This solicitation is for a design-build project to renovate latrines at Building B2400 at Joint Base Charleston, South Carolina. The project is set aside for women-owned small businesses and involves providing all personnel, equipment, materials, and supervision to complete the latrine renovations. The estimated value is between $1 million and $5 million. Questions are due by May 1st and the notice to proceed will be issued within 45 days of award. The Air Force is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to NNPTC B2400 Design Build Latrines, newest first.
File Type Posted
Solicitation Amendment FA441823R00190005 SF 30.pdf PDF
12.2 DKGV 1132665 Repair NNPTC Training Facility B.2400 Section B Rev 3.docx DOCX document
Solicitation Amendment FA441823R00190004 SF 30.pdf PDF
12.2 DKGV 1132665 Repair NNPTC Training Facility B.2400 Section B Rev2.docx DOCX document
Solicitation Amendment FA441823R00190003 SF 30.pdf PDF
FA441823R0019 NNPTC Latrines B2400 Floor Plan Building Access.pdf PDF
Photos FA441823R0019 (B2400 NNPTC).pdf PDF
Q and A for FA441823R0019 NNPTC Latrines 2 CES responses.docx DOCX document
Q and A for FA441823R0019 NNPTC Latrines 3 CES responses.docx DOCX document
FA441823R0019 NNPTC Latrines B2400 Electrical.pdf PDF
12.1 DKGV 1132665 Repair NNPTC Training Facility, B.2400 - Section B Rev1.docx DOCX document
Part_3_statement_of_work__project_program 20230509 Rev1.docx DOCX document
Q and A for FA441823R0019 NNPTC Latrines 1 CES responses.xlsx XLSX spreadsheet
Solicitation Amendment FA441823R00190002 SF 30.pdf PDF
Solicitation Amendment FA441823R00190001 SF 30.pdf PDF
Attach 8 - Minimum Materials Engineering and Construction Requirements.pdf PDF
Attach 7 - Statement of Work.pdf PDF
Attachment 1 Table of content.pdf PDF
Attachment 1 Cont. B2400 Building Drawings part 3 pg 1 - 123.pdf PDF
Attach 4 - Recovered Materials Determination (Green Procurement).pdf PDF
Attach 6 - Form 4288-R (Submittal Register).xlsx XLSX spreadsheet
Attachment 1 Cont. B2400 Simplified Floor Plan.pdf PDF
Attachment 1 - Cont. Drawings and other Docs.pdf PDF
Attach 3 - Performance Time.pdf PDF
Attachment 1 Cont. B2400 Building Drawings part 1 pg 1-240.pdf PDF
Attachment 1 Cont. Drawings and other Docs.pdf PDF
Attach 5 - Wage Determination SC 20230022.pdf PDF
Attachment 1 Cont. B2400 Building Drawings part 2 pg 1 - 115.pdf PDF
Attach 2 - General Requirements Design Build Div 1 Specs.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER

7. ISSUED BY CODE 8. ADDRESS OFFER TO

9. FOR INFORMATION

CALL:

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

11. The contractor shall begin performance within calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See ).

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

b. An offer guarantee is, is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

STANDARD FORM 1442 (REV. 8/2014)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d)

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

12b. CALENDAR DAYS

YES NO

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED PAGE OF PAGES

AMOUNTS

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

AWARD (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA

BY

31c. DATE

STANDARD FORM 1442 (REV. 8/2014) BACK

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )

26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY

Section A - Solicitation/Contract Form

NNPTC B2400 Design Build Latrines

Proposal Identifier: FA441823R0019 Date: 17 Apr 2023

FA441823R0019

Section B - Supplies or Services & Prices or Costs

Additional Information/Notes

Item Supplies/Service Quantity Unit Unit Price

Amount

Design/Repair Latrines NNPTC Training Facility B2400:

This CLIN includes all design effort, work, labor, materials, and equipment required to repair or replace existing insulation, wallboard, tile, partitions, flooring, doors, steel studs and lighting in the project areas of Building 2400, as required by the contract document drawings and specifications in P119, P119A, P123, P221, P221A, P224, P319, P320, and P32.

Pricing Arrangement: Firm Fixed Price

1 Job

Design/Expand Latrines NNPTC Training Facility B2400:

This CLIN includes all design effort, work, labor, materials, and equipment required exclusively for the expansion including insulation, wallboard, tile, partitions, flooring, steel studs, lighting, electrical, mechanical, plumbing, and fire systems in the project areas of Building 2400, as required by the contract document drawings and specifications in P119, P122, P221, P223, P318, and P320.

Pricing Arrangement: Firm Fixed Price

1 Job

Est. Qty 400 LF: REPAIR Latrines NNPTC Training Facility B2400:

This CLIN includes all work, labor, materials, and equipment required to replace existing deteriorated galvanized steel studs and track per linear foot of floor in the project areas of Building 2400, as required by the contract document drawings and specifications. Linear footage shall be measured at the base of the wall along the floor to include top track, bottom track, vertical studs, and any additional steel stud bracing as necessary.

Pricing Arrangement: Firm Fixed Price

400 Linear Foot

Est. Qty 300 CF: REPAIR Latrines NNPTC Training Facility B2400:

This CLIN includes all work, labor, materials, and equipment required to demolish, if required, existing tile mortar bed per cubic foot in P119, P119A, P123, P221, P221A, P224, P319, P320, and P320A latrine areas of Building 2400, as required by the contract document drawings and specifications.

Pricing Arrangement: Firm Fixed Price

300 Cubic Feet

Est Qty 225 LF: REPAIR Latrines NNPTC Training Facility B2400:

This CLIN includes all work, labor, materials, and equipment required to clean the main sewer line from the closest point of the stack locations to the sewer manhole that has been identified in the rear of the building.

Pricing Arrangement: Firm Fixed Price

225 Linear Foot

Est Qty 300 CF: REPAIR Latrines NNPTC Training Facility B2400:

This CLIN includes all work, labor, materials, and equipment required to provide and place a quick set mortar bed for the epoxy floor system per cubic foot in P119, P119A, P123, P221, P221A, P224, P319, P320, and P320A latrine areas of Building 2400, as required by the contract document drawings and specifications.

Pricing Arrangement: Firm Fixed Price

300 Cubic Feet

Est Qty 5900 SQFT: REPAIR Latrines NNPTC Training Facility B2400:

This CLIN includes all work, labor, materials, and equipment required for

Square Foot abatement of lead and/or asbestos.

Pricing Arrangement: Firm Fixed Price

5,900

Section C - Description/Specifications/Statement of Work

ATTACHMENTS DESCRIPTION DATE PAGES PERFORMANCE AND PAYMENT BOND REQUIREMENTS (IAW FAR 28.101-2 and FAR28.

102-3)

PROPOSAL BOND: The offeror shall submit a Proposal Bond (Standard Form 24) with good and sufficient surety or sureties acceptable to the Government. Proposal Bond, in the amount of 20 percent (20%) of the proposal price. The Proposal Bond penalty may be expressed in terms of a percentage of the proposal price or may be expressed in dollars and cents. The contractor shall submit a Performance Bond (Standard Form 25) and a Payment Bond (Standard Form 25-A) with good and sufficient surety and sureties to the Government within 15 days of award.

The penal sum of such bonds will be as follows: PERFORMANCE BOND: The penal sum of the performance bonds shall equal one hundred percent (100%) of the contract price.

PAYMENT BOND: The penal sum of the payment bonds shall equal one hundred percent (100%) of the contract price.

BUSINESS LICENSE TAX - SOUTH CAROLINA In accordance with Contract Clause entitled, "Federal, State and Local Taxes" dated APR2003 /FAR 52.229-3 incorporated by reference, be advised that the Cities of North Charleston, North (for North Field) and Goose Creek, South Carolina impose a business license tax on all contract work within those cities. The cities interpret this to include contractors performing work for the United States government within the limits of North Charleston. Joint Base Charleston- Air Base is included within the City of North Charleston, South Carolina. Portions of Joint Base Charleston - Weapons Station are within both Goose Creek and North Charleston, South Carolina. The cost of a business license is proportional to the dollar amount of work being executed. Information for business licenses may be obtained by contacting the respective municipalities.

REQUIRED INSURANCE (IAW FAR 28.306 (b)) Reference FAR clause52.228-5 entitled "Insurance..." the Contractor shall, as its own expense, procure and thereafter maintain the following kinds of insurance with respect to performance under the contract.

Workman's Compensation and Employers Liability Insurance as required by law except that if this contract is to be performed in a state which does not require or permit private insurance, then compliance with the statutory or administrative requirements in any such state will be satisfactory. The required Workman's Compensation Insurance shall extend to cover employer's liability for accidental bodily injury or death and for occupational disease with a minimum liability of $100,000.

General Liability Insurance. Bodily injury liability insurance, in the minimum limits of $500,000 per occurrence shall be required on the comprehensive form of policy. Automobile Liability Insurance. The insurance shall be required on the comprehensive form of policy and shall provide bodily liability injury and property damage liability covering the operation of all automobiles used in connection with the performance of this contract. At least the minimum amount of $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage shall be required.

CONTRACTOR CONSENT TO BACKGROUND CHECKS The contractor and, as applicable, subcontractor shall not employ persons for work on this contract if such employee is identified as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population, nor shall the contractor or subcontractor employ persons under this contract who have an outstanding criminal warrant, are currently on probation or parole, or are on the state /national Sex Offender Register as identified by South Carolina Law Enforcement Division (SLED)/National Crime Information Center (NCIC). All contractor and subcontractor personnel must consent to NCIC criminal history background checks. Contractor and subcontractor personnel who do not consent to an NCIC check will be denied access to the installation. Information required to conduct an NCIC check includes full name, driver's license number, social security number, date of birth of the person entering the installation.

The contractor shall provide this information using the 628SFS/JB CHS-AB Worksheet for Base Access, "Application for Personnel to Work under Department of Defense Contract at Joint Base Charleston" and shall submit it in conjunction with the contractor's request for access. Completion of a successful NCIC check does not invalidate the requirement for an escort when contractor or subcontractor personnel are working within controlled or restricted areas. Contractors shall ensure their employees and those of their subcontracts have the proper credentials allowing them to work in the United States. Persons later found to be undocumented or illegal aliens will be remanded to the proper authorities. The contractor shall not be entitled to any compensation for delays or expenses associated with complying with the provisions of this provision. Furthermore, nothing in this provision shall excuse the contractor from proceeding with the contract as required. Badges -Contractors and subcontractors shall submit the completed and approved JBCHS-AB Worksheet for Base Access, "Application for Personnel to Work Under Department of Defense Contract at Joint Base Charleston" prior to planning to work. Upon completion of the background check, the employee will report to the installation Visitor Control Center, with a photo identification issued by a Federal/State activity for receipt of a badge with a designation of the area of the base he will be allowed access.

(NOTE: A Driver's License or Identification Card cannot say any of these phrases; "Not for Federal Use", "Not for Federal Purpose", or "Not for Federal Identification"). Badges will be always worn in a visible manner to government personnel. At the conclusion of work for the prime contractor and any subcontractor, all badges will be turned in to the entry control center. All contractor or contractor employees' vehicles used for the performance of this contract shall comply with all local, state, and federal regulations. Additionally, any pass shall be surrendered to Security Forces upon demand to positively identify a person's need to be on Joint Base Charleston. Access to Installation during Force Protection Conditions (FPCONs)- Contractors will be assigned a mission essential designation IAW requirements contained in JBCIDP 31-1, Installation Security Instruction. Only the installation commander or the unit commander requesting contract support will assign the mission essential designation.

Contractors Working in Controlled or Restricted Areas - The unit requesting contract support will always provide escort (s) for contractors when within a controlled area. Contractors shall not escort other contractor employees within controlled or restricted areas. In addition, contractors shall fulfill, maintain, and comply with all security requirements IAW AF 31-101, The Air Force Installation Security Program, and command/local directives. Contractors Responsibilities while Working within Controlled or Restricted Areas - Only contractor personnel with proper authority and qualifications shall enter a controlled or restricted area. Certain facilities require the issuance of an AF Form 1199 or AF Form 1199CD.The government, at any time, may revoke the AF Form 1199. The procedures for the issuance of an AF Form 1199CD are contained in JBCIDP 31-1, Installation Security Instruction. Contractors shall not escort other contractor employees within controlled or restricted areas. In addition, contractors shall fulfill, maintain, and comply with all security requirements contained in JBCIDP 31-1,Installation Security Instruction. Access to Government Facilities with Controlled or Restricted Areas - The contractor shall comply with security regulations imposed by the installation commander and/or the agency responsible for the project location. Due to specific mission requirements inherent in controlled or restricted areas on Joint Base Charleston, the government may direct the contractor to leave the controlled or restricted areas at any given time.

FORCE PROTECTION CONDITIONS Force Protection Conditions(FPCON) are implemented on the base to increase protective measures in anticipation of, or in response to, the threat of terrorist attack. The DoD FPCON consists of five progressive levels of increasing protective measures.

The circumstances that apply and the purposes of each protective posture are as follows:

FPCON NORMAL: Applies when a general global threat of possible terrorist activity exists and warrants a routine security posture. Ata minimum, access control will be conducted at all DoD installations and facilities.

FPCON ALPHA: Applies when there is an increased general threat of possible terrorist activity against personnel or facilities, and the nature and extent of the threat are unpredictable. ALPHA measures must be capable of being maintained indefinitely.

FPCON BRAVO: Applies when an increased or more predictable threat of terrorist activity exists. Sustaining BRAVO measures for a prolonged period may affect operational capability and military-civil relationships with local authorities.

FPCON CHARLIE: Applies when an incident occurs, or intelligence is received indicating some form of terrorist action or targeting against personnel or facilities is likely. Prolonged implementation of CHARLIE measures may create hardship and affect the activities of the unit and its personnel.

FPCON DELTA: Applies in the immediate area where a terrorist attack has occurred or when intelligence has been received that terrorist action against a specific location or person is imminent. This FPCON is usually declared as a localized condition. FPCON DELTA measures are not intended to be sustained for an extended duration.

Level I Antiterrorism Awareness Training is required to be completed by all contractors within 30 days of requiring access, and annually thereafter. Coordination for training shall be by the contractor after contract award. This provision shall NOT apply to contractors requiring access on contracts awarded through 30 September 2023. It shall apply to contractors requiring access on contracts awarded on or after 1 October 2023. This provision shall not apply to deliveries, contractors requiring access using single day passes, or any contractors requiring access for less than or equal to 180 continuous calendar days in a 1year. period. JS-US007-Level I Antiterrorism Awareness Training can be found here:

https://jko.jten.mil/courses/AT-level1/launch.html or contact the Contracting Officer for the most up-to-date training site.

Submit all completion certificates, and monthly updated lists of personnel requiring and having completed the training with dates to demonstrate compliance with this requirement, to the Contracting Officer for information only.

PASSES FOR EMPLOYEES Requests for passes will be submitted to the CE Project Manager/COR. These passes will run through the contract completion date (or the period that the employee will be required to be at the job site) and should be turned into the contract administrator upon contract completion. You may also submit a letter to the CO requesting authorization for two contractor employees to sign "temporary" workers onto the base. The CO will forward the authorization letter to the Visitor Control Center where it will be kept on file through the completion of the contract.

If work is performed in the airfield, temporary airfield passes must be obtained through the technical inspector. Note that all employees must have a valid identification and Social Security card to obtain abase pass. Refer to the Contract Clause 5352.242-9001, Background Checks for Contractor Personnel Requiring Entry /Access to Installation/Locations (June2004), for information on required background checks for all workers entering Joint Base Charleston.

GREEN PROCUREMENT The Green Procurement Program (GPP) is a mandatory federal acquisition program that focuses on the purchase and use of environmentally preferable products and services. Many different items are covered by the GPP. Recycled-content products are designated by the Environmental Protection Agency (EPA). "Bio based" products made from renewable plant materials are designated by the Department of Agriculture (USDA). Energy and water efficient products are designated by the Department of Energy (DOE). GPP also requires us to avoid purchasing Ozone Depleting Substances(ODS) and EPA-designated Priority Chemicals. Environmentally preferable purchasing (EPP) is a voluntary program, and it encourages the purchase of goods and services that have decreased effects on human health and the environment (compared to the competing goods and serve the same purpose) but are not already required by one of the mandatory GPP elements. The Environmental Protection Agency (EPA) promulgates this product information via https://www.epa.gov/contracts/greening-government-procurement.Green Procurement is mandated, except when the Contractor can show that the product with recycled content does not meet intended specifications, has excessive cost, or cannot be delivered in time to support the schedule of the contract. If the Contractor is unable to locate a specified product meeting the GPP requirement, identify the issue to the Contracting Officer's Technical Representative for guidance. GPP is based on legal requirements and the Department of Defense facilities are subject to enforcement action if these requirements are ignored.

(End of Section C)

Requirements

The work includes providing a design and all labor, material parts, and equipment necessary to repair and renovate six (6) latrines located in rooms P119, P123, P221, P224, P319 and P320 in building 2400. The vestibules P119A, P121A, and P320A shall be included in the renovation. This project will require an expansion into adjoining spaces, which are currently vending areas, to add at least two additional water closets to the existing womens latrines, rooms P119, P221, and P320. One of the additional closets shall be ADA compliant.

The vending areas will have to be modifi ed, including any required electrical, mechanical, plumbing and fi re systems work, to accommodate a new vending area layout. Two vending machines shall remain in the area and will need to be repositioned in the new layout. The renovation of the mens latrines, rooms P123, P224, and P319 shall include the conversion of one water closet to meet ADA requirements.

Section D - Packaging and Marking

Section E - Inspection and Acceptance

FAR Clauses Incorporated by Reference

Number Title Effective Date 52.246-12 Inspection of Construction. Aug 1996

Overall Contract Inspection/Acceptance Locations

Inspection and Acceptance Location

Both Destination Instructions: No payment request until accepted by the Government

DoDAAC: F1M3E2 CountryCode: USA

F1M3E2 628 CES CECC

AF BPN NO MILSBILL CP8439634955, 100 W STEWART AVE BLDG 661

JOINT BASE CHARLESTON, SC 29404-4827

UNITED STATES

William Dorsey Email: william.dorsey.12@us.af.mil Telephone: 843 794-4019

Inspection and Acceptance Location

Both Destination Instructions: No payment request until accepted by the Government.

DoDAAC: F1M3E2 CountryCode: USA

F1M3E2 628 CES CECC

AF BPN NO MILSBILL CP8439634955, 100 W STEWART AVE BLDG 661

JOINT BASE CHARLESTON, SC 29404-4827

UNITED STATES

William Dorsey Email: william.dorsey.12@us.af.mil Telephone: 843 794-4016

Inspection and Acceptance Location

Both Destination Instructions: No payment request until accepted by the Government

DoDAAC: F1M3E2 CountryCode: USA

F1M3E2 628 CES CECC

AF BPN NO MILSBILL CP8439634955, 100 W STEWART AVE BLDG 661

JOINT BASE CHARLESTON, SC 29404-4827

UNITED STATES

William Dorsey Email: william.dorsey.12@us.af.mil Telephone: 843 793-4016

Inspection and Acceptance Location

Both

Destination Instructions: No payment request until accepted by the Government

DoDAAC: F1M3E2 CountryCode: USA

F1M3E2 628 CES CECC

AF BPN NO MILSBILL CP8439634955, 100 W STEWART AVE BLDG 661

JOINT BASE CHARLESTON, SC 29404-4827

UNITED STATES

William Dorsey Email: william.dorsey.12@us.af.mil Telephone: 843 794-4016

Inspection and Acceptance Location

Both Destination Instructions: No payment request until accepted by the Government

DoDAAC: F1M3E2 CountryCode: USA

F1M3E2 628 CES CECC

AF BPN NO MILSBILL CP8439634955, 100 W STEWART AVE BLDG 661

JOINT BASE CHARLESTON, SC 29404-4827

UNITED STATES

William Dorsey Email: william.dorsey.12@us.af.mil Telephone: 843 794-4016

Inspection and Acceptance Location

Both Destination Instructions: No payment request until accepted by the Government

DoDAAC: F1M3E2 CountryCode: USA

F1M3E2 628 CES CECC

AF BPN NO MILSBILL CP8439634955, 100 W STEWART AVE BLDG 661

JOINT BASE CHARLESTON, SC 29404-4827

UNITED STATES

William Dorsey Email: william.dorsey.12@us.af.mil Telephone: 843 794-4016

Inspection and Acceptance Location

Both Destination Instructions: No payment request until accepted by the Government

DoDAAC: F1M3E2 CountryCode: USA

F1M3E2 628 CES CECC

AF BPN NO MILSBILL CP8439634955, 100 W STEWART AVE BLDG 661

JOINT BASE CHARLESTON, SC 29404-4827

UNITED STATES

William Dorsey Email: william.dorsey.12@us.af.mil Telephone: 843 794-4016

Section F - Deliveries or Performance

Overall Contract Delivery Period

From date of lead time event to beginning of performance 10 Calendar Days Date of Notice to Proceed Receipt

From date of lead time event to completion of performance 525 Calendar Days Date of Notice to Proceed Receipt

Line Item

Delivery Schedule Quantity Address and POC

Delivery Schedule From date of lead time event to completion of performance 525 Calendar Days Date of Notice to Proceed Receipt

1 Job Place of Performance DoDAAC: F1M3E2 CountryCode: USA

F1M3E2 628 CES CECC

AF BPN NO MILSBILL CP8439634955, 100 W STEWART

AVE BLDG 661

JOINT BASE CHARLESTON, SC 29404-4827

UNITED STATES

William Dorsey Email: william.dorsey.12@us.af.mil Telephone: 843 794-4016

Delivery Schedule From date of lead time event to completion of performance 525 Calendar Days Date of Notice to Proceed Receipt

1 Job Place of Performance DoDAAC: F1M3E2 CountryCode: USA

F1M3E2 628 CES CECC

AF BPN NO MILSBILL CP8439634955, 100 W STEWART

AVE BLDG 661

JOINT BASE CHARLESTON, SC 29404-4827

UNITED STATES

William Dorsey Email: william.dorsey.12@us.af.mil Telephone: 843 794-4016

Delivery Schedule From date of lead time event to completion of performance 525 Calendar Days Date of Notice to Proceed Receipt

400 Linear Foot

Place of Performance DoDAAC: F1M3E2 CountryCode: USA

F1M3E2 628 CES CECC

AF BPN NO MILSBILL CP8439634955, 100 W STEWART

AVE BLDG 661

JOINT BASE CHARLESTON, SC 29404-4827

UNITED STATES

William Dorsey Email: william.dorsey.12@us.af.mil Telephone: 843 794-4016

Delivery Schedule From date of lead time event to completion of performance 525 Calendar Days

300 Cubic Feet

Place of Performance DoDAAC: F1M3E2 CountryCode: USA

F1M3E2 628 CES CECC

Date of Notice to Proceed Receipt AF BPN NO MILSBILL CP8439634955, 100 W STEWART

AVE BLDG 661

JOINT BASE CHARLESTON, SC 29404-4827

UNITED STATES

William Dorsey Email: william.dorsey.12@us.af.mil Telephone: 843 794-4016

Delivery Schedule From date of lead time event to completion of performance 525 Calendar Days Date of Notice to Proceed Receipt

225 Linear Foot

Place of Performance DoDAAC: F1M3E2 CountryCode: USA

F1M3E2 628 CES CECC

AF BPN NO MILSBILL CP8439634955, 100 W STEWART

AVE BLDG 661

JOINT BASE CHARLESTON, SC 29404-4827

UNITED STATES

William Dorsey Email: william.dorsey.12@us.af.mil Telephone: 843 794-4016

Delivery Schedule From date of lead time event to completion of performance 525 Calendar Days Date of Notice to Proceed Receipt

300 Cubic Feet

Place of Performance DoDAAC: F1M3E2 CountryCode: USA

F1M3E2 628 CES CECC

AF BPN NO MILSBILL CP8439634955, 100 W STEWART

AVE BLDG 661

JOINT BASE CHARLESTON, SC 29404-4827

UNITED STATES

William Dorsey Email: william.dorsey.12@us.af.mil Telephone: 843 794-4016

Delivery Schedule From date of lead time event to completion of performance 525 Calendar Days Date of Notice to Proceed Receipt

5,900 Square Foot

Place of Performance DoDAAC: F1M3E2 CountryCode: USA

F1M3E2 628 CES CECC

AF BPN NO MILSBILL CP8439634955, 100 W STEWART

AVE BLDG 661

JOINT BASE CHARLESTON, SC 29404-4827

UNITED STATES

William Dorsey Email: william.dorsey.12@us.af.mil Telephone: 843 794-4016

Section G - Contract Administration Data

DFARS Clauses Incorporated by Reference

Number Title Effective Date 252.201-7000 Contracting Officer's Representative. Dec 1991 252.204-7006 Billing Instructions. Oct 2005 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018 252.236-7000 Modification Proposals--Price Breakdown. Dec 1991

DFARS Clauses Incorporated by Full Text

252.232-7006 Wide Area WorkFlow Payment Instructions. Jan 2023

As prescribed in 232.7004(b), use the following clause:

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) As used in this clause- Definitions.

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as Electronic invoicing.

authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) To access WAWF, the Contractor shall- WAWF access.

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice WAWF training.

Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/

(e) Document submissions may be via web entry, Electronic Data Interchange, or File Transfer WAWF methods of document submission.

Protocol.

(f) The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF payment instructions.

WAWF for this contract or task or delivery order:

(1) The Contractor shall submit payment requests using the following document type(s): Document type.

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items-

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

COMBO

(B) For services that do not require shipment of a deliverable, submit the Invoice 2in1, which meets the requirements for the invoice and receiving report.

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]

(3) The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF Document routing.

when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC F87700

Issue By DoDAAC FA4418

Admin DoDAAC FA4418

Inspect By DoDAAC F1M3E2

Ship To Code ____

Ship From Code ____

Mark For Code ____

Service Approver (DoDAAC) ____

Service Acceptor (DoDAAC) FA4418

Accept at Other DoDAAC ____

LPO DoDAAC ____

DCAA Auditor DoDAAC ____

Other DoDAAC(s) ____

(4) The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in Payment request.

accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F. Receiving report.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

Section H - Special Contract Requirements

SPECIAL INFORMATION AND INSTRUCTIONS:

IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK THE WWW. SAM.GOV

WEBSITE FOR ANY AMENDMENTS TO THIS SOLICITATION. YOU ARE ENCOURAGED TO

REGISTER ON THE WWW.SAM.GOV WEBSITE TO RECEIVE NOTIFICATION OF CHANGES TO THIS

SOLICITATION. FAILURE TO ACKNOWLEDGE AMENDMENTS MAY RENDER YOUR PROPOSAL

NONRESPONSIVE.

PRE-PROPOSAL CONFERENCE/SITE VISIT:

1. A pre-proposal conference and site visit is scheduled for 25 April 2023 at 9:00 AM EST. All attendees shall meet NLT 8:30 AM EST at the Weapons Station Visitor Control Center (VCC) 1650 Red Bank Rd. Goose Creek, SC 29445. Offerors are encouraged to attend and are requested to contact the Contract Specialist at the following email: brian.hawk@us.af.mil. Government transportation will be provided to transport attendees to the project site. Ensure attendees have a valid driver's license, vehicle registration, and proof of insurance available for background check to again access to the base. Some delays should be anticipated. Offerors should allow sufficient time to arrive on time at the Visitor Control Center parking lot.

2. The purpose of this conference is to visit the construction site, clarify the statement of work and terms of the solicitation, and to answer any questions concerning the solicitation. Offerors are requested to prepare all questions in writing prior to the scheduled date of the conference.

Submission of questions prior to the conference is encouraged.

3. The deadline for all questions pertaining to this solicitation will be 1 May 2023 at 12:00 PM EST.

4. Remarks at the conference shall NOT change the terms of the solicitation, drawings or specifications. Unless the solicitation is amended inwriting, it will remain unchanged. Should an amendment be issued, it must be returned and acknowledged with the proposal.

(End Section H)

Section I - Contract Clauses

FAR Clauses Incorporated by Reference

Number Title Effective Date 52.202-1 Definitions. Jun 2020 52.203-5 Covenant Against Contingent Fees. May 2014 52.203-6 Restrictions on Subcontractor Sales to the Government. Jun 2020 52.203-7 Anti-Kickback Procedures. Jun 2020 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity. May 2014 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. May 2014 52.203-12 Limitation on Payments to Influence Certain Federal Transactions. Jun 2020 52.203-13 Contractor Code of Business Ethics and Conduct. Nov 2021

52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights.

Jun 2020

52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements. Jan 2017 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper. May 2011 52.204-9 Personal Identity Verification of Contractor Personnel. Jan 2011 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. Jun 2020 52.204-13 System for Award Management Maintenance. Oct 2018 52.204-18 Commercial and Government Entity Code Maintenance. Aug 2020 52.204-19 Incorporation by Reference of Representations and Certifications. Dec 2014

52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities.

Nov 2021

52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.

Nov 2021

52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment.

