Solicitation - FA462626R0003.pdf

PDF 2 MB Posted

Attached to
Demo Buildings 1879, 29001, 29002
Solicitation number
FA4626-26-R-0003
Issued by

About this file

This document is a Request for Proposal (RFP) for a demolition project at Malmstrom Air Force Base in Montana. The solicitation (FA462626R0003) is for demolishing three buildings (Buildings 1879, 29001, and 29002) and associated site work, with a small business set-aside of 100%. The total project is valued between $250,000 and $500,000, with a NAICS code of 238910 and a small business size standard of $19 million in annual receipts.

Key contract details include a 10-day period to begin work after notice to proceed, with a total performance period of 84 calendar days. The contract requires performance and payment bonds. The scope of work involves comprehensive demolition services including design, mobilization, building demolition, utility disconnection, asbestos and lead paint abatement, site work, and associated tasks. The project will be conducted at the 341st Missile Wing location, with proposals due on 23 December 2025 at 2:00 PM local time. An organized site visit is scheduled for 15 December 2025 at 1:30 PM MST at the 34st Contracting Squadron, Building 145 at Malmstrom AFB.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(See ).

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR

INFORMATION CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

SOLICITATION

1. SOLICITATION NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

CODE

6. PROJECT NUMBER

8. ADDRESS OFFER TO

4. CONTRACT NUMBER

7. ISSUED BY

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

11. The contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and

b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than

STANDARD FORM 1442 (REV. 12/2022)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

is, is not required.

local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.

calendar days and complete it within calendar days after receiving

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

12b. CALENDAR DAYS

2. TYPE OF SOLICITATION

SEALED BID (IFB)

INVITATION FOR BID

NEGOTIATED (RFP)

REQUEST FOR PROPOSAL

3. DATE ISSUED PAGE OF PAGES

AWARD (To be completed by Government)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

OFFER (Must be fully completed by offeror)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

CODE FACILITY CODE

15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

21. ITEMS ACCEPTED:

22. AMOUNT

26. ADMINISTERED BY

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31c. DATE

STANDARD FORM 1442 (REV. 12/2022) BACK

31b. UNITED STATES OF AMERICA

BY

31a. NAME OF CONTRACTING OFFICER (Type or print)

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30b. SIGNATURE 30c. DATE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

23. ACCOUNTING AND APPROPRIATION DATA

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES

CODE AT

27. PAYMENT WILL BE MADE BY

10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )

20b. SIGNATURE 20c. OFFER DATE

Section A - Solicitation/Contract Form Demo Buildings 1879, 29001, 29002

NAICS: 238910

Size Standard: USD 19,000,000.00 Annual receipts

Small Business Type: Small Business Set Aside Percent: 100

Product Service Code: P400

FA462626R0003

Section B - Supplies or Services & Prices or Costs Additional Information/Notes

Item Supplies / Services Quantity Unit Unit Price Amount

Design: Measurement and payment for this item shall be at the contract lump sum price for "Design".

Payment shall include all costs for labor, materials, and equipment associated with the design of the demo of the entire building including exterior improvements shown on the attached drawings, topographic site survey, cutting, removing, and capping utilities, backfill, compaction, grading, seeding, providing plans and specs and all other incidental items necessary to complete the work.

Product Service Code: P400 Pricing Arrangement: Firm Fixed Price

1 Job

Mobilization: Measurement and payment for this item shall include all costs related to general contract requirements, administration, and overhead and shall be merged and included in the contract lump sum price for "Mobilization". The cost of all insurance, permits, security processes, licenses, safety, fees, taxes, purchasing permits and licenses, utility location, shop drawings and as-builts, general administration and overhead, movement of equipment, tools, project superintendent and workmen, quality control, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for Mobilization.

Product Service Code: P400 Pricing Arrangement: Firm Fixed Price

1 Job

Demolish Building 1897: Measurement and payment for this item shall be at the contract lump sum price for "Demolish Building 1897". Payment shall include all costs for labor, materials, and equipment to demolish the entire building including foundation, removal of all materials off site to a landfill, cleanup, and all other incidental items necessary to complete the work. If any asbestos containing materials are found during the asbestos survey performed during design, this will constitute unforeseen site conditions and require a Modification to the contract documents.

Product Service Code: P400 Pricing Arrangement: Firm Fixed Price

1 Job

Demolish Building 29001:

Measurement and payment for this item shall be at the contract lump sum price for "Demolish Building 29001". Payment shall include all costs for labor, materials, and equipment to demolish the entire building including foundation, dirt berm, removal of all materials off site to a landfill, cleanup, and all other incidental items necessary to complete the work. If any asbestos containing materials are found during the asbestos survey performed during design, this will constitute unforeseen site conditions and require a Modification to the contract documents.

Product Service Code: P400 Pricing Arrangement: Firm Fixed Price

1 Job

Demolish Building 29002:

Measurement and payment for this item shall be at the contract lump sum price for "Demolish Building 29002". Payment shall include all costs for labor, materials, and equipment to demolish the entire building including foundation, removal of all materials off site to a landfill, cleanup, and all other incidental items necessary to complete the work. If any asbestos containing materials are found during the asbestos survey performed during design, this will constitute unforeseen site conditions and require a Modification to the contract documents.

Product Service Code: P400 Pricing Arrangement: Firm Fixed Price

1 Job

Utilities: Measurement and payment for this item shall be at the contract lump sum price for "Utilities". Payment shall include all costs for labor, materials, and equipment to cut, remove and cap water and sewer building utilities, pull back comm lines, electrical lines, backfill and compact utility trenches and all incidental items necessary to complete the work.

Product Service Code: P400 Pricing Arrangement: Firm Fixed Price

1 Job

Sitework: Measurement and payment for this item shall be at the contract lump sum price for "Sitework". Payment shall include all costs for labor, materials, and equipment to backfill, compact and grade the site after demolition, install and maintain new seed, cleanup and all incidental items necessary to complete the work.

Product Service Code: P400 Pricing Arrangement: Firm Fixed Price

1 Job

Bonding: Measurement and payment for this item shall be at the contract lump sum price for "Bonding" and shall include all costs related to furnishing the bonds as required in the Contract Documents.

1 Each

Product Service Code: P400 Pricing Arrangement: Firm Fixed Price

Asbestos and Lead Paint Abatement:

Measurement and payment for this item shall be at the contract lump sum price for "Asbestos and Lead Paint Abatement". Payment shall include all costs for labor, materials, and equipment for the removal and legal disposal of all asbestos containing materials in accordance with Montana, EPA and OSHA standards for such procedures, monitoring, and all other incidental items necessary to complete the work. The Government acknowledges that asbestos containing materials are present within the project area, as identified in the attached asbestos reports dated 2003 and 2011. This CLIN covers the abatement of those known materials show in the referenced reports.

Product Service Code: P400 Pricing Arrangement: Firm Fixed Price

1 Job

Asbestos and Lead Paint Investigation: Measurement and payment for this item shall be at the contract lump sum price for "Asbestos and Lead Paint Testing".

Payment shall include all costs for labor, materials, and equipment for the testing for all asbestos and lead paint containing materials in accordance with Montana, EPA and OSHA standards for such procedures, monitoring, and all other incidental items necessary to complete the work.

Product Service Code: P400 Pricing Arrangement: Firm Fixed Price

1 Job

Section C - Description/Specifications/Statement of Work

Requirements DSN/CSN: The Contractor shall perform all services and provide all labor, materials, and equipment necessary to completely demolish the buildings. This work shall be accomplished in accordance with the (UFC Unified Facilities Code) specifications, and additional requirements of the Statement of Work.

Section D - Packaging and Marking

Section E - Inspection and Acceptance

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.246-12 Inspection of Construction. Aug 1996 52.246-13 Inspection-Dismantling, Demolition, or Removal of Improvements. Aug 1996 Overall Contract Inspection/Acceptance Locations

Inspection and Acceptance Location

Both Destination Instructions: See Statement of Work (SOW) or Performance Work Statement (PWS) for Acceptance/inspection criteria.

DoDAAC: F2W3D5 CountryCode: USA

341 CES CECR BASE SRMC

AF BPN NO MILSBILLS PROCESSES, 39 78TH ST N BLDG 470

MALMSTROM AFB, MT 59402

UNITED STATES

Brady Lorenz Email: brady.lorenz@us.af.mil Telephone: 4067316144

Inspection and Acceptance Location

Both Destination Instructions: See Statement of Work (SOW) or Performance Work Statement (PWS) for Acceptance/inspection criteria.

DoDAAC: F2W3D5 CountryCode: USA

341 CES CECR BASE SRMC

AF BPN NO MILSBILLS PROCESSES, 39 78TH ST N BLDG 470

MALMSTROM AFB, MT 59402

UNITED STATES

Brady Lorenz Email: brady.lorenz@us.af.mil Telephone: 4067316144

Inspection and Acceptance Location

Both Destination Instructions: See Statement of Work (SOW) or Performance Work Statement (PWS) for Acceptance/inspection criteria.

DoDAAC: F2W3D5 CountryCode: USA

341 CES CECR BASE SRMC

AF BPN NO MILSBILLS PROCESSES, 39 78TH ST N BLDG 470

MALMSTROM AFB, MT 59402

UNITED STATES

Brady Lorenz Email: brady.lorenz@us.af.mil Telephone: 4067316144

Inspection and Acceptance Location

Both Destination Instructions: See Statement of Work (SOW) or Performance Work Statement (PWS) for Acceptance/inspection criteria.

DoDAAC: F2W3D5 CountryCode: USA

341 CES CECR BASE SRMC

AF BPN NO MILSBILLS PROCESSES, 39 78TH ST N BLDG 470

MALMSTROM AFB, MT 59402

UNITED STATES

Brady Lorenz Email: brady.lorenz@us.af.mil Telephone: 4067316144

Inspection and Acceptance Location

Both Destination Instructions: See Statement of Work (SOW) or Performance Work Statement (PWS) for Acceptance/inspection criteria.

DoDAAC: F2W3D5 CountryCode: USA

341 CES CECR BASE SRMC

AF BPN NO MILSBILLS PROCESSES, 39 78TH ST N BLDG 470

MALMSTROM AFB, MT 59402

UNITED STATES

Brady Lorenz Email: brady.lorenz@us.af.mil Telephone: 4067316144

Inspection and Acceptance Location

Both Destination Instructions: See Statement of Work (SOW) or Performance Work Statement (PWS) for Acceptance/inspection criteria.

DoDAAC: F2W3D5 CountryCode: USA

341 CES CECR BASE SRMC

AF BPN NO MILSBILLS PROCESSES, 39 78TH ST N BLDG 470

MALMSTROM AFB, MT 59402

UNITED STATES

Brady Lorenz Email: brady.lorenz@us.af.mil Telephone: 4067316144

Inspection and Acceptance Location

Both Destination Instructions: See Statement of Work (SOW) or Performance Work Statement (PWS) for Acceptance/inspection criteria.

DoDAAC: F2W3D5 CountryCode: USA

341 CES CECR BASE SRMC

AF BPN NO MILSBILLS PROCESSES, 39 78TH ST N BLDG 470

MALMSTROM AFB, MT 59402

UNITED STATES

Brady Lorenz Email: brady.lorenz@us.af.mil Telephone: 4067316144

Inspection and Acceptance Location

Both Destination Instructions: See Statement of Work (SOW) or Performance Work Statement (PWS) for Acceptance/inspection criteria.

DoDAAC: F2W3D5 CountryCode: USA

341 CES CECR BASE SRMC

AF BPN NO MILSBILLS PROCESSES, 39 78TH ST N BLDG 470

MALMSTROM AFB, MT 59402

UNITED STATES

Brady Lorenz Email: brady.lorenz@us.af.mil Telephone: 4067316144

Inspection and Acceptance Location

Both Destination Instructions: See Statement of Work (SOW) or Performance Work Statement (PWS) for Acceptance/inspection criteria.

DoDAAC: F2W3D5 CountryCode: USA

341 CES CECR BASE SRMC

AF BPN NO MILSBILLS PROCESSES, 39 78TH ST N BLDG 470

MALMSTROM AFB, MT 59402

UNITED STATES

Brady Lorenz Email: brady.lorenz@us.af.mil Telephone: 4067316144

Inspection and Acceptance Location

Both Destination Instructions: See Statement of Work (SOW) or Performance Work Statement (PWS) for Acceptance/inspection criteria.

DoDAAC: F2W3D5 CountryCode: USA

341 CES CECR BASE SRMC

AF BPN NO MILSBILLS PROCESSES, 39 78TH ST N BLDG 470

MALMSTROM AFB, MT 59402

UNITED STATES

Brady Lorenz Email: brady.lorenz@us.af.mil Telephone: 4067316144

Section F - Deliveries or Performance Overall Contract Delivery Period

Line Item Delivery Schedule Quantity Address and POC

Delivery Schedule From date of lead time event to completion of performance 84 Calendar Days Date of Notice to Proceed Receipt

1 Job Place of Performance DoDAAC: F2W3D5 CountryCode: USA

341 CES CECR BASE SRMC

AF BPN NO MILSBILLS PROCESSES, 39 78TH ST N BLDG 470

MALMSTROM AFB, MT 59402

UNITED STATES

Brady Lorenz Email: brady.lorenz@us.af.mil Telephone: 4067316144

Delivery Schedule From date of lead time event to completion of performance 84 Calendar Days Date of Notice to Proceed Receipt

1 Job Place of Performance DoDAAC: F2W3D5 CountryCode: USA

341 CES CECR BASE SRMC

AF BPN NO MILSBILLS PROCESSES, 39 78TH ST N BLDG 470

MALMSTROM AFB, MT 59402

UNITED STATES

Brady Lorenz Email: brady.lorenz@us.af.mil Telephone: 4067316144

Delivery Schedule From date of lead time event to completion of performance 84 Calendar Days Date of Notice to Proceed Receipt

1 Job Place of Performance DoDAAC: F2W3D5 CountryCode: USA

341 CES CECR BASE SRMC

AF BPN NO MILSBILLS PROCESSES, 39 78TH ST N BLDG 470

MALMSTROM AFB, MT 59402

UNITED STATES

Brady Lorenz Email: brady.lorenz@us.af.mil Telephone: 4067316144

Delivery Schedule From date of lead time event to completion of performance 84 Calendar Days Date of Notice to Proceed Receipt

1 Job Shipment in Place Location DoDAAC: F2W3D5 CountryCode: USA

341 CES CECR BASE SRMC

AF BPN NO MILSBILLS PROCESSES, 39 78TH ST N BLDG 470

MALMSTROM AFB, MT 59402

UNITED STATES

Brady Lorenz Email: brady.lorenz@us.af.mil Telephone: 4067316144

Delivery Schedule From date of lead time event to completion of performance 84 Calendar Days Date of Notice to Proceed Receipt

1 Job Place of Performance DoDAAC: F2W3D5 CountryCode: USA

341 CES CECR BASE SRMC

AF BPN NO MILSBILLS PROCESSES, 39 78TH ST N BLDG 470

MALMSTROM AFB, MT 59402

UNITED STATES

Brady Lorenz Email: brady.lorenz@us.af.mil Telephone: 4067316144

Delivery Schedule From date of lead time event to completion of performance 84 Calendar Days Date of Notice to Proceed Receipt

1 Job Place of Performance DoDAAC: F2W3D5 CountryCode: USA

341 CES CECR BASE SRMC

AF BPN NO MILSBILLS PROCESSES, 39 78TH ST N BLDG 470

MALMSTROM AFB, MT 59402

UNITED STATES

Brady Lorenz Email: brady.lorenz@us.af.mil Telephone: 4067316144

Delivery Schedule From date of lead time event to completion of performance 84 Calendar Days Date of Notice to Proceed Receipt

1 Job Place of Performance DoDAAC: F2W3D5 CountryCode: USA

341 CES CECR BASE SRMC

AF BPN NO MILSBILLS PROCESSES, 39 78TH ST N BLDG 470

MALMSTROM AFB, MT 59402

UNITED STATES

Brady Lorenz Email: brady.lorenz@us.af.mil Telephone: 4067316144

Delivery Schedule From date of lead time event to completion of performance 84 Calendar Days Date of Notice to Proceed Receipt

1 Each Place of Performance DoDAAC: F2W3D5 CountryCode: USA

341 CES CECR BASE SRMC

AF BPN NO MILSBILLS PROCESSES, 39 78TH ST N BLDG 470

MALMSTROM AFB, MT 59402

UNITED STATES

Brady Lorenz Email: brady.lorenz@us.af.mil Telephone: 4067316144

Delivery Schedule From date of lead time event to completion of performance 84 Calendar Days Date of Notice to Proceed Receipt

1 Job Place of Performance DoDAAC: F2W3D5 CountryCode: USA

341 CES CECR BASE SRMC

AF BPN NO MILSBILLS PROCESSES, 39 78TH ST N BLDG 470

MALMSTROM AFB, MT 59402

UNITED STATES

Brady Lorenz Email: brady.lorenz@us.af.mil Telephone: 4067316144

Delivery Schedule From date of lead time event to completion of performance 84 Calendar Days Date of Notice to Proceed Receipt

1 Job Place of Performance DoDAAC: F2W3D5 CountryCode: USA

341 CES CECR BASE SRMC

AF BPN NO MILSBILLS PROCESSES, 39 78TH ST N BLDG 470

MALMSTROM AFB, MT 59402

UNITED STATES

Brady Lorenz Email: brady.lorenz@us.af.mil Telephone: 4067316144

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.242-15 Stop-Work Order. Aug 1989 52.242-17 Government Delay of Work. Apr 1984 52.247-34 F.o.b. Destination. Jan 1991

Section G - Contract Administration Data

DFARS Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018 252.236-7000 Modification Proposals--Price Breakdown. Dec 1991

DFARS Clauses Incorporated by Full Text

252.232-7006 Wide Area WorkFlow Payment Instructions. (Jan 2023)

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) As used in this clause- Definitions.

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Electronic invoicing.

Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) To access WAWF, the Contractor shall- WAWF access.

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before WAWF training.

submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/

(e) Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol. WAWF methods of document submission.

(f) The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this WAWF payment instructions.

contract or task or delivery order:

(1) The Contractor shall submit payment requests using the following document type(s): Document type.

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items-

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

Invoice 2in1

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]

(3) The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating Document routing.

payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC F87700

Issue By DoDAAC FA4626

Admin DoDAAC FA4626

Inspect By DoDAAC F2W3D5

Ship To Code ____

Ship From Code ____

Mark For Code ____

Service Approver (DoDAAC) F2W3D5

Service Acceptor (DoDAAC) FA4626

Accept at Other DoDAAC ____

LPO DoDAAC ____

DCAA Auditor DoDAAC ____

Other DoDAAC(s) ____

(4) The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance Payment request.

with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F. Receiving report.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

Jillian Urick - jillian.urick@us.af.mil

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

Section H - Special Contract Requirements

Section I - Contract Clauses

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.202-1 Definitions. Jun 2020 52.203-3 Gratuities. Apr 1984 52.203-5 Covenant Against Contingent Fees. May 2014 52.203-7 Anti-Kickback Procedures. Jun 2020 52.203-12 Limitation on Payments to Influence Certain Federal Transactions. Jun 2020 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements. Jan 2017 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. Jun 2020 52.204-13 System for Award Management Maintenance. Oct 2018 52.204-18 Commercial and Government Entity Code Maintenance. Aug 2020 52.204-19 Incorporation by Reference of Representations and Certifications. Dec 2014 52.204-21 Basic Safeguarding of Covered Contractor Information Systems. Nov 2021

52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities.

Dec 2023

52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.

Nov 2021

52.204-27 Prohibition on a ByteDance Covered Application. Jun 2023

52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded

Jan 2025

52.209-10 Prohibition on Contracting with Inverted Domestic Corporations. Nov 2015 52.211-13 Time Extensions. Sep 2000 52.215-8 Order of Precedence-Uniform Contract Format. Oct 1997 52.219-6 Notice of Total Small Business Set-Aside. Nov 2020 52.219-8 Utilization of Small Business Concerns. Jan 2025 52.222-3 Convict Labor. Jun 2003 52.222-4 Contract Work Hours and Safety Standards -Overtime Compensation. May 2018 52.222-6 Construction Wage Rate Requirements. Aug 2018 52.222-7 Withholding of Funds. May 2014 52.222-8 Payrolls and Basic Records. Jul 2021 52.222-9 Apprentices and Trainees. (DEVIATION 2025-O0003) Jul 2005 Deviation 2025-O0003 Mar 2025 52.222-10 Compliance with Copeland Act Requirements. Feb 1988 52.222-11 Subcontracts (Labor Standards). May 2014 52.222-12 Contract Termination-Debarment. May 2014 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations. May 2014 52.222-14 Disputes Concerning Labor Standards. Feb 1988 52.222-15 Certification of Eligibility. May 2014 52.222-21 Prohibition of Segregated Facilities. Apr 2015 52.222-26 Equal Opportunity. Sep 2016 52.222-27 Affirmative Action Compliance Requirements for Construction. Apr 2015 52.222-35 Equal Opportunity for Veterans. Jun 2020 52.222-36 Equal Opportunity for Workers with Disabilities. Jun 2020 52.222-37 Employment Reports on Veterans. Jun 2020 52.222-40 Notification of Employee Rights Under the National Labor Relations Act. Dec 2010 52.222-50 Combating Trafficking in Persons. Oct 2025 52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026. Jan 2022 52.222-62 Paid Sick Leave Under Executive Order 13706. Jan 2022 52.223-5 Pollution Prevention and Right-to-Know Information. May 2024 52.223-10 Waste Reduction Program. (DEVIATION 2025-O0004) May 2024 Deviation 2025-O0004 Mar 2025 52.223-21 Foams. May 2024 52.223-23 Sustainable Products and Services. (DEVIATION 2025-O0004) May 2024 Deviation 2025-O0004 Mar 2025 52.225-13 Restrictions on Certain Foreign Purchases. Feb 2021 52.226-7 Drug-Free Workplace. May 2024 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving. May 2024 52.227-1 Authorization and Consent. Jun 2020 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement. Jun 2020 52.227-4 Patent Indemnity-Construction Contracts. Dec 2007 52.228-2 Additional Bond Security. Oct 1997 52.228-11 Pledges of Assets (DEVIATION 2020-O0016) Feb 2021 Deviation 2020-O0016 Apr 2020 52.228-12 Prospective Subcontractor Requests for Bonds. Dec 2022 52.228-14 Irrevocable Letter of Credit. Nov 2014 52.228-15 Performance and Payment Bonds-Construction (Deviation 2020-O0016) Jun 2020 Deviation 2020-O0016 Apr 2020 52.229-3 Federal, State, and Local Taxes. Feb 2013 52.232-23 Assignment of Claims. May 2014 52.232-27 Prompt Payment for Construction Contracts. Jan 2017 52.232-33 Payment by Electronic Funds Transfer-System for Award Management. Oct 2018 52.232-39 Unenforceability of Unauthorized Obligations. Jun 2013 52.232-40 Providing Accelerated Payments to Small Business Subcontractors. Mar 2023 52.233-1 Disputes. May 2014 52.233-3 Protest after Award. Aug 1996 52.233-4 Applicable Law for Breach of Contract Claim. Oct 2004 52.236-2 Differing Site Conditions. Apr 1984

52.236-3 Site Investigation and Conditions Affecting the Work. Apr 1984 52.236-5 Material and Workmanship. Apr 1984 52.236-6 Superintendence by the Contractor. Apr 1984 52.236-7 Permits and Responsibilities. Nov 1991 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. Apr 1984 52.236-10 Operations and Storage Areas. Apr 1984 52.236-11 Use and Possession Prior to Completion. Apr 1984 52.236-12 Cleaning Up. Apr 1984 52.236-13 Accident Prevention. Nov 1991 52.236-17 Layout of Work. Apr 1984 52.236-21 Specifications and Drawings for Construction. Feb 1997 52.236-26 Preconstruction Conference. Feb 1995

52.240-1 Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act-Covered Foreign Entities.

Nov 2024

52.242-14 Suspension of Work. Apr 1984 52.243-5 Changes and Changed Conditions. Apr 1984

52.244-6 Subcontracts for Commercial Products and Commercial Services. (DEVIATION 2025- O0003)

Oct 2025 Deviation 2025-O0003 Mar 2025

52.246-21 Warranty of Construction. Mar 1994 52.247-12 Supervision, Labor, or Materials. Apr 1984 52.249-2 Termination for Convenience of the Government (Fixed-Price). Apr 2012 52.249-2 Termination for Convenience of the Government (Fixed-Price). (Alternate I) Apr 2012 Alternate I Sep 1996 52.253-1 Computer Generated Forms. Jan 1991

DFARS Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

252.203-7000 Requirements Relating to Compensation of Former DoD Officials. Sep 2011 252.203-7002 Requirement to Inform Employees of Whistleblower Rights. Dec 2022 252.204-7003 Control of Government Personnel Work Product. Apr 1992

252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting. (DEVIATION

2024-O0013 REVISION 1)

May 2024 Deviation 2024-O0013 May 2024

252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support. Jan 2023

252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services.

Jan 2023

252.204-7020 NIST SP 800-171 DoD Assessment Requirements. Nov 2023

252.209-7004 Subcontracting with Firms that are Owned or Controlled by the Government of a Country that is a State Sponsor of Terrorism.

May 2019

252.223-7006 Prohibition on Storage, Treatment, and Disposal of Toxic or Hazardous Materials. Sep 2014 252.223-7008 Prohibition of Hexavalent Chromium. Jan 2023 252.225-7012 Preference for Certain Domestic Commodities. Apr 2022 252.225-7048 Export-Controlled Items. Jun 2013 252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime. Jan 2023 252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region. Jun 2023 252.226-7003 Drug-Free Work Force. Aug 2024 252.232-7004 DoD Progress Payment Rates (DEVIATION 2020-O0010) Oct 2014 Deviation 2020-O0010 Mar 2020 252.232-7010 Levies on Contract Payments. Dec 2006 252.237-7010 Prohibition on Interrogation of Detainees by Contractor Personnel. Jan 2023 252.243-7001 Pricing of Contract Modifications. Dec 1991 252.244-7000 Subcontracts for Commercial Products or Commercial Services. Nov 2023 252.246-7004 Safety of Facilities, Infrastructure, and Equipment for Military Operations. Oct 2010 252.247-7023 Transportation of Supplies by Sea. Oct 2024

FAR Clauses Incorporated by Full Text

52.211-10 Commencement, Prosecution, and Completion of Work. (Apr 1984)

Commencement, Prosecution, and Completion of Work (Apr 1984)

The Contractor shall be required to (a) commence work under this contract within after the date the Contractor receives the notice to proceed, 10 calendar days

(b) prosecute the work diligently, and (c) complete the entire work ready for use not later than . The time 84 calendar days after receipt of the notice to proceed stated for completion shall include final cleanup of the premises.

(End of clause)

52.219-28 Postaward Small Business Program Rerepresentation. (Jan 2025)

Postaward Small Business Program Rerepresentation (Jan 2025)

(a) Definitions. As used in this clause-

Long-term contract means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.

Small business concern-

(1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in its field of operation, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (d) of this clause.

(2) Affiliates, as used in this definition, means business concerns, one of whom directly or indirectly controls or has the power to control the others, or a third party or parties control or have the power to control the others. In determining whether affiliation exists, consideration is given to all appropriate factors including common ownership, common management, and contractual relationships. SBA determines affiliation based on the factors set forth at 13 CFR 121.103.

(b) If the Contractor represented that it was any of the small business concerns identified in 19.000(a)(3) prior to award of this contract, the Contractor shall rerepresent its size and socioeconomic status according to paragraph (f) of this clause or, if applicable, paragraph (h) of this clause, upon occurrence of any of the following:

(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.

(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.

(3) For long-term contracts-

(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and

(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.

(c) If the Contractor represented its status as any of the small business concerns identified at 19.000(a)(3) prior to award of this contract, the Contractor shall rerepresent its size and socioeconomic status according to paragraph (f) of this clause or, if applicable, paragraph (h) of this clause, for the NAICS code assigned to an order (except that paragraphs (c)(1) through (3) of this clause do not apply to an order issued under a Federal Supply Schedule contract at subpart 8.4)-

(1) Set aside exclusively for a small business concern identified at 19.000(a)(3) that is issued under an unrestricted multiple-award contract, unless the order is issued under the reserved portion of an unrestricted multiple-award contract ( e.g., an order set aside for a woman-owned small business under a multiple-award contract that is not set-aside, unless the order is issued under the reserved portion of the multiple-award contract);

(2) Issued under a multiple-award contract set aside for small businesses that is further set aside for a specific socioeconomic category that differs from the underlying multiple-award contract ( e.g., an order set aside for a HUBZone small business concern under a multiple-award contract that is set aside for small businesses);

(3) Issued under the part of the multiple-award contract that is set aside for small businesses that is further set aside for a specific socioeconomic category that differs from the underlying set-aside part of the multiple-award contract ( e.g., an order set aside for a WOSB concern under the part of the multiple-award contract that is partially set aside for small businesses); and

(4) When the Contracting Officer explicitly requires it for an order issued under a multiple-award contract, including for an order issued under a Federal Supply Schedule contract (see 8.405-5(b) and 19.301-2(b)(2)).

(d) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code(s) assigned to this contract. The small business size standard corresponding to this NAICS code(s) can be found at https://www.sba.gov/document/support--table-size-standards.

(e) The small business size standard for a Contractor providing an end item that it does not manufacture, process, or produce itself, for a contract other than a construction or service contract, is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541519, if the acquisition-

(1) Was set aside for small business and has a value above the simplified acquisition threshold;

(2) Used the HUBZone price evaluation preference regardless of dollar value, unless the Contractor waived the price evaluation preference; or

(3) Was an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.

(f) Except as provided in paragraph (h) of this clause, the Contractor shall make the representation(s) required by paragraphs (b) and (c) of this clause by validating or updating all its representations in the Representations and Certifications section of the System for Award Management (SAM) and its other data in SAM, as necessary, to ensure that they reflect the Contractor's current status. The Contractor shall notify the contracting officer in writing within the timeframes specified in paragraph (b) of this clause, or with its offer for an order (see paragraph (c) of this clause), that the data have been validated or updated, and provide the date of the validation or update.

(g) If the Contractor represented that it was other than a small business concern prior to award of this contract, the Contractor may, but is not required to, take the actions required by paragraphs (f) or (h) of this clause.

(h) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:

(1) The Contractor represents that it [ ] is, [ ] is not a small business concern under 238910NAICS Code assigned to TBDcontract number.

(2) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not, a small disadvantaged business concern as defined in 13 CFR 124.1001.

(3) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not a women-owned small business concern.

(4) Women-owned small business (WOSB) joint venture eligible under the WOSB Program. The Contractor represents that it [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [The Contractor shall enter the name and unique entity identifier of each party to the joint venture: ____.]

(5) Economically disadvantaged women-owned small business (EDWOSB) joint venture. The Contractor represents that it [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [The Contractor shall enter the name and unique entity identifier of each party to the joint venture: ____ .]

(6) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause. ] The Contractor represents that it [ ] is, [ ] is not a veteran-owned small business concern.

(7) [Complete only if the Contractor represented itself as a veteran-owned small business concern in paragraph (h)(6) of this clause.] The Contractor represents that it [ ] is, [ ] is not a service-disabled veteran-owned small business concern.

(8) Service-disabled veteran-owned small business (SDVOSB) joint venture eligible under the SDVOSB Program. The Contractor represents that it [ ] is, [ ] is not an SDVOSB joint venture eligible under the SDVOSB Program that complies with the requirements of 13 CFR 128.402. [The Contractor shall enter the name and unique entity identifier of each party to the joint venture: ____.]

(9) [ Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause. ] The Contractor represents that-

(i) It [ ] is, [ ] is not a HUBZone small business concern listed, on the date of this representation, on the List of Qualified HUBZone Small Business Concerns maintained by the Small Business Administration, and no material changes in ownership and control, principal office, or HUBZone employee percentage have occurred since it was certified in accordance with 13 CFR part 126; and

(ii) It [ ] is, [ ] is not a HUBZone joint venture that complies with the requirements of 13 CFR part 126, and the representation in paragraph (h)(8)(i) of this clause is accurate for each HUBZone small business concern participating in the HUBZone joint venture. [The Contractor shall enter the names of each of the HUBZone small business concerns participating in the HUBZone joint venture: ____.] Each HUBZone small business concern participating in the HUBZone joint venture shall submit a separate signed copy of the HUBZone representation.

[____Contractor to sign and date and insert authorized signer's name and title.]

(End of clause)

52.225-9 Buy American-Construction Materials. (Oct 2022)

Buy American-Construction Materials (Oct 2022)

(a) Definitions. As used in this clause-

Commercially available off-the-shelf (COTS) item-

(1) Means any item of supply (including construction material) that is-

(i) A commercial product (as defined in paragraph (1) of the definition of "commercial product" at Federal Acquisition Regulation (FAR) 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace;

and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

Cost of components means-

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

Critical component means a component that is mined, produced, or manufactured in the United States and deemed critical to the U.S. supply chain. The list of critical components is at FAR 25.105.

Critical item means a domestic construction material or domestic end product that is deemed critical to U.S. supply chain resiliency. The list of critical items is at

FAR 25.105.

Domestic construction material means-

(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-

(i) An unmanufactured construction material mined or produced in the United States; or

(ii) A construction material manufactured in the United States, if-

(A) The cost of its components mined, produced, or manufactured in the United States exceeds 60 percent of the cost of all its components, except that the percentage will be 65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029.

Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or

(B) The construction material is a COTS item; or

(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".

Fastener means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.

Foreign construction material means a construction material other than a domestic construction material.

Foreign iron and steel means iron or steel products not produced in the United States. Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.

Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components.

The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.

Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.

"United States" means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements 41 U.S.C.chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows:

____________[Contracting Officer to list applicable excepted materials or indicate "none"]

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-

(i) The cost of domestic construction material would be unreasonable.

(A) For domestic construction material that is not a critical item or does not contain critical components.

(1) The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;

(2) For construction material that is not a COTS item and does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that is manufactured in the United States and does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest offer of foreign construction material that exceeds 55 percent domestic content as a domestic offer and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(A)(1) of this clause.

(3) The procedures in paragraph (b)(3)(i)(A)(2) of this clause will no longer apply as of January 1, 2030.

(B) For domestic construction material that is a critical item or contains critical components.

(1) The cost of a particular domestic construction…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .