Solicitation - FA568226Q0005.pdf
PDF 718 KB Posted
- Solicitation number
- FA568226Q0005
About this file
This is a Solicitation for Commercial Products and Commercial Services for construction repair work at Aviano Air Base in Italy.
The U.S. Air Force, through its 31 CES Engineer office (FA5682), seeks a contractor to repair doors at Zulu Loop 1st Generation PASs (Priority Aircraft Service Structures) under project ASHE 22-1058. The solicitation was issued May 19, 2026, with quotes due June 18, 2026 at 2:00 PM. An organized site visit is scheduled for May 28, 2026 at 9:30 AM at Gate #8 (LVIS Gate), Aviano Air Base. The contract is a firm fixed-price award for one lot, with work to commence within 30 calendar days of receiving the notice to proceed and be completed within 180 calendar days, inclusive of final cleanup. The contractor must furnish all labor, equipment, materials, transportation, and supervision required to complete the project. All pricing must be submitted in Euro currency only; offers in other currencies will not be considered. The Government reserves the right to cancel the solicitation without obligation to reimburse offerors for costs incurred.
Offerors must provide a cover letter acknowledging compliance with all terms and conditions, proof of active SAM registration, a current SOA OS18A certification covering the full project amount, a DURC document certifying payment of host social security benefits (not older than 120 days), and an anti-mafia self-certification. Proposals must include a detailed price breakdown via a Construction Cost Estimate Breakdown form and a technical proposal limited to 20 pages demonstrating experience with at least two similar projects completed within the last five years involving mechanical repair, refurbishment, or installation of large heavy movable steel structures. The evaluation is a Lowest Price Technically Acceptable (LPTA) source selection in which the two lowest-priced proposals meeting all requirements will be evaluated for technical acceptability; once one is deemed acceptable with reasonable and balanced pricing, that proposal will be selected for award. The solicitation applies the Balance of Payments Program requiring domestic construction materials, incorporates DFARS clauses addressing tax exemptions for Italy, observance of host country labor laws, insurance requirements (€1,000,000 per person/€5,000,000 per occurrence for employee and third-party bodily injury and €1,500,000 for third-party property damage), and a 2-year warranty on completed work.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30. 1. REQUISITION NUMBER PAGE 1 OF
2. CONTRACT NUMBER 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER 5. SOLICITATION NUMBER
FA568226Q0005
6. SOLICITATION ISSUE DATE
19 May 2026
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
SARA GIACOMELLO
b. TELEPHONE NUMBER (no collect calls) 00390434307933
8. OFFER DUE DATE/
LOCAL TIME
18 Jun 2026
02:00 PM
9. ISSUED BY CODE: FA5682
FA5682 31 CONS DA LGC
UNIT 6102 BOX 140, APO AE 09604-6102
APO, AE 09604-6102
UNITED STATES
SARA GIACOMELLO, Email: jessica.cuccagna.it@us.af.mil Telephone:
00390434307933 Jessica Cuccagna, Email: jessica.cuccagna.it@us.af.mil Telephone: 3146327138
10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:
SMALL BUSINESS WOMEN-OWNED SMALL
BUSINESS (WOSB)
NORTH AMERICAN
INDUSTRY
CLASSIFICATION
STANDARD (NAICS):
238190
HUBZONE SMALL
BUSINESS
ECONOMICALLY
DISADVANTAGED WOMEN-
OWNED SMALL BUSINESS
(EDWOSB)
SIZE STANDARD:
SERVICE-DISABLED
VETERAN-OWNED SMALL
BUSINESS (SDVOSB)
8(A)
11. DELIVERY FOR FREE ON
BOARD (FOB) DESTINATION
UNLESS BLOCK IS MARKED
SEE SCHEDULE
12. DISCOUNT TERMS 13a.THIS CONTRACT IS A
RATED ORDER UNDER
THE DEFENSE PRIORITIES
AND ALLOCATIONS
SYSTEM-DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
REQUEST FOR
QUOTE (RFQ)
INVITATION
FOR BID (IFB)
REQUEST FOR
PROPOSAL (RFP)
15. DELIVER TO CODE: F1F3A2
31 CES ENGINEER
AF BPN NO MILSBILLS PROCESSES, UNIT 6110 BOX 14
APO, AE 09604-3014
UNITED STATES
Sara Giacomello, Email: sara.giacomello.it@us.af.mil Telephone: 00390434307933
16. ADMINISTERED BY CODE:
17a. CONTRACTOR/
OFFERER
CODE FACILITY
CODE:
TELEPHONE NUMBER
18a. PAYMENT WILL BE MADE BY CODE:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED SEE ADDENDUM
19.
ITEM NUMBER
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT
PRICE
24.
AMOUNT
See Schedule (Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA
See Section G - Contract Administration Data
26. TOTAL AWARD AMOUNT (For Government Use Only)
27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR
52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
ARE ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN COPIES TO
ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH
OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT TO THE
TERMS AND CONDITIONS SPECIFIED
29. AWARD OF CONTRACT: REFERENCE OFFER DATED . YOUR
OFFER ON SOLICITATION (BLOCK 5), INCLUDING ANY ADDITIONS OR
CHANGES WHICH ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS: See Schedule
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)
31c. DATE SIGNED
COMPUTER GENERATED STANDARD FORM 1449 (REV. 11/2021)
PREVIOUS EDITION IS NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.212
Solicitation/Contract Form ASHE 22-1058 REPAIR DOORS AT ZULU LOOP 1ST GEN PASs
ASHE 22-1058 REPAIR DOORS AT ZULU LOOP 1ST GEN PASs Product Service Code: Z1BZ
FA568226Q0005
Supplies or Services & Prices or Costs Additional Information/Notes
ALL QUANTITIES INDICATED IN THE PROJECT DOCUMENTS FURNISHED BY THE GOVERNMENT, INCLUDING THE CONSTRUCTION COST BREAKDOWN, ARE ESTIMATES AND THE GOVERNMENT SHALL NOT BE HELD RESPONSIBLE FOR THE ACCURACY OF THE ESTIMATED QUANTITIES. THE CONTRACT SHALL
REQUIRE A COMPLETED PROJECT ON A LUMP SUM BASIS.
IT IS THE RESPONSIBILITY OF THE OFFEROR TO CALCULATE, FORESEE AND PERFORM ALL QUANTITIES OF WORK MANIFESTLY NECESSARY TO DELIVER
A COMPLETE PROJECT BASED ON ITS OVERALL SCOPE.
THE CONTRACTOR/SUBCONTRACTOR SHALL BE IN POSSESSION OF A CURRENT SOA OS18A THROUGHOUT THE ENTIRE PERFORMANCE OF THE
CONTRACT.
ALL PROJECT WORK SHALL BE PERFORMED IN COMPLIANCE WITH HOST NATION LAW D.LGS. 81/2008
ALL PRICES SHOULD BE SUBMITTED IN EURO CURRENCY. OFFERS NOT SUBMITTED IN EURO CURRENCY WILL NOT BE CONSIDERED FOR AWARD
Item Supplies / Services Quantity Unit Unit Price Amount
THE CONTRACTOR SHALL FURNISH ALL
LABOR, EQUIPMENT, MATERIALS,
TRANSPORTATION, SUPERVISION AND ANY
OTHER NECESSARY WORK TO ACCOMPLISH
THE PROJECT HEREIN LISTED AT THE
PRICE STATED BELOW AND STRICTLY IN
ACCORDANCE WITH THE TERMS AND
CONDITIONS OF THIS CONTRACT
INCLUDING THE FOLLOWING ATTACHED
DOCUMENTS LISTED IN SECTION J
HEREIN: PROJECT ASHE 22-1058 REPAIR
DOORS 1ST GEN PASs ZULU LOOP
Product Type Code: Z1JZ Product Service Code: Z1BZ Pricing Arrangement: Firm Fixed Price
1 Lot
Description/Specifications/Statement of Work Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.
Requirements PROJECT ASHE 22-1058 REPAIR DOORS 1ST GEN PASs ZULU LOOP
Packaging and Marking
Inspection and Acceptance
FAR Clauses Incorporated by Reference
Number Title Effective Date Alternate/ Deviation
Variation Effective Date
52.246-12 Inspection of Construction. Aug 1996
DFARS Clauses Incorporated by Full Text
252.229-7003 Tax Exemptions (Italy). (Mar 2012)
TAX EXEMPTIONS ( ITALY ) (MAR 2012)
(a) As the Contractor represented in its offer, the contract price, including the prices in subcontracts awarded under this contract, does not include taxes from which the United States Government is exempt.
(b) The United States Government is exempt from payment of ( ) tax in accordance with Article 72 of the implementing decree on all Imposta Valore Aggiunto IVA IVA supplies and services sold to United States Military Commands in Italy .
(1) The Contractor shall include the following information on invoices submitted to the United States Government:
( ) The contract number.i
(ii) The tax exemption claimed pursuant to Article 72 of Decree Law 633, dated October 26, 1972 . IVA
(iii) The following fiscal code(s): 91000190933
(2)( ) Upon receipt of the invoice, the paying office will include the following certification on one copy of the invoice:i
"I certify that this invoice is true and correct and reflects expenditures made in Italy for the Common Defense by the United States Government pursuant to international agreements. The amount to be paid does not include the tax, because this transaction is not subject to the tax in IVA accordance with Article 72 of Decree Law 633, dated October 26, 1972 ."
An authorized United States Government official will sign the copy of the invoice containing this certification.
(ii) The paying office will return the certified copy together with payment to the Contractor. The payment will not include the amount of the tax. IVA
(iii) The Contractor shall retain the certified copy to substantiate non-payment of the tax. IVA
(3) The Contractor may address questions regarding the tax to the Ministry of Finance, Office, Rome (06) 520741. IVA IVA
(c) In addition to the tax, purchases by the United States Forces in Italy are exempt from the following taxes: IVA
(1) (Production Tax for Petroleum Products). Imposta di Fabbricazione
(2) (Consumption Tax for Electrical Power). Imposta di Consumo
(3) (Customs Duties). Dazi Doganali
(4) e Merci per Via e per Via (Port Fees). Tassa di Sbarco d'Imbarco sulle Transportate Aerea Maritima
(5) de (Vehicle Circulation Tax). Tassa Circolazione sui Veicoli
(6) (Registration Tax). Imposta di Registro
(7) (Stamp Tax). Imposta di Bollo
(End of clause)
Deliveries or Performance The Contractor shall be required to commence work under this contract within 30 calendar days after the date the Contractor receives the notice to proceed, prosecute the work diligently, and complete the entire work ready for use not later than 180 calendar days after the date the contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.
Line Item Delivery Schedule Quantity Address and POC
Delivery Schedule From date of lead time event to completion of performance 180 Calendar Days Date of Notice to Proceed Receipt
1 Lot Place of Performance DoDAAC: F1F3A2 CountryCode: USA
31 CES ENGINEER
AF BPN NO MILSBILLS PROCESSES, UNIT 6110 BOX 14
APO, AE 09604-3014
UNITED STATES
Sara Giacomello Email: sara.giacomello.it@us.af.mil Telephone: 00390434307933
Contract Administration Data
DFARS Clauses Incorporated by Reference
Number Title Effective Date Alternate/ Deviation
Variation Effective Date
252.201-7000 Contracting Officer's Representative. Dec 1991 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018 252.232-7008 Assignment of Claims (Overseas). Jun 1997 252.236-7000 Modification Proposals--Price Breakdown. Dec 1991
DFARS Clauses Incorporated by Full Text
252.232-7006 Wide Area WorkFlow Payment Instructions. (Jan 2023)
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) As used in this clause- Definitions.
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Electronic invoicing.
Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) To access WAWF, the Contractor shall- WAWF access.
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before WAWF training.
submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol. WAWF methods of document submission.
(f) The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract WAWF payment instructions.
or task or delivery order:
(1) The Contractor shall submit payment requests using the following document type(s): Document type.
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items-
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
CONSTRUCTION FACILITIES MANAGEMENT INVOICE
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
N/A
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]
(3) The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment Document routing.
requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC F87700
Issue By DoDAAC FA5682
Admin DoDAAC FA5682
Inspect By DoDAAC F1F3A2
Ship To Code N/A
Ship From Code N/A
Mark For Code N/A
Service Approver (DoDAAC) N/A
Service Acceptor (DoDAAC) F1F3A2
Accept at Other DoDAAC N/A
LPO DoDAAC N/A
DCAA Auditor DoDAAC N/A
Other DoDAAC(s) N/A
(4) The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the Payment request.
payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F. Receiving report.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
sara.giacomello.it@us.af.mil jessica.cuccagna.it@us.af.mil
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Special Contract Requirements
ADDITIONAL REQUIREMENTS
NON WORKDAYS
1. Unless otherwise approved by the Contracting Officer, work shall not be performed at the on base site of work on the following U.S. or Italian holidays (including other base closure days).
2. Regular working days as used herein mean Monday through Friday, from 0800 to 1700 hrs, of each week with exception of established Italian or American holidays or any other day proclaimed an official holiday by either Government.
Italian Holidays:
1 January New Year's Day 6 January Epiphany Easter Monday Monday following Easter 12 April Aviano Patron's Day 25 April Liberation Day 1 May Labor Day 2 June Republic Day 15 August Assumption Day 1 November All Saints' Day 8 December Immaculate Conception 25 December Christmas Day 26 December St. Stephen's Day
U.S. Holidays:
1 January * New Year's Day 3rd Monday in January Martin Luther King's Birthday 3rd Monday in February Washington's Birthday Last Monday in May Memorial Day 19th June* Juneteenth National Independence Day 4th of July* Independence Day 1st Monday in September Labor Day 2nd Monday in October Columbus Day 11 November * Veteran's Day 4th Thursday in November Thanksgiving Day 25 December* Christmas Day *When the holiday is on a Saturday, the preceding Friday will be the U.S. holiday. When the holiday is on a Sunday, the following Monday will be a U.S. holiday. If delivery is scheduled for a proclaimed holiday, delivery will be made on the next normal workday.
EFT PAYMENT INFORMATION
Information will be indicated when processing each invoice in WAWF
OBSERVANCE OF HOST COUNTRY SOCIAL CONTRIBUTION LABOR LAW
(a) The Contractor throughout the life of this contract shall scrupulously observe the requirements of Italian Law regarding the payment of social contributions for Italian national employees as well as the similar laws/directives for all legally employed workers. The contractor shall require subcontractors at all tiers to also comply with the payment requirements of this law and those of the European Community member nations. The Contractor shall on a yearly basis, provide copies of the certifications (DURC) issued by the appropriate host nation authority attesting compliance with regular payment requirements of this law and/or corresponding documentation issued for employees that are citizens of other European Community member countries. The certifications shall be provided any time a new employee or subcontractor performs work under this contract or upon expiration of any previously provided certifications. Failure of the Contractor to strictly observe this special contract requirement shall be sufficient reason for the U.S. Government to terminate this contract for Cause.
(b) The contractor shall be responsible for complying with any and all Italian labor laws, relations and standards in effect or which shall come into effect during the term of this contract. Such compliance shall pertain to: hours of work, wages, salaries, working conditions, labor relations (including collective bargaining, union agreements etc.), particular workmen's compensation, social security contributions for all categories of dependents and professionals. The Contractor and all subcontractors are required to adhere with all safety laws in effect (I.L. 626, Legislative Decree 9 April 2008, n. 81) and that may come into effect of the Italian Government. The Contracting Officer reserves the right to suspend work until such time as adherence to the laws is assured and to remove from the worksite any worker found to ignore required safety practices. Such suspension of work or removal of employees shall be at no cost to the Government. Failure by the contractor to correct deficiencies in reasonable time shall be cause for Termination for Default.
(c) Furthermore the contractor shall safeguard his firm with additional insurance against the risks of monetary recovery by Italian authorities and workers for accidents, injuries or deaths which are imputable to the contractor for failure to observe required safety practices and/or any requirement of paragraph a. above.
(d) The contractor shall be totally responsible and shall save harmless the U.S. Government from any and all disputes, claims, or grievance initiated by employees or third parties because of failure to comply with this special contract requirement.
(e) Construction contractors shall be responsible for written notification to the local labor benefits office of site work initiation under this contract and shall produce copy of such notice to the Contracting Officer.
(f) With each base pass request the Contractor shall furnish the health insurance and labor benefits employee number.
(g) With signature of the offer the contractor warrants that the proposed price(s)include all costs in effect or which shall come into effect during the term of the contract for compliance with this contract requirement and also for all responsibilities and risks as indicated herein
INSURANCE AMOUNTS
Pursuant to contract clause 52.228-5, Insurance-Work on a Government Installation, the following are the kinds and minimum amounts of insurance that are required for performance of this contract. Employee and third party bodily injury (in addition to the mandatory contractor's country social insurance).
(i) Per Person: EURO 1,000,000.00
Per Occurrence: EURO 5,000,000.00
(ii) Third Party Property Damages, Per Occurrence: EURO 1,500,000.00 Vehicle Liability Insurance in accordance with the mandatory requirements of the contractor's country and those of the European Common Market for work outside of the contractor's country. Insurance policies may be denominated in other than currency of the contractor's country provided the amount is equivalent to those stated above and the insurance policies are valid in the country where work is to be performed.
PREPARATION OF MATERIAL APPROVAL SUBMITTALS
The submittals contemplated by the clause entitled "Material and Workmanship" shall be accomplished on and in accordance with the instructions pertaining to AF Form 3000, Material Approval Submittal.
PREPARATION OF PROGRESS SCHEDULES AND REPORTS
The reports contemplated by the clause herein entitled: "Schedules for Construction Contracts" shall be accomplished on and in accordance with the instructions pertaining to AF Form 3064, Contract Progress Schedule, and AFForm 3065, Contract Progress Report.
52.228-15 Performance Payment Bonds - Construction (Jun 2020)
Para (b) (1) replace 100 percent with 10 percent
Para (b) (2) NOT APPLICABLE
Para (b) (3) replace 100 percent with 10 percent Duration of the performance bond shall include any extension to the performance period and 2-year warranty after acceptance of the work.
USE OF DRAWINGS, MAPS, SITE PLANS AND OTHER DOCUMENTS (Applicable to Section "Representations, Certification, & Other Statements" of the Solicitation)
a. For purposes of this certification drawings, maps, site plans and other documents shall be referred to as the "documents".
b. The Offeror certifies that he understands and shall observe the following instructions concerning the "documents" furnished by the government including those developed by him if required by the scope of the eventual contract: The "documents" shall not be:
(1) reproduced in whole or in part without the written consent of the Contracting Officer prior to award of the contract.
(2) released to third party personnel or subcontractors without the written consent of the Contracting Officer. For purposes of obtaining written consent, the Contractor shall provide the Contracting Officer the name of the firms who require the "documents" and the contents to be released.
(3) reproduced in whole or in part after contract award, without the written consent of the Contracting Officer. The request for approval shall contain a list of "documents" that require reproduction, the number of copies and to whom they will be distributed.
(4) retained by the Contractor after contract completion without the approval of the Contracting Officer.
NAME OF OFFEROR: __________________________________________________________
SIGNATURE:___________________________________________________________________
NAME AND TITLE OF SIGNER: _________________________________________________
(Applicable to Section "Representations, Certification, & Other Statements" of the Solicitation ) The undersigned contractor, NONAPPLICABILITY OF ITALIAN CIVIL CODE having seen and completely knowledgeable of the contents of the solicitation and eventual contract, in all of its parts, hereby renounces to any and all rights afforded to him by article 1341 of the Italian Civil Code with respect to the provisions and clauses of this contract and Italian Civil Code articles 1664, 1467 and 1673. The renouncement is made on his own free will without having received influence of any kind, from any third parties, including the contracting officer. The contractual price includes adequate monetary compensation for this renouncement. I hereby certify to have read and understood all terms, conditions and clauses of this contract and hereby approve them in their entirety.
NAME OF CONTRACTOR: _______________________________________________________
POSITION OF AGENT:___________________________________________________________
SIGNATURE OF AGENT: _________________________________________________________
DAF PART 42 CONTRACTOR ACCESS TO AIR FORCE INSTALLATIONS
- The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Department of the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation.
- The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The letter will also specify the individual(s) authorized to sign for a request for base identification credentials or vehicle passes. The contracting officer will endorse the request and forward it to the issuing base pass and registration office or Security Forces for processing. When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver's license, current vehicle registration, valid vehicle insurance certificate, and any other document required to obtain a vehicle pass.
- During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.
- When work under this contract requires unescorted entry to controlled or restricted areas, the contractor shall comply with any applicable regulation.
- Upol completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.
- The contractor shall provide an after-hours contact number or after-hour email in the Emergency Mass Notification System (EMNS) for each of their personnel, whose normal place of duty is on a DoD installation or within a DoD facility. The contractor shall comply with any additional requirements in DAFMAN 10-206 for emergency operational reporting. Foreign Nationals may participate and may remove themselves from the Emergency Mass Notification System at any time. To update information, personnel can access the globe icon on their system desktop screen and choose the "Access Self-Service" option.
- Failure to comply with these requirements may result in withholding of final payment.
DAF PART 1 USAFE OMBUDSMAN
a. An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern. The existence of the ombudsman does not affect the authority of the program manager, contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of protests or formal contract disputes. The ombudsman may refer the interested party to another official who can resolve the concern.
b. Before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution. Consulting an ombudsman does not alter or postpone the timelines for any other processes (e.g., agency level bid protests, GAO bid protests, requests for debriefings, employee-employer actions, contests of OMB Circular A-76 competition performance decisions).
c. If resolution cannot be made by the contracting officer, the interested party may contact the ombudsman.
Primary:
Mr. Alex Hight
AFICC/KU, UNIT 3103, APO, AE 09094-3103
AFICC/KU, Geb 404, Flugplatz Ramstein, 66877 Ramstein-Miesenbach, Germany E-mail: alex.hight@us.af.mil Tel: DSN: (314)480-2209 Fax: (49)-6371-47-2025
Alternate:
Mr. Alexander Larsen
AFICC/KU, UNIT 3103, APO, AE 09094-3103
AFICC/KU, Geb 404, Flugplatz Ramstein, 66877 Ramstein-Miesenbach, Germany E-mail: alexander.larsen.1@us.af.mil Tel: Comm: (49)-6371-47-5938 DSN: (314)480-5938 Fax: (49)-6371-47-2025.
Concerns, issues, disagreements, and recommendations that cannot be resolved at the Center/MAJCOM/FLDCOM/DRU ombudsman level, may be brought by the interested party for further consideration to the Department of the Air Force ombudsman, Associate Deputy Assistant Secretary (ADAS) (Contracting), SAF/AQC, 1060 Air Force Pentagon, Washington DC 20330-1060, phone number (571) 256-2395, facsimile number (571) 256-2431.
d. The ombudsman has no authority to render a decision that binds the agency.
e. Do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements. Such inquiries shall be directed to the contracting officer.
DAF PART 23 ELIMINATION OF USE OF CLASS I OZONE DEPLETING DUBSTANCES (ODS)
a. Contractors shall not:
1. Provide any service or product with any specification, standard, drawing, or other document that requires the use of a Class I ODS in the test, operation, or maintenance of any system, subsystem, item, component, or process; or
2. Provide any specification, standard, drawing, or other document that establishes a test, operation, or maintenance requirement that can only be met by use of a Class I ODS as part of this contract/order.
b. For the purposes of Department of the Air Force policy, the following products that are pure (i.e., they meet the relevant product specification identified in AFI 32-7086[AR2] ) are Class I ODSs:
1. Halons: 1011, 1202, 1211, 1301, and 2402;
2. Chlorofluorocarbons (CFCs): CFC-11, CFC-12, CFC-13, CFC-111, CFC-112, CFC-113, CFC-114, CFC-115, CFC-211, CFC-212, CFC- 213, CFC-214, CFC-215, CFC-216, and CFC-217, and the blends R-500, R-501, R-502, and R-503; and
3. Carbon Tetrachloride, Methyl Chloroform, and Methyl Bromide.
Contract Clauses With reference to clause RFO 52.246-21 Warranty of Construction (Mar 1994), of this request for quote, change all reference to one (1) year to read two (2) years.
FAR Clauses Incorporated by Reference
Number Title Effective Date Alternate/ Deviation
Variation Effective Date
52.202-1 Definitions. Jun 2020 52.203-3 Gratuities. Apr 1984 52.203-6 Restrictions on Subcontractor Sales to the Government. (Alternate I) Jun 2020 Alternate I Nov 2021 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements. Jan 2017 52.204-9 Personal Identity Verification of Contractor Personnel. Jan 2011 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. (Deviation 2026-O0038) Feb 2026 52.204-13 System for Award Management-Maintenance. (Deviation 2026-O0038) Feb 2026 52.204-19 Incorporation by Reference of Representations and Certifications. Dec 2014 52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (Deviation 2026-O0038) Feb 2026
52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters. (Deviation 2026-O0038) Feb 2026 52.209-10 Prohibition on Contracting With Inverted Domestic Corporations. (Deviation 2026-O0038) Feb 2026 52.222-50 Combating Trafficking in Persons. (Deviation 2026-O0038) Feb 2026 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving. May 2024 52.228-5 Insurance-Work on a Government Installation. Jan 1997 52.228-14 Irrevocable Letter of Credit. Nov 2014 52.228-15 Performance and Payment Bonds-Construction. Jun 2020 52.229-12 Tax on Certain Foreign Procurements. Feb 2021 52.232-27 Prompt Payment for Construction Contracts. Jan 2017 52.232-33 Payment by Electronic Funds Transfer-System for Award Management. Oct 2018 52.232-40 Providing Accelerated Payments to Small Business Subcontractors. Mar 2023 52.233-3 Protest after Award. (Deviation 2026-O0038) Feb 2026 52.233-4 Applicable Law for Breach of Contract Claim. (Deviation 2026-O0038) Feb 2026 52.236-2 Differing Site Conditions. (Deviation 2026-O0038) Feb 2026 52.236-3 Site Investigation and Conditions Affecting the Work. (Deviation 2026-O0038) Feb 2026 52.236-5 Material and Workmanship. (Deviation 2026-O0038) Feb 2026 52.236-6 Superintendence by the Contractor. (Deviation 2026-O0038) Feb 2026 52.236-7 Permits and Responsibilities. (Deviation 2026-O0038) Feb 2026 52.236-8 Other Contracts. (Deviation 2026-O0038) Feb 2026 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (Deviation 2026-
O0038) Feb 2026
52.236-10 Operations and Storage Areas. (Deviation 2026-O0038) Feb 2026 52.236-11 Use and Possession Prior to Completion. (Deviation 2026-O0038) Feb 2026 52.236-12 Cleaning Up. (Deviation 2026-O0038) Feb 2026 52.236-13 Accident Prevention. (Deviation 2026-O0038) Feb 2026 52.236-14 Availability and Use of Utility Services. (Deviation 2026-O0038) Feb 2026 52.236-15 Schedules for Construction Contracts. (Deviation 2026-O0038) Feb 2026 52.236-17 Layout of Work. (Deviation 2026-O0038) Feb 2026 52.236-21 Specifications and Drawings for Construction. (Alternate I) Feb 2026 Alternate I Apr 1984 52.240-91 Security Prohibitions and Exclusions. (Deviation 2026-O0038) Feb 2026 52.242-13 Bankruptcy. Jul 1995 52.242-14 Suspension of Work. Apr 1984 52.243-4 Changes. (Deviation 2026-O0038) Feb 2026 52.244-6 Subcontracts for Commercial Products and Commercial Services. (Deviation 2026-O0038) Apr 2026 52.246-21 Warranty of Construction. Mar 1994 52.249-2 Termination for Convenience of the Government (Fixed-Price). (Alternate I) Apr 2012 Alternate I Sep 1996 52.249-10 Default (Fixed-Price Construction). Apr 1984 52.253-1 Computer Generated Forms. (Deviation 2026-O0038) Feb 2026
DFARS Clauses Incorporated by Reference
Number Title Effective Date Alternate/ Deviation
Variation Effective Date
252.203-7000 Requirements Relating to Compensation of Former DoD Officials. Sep 2011 252.203-7002 Requirement to Inform Employees of Whistleblower Rights. Dec 2022 252.204-7003 Control of Government Personnel Work Product. Apr 1992 252.204-7004 Antiterrorism Awareness Training for Contractors. Jan 2023 252.204-7009 Limitations on the Use or Disclosure of Third-Party Contractor Reported Cyber Incident Information. Jan 2023 252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting. May 2024 252.204-7014 Limitations on the Use or Disclosure of Information by Litigation Support Contractors. Jan 2023 252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support. Jan 2023 252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services. Jan 2023 252.204-7020 NIST SP 800-171 DoD Assessment Requirements. Nov 2023 252.209-7004 Subcontracting with Firms that are Owned or Controlled by the Government of a Country that is a State
Sponsor of Terrorism.
May 2019
252.222-7002 Compliance with Local Labor Laws (Overseas). Jun 1997 252.223-7006 Prohibition on Storage, Treatment, and Disposal of Toxic or Hazardous Materials. Sep 2014
252.223-7008 Prohibition of Hexavalent Chromium. Jan 2023 252.225-7012 Preference for Certain Domestic Commodities. Apr 2022 252.225-7016 Restriction on Acquisition of Ball and Roller Bearings. Jan 2023 252.225-7041 Correspondence in English. Jun 1997 252.225-7048 Export-Controlled Items. Jun 2013 252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime. Jan 2023 252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region. Jun 2023 252.226-7001 Utilization of Indian Organizations, Indian-Owned Economic Enterprises, and Native Hawaiian Small
Business Concerns.
Jan 2023
252.229-7006 Value Added Tax Exclusion (United Kingdom) Dec 2011 252.229-7008 Relief from Import Duty (United Kingdom). Dec 2011 252.232-7010 Levies on Contract Payments. Dec 2006 252.233-7001 Choice of Law (Overseas). Jun 1997 252.236-7005 Airfield Safety Precautions. Dec 1991 252.243-7001 Pricing of Contract Modifications. Dec 1991 252.243-7002 Requests for Equitable Adjustment. Dec 2022 252.246-7004 Safety of Facilities, Infrastructure, and Equipment for Military Operations. Oct 2010 252.247-7023 Transportation of Supplies by Sea. Oct 2024
FAR Clauses Incorporated by Full Text
52.212-4 Terms and Conditions-Commercial Products and Commercial Services. (Deviation 2026-O0038) (Feb 2026)
Terms and Conditions-Commercial Products and Commercial Services (Feb 2026) (Deviation 2026-O0038)
(a) Definitions. The clause at Federal Acquisition Regulation (FAR) 52.202-1, Definitions, is incorporated by reference.
(b) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post acceptance rights-
(1) Within a reasonable time after the defect was discovered or should have been discovered; and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(c) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.
(d) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.
(e) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal, or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause FAR 52.233-1, Disputes, which is incorporated in this contract by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.
(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence. Examples of occurrences include acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. When an excusable delay occurs, the Contractor shall-
(1) Notify the Contracting Officer in writing as soon as possible;
(2) Remedy the delay as quickly as possible; and
(3) Notify the Contracting Officer when the occurrence is over.
(g) Invoice. The Government will handle invoices according to the Prompt Payment Act (31 U.S.C. 3903) and 5 CFR part 1315. The Contractor shall submit invoices to the address designated in the contract to receive invoices. An invoice must include the information required by 5 CFR part 1315.9(b).
(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees, and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark, or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.
(i) Payment-
(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.
(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act ( 31 U.S.C. 3903) and prompt payment regulations at 5 CFR part 1315.
(3) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date that appears on the payment check or the specified payment date if an electronic funds transfer payment is made.
(4) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall-
(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the-
(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);
(B) Affected contract number and delivery order number, if applicable;
(C) Affected line item or subline item, if applicable;
(D) Contractor point of contact; and
(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.
(5) Interest.
(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.
(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.
(iii) Final decisions. The Contracting Officer will issue a final decision as required by FAR part 33 if-
(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;
(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or
(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see FAR part 32).
(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.
(v) Amounts shall be due at the earliest of the following dates:
(A) The date fixed under this contract.
(B) The date of the first written demand for payment, including any demand for payment resulting from a termination for cause.
(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on-
(A) The date on which the designated office receives payment from the Contractor;
(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or
(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.
(vii) The interest charge made under this clause may be reduced under the procedures for interest credits prescribed in FAR part 32 in effect on the date of this contract.
(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon-
(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or
(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.
(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.
(l) Termination for the Government's convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination.
The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor's records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.
(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. The Government will send a cure notice to the Contractor, unless the reason for the termination is late delivery. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.
(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.
(o) Warranty. The Contractor warrants and implies that the items delivered under this contract are merchantable and fit for use for the particular purpose described in this contract.
(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.
(q) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 40 U.S.C. chapter 37, Contract Work Hours and Safety Standards; 41 U.S.C. chapter 87, Kickbacks; 49 U.S.C. 40118, Government-financed air transportation; and 41 U.S.C. chapter 21 relating to procurement integrity.
(r) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:
(1) The schedule of supplies/services;
(2) The Disputes, Payments, Invoice, Compliance with Laws Unique to Government Contracts, and Unauthorized Obligations paragraphs of this clause;
(3) Other contract clauses incorporated in the solicitation or contract;
(4) Addenda to this solicitation or contract;
(5) Solicitation provisions incorporated in the solicitation;
(6) Other paragraphs of this clause;
(7) Other documents, exhibits, and attachments; and
(8) The specification.
(s) Unauthorized obligations.
(1) Except as stated in paragraph (s)(2) of this clause, when any supply or service acquired under this contract is subject to any End User License Agreement (EULA), Terms of Service (TOS), or similar legal instrument or agreement, that includes any clause requiring the Government to indemnify the Contractor or any person or entity for damages, costs, fees, or any other loss or liability that would create an Anti-Deficiency Act violation (31 U.S.C. 1341), the following shall govern:
(i) Any such clause is unenforceable against the Government.
(ii) Neither the Government nor any Government-authorized end user shall be deemed to have agreed to such clause by virtue of it appearing in the EULA, TOS, or similar legal instrument or agreement. If the EULA, TOS, or similar legal instrument or agreement is invoked through an "I agree" click box or other comparable mechanism (e.g., "click-wrap" or "browse-wrap" agreements), execution does not bind the Government or any Government authorized end user to such clause.
(iii) Any such clause is deemed to be stricken from the EULA, TOS, or similar legal instrument or agreement.
(2) Paragraph (s)(1) of this clause does not apply to indemnification by the Government that is expressly authorized by statute and specifically authorized under applicable agency regulations and procedures.
(t) Comptroller General examination of record. This paragraph applies if this contract was awarded using other than sealed bid procedures and is in excess of the simplified acquisition threshold on the date of award of this contract.
(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices, at all reasonable times, the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR part 4, longer period required by statute, or periods specified in other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.
(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This clause does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.
(u) Incorporation by reference. The Contractor's representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.
(End of clause)
52.223-3 Hazardous Material Identification and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .