This document contains answers to questions regarding Solicitation Number 140R4021R0020 for the Tyzack Pumping Plant Regulating Tank Coating project. The Bureau of Reclamation is seeking to coat the exterior of a 24.5 foot tall regulating tank and the exterior of a 14-inch bypass pipe located in a tunnel at the base of Red Fleet Dam. Water will be available on site from a hose bib and pump house, though coordination will be required to empty the bypass pipe for work. The solicitation requires SSPC QP2 certification for coating removal contractors. A Service Wage Determination has been added as an attachment. "Or equal" coating products may be substituted with approval from the Contracting Officer's Representative. Test results have been provided showing lead levels on the regulating tank exterior and that the tank and bypass pipe interiors were not tested. Public lands near the site may be used for staging and parking.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tyzack Pumping Plant Regulating Tank Coating Project (Solicitation No. 140R4021R0020)
Questions and Answers
1. There is a provision in section 02 83 30 1.05 Qualifications B. Coating Removal Contractor Qualifications that state the contractor removing hazardous material must be SSPC QP‐2 certified. Is this certification required at the time of bid as attachment or during Award submittal process? Yes, the certifications are required to be submitted at the time of bid.
2. There is no listed Painter Wage listed in the provided UT20200023 Davis Bacon certified Wage rates. Could the Bureau provide this before the project would commence? The Service Wage Determination has been added to the solicitation and is attached to this amendment. It is now Attachment 9 to the solicitation and is titled Att 9 Service Wage Determination.
3. Is there water available at the tunnel control house for use of the work? If so, what pressures and quantities are available? The gate house has a hose bib off the 42” pipe with 25‐50 psi depending on reservoir elevation. The pump house also has water while operating at approximately 90 psi.
4. The Listed IE‐03 Interior Coating (at tank) listed would require a 7 day at 70‐75 degree final cure before tank could be placed into service. Would Reclamation consider other 100 % solids products to shorten the cure time? Many of the listed products have fast cure or low temperature cure options if needed. “Or Equal” products may also be substituted as approved by the COR.
5. The 14” bypass pipe appears like it could possibly be Ductile Pipe. In the event this is the case is it possible that a different Cleanliness Standard be specified or provide information on what standard of prep would be acceptable for Ductile. The 14” bypass pipe is steel. Drawings 450‐D‐ 51, 55, & 73‐76 all refer to the pipe as steel.
6. The Tunnel 14” pipe appears to have a lot of coating material on it presently. Could this be identified as to what it is and at how thick? The existing coating is coal tar enamel to 3/32 inch thickness plus or minus 1/32 inch.
7. Will the tank be empty at the site visit? No, the tank was not empty at the site visit due to ongoing water delivery requirements. However, it obviously will be empty during the shutdown period in March to allow the interior to be coated.
8. Will the 14” bypass pipe have water in it while the exterior is being recoated? The bypass pipe will need to be utilized during the pumping plant shutdown in March. However, if coated before or after the shutdown, the pipe could be emptied with coordination from Uintah Water Conservancy District.
9. Will the government amend the Solicitation to look going back 8‐10 years? No.
10. Will the government accept past performance of our subcontractor as if they were our own? We require past performance information on the prime contractor. If subcontractor past performance is submitted, it may or may not be beneficial to the prime contractor.
11. There is an overflow pipe shown on Drawing 450‐D‐225 and 361. Does the interior of this pipe need to be recoated? No, the interior of this pipe does not need to be recoated. Only the exterior of this pipe is to be recoated.
12. Since this tank is partially buried, is the exterior painting scope for the regulating tank only for exposed surfaces (24.5 feet) not the 11.5 feet that is buried, correct? Yes, this is correct.
13. The tank access is a small tight road with very little land, is the property just off the highway public land where we could use as employee parking, offloading trucks and staging? Yes, the property just off Highway 141 where you turn for the tank is public land managed by the Bureau of Land Management. The land at the base of the dam near the 14” bypass pipe is owned by the Bureau of Reclamation and can be used as well.
14. Has the tank been tested for lead? If so, can you provide the results. Yes, the exterior of the regulating tank has been tested for lead. The interior of the tank and the exterior of the 14” bypass pipe were not tested for lead. The Lead Paint Test Results has been added to the solicitation and is attached to this amendment. It is now Attachment 10 to the solicitation and is titled Att 10 Lead Paint Test Results.
15. Where is the 14” pipe is located? Is it an adjacent tunnel or Gallery close by? The 14” pipe is located in a tunnel at the base of Red Fleet
Dam. Figure 1 below shows the location of both the regulating tank and 14” bypass pipe.
Figure 1: Location of Regulating Tank and 14” Bypass Pipe