Solicitation Amendment FA462626R00030001 SF 30.pdf
PDF 1 MB Posted
- Attached to
- Demo Buildings 1879, 29001, 29002
- Solicitation number
- FA4626-26-R-0003
About this file
This Standard Form 30 Amendment of Solicitation/Modification of Contract modifies a federal contract for demolition and fire alarm panel relocation services at Malmstrom Air Force Base. The amendment extends the solicitation response due date from 23 December 2025 to 29 December 2025 and updates several line items, including demolition of Buildings 1879, 29001, and 29002, with modifications to asbestos-related language. A new Line Item 0011 is added for Building 1879 Fire Alarm Panel Relocation, which involves relocating the fire control panel to the east wall of building 1934, including reconnecting pull stations, adding a weather-resistant enclosure, and performing necessary trenching, wiring, and conduit work. The place of performance is the 341 CES CECR BASE SRMC at Malmstrom Air Force Base, Montana, with a delivery timeline of 84 calendar days from the Notice to Proceed. The amendment includes updates to various attachments such as the Statement of Work, Concept Plan, and wage determination.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section A - Solicitation/Contract Form
The following modifications were made:
Information From To Response Due Date 23 Dec 2025 29 Dec 2025
Section B - Supplies or Services & Prices or Costs
Line Item 0003
The following Line Item modifications were made:
Information From To
Description
Demolish Building 1897: Measurement and payment for this item shall be at the contract lump sum price for "Demolish Building 1897". Payment shall include all costs for labor, materials, and equipment to demolish the entire building including foundation, removal of all materials off site to a landfill, cleanup, and all other incidental items necessary to complete the work. If any asbestos containing materials are found during the asbestos survey performed during design, this will constitute unforeseen site conditions and require a Modification to the contract documents.
Demolish Building 1879: Measurement and payment for this item shall be at the contract lump sum price for "Demolish Building 1879". Payment shall include all costs for labor, materials, and equipment to demolish the entire building including foundation, removal of all materials off site to a landfill, cleanup, and all other incidental items necessary to complete the work. If any asbestos containing materials are found during the asbestos survey performed during design, this will constitute unforeseen site conditions and require a Modification to the contract documents.
Line Item 0004
The following Line Item modifications were made:
Information From To
Description
Demolish Building 29001: Measurement and payment for this item shall be at the contract lump sum price for "Demolish Building 29001". Payment shall include all costs for labor, materials, and equipment to demolish the entire building including foundation, dirt berm, removal of all materials off site to a landfill, cleanup, and all other incidental items necessary to complete the work. If any asbestos containing materials are found during the asbestos survey performed during design, this will constitute unforeseen site conditions and require a Modification to the contract documents.
Demolish Building 29001: Measurement and payment for this item shall be at the contract lump sum price for "Demolish Building 29001". Payment shall include all costs for labor, materials, and equipment to demolish the entire building including foundation, dirt berm, removal of all materials off site to a landfill, cleanup, and all other incidental items necessary to complete the work.
Line Item 0005
The following Line Item modifications were made:
Information From To
Description
Demolish Building 29002: Measurement and payment for this item shall be at the contract lump sum price for "Demolish Building 29002". Payment shall include all costs for labor, materials, and equipment to demolish the entire building including foundation, removal of all materials off site to a landfill, cleanup, and all other incidental items necessary to complete the work. If any asbestos containing materials are found during the asbestos survey performed during design, this will constitute unforeseen site conditions and require a Modification to the contract documents.
Demolish Building 29002: Measurement and payment for this item shall be at the contract lump sum price for "Demolish Building 29002". Payment shall include all costs for labor, materials, and equipment to demolish the entire building including foundation, removal of all materials off site to a landfill, cleanup, and all other incidental items necessary to complete the work.
Line Item 0011
The following Line Item(s) were added:
Item Supplies / Services Quantity Unit Unit Price Amount
Building 1879 Fire Alarm Panel Relocation: Measurement and payment for this item shall be at the contract lump sum price for "Building 1879 Fire Alarm Panel Relocation". Payment shall include all costs for labor, materials, and equipment to relocate the fire control panel in 1879 to the east facing wall of building 1934. This shall include but is not limited to reconnecting all pull stations in
FA462626R00030001
the horse stables, adding a new weather resistant enclosed box for the station to remain in, trenching, wiring, and conduit needed to perform the task.
