipe, cable, ground mat, and other buried items before performing any drilling or cutting of concrete.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

3.01 PROTECTION

A. Provide protection for personnel and existing facilities from harm due to the Contractor's operations. Protection shall be subject to approval of the COR.

B. Arrange protective installations to permit continuous operation of existing equipment and facilities not directly impacted by the work.

C. Arrange protective installations to permit operation of impacted equipment and facilities immediately upon completion of the work.

3.02 REMOVAL OF PROTECTIVE INSTALLATIONS

A. Remove protective installations upon completion of work. Materials furnished by the Contractor to provide protection remain property of the Contractor.

Protection of Existing Installations

01 56 10 - 2

3.03 REPAIR

A. Repair, at Contractor's expense, damage to existing installations due to Contractor's operations or Contractor's failure to provide proper protection. At the Government's option, damage may be repaired by the Government, and the Contractor will be back charged repair costs.

Protection of Existing Utilities

01 56 15 - 1

SECTION 01 56 15

PROTECTION OF EXISTING UTILITIES

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the Price Schedule for other items of work.

2. Costs for repair of installations damaged by the Contractor's operations are the

Contractor's responsibility.

1.02 REFERENCE STANDARDS

A. Bureau of Reclamation (USBR)

1. RSHS-2014 Reclamation Safety and Health Standards including revisions posted at https://www.usbr.gov/safety/rshs/index.html

1.03 PROJECT CONDITIONS

A. Drawings included in these specifications show existing utilities but may not show all utilities or exact locations at the jobsite.

B. Obtain location of buried conduit, pipe, cable, ground mat, and other buried items before any activity that could damage the utilities.

C. Be aware of pipeline appurtenances along the access road to the Steel Regulating Tank.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

3.01 INTERFERENCE WITH OPERATION OR MAINTENANCE

A. Do not interfere with normal operations or maintenance service on utilities not being modified under this contract.

1. Provide access to utilities in a manner satisfactory to The Water District, operators and the Government.

2. Locate buried power, communications, natural gas, and water lines before performing any activity that could damage them.

https://www.usbr.gov/safety/rshs/index.html

Protection of Existing Utilities

01 56 15 - 2

B. Provide required temporary structures; make necessary repairs, replacements, or similar operations; and furnish indemnity or other bonds as needed.

3.02 CLEARANCES

A. The Contractor shall provide all clearances required for construction operations in accordance with RSHS.

Existing Fences

01 56 20 - 1

SECTION 01 56 20

EXISTING FENCES

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Costs to repair fences damaged by Contractor operations are the Contractor’s responsibility.

PART 2 PRODUCTS

2.01 MATERIALS.

A. Provide new replacement materials of similar type when required.

PART 3 EXECUTION

3.01 TEMPORARY FENCES

A. Where existing chain link fence is damaged or must be removed to accommodate Contractor work, protect the openings made in the existing chain link fencing to prevent unauthorized entry.

1. Provide temporary fencing or other approved means to protect openings, in such a manner that, entry through or over the protection will entail no less difficulty than provided by the existing fencing.

2. Maintain temporary protection until openings are closed by permanent construction.

B. If the Contractor does not immediately provide necessary temporary fencing or protection, the Contracting Officer will cause the work to be performed and back charge the Contractor for such work.

C. Remove temporary fences and protection as a part of cleanup operations prior to final acceptance of completed work.

3.02 FENCE REBUILDING

A. Where fences are removed to accommodate construction, rebuild at original locations.

B. Construct rebuilt fencing that is structurally sound and matches, or is better, than existing fencing installation.

Existing Fences

01 56 20 - 2

Environmental Controls

01 57 20 - 1

SECTION 01 57 20

ENVIRONMENTAL CONTROLS

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the Price Schedule for other items of work.

2. Costs for damages and work stoppage are the Contractor's responsibility.

1.02 REFERENCE STANDARDS

A. Occupational Safety and Health Administration (OSHA)

1. Osha.gov/laws-regs

B. Bureau of Reclamation (USBR)

1. RSHS-2014 Reclamation Safety and Health Standards, including revisions and updates posted at https://www.usbr.gov/safety/rshs/index.html

1.03 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 - Submittals.

B. RSN 01 57 20-1, Copy of…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .