Att_5_Limitations_on_Subcontracting_Worksheet.pdf
PDF 11 KB Posted
- Attached to
- Tyzack Pumping Plant Regulating Tank Coating
- Solicitation number
- 140R4021R0020
About this file
This document provides a worksheet for calculating subcontracting percentages under Federal Acquisition Regulation Clause 52.219-14, Limitations on Subcontracting. The worksheet requires contractors to input direct labor costs, fringe benefits, and general and administrative costs for both the prime contractor and any subcontractors. These figures are used to calculate the subcontracting labor cost percentage to ensure compliance with limitations on subcontracting.
The related federal contract opportunity is solicitation number 140R4021R0020 from the Department of the Interior Bureau of Reclamation to perform coating work at the Tyzack Pumping Plant Regulating Tank. Bids are due by an unspecified date. The contractor will be required to coat the regulating tank to preserve the structure. Compliance with limitations on subcontracting must be demonstrated as required by the terms of the prime contract.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of the Interior
FAR Clause 52.219-14, Limitations of Subcontracting
Subcontracting Percentage Worksheet
PRIME CONTRACTOR: SOURCE:
SUBCONTRACTOR: SOURCE:
PRIME CONTRACTOR SUBCONTRACTOR
DIRECT LABOR $ $
FRINGE BENEFITS* $ $
SUB TOTAL (A) $ (B) $
LABOR G&A**@______% $ $
TOTAL LABOR COSTS (C) $ (D) $
To calculate the subcontracting percentage, first add DIRECT LABOR and FRINGE BENEFITS and enter the figures for the prime contractor in space (A) and for the subcontractor (if available)** in space (B).
Next, Calculate the LABOR G&A by multiplying the G&A rate by the SUBTOTAL figure in space (A).
Calculate the subcontractor’s LABOR G&A by multiplying the subcontractor’s G&A rate by the subcontractor’s SUBTOTAL figure in (B).
Add the LABOR G&A to the SUBTOTAL and record that figure in the spaces for TOTAL LABOR COSTS at (C) and (D) respectively.
Next, using the formula below, calculate the subcontracting labor percentage.
(D)
(C) + (D)
SUBCONTRACTING LABOR COST PERCENTAGE = %
* The firm must demonstrate that their labor overhead is allowable in accordance with FAR 31.205- 6(m). Failure to do so will csuse the entire overhead to be eliminated from the calculations.
** G&A denotes General and Administrative Costs
*** You need to compare as like figures as possible. Therefore, if you have a breakdown of the subcontractos’s costs use it in the formulation above. If you do not have a breakdown you need to use the TOTAL SUBCONTRACTING AMOUNT for item (D) even though you must still breakdown the contractor’s costs.