Product Service Code: P400 Pricing Arrangement: Firm Fixed Price
1 Job
Section E - Inspection and Acceptance
Line Item 0011
The following Inspection and Acceptance Location(s) were added:
Inspection and Acceptance Location - DoDAAC: F2W3D5
Information Value Action Both Location Destination
Inspection and Acceptance Location
F2W3D5
341 CES CECR BASE SRMC
AF BPN NO MILSBILLS PROCESSES, 39 78TH ST N BLDG 470
MALMSTROM AFB, MT 59402
UNITED STATES
Instructions See Statement of Work (SOW) or Performance Work Statement (PWS) for Acceptance/inspection criteria.
POC Name Brady Lorenz POC Email brady.lorenz@us.af.mil POC Telephone 4067316144
Section F - Deliveries or Performance
Line Item 0011
The following Delivery Information was added:
Place of Performance - DoDAAC: F2W3D5
Information Value
Address
Place of Performance F2W3D5
341 CES CECR BASE SRMC
AF BPN NO MILSBILLS PROCESSES, 39 78TH ST N BLDG 470
MALMSTROM AFB, MT 59402
UNITED STATES
POC Name Brady Lorenz POC Email brady.lorenz@us.af.mil POC Telephone 4067316144 Delivery 84 Calendar Days, From Date of Notice to Proceed Receipt to completion of performance
Section J - List of Attachments
Header Miscellaneous Text (Modified):
Attachment 1 - Design Build Statement of Work (4 Sept 2025) DSN-CSN Amended Statement of Work dated 16 Dec 2025
Attachment 2 - Combined Specifications
Attachment 3 - Concept Plan Concept Plan Amendment 001
Attachment 4 - 1879 ACM Pb Results East Base Natural Gas Services (31 Oct 2011)
Attachment 5 - 1879 ACM Pb Design Survey Results East Base Natural Gas Services (20 Dec 2011)
Attachment 6 - 1879 ACM Sample Results (2003)
Attachment 7 - Wage Determination MT 20250066 (updated 12 Dec 2025)
Attachment 8 - Sections L and M (updated 18 Dec 2025)
Attachment 9 - Buildings 29001 and 29002 Final Hazmat Report dated (15 Oct 2024)
Attachment 10 - Building 1879 Combined Photos
Attachment 11 - Building 29001 Combined Photos
Attachment 12 - Building 29002 Combined Photos
Attachment 13 - Exterior Box Photos
Attachment 14 - Q&A dated 18 Dec 2025
| SUMMARY OF CHANGES |
| Solicitation/Contract Form |
| Supplies or Services & Prices or Costs |
| Inspection and Acceptance |
| Deliveries or Performance |
| List of Attachments |
| IDCode: J |
| Page: 1 |
| Pages: 4 |
| AmendNo: 0001 |
| EffDate: 18 Dec 2025 |
| ReqNo: |
| ProjNo: NZAS 23-0008 |
| IssCode: FA4626 |
| AdmCode: |
| IssuedBy: FA4626 341 CONS LGC |
7015 GODDARD DR, BLDG 145 CP 406 731 3744
MALMSTROM AFB, MT 59402-6863
UNITED STATES
JILLIAN URICK, Email: jillian.urick@us.af.mil Telephone: 731-3772 Colleen Goad, Email: colleen.goad.1@us.af.mil Telephone: 632-3473 AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: FA462626R0003 |
| SolDate: 09 Dec 2025 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: 1 |
| OffrNoEx: Off |
| NoCopies: 1 |
| ApprData: See Section G - Contract Administration Data |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: This purpose of the Amendment is to: |
1. Extend the Solicitation period from 23 Dec 2025 to 29 Dec 2025 (see Attachment 8 dated 18 Dec 2025)
2. Update the Statement of Work (dated 16 Dec 2025), project Concept Plan, and MT Wage Determination.
3. Revise CLINs 0003, 0004, and 0005
4. Add CLIN 0011
5. Add Attachments 9-14
| ContNameTitle: |
| CoNameTitle: COLLEEN T. GOAD |
| ContDate: |
| CODate: 18 Dec 2025 |
File details come from the government source that posted it. Updated .