About this file
This document contains questions and answers regarding the Tyzack Pumping Plant Regulating Tank Coating Project solicitation. The solicitation is for coating work on an existing regulating tank at the Tyzack Pumping Plant. The Bureau of Reclamation is the contracting agency. According to the questions and answers, the tank will be drained and cleared of sludge by the owner prior to work. Best practices are allowed to access hard to reach areas of existing pipes. Available drawings were provided but no updated underside drawings showing roof supports. The contractor is responsible for ensuring compliance with all applicable laws and regulations such as air permit requirements.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tyzack Pumping Plant Regulating Tank Coating Project (Solicitation No. 140R4021R0020)
Questions and Answers (Part 2)
16. Will the tank be drained and cleared of sludge? Yes. The District will drain the tank and pump out any sediment/sludge from the bottom of the tank.
17. Due to the proximity of the 14” pipe to the concrete wall, are best practice methods allowed on areas of the pipe that are hard to access? Quality control is the responsibility of the contractor with quality assurance by the government. Best practice methods can be used to meet the specified requirements as approved by the COR.
18. The specification for containment set up requires a load capacity design. Are there updated drawings of the underside showing the support structure of the roof? All available drawings were provided.
19. The solicitation calls for replacing electrical equipment in congested areas. Will this project require major electrical work other than moving equipment for coating purposes? No, there is no major electrical work associated with this project.
20. We would like to confirm that an air permit is not required if the project falls within the specifications for the small source exemption (https://utahgov.co1.qualtrics.com/jfe/form/SV_3t4JtgzRudum7l3). It is the contractor’s responsibility to ensure compliance with all federal, state, and local laws and regulations.