Nov 2021

52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters. Oct 2018 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations. Nov 2015 52.215-8 Order of Precedence-Uniform Contract Format. Oct 1997 52.217-2 Cancellation Under Multi-year Contracts. Oct 1997 52.219-8 Utilization of Small Business Concerns. Oct 2022 52.222-3 Convict Labor. Jun 2003 52.222-6 Construction Wage Rate Requirements. Aug 2018 52.222-7 Withholding of Funds. May 2014 52.222-8 Payrolls and Basic Records. Jul 2021 52.222-9 Apprentices and Trainees. Jul 2005 52.222-10 Compliance with Copeland Act Requirements. Feb 1988 52.222-11 Subcontracts (Labor Standards). May 2014 52.222-12 Contract Termination-Debarment. May 2014 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations. May 2014 52.222-14 Disputes Concerning Labor Standards. Feb 1988 52.222-15 Certification of Eligibility. May 2014 52.222-21 Prohibition of Segregated Facilities. Apr 2015 52.222-26 Equal Opportunity. Sep 2016 52.222-27 Affirmative Action Compliance Requirements for Construction. Apr 2015 52.222-35 Equal Opportunity for Veterans. Jun 2020 52.222-36 Equal Opportunity for Workers with Disabilities. Jun 2020 52.222-37 Employment Reports on Veterans. Jun 2020 52.222-50 Combating Trafficking in Persons. Nov 2021 52.222-54 Employment Eligibility Verification. May 2022 52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026. Jan 2022 52.222-62 Paid Sick Leave Under Executive Order 13706. Jan 2022 52.223-5 Pollution Prevention and Right-to-Know Information. May 2011 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving. Jun 2020 52.223-19 Compliance with Environmental Management Systems. May 2011 52.223-21 Foams. Jun 2016 52.225-13 Restrictions on Certain Foreign Purchases. Feb 2021 52.228-2 Additional Bond Security. Oct 1997 52.228-5 Insurance-Work on a Government Installation. Jan 1997 52.228-11 Individual Surety-Pledge of Assets. Feb 2021 52.228-12 Prospective Subcontractor Requests for Bonds. Dec 2022 52.228-14 Irrevocable Letter of Credit. Nov 2014 52.229-3 Federal, State, and Local Taxes. Feb 2013 52.229-12 Tax on Certain Foreign Procurements. Feb 2021 52.232-17 Interest. May 2014 52.232-18 Availability of Funds. Apr 1984 52.232-23 Assignment of Claims. May 2014 52.232-29 Terms for Financing of Purchases of Commercial Products and Commercial Services. Nov 2021

52.232-33 Payment by Electronic Funds Transfer-System for Award Management. Oct 2018 52.232-39 Unenforceability of Unauthorized Obligations. Jun 2013 52.232-40 Providing Accelerated Payments to Small Business Subcontractors. Nov 2021 52.233-1 Disputes. May 2014 52.233-3 Protest after Award. Aug 1996 52.233-4 Applicable Law for Breach of Contract Claim. Oct 2004 52.236-2 Differing Site Conditions. Apr 1984 52.236-3 Site Investigation and Conditions Affecting the Work. Apr 1984 52.236-5 Material and Workmanship. Apr 1984 52.236-6 Superintendence by the Contractor. Apr 1984 52.236-7 Permits and Responsibilities. Nov 1991 52.236-8 Other Contracts. Apr 1984

52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements.

Apr 1984

52.236-10 Operations and Storage Areas. Apr 1984 52.236-11 Use and Possession Prior to Completion. Apr 1984 52.236-12 Cleaning Up. Apr 1984 52.236-13 Accident Prevention. Nov 1991 52.236-15 Schedules for Construction Contracts. Apr 1984 52.236-21 Specifications and Drawings for Construction. Feb 1997 52.242-13 Bankruptcy. Jul 1995 52.242-14 Suspension of Work. Apr 1984 52.243-4 Changes. Jun 2007 52.244-6 Subcontracts for Commercial Products and Commercial Services. Dec 2022 52.249-2 Termination for Convenience of the Government (Fixed-Price). Apr 2012 52.249-10 Default (Fixed-Price Construction). Apr 1984

DFARS Clauses Incorporated by Reference

Number Title Effective Date 252.203-7000 Requirements Relating to Compensation of Former DoD Officials. Sep 2011

252.203-7001 Prohibition on Persons Convicted of Fraud or Other Defense-Contract-Related Felonies.

Jan 2023

252.203-7002 Requirement to Inform Employees of Whistleblower Rights. Dec 2022 252.204-7003 Control of Government Personnel Work Product. Apr 1992 252.204-7004 Antiterrorism Awareness Training for Contractors. Jan 2023 252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting. Jan 2023 252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support. Jan 2023

252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services.

Jan 2023

252.209-7004 Subcontracting with Firms that are Owned or Controlled by the Government of a Country that is a State Sponsor of Terrorism.

May 2019

252.222-7006 Restrictions on the Use of Mandatory Arbitration Agreements. Jan 2023 252.223-7004 Drug-Free Work Force. Sep 1988 252.223-7006 Prohibition on Storage, Treatment, and Disposal of Toxic or Hazardous Materials. Sep 2014 252.223-7008 Prohibition of Hexavalent Chromium. Jan 2023 252.225-7048 Export-Controlled Items. Jun 2013 252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime. Jan 2023

252.226-7001 Utilization of Indian Organizations, Indian-Owned Economic Enterprises, and Native Hawaiian Small Business Concerns.

Jan 2023

252.232-7010 Levies on Contract Payments. Dec 2006 252.237-7010 Prohibition on Interrogation of Detainees by Contractor Personnel. Jan 2023 252.243-7001 Pricing of Contract Modifications. Dec 1991 252.243-7002 Requests for Equitable Adjustment. Dec 2022 252.244-7000 Subcontracts for Commercial Products or Commercial Services. Jan 2023 252.246-7003 Notification of Potential Safety Issues. Jan 2023 252.246-7004 Safety of Facilities, Infrastructure, and Equipment for Military Operations. Oct 2010

FAR Clauses Incorporated by Full Text

52.204-1 Approval of Contract. Dec 1989

As prescribed in , insert the following clause:4.103

APPROVAL OF CONTRACT (DEC 1989)

This contract is subject to the written approval of [identify title of designated agency official here] and shall not be binding until Robert R. Melton so approved.

(End of clause)

52.211-10 Commencement, Prosecution, and Completion of Work. Apr 1984

As prescribed in , insert the following clause in solicitations and contracts when a fixed-price construction contract is contemplated. The 11.404(b) clause may be changed to accommodate the issuance of orders under indefinite-delivery contracts for construction.

Commencement, Prosecution, and Completion of Work (Apr 1984)

The Contractor shall be required to (a) commence work under this contract within calendar days after the date the Contractor receives the notice to 10 proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than .* The time 525 days from Notice to Proceed stated for completion shall include final cleanup of the premises.

* The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.

(End of clause)

52.211-12 Liquidated Damages-Construction. Sep 2000

As prescribed in , insert the following clause in solicitations and contracts:11.503(b)

Liquidated Damages-Construction (Sept 2000)

If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the (a) Government in the amount of for each calendar day of delay until the work is completed or accepted.$634.00

If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These (b) liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

52.219-14 Limitations on Subcontracting. Oct 2022

As prescribed in , insert the following clause:19.507(e)

LIMITATIONS ON SUBCONTRACTING (OCT 2022)

This clause does not apply to the unrestricted portion of a partial set-aside.(a)

, as used in this clause, means a first-tier subcontractor, including an independent contractor, that-(b) Definition. Similarly situated entity

Has the same small business program status as that which qualified the prime contractor for the award ( , for a small business set-(1) e.g.

aside contract, any small business concern, without regard to its socioeconomic status); and

Is considered small for the size standard under the North American Industry Classification System (NAICS) code the prime contractor (2) assigned to the subcontract.

This clause applies only to-(c) Applicability.

Contracts that have been set aside for any of the small business concerns identified in 19.000(a)(3);(1)

Part or parts of a multiple-award contract that have been set aside for any of the small business concerns identified in 19.000(a)(3);(2)

Contracts that have been awarded on a sole-source basis in accordance with subparts 19.8, 19.13, 19.14, and 19.15;(3)

Orders expected to exceed the simplified acquisition threshold and that are-(4)

Set aside for small business concerns under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F); or(i)

Issued directly to small business concerns under multiple-award contracts as described in 19.504(c)(1)(ii);(ii)

Orders, regardless of dollar value, that are-(5)

Set aside in accordance with subparts 19.8, 19.13, 19.14, or 19.15 under multiple-award contracts, as described in 8.405-5 and 16.505(i) (b)(2)(i)(F); or

Issued directly to concerns that qualify for the programs described in subparts 19.8, 19.13, 19.14, or 19.15 under multiple-award (ii) contracts, as described in 19.504(c)(1)(ii); and

Contracts using the HUBZone price evaluation preference to award to a HUBZone small business concern unless the concern waived the (6) evaluation preference.

An independent contractor shall be considered a subcontractor.(d) Independent contractors.

By submission of an offer and execution of a contract, the Contractor agrees that in performance of a (e) Limitations on subcontracting.

contract assigned a North American Industry Classification System (NAICS) code for-

Services (except construction), it will not pay more than 50 percent of the amount paid by the Government for contract performance to (1) subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract;

Supplies (other than procurement from a nonmanufacturer of such supplies), it will not pay more than 50 percent of the amount paid by (2) the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both supplies and services, the 50 percent limitation shall apply only to the supply portion of the contract;

General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding (3) the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 85 percent subcontract amount that cannot be exceeded; or

Construction by special trade contractors, it will not pay more than 75 percent of the amount paid by the Government for contract (4) performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 75 percent subcontract amount that cannot be exceeded.

The Contractor shall comply with the limitations on subcontracting as follows:(f)

For contracts, in accordance with paragraphs (c)(1), (2), (3) and (6) of this clause-(1)

[ ] Contracting Officer check as appropriate.

[ ] By the end of the base term of the contract and then by the end of each subsequent option period; or

[ ] By the end of the performance period for each order issued under the contract.

For orders, in accordance with paragraphs (c)(4) and (5) of this clause, by the end of the performance period for the order.(2)

(g) A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (e) of this clause will be performed by the aggregate of the joint venture participants.

(1) In a joint venture comprised of a small business protégé and its mentor approved by the Small Business Administration, the small business protégé shall perform at least 40 percent of the work performed by the joint venture. Work performed by the small business protégé in the joint venture must be more than administrative functions.

(2) In an 8(a) joint venture, the 8(a) participant(s) shall perform at least 40 percent of the work performed by the joint venture. Work performed by the 8(a) participants in the joint venture must be more than administrative functions.

(End of clause)

52.219-28 Post-Award Small Business Program Rerepresentation. Oct 2022

As prescribed in , insert the following clause:19.309(c)(1)

POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (OCT 2022)

. As used in this clause-(a) Definitions means a contract of more than five years in duration, including options. However, the term does not include contracts that Long-term contract exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.

-Small business concern

(1) Means a concern, including its affiliates, that is…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .