Attach 2 - General Requirements Design Build Div 1 Specs.pdf

PDF 7 MB Posted

Attached to
NNPTC B2400 Design Build Latrines Federal contract opportunity
Solicitation number
FA441823R0019
Issued by
Department of the Air Force Air Mobility Command

About this file

This federal solicitation is for a design-build project to construct latrines at Building B2400 at Joint Base Charleston, South Carolina. The project has a magnitude between $1 million and $5 million, with the notice to proceed to be issued within 45 days of award. This opportunity is set aside solely for women-owned small businesses. Questions regarding the solicitation should be directed to the point of contact provided. Funds have not yet been obligated for this effort, so no award will be made until funding is available.

View the file

Other files for this federal contract opportunity

Other files attached to NNPTC B2400 Design Build Latrines, newest first.
File Type Posted
Solicitation Amendment FA441823R00190005 SF 30.pdf PDF
12.2 DKGV 1132665 Repair NNPTC Training Facility B.2400 Section B Rev 3.docx DOCX document
12.2 DKGV 1132665 Repair NNPTC Training Facility B.2400 Section B Rev2.docx DOCX document
Solicitation Amendment FA441823R00190004 SF 30.pdf PDF
Part_3_statement_of_work__project_program 20230509 Rev1.docx DOCX document
Q and A for FA441823R0019 NNPTC Latrines 1 CES responses.xlsx XLSX spreadsheet
Solicitation Amendment FA441823R00190003 SF 30.pdf PDF
FA441823R0019 NNPTC Latrines B2400 Floor Plan Building Access.pdf PDF
Photos FA441823R0019 (B2400 NNPTC).pdf PDF
Q and A for FA441823R0019 NNPTC Latrines 2 CES responses.docx DOCX document
Q and A for FA441823R0019 NNPTC Latrines 3 CES responses.docx DOCX document
FA441823R0019 NNPTC Latrines B2400 Electrical.pdf PDF
12.1 DKGV 1132665 Repair NNPTC Training Facility, B.2400 - Section B Rev1.docx DOCX document
Solicitation Amendment FA441823R00190002 SF 30.pdf PDF
Solicitation Amendment FA441823R00190001 SF 30.pdf PDF
Attach 8 - Minimum Materials Engineering and Construction Requirements.pdf PDF
Attach 7 - Statement of Work.pdf PDF
Attachment 1 Cont. B2400 Building Drawings part 2 pg 1 - 115.pdf PDF
Attachment 1 Table of content.pdf PDF
Attachment 1 Cont. B2400 Building Drawings part 3 pg 1 - 123.pdf PDF
Attach 4 - Recovered Materials Determination (Green Procurement).pdf PDF
Attach 6 - Form 4288-R (Submittal Register).xlsx XLSX spreadsheet
Attachment 1 Cont. B2400 Simplified Floor Plan.pdf PDF
Attachment 1 - Cont. Drawings and other Docs.pdf PDF
Attach 3 - Performance Time.pdf PDF
Solicitation - FA441823R0019.pdf PDF
Attachment 1 Cont. B2400 Building Drawings part 1 pg 1-240.pdf PDF
Attachment 1 Cont. Drawings and other Docs.pdf PDF
Attach 5 - Wage Determination SC 20230022.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

PART 1 GENERAL

JBCGS SECTION 01 33 16

DESIGN AFTER AWARD

06/15

1.1 DESIGN RESPONSIBILITY

The Contractor shall furnish and be responsible for a complete set of design documents as called for hereinafter. Design shall be completed by Design Professionals (Architects and Engineers), registered and licensed in good standing in the State of South Carolina.

1.2 SUBMITTALS

Government approval is required for submittals with a “G” designation;

submittals not having a “G” designation are for information only. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES, except as modified herein:

SD-01 Preconstruction Submittals

Preliminary (35%) Design Submittal; G

Intermediate (65%) Design Submittal; G

Pre-Final (95%) Design Submittal; G

Final (100%) Design Submittal; G

Final (100%) Design Submittal; G

Structural Interior Design (SID) Submittal; G

Permits; G

Design Review Meeting Minutes

1.3 DESIGN SUBMITTALS

The Contractor shall submit the design in different phases and different stages to the Government for review. The number and requirements of each design submittal are listed in the SUBMITTAL DISTRIBUTION chart below. The number and contents of the design submittals shall be reflected in the Contractor's progress charts. All comments for each submittal shall have been annotated and incorporated into the design before approval is granted by the Contracting Officer.

Items of work shall be submitted in complete packages as outlined in the following paragraphs. Partial design submissions of various portions of the project will not be allowed.

1.3.1 PRELIMINARY (35%) DESIGN SUBMITTAL

The Preliminary (35%) Design Submittal is a narrative with design analysis and drawings presenting the design and containing sufficient information to permit the reviewer to clearly understand the functional and technical approach the designer is following to complete the project.

As a minimum, the narrative shall discuss the civil, site engineering and architectural requirements; construction materials and finishes; structural and foundation system; communications systems; power and electrical systems;

force protection; sustainable design and development features most favorable for this project; and plumbing and HVAC systems. Items or details which cannot adequately be described in narrative form should be graphically shown on fold-out drawings, sketches, tabulations, and/or photographs bound in a brochure or notebook. An estimate of time and phasing will also be included in the submittal. In addition, an index of the anticipated guide specifications to be utilized for the design shall be included. Design will be stopped for this review phase unless stated otherwise by specific instructions and the installation has approval authority for concept design(s) shown in this submittal.

1.3.2 INTERMEDIATE (65%) DESIGN SUBMITTAL

The Intermediate (65%) Design Submittal will represent design progress halfway from concept acceptance to the final design phase. The intent is to check progress and layouts per customer and reviewers comments. Design effort toward final design will stop at this submittal until receipt of comments.

Prior to submitting the finished preliminary design, the AE shall ensure that the design has been thoroughly checked and coordinated between various design specialties. The submittal will include a tabulation recapitulating the total utility system loads - electrical, steam, gas, sanitary sewer, water, etc. -giving the point of connection into the existing utility systems. Any unusual utility system aspects of the project, especially those requiring resolution prior to final design, will be commented upon. The average annual energy use per square foot of net floor area shall be calculated and stated in BTU per square foot.

1.3.3 PRE-FINAL (95%) DESIGN SUBMITTAL

The Pre-Final (95%) Design Submittal includes copies of bid documents (Completed Drawings, Specifications, and supporting documentation) ready to construct with all design work complete. Prior to submission the AE shall make a thorough check of plans, specifications, and all other required data to eliminate errors, inconsistencies, and for coordination between architectural, structural, mechanical, and other applicable phases of the work. Final reproducible specifications shall be completely proofed and corrected to eliminate typographical errors, misspelled words, etc. Copies of internal design quality control checklists shall be included with the submittal. After the Pre-Final submittal review is complete, the review comments will be furnished to the AE by the Government. Notice to proceed on final design will be by separate letter signed by the Contracting Officer upon the Contractor’s resolution of any comments generated during the review of the Pre-Final Design Submittal.

1.3.4 FINAL (100%) DESIGN SUBMITTAL

The Final (100%) Design Submittal includes copies of Completed Drawings, Specifications, and supporting documentation ready to construct with all design work complete and all comments incorporated. Drawings and specifications shall be signed and sealed and marked as FINAL SUBMITTALS.

1.3.5 STRUCTURAL INTERIOR DESIGN (SID) SUBMITTAL

The Structural Interior Design includes selection, specification and installation of all the building related finishes, materials and colors. All SID materials, finishes and colors shall be reviewed by the Government for compliance with the RFP. All SID submittals will run concurrent with the Architectural design submittals.

1.3.5.1 SID PREDEFINITION CONFERENCE

The Contractor shall lead an on-site predefinition conference at attended by Government personnel. The purpose of the predefinition conference is to present and discuss the SID color scheme for the project. Actual exterior and interior materials, finishes and colors are to be provided for review and comment. The Contractor may provide colored exterior elevations/perspectives of the SID color scheme to assist in the discussion of the SID. At the end of the predefinition conference, the Government will decide the necessary adjustments needed to the SID and this information will be used by the Contractor to further develop the project.

1.3.6 PERMITS

Prior to start of construction, the Contractor is responsible for identifying and obtaining all necessary permits and licenses required by the design.

1.3.7 GOVERNMENT APPROVAL

The approval of submittals by the Contracting Officer's Representative shall not be construed as a complete check, but will indicate only that the design appears to be in conformance with the contract requirements. Approval will not relieve the Contractor of the responsibility for any errors which may exist, as the Contractor is responsible for the design and construction of all work.

1.3.8 INCOMPLETE SUBMITTALS

Provide complete submittals in accordance with “STAGES AND CONTENTS OF DESIGN SUBMITTALS” below for each design submittal. Incomplete submittals will be rejected and will not be reviewed by the Government. Government review period shall be provided in accordance with “DESIGN SCHEDULE” below and will begin only upon the receipt of a complete design submittal package.

1.3.9 DESIGN ANALYSIS

1.3.9.1 MEDIA AND FORMAT

The design analysis shall be presented on 8-1/2" x 11" paper except that larger sheets may be used when required for graphs or other special calculation forms. All sheets shall be reproducible form. The material may be typewritten, hand lettered, handwritten, or a combination thereof, provided it is legible. Side margins shall be 1-inch minimum to permit side binding and head-to-head printing. Bottom margins shall be 1 1/4 inches, with page numbers centered 1-inch from the bottom.

1.3.9.2 ORGANIZATION

The several parts and sheets of the design analysis shall be given a sequential binding number and bound under a cover indicating the name of the facility and project number, if applicable. The title page shall carry the designation of the submittal being made. The complete design analysis presented for final review with the final drawings and specifications shall carry the designation "FINAL DESIGN ANALYSIS" on the title page.

1.3.9.3 DESIGN CALCULATIONS

Design calculations are a part of the design analysis. When they are voluminous, they shall be bound separately from the narrative part of the design analysis. The design calculations shall be presented in a clean and legible form incorporating a title page and index for each volume. A table of contents, which shall be an index of the indices, shall be furnished when there is more than one volume. The source of loading conditions, supplementary sketches, graphs, formulae, and references shall be identified.

Assumptions and conclusions shall be explained. Calculation sheets shall carry the names or initials of the computer and the checker and the dates of calculations and checking. No portion of the calculations shall be computed and checked by the same person. Design calculations shall be sealed and signed.

1.3.10 DRAWINGS

All drawings shall be Computer-Aided Design and Drafting (CADD). Drawings shall be provided in Autdesk ACAD (.dwg) format and Adobe Acrobat (.pdf) format. Drawings shall be provided in release year, as directed, to be compatible with the Government’s current version. The Contractor shall prepare the drawings in such a manner that the Government could construct the facility without any additional assistance from the Contractor. Drawings shall be complete. Unnecessary work such as duplicate views, notes and lettering, and repetition of details shall not be permitted. Standard details not applicable to the project shall not be shown. Details of standard products or items which are adequately covered by specifications shall not be included on the drawings. Drawings shall be detailed such that conformance with the RFP can be checked and to the extent that shop drawings can be checked. Shop drawings shall not be used as design drawings. The Contractor shall use standard Joint Base Charleston title blocks and borders on all drawings at all submittal stages. Standard drawing sheet formats and title blocks, and file and drawing CADD file names will be furnished to the Contractor by the Government. The Contractor shall incorporate the drawing, file, and contract numbers on individual drawing sheets at the earliest submittal.

All half size drawings shall be 11" x 17" blue/black lines or plots.

Building drawings shall consist of 1/8" scale minimum floor plans. Elevations shall be drawn to a 1/8" scale minimum. The scale of other visual information shall be as required. Building wall sections shall be drawn at a minimum of 1/4" scale. The site and exterior utility drawings shall use a minimum scale of 1" = 30' unless otherwise indicated. Minimum text size on half size drawings is 1/8".

1.3.11 SPECIFICATIONS

The Contractor shall submit marked-up specifications at the 65% submittal, and final specifications at the 95% and 100% submittals. All marked-out or redlined text shall be deleted and all inserted text shall be typed at the 95% and 100% submittals. The specifications shall be detailed enough such that another product meeting the specification could be substituted and it would not adversely impact the project.

1.3.11.1 TECHNICAL SPECIFICATIONS

Utilize Unified Facilities Guide Specifications (UFGS) in the SpecsIntact format. Utilize complete project specifications to cover the full scope of work. Delete references to materials that are not allowed or that are not intended to be provided. Government standards will not be referenced in the specifications; instead, provide any specific requirement of the standard in the specification as applicable.

These UFGS Specifications are available on the Internet at:

http://www.wbdg.org/ccb/

Operations and maintenance (O&M) portions of UFGS shall be edited by the respective Designers of Record in the design phase. O&M requirements in the UFGS shall not be edited out. Submittals, operating procedures, schematics, as-built drawings, manuals, software, and computer hardware required in the UFGS for system operation incorporated in the design phase are critical to the operation of the new facility on completion.

1.3.12 SUBMITTAL REGISTER

The Contractor shall develop submittal requirements required during http://www.wbdg.org/ccb/ construction as part of the design phase of the contract. This shall be done by the Contractor's Designer of Record by producing a Contractor Submittal Register at each submittal during design. A submittal register shall be prepared for each section of the specifications for the submittal requirements of that section. The Contractor's Designer of Record shall be responsible for listing all required submittals necessary to insure the project requirements are complied with. The Register shall identify submittal items such as shop drawings, manufacturer's literature, certificates of compliance, material samples, guarantees, test results, etc. that the Contractor shall submit for review and/or approval action during the life of the construction contract.

See specifications Section 01 33 00 SUBMITTAL PROCEDURES for submittal and submittal register definitions and procedures.

1.3.13 DATING MATERIALS

All design materials submitted shall be dated in an appropriate location.

Whenever items are corrected or later resubmitted, they will show a revised date in order to differentiate later material from the original submittal.

1.3.14 QUANTITY OF SUBMITTAL ITEMS

The documents which the Contractor shall submit to the Government for each submittal are listed and generally described in the “SUBMITTAL DISTRIBUTION” chart below.

1.3.14.1 SUBMITTAL DISTRIBUTION

The contractor shall provide the following submittal items to reviewers in the quantities indicated. Submittal shall be submitted using JB CHS Transmittal Form 4025.

Documents to 628th CES 35% 65% 95% 100% Final

Basis of Design/Design Narrative E E E E, HC (1)

Engineering Reports E E E E, HC (1)

Design Calculations E E E E, HC (1)

ACM/LBP Survey/Report E 0 0 E

Drawings (Size 11 x 17 @ ½ size) E, HC (2) E, HC (2) E, HC (2) E, HC (2)

Drawings- full size E E E E, HC (1)

Specifications – Covers & Binders E E E E, HC (1)

Specifications – Pages (8-1/2” x 11”)

E E E E, HC (1)

Contractor Annotated Government Comments

E E E E

Ozone Depleting Substances (ODS) Memo

E 0 0 E

Submittal Register 4288R E E E E

All submittal documents to 628th Contracting Squadron

E E E E

Entire Package on CD ROM HC (1) HC (1) HC (1) HC (1) 2 “E” means that the contractor will be given a request via DOD Safe to transmit submittal document electronically to the PM and Contract Specialist.

“HC” means the contractor provides a hard copy of the submittal document in quantities indicated.

1.4 DESIGN SCHEDULE

Within 3 calendar days after Notice to Proceed, the Contractor shall submit, for approval, a complete design schedule with all submittals and review times indicated by specific calendar dates. The schedule shall be updated monthly with copies furnished to the Contracting Officer. No progress payments will be made without an approved schedule. Any additional changes which the Contractor may wish to make to number or composition of design submittals shall be made 21 calendar days prior to the expected submittal date. The Contractor shall allow twenty-one (21) calendar days for the Government review period if submittal dates are met. If a scheduled design submittal date is not met without notifying the Contracting officer in writing one (1) week in advance of the scheduled submittal date, 21 calendar days shall be allowed for the Government review period. See Paragraph: "SUBMITTAL REVIEWS".

1.5. MAILING OF SUBMITTALS

All submittals to the Government during design shall be mailed using overnight mailing service. The addresses to where each copy shall be mailed are listed below. Each submittal shall have a transmittal letter accompanying it which indicates the date, design percentage, type of submittal, list of items submitted, transmittal number and point of contact with telephone number.

1.5.1 ADDRESSES FOR SUBMITTAL DISTRIBUTION

Joint Base Charleston - Engineering:

a. For Projects at Joint Base Charleston (Weapons Station)

William T Dorsey Joint Base Charleston – Weapons Station 3110 W. Old Tom Road, Building 909, Goose Creek, SC 29445

Joint Base Charleston - Contracting:

628 CONS/PKB

101 E. Hill Boulevard Charleston AFB SC 29404

1.6 SUBMITTAL REVIEWS

For each design review submittal, the Contractor will be furnished comments from Government personnel involved in the review process. The review will be for conformance with the technical requirements of the solicitation. The Government will take twenty-one (21) days to review and comment on each design submittal. The last two weeks of the calendar year shall not be considered when scheduling review times or meeting times. If the Contractor disagrees technically with any comment or comments and does not intend to comply with the comment, he shall clearly outline, with ample justification, the reasons for noncompliance within five (5) days after receipt of these comments in order that the comment can be resolved. The disposition of all comments shall be furnished in writing within 5 working days after the review meeting. The Contractor is cautioned in that if he believes the action required by any comment exceeds the requirements of this contract that he should take no action and notify the Contracting Officer’s Representative (COR) in writing immediately.

Review conferences will be held for each design submittal on Joint base Charleston. The Contractor shall bring the personnel that developed the design submittal to the review conference. These conferences will take place the week after the twenty-one (21) day review period. The Contractor shall be responsible for writing and distributing Minutes on each submittal review meeting within seven (7) calendar days of the meeting. Time for design submittal reviews and conferences will be included in the Contractor’s schedule. Distribution shall be to each office listed under paragraph 1.5.1, ADDRESSES FOR SUBMITTAL DISTRIBUTION

During the design review process, comments will be made on the design submittals that will change the drawings and specifications. The Government will make no additional payments to the Contractor for the incorporation of comments. Review comments are considered part of the design/build process.

If the Government requests a design change after the approved Final Design Submittal drawings and specifications have been submitted, then this shall be considered a change and proper payment will be made by the Government.

If a design submittal is not of the quality level required for the stage of design submitted, the Government has the right to return the submittal to the Contractor so the design quality can be increased, and request a resubmittal.

The review time will begin when the submittal received is of the quality level required by the Government for the stage of design submitted. Returned incomplete submittals will not be the basis of a claim by the Contractor for additional time or money.

1.7 DESIGNER OF RECORD

The Contractor shall identify and have on his staff a Designer of Record to develop submittal requirements during design and be responsible for each submittal identified in the Contractor Submittal Register. A Designer of Record may be responsible for more than one submittal. All areas of work shall be accounted for by a listed Designer of Record. Designer of Record shall approve all submittals they are responsible for prior to submittal to the Government.

1.8 Order of Precedence

The contract consists of the solicitation, the approved proposal, and the final design. In the event of conflict or inconsistency between any of the below described portions of the conformed contract, precedence must be given in the following order:

a. Any portions of the proposal or final design that exceed the requirements of the solicitation.

1. Any portion of the proposal that exceeds the final design.

2. Any portion of the final design that exceeds the proposal.

3. Where portions within either the proposal or the final design conflict, the portion that most exceeds the requirements of the solicitation has precedence.

b. The requirements of the solicitation, in descending order of precedence:

1. Standard Form 1442, Price Schedule, and Davis Bacon Wage Rates.

2. Part 1 - Contract Clauses.

3. Part 2 - General Requirements.

4. Part 3 - Project Program Requirements.

5. Part 6 - Attachments (excluding Concept Drawings).

6. Part 5 - Prescriptive Specifications exclusive of performance specifications.

7. Part 4 - Performance Specifications exclusive of prescriptive specifications.

8. Part 6 - Attachments (Concept Drawings).

c. Within Part 3- Project Program Requirements Section 5.0 ROOM

REQUIREMENTS provides detailed requirements on a room by room basis that further defines requirements that are in addition to the

ENGINEERING SYSTEMS REQUIREMENTS SECTION.

d. Government review or approval of any portion of the proposal or final design does not relieve the Contractor from responsibility for errors or omissions with respect thereto.

--END OF SECTION --

06/15

1.1 DESIGN RESPONSIBILITY

1.2 SUBMITTALS

1.3 DESIGN SUBMITTALS

1.3.1 PRELIMINARY (35%) DESIGN SUBMITTAL

1.3.2 INTERMEDIATE (65%) DESIGN SUBMITTAL

1.3.3 PRE-FINAL (95%) DESIGN SUBMITTAL

1.3.4 FINAL (100%) DESIGN SUBMITTAL

1.3.5 STRUCTURAL INTERIOR DESIGN (SID) SUBMITTAL

1.3.5.1 SID PREDEFINITION CONFERENCE

1.3.6 PERMITS

1.3.7 GOVERNMENT APPROVAL

1.3.8 INCOMPLETE SUBMITTALS

1.3.9 DESIGN ANALYSIS

1.3.9.2 ORGANIZATION

1.3.9.3 DESIGN CALCULATIONS

1.3.10 DRAWINGS

1.3.11 SPECIFICATIONS

1.3.11.1 TECHNICAL SPECIFICATIONS

1.3.12 SUBMITTAL REGISTER

1.3.13 DATING MATERIALS

1.3.14 QUANTITY OF SUBMITTAL ITEMS

1.3.14.1 SUBMITTAL DISTRIBUTION

1.4 DESIGN SCHEDULE

1.5. MAILING OF SUBMITTALS

1.5.1 ADDRESSES FOR SUBMITTAL DISTRIBUTION

1.6 SUBMITTAL REVIEWS

1.7 DESIGNER OF RECORD

Contractor Incident Report System (CIRS)

1. Contract Information Incident Information Prime Contractor:

Cage Code:

Contract Number:

Installation of Incident:

Task Order #:

Contracting Activity/ROICC Office:

Contractor Contact Information Name (Last, First):

Phone #:

Email Address:

Date Notified:

2. Incident Type (Please Check/Bold All That Apply) Assault/Violent Act Extreme Environmental Exposure Man over the side (No water entry)

Diving Falls, slip, trip, or bodily exertion Man Overboard - Water Entry

Electrical Shock/Burns Fires - All Types Material Handling Equipment

Equipment Installation/Repair Hazardous Material (any type) Ordnance-Related (Explosive)

Explosion, Non-Ordnance Industrial (Select Additional Below) Vehicle (Government or Private)

Industrial Incident Additional Information (Please Check/Bold All That Apply)

Confined Space Hand and Power Tools Work Platforms and Scaffolding

Demolition/Renovation Rigging Underground Construction, Shafts, and Caissons

Trenching/Entrapment Cranes and Hoisting Equipment Concrete, Masonry, Steel Erection and Residential Construction

Traffic Control Floating Plant and Marine Activities Tree Maintenance and Removal

Welding and Cutting Pressurized Equipment and System Airfield and Aircraft Operations

Control of Hazardous Energy Fall Protection

Date _____/_____/_____ Final Report Follow-up Report Initial Report

Contractor Incident Report System (CIRS) 1

3. General Information Incident Information Date of Accident:

Time of Accident:

Describe the accident in detail in your words: (Use the back of page if you need additional space)

Exact Location of Accident:

Were Hazardous Material(s) Involved Yes No

If Yes, Explain What Hazardous Materials Were Involved and Why:

Who Provided Clean-up? Onsite Base Public

Activity of the injured person at the time of incident:

Personal Protective Equipment: (Check/Bold Response)

List PPE Used:

Wrong PPE for job Not related to Mishap

Not Required Available and not used Available and used

Contractor Incident Report System (CIRS) 2

4. Fully Explain What Allowed or Caused the Incident: Incident Information

Direct Cause:

Indirect Cause:

Additional Action Taken: (Please Include a Begin Date and Est. End Date in Description)

Additional Action Taken: (Please Include a Begin Date and Est. End Date in Description) (Use the back of page if you need additional space)

5. Contributing Factors:

Was Visibility Restricted? Yes No

Distance Visibility was restricted:

Unit of Measure (Check/Bold): Feet Yards Meters Miles Nautical Miles

Visibility Restricted By: (Check/Bold all that apply)

Fog Smoke Rain Sleet Snow

Mist Dust Sandstorm Unknown Object Other:

Lighting Conditions at Site of Mishap:

(Please Check)

Adequate Inadequate Unknown

Was Noise Level a Factor:

(Please Check)

Yes No Unknown

Was Carbon Monoxide (CO) a Factor:(Please Check)

Yes No

If Yes CO Alarm Manufacturer:

Contractor Incident Report System (CIRS) 3

5. Contributing Factors: Continued Incident Information

Other Contributing Factors:

6. Attached Documents Attached Documents/Files Name/Description:

Date Added:

Uploaded By:

Contractor Incident Report System (CIRS) 4

1. Injured Data Person #

Age:

Gender:

(Check/Bold)

Male Female

Prime Contractor Company Name:

Subcontractor Company Name:

2. General Information Drug or Alcohol Involved: (Check/Bold all that apply)

None Unknown Alcohol Drugs Alcohol and Drugs

Who Provided First Aid? Onsite Base Public

Was Ergonomics a Factor: (Check/Bold) Yes No

Type of Ergonomic Injury: (Check/Bold All That Apply)

Lifting Positioning Bending Equipment Placement Office

Equipment Placement Industrial Repetitive Motion Impact Strain

3. Injury Illness/Fatality Information

Severity of Injury/Illness: (Check/Bold)

Where There Days Lost:

Where There Days Hospitalized:

Where There Days Restricted Duty:

Part of Body Affected:

Nature of Injury or Illness:

Event or Exposure:

Source of Injury or Illness:

General Location Description:

Injury Activity Code:

No Injury Non-Recordable Case Permanent Partial Disability Recordable First Aid Case Other Recordable Case Permanent Total Disability

Recordable Workday Case Involving Restricted Duty Temporary Disability Lost Workday Case Involving Days Away From Work Fatality

Contractor Incident Report System (CIRS) 5 douglas.tusing

Typewritten Text

(if applicable)

4. License Person #

Are Appropriate License and Certification/Medical Current: (Check/Bold) Yes No

Describe or Explain:

Attach Image of License or Certification

5. Training

Was all the contract-required training provided to the employee: (Check/Bold) Yes No

Explain:

6. Attached Documents

Attached Documents

Contractor Incident Report System (CIRS) 6

1. Involved Person Data Property Damage

Age:

Gender:

Male Female

Contractor:

Contractor:

2. Attached Documents

Attached Documents

3. Property Damaged

Was Anyone Injured: Yes No

Was A Government Motor Vehicle Involved: Yes No

Property Type

Property ID #

Detailed Description

Property Owned By

Estimated Cost USD

Lost Use Days

Contractor Incident Report System (CIRS) 7

4. License Property Damage

Are Appropriate License and Certification/Medical Current: (Check/Bold) Yes No

Describe or Explain:

Attach Image of License or Certification

5. Training

Was all the contract-required training provided to the employee? (Check/Bold) Yes No

Explain:

Contractor Incident Report System (CIRS) 8

CONTRACTOR INCIDENT REPORT SYSTEM (CIRS) INSTRUCTIONS

Complete Only Sections Appropriate to Incident (Rev. 03/11).

NOTE: THE ATTACHED CIRS FORM IS TO BE USED BY CONTRACTORS TO RECORD THE RESULTS OF THEIR ACCIDENT/INCIDENTS INVESTIGATIONS AND SHALL BE PROVIDED TO THE CONTRACTING OFFICER WITHIN

THE REQUIRED TIMEFRAMES.

GENERAL. Complete a separate report for each person who was injured in the accident pages 5-6. A report needs to be completed for all OSHA recordable accidents and property damage cases. Please type or print legibly. Appropriate items shall be Checkd/Bolded, non-applicable sections shall be marked “N/A”. If additional space is needed, provide the information on a separate sheet of paper and attach to the completed form.

Mark the report: (Check/Bold) Initial: If this form is being used as initial notification of a Fatality or High Visibility Mishap. The initial form is due within 4 hours of a serious accident. A form marked ‘Follow-up’ or ‘Final’ is required within 5 days.

Follow-Up: If you are providing additional information on a report previously submitted.

Final: If you are providing a completed report and expect no changes.

Incident Information Section 1 Contract Information – Incident Information Prime Contractor: Name as it appears on contract documents.

Cage Code: If known.

Contract Number: Number as it appears on the contract documents.

Installation: Name of installation where incident occurred.

Task Order #: Insert number if applicable.

Contracting Activity/ROICC Office: Enter the name and address of the Contracting Office administering the contract under which the mishap took place (e.g. ROICC MCBH, ROICC NORFOLK, PWC GUAM, etc.).

Contractor Contact Information: (Contractor point of contact information for the individual responsible for completing the form) Self Explanatory

Section 2 Incident Type: Check/Bold most applicable category, if you select Industrial you must Check/Bold at least one additional category from the Industrial Incident Additional Information Section.

Section 3 General Information Incident Information Date of Accident: Enter the month, day, and year of accident.

Time of Accident: Enter the local time of accident in military time. Example: 14:30 hrs (not 2:30 p.m.).

Describe the Accident in Detail in your words: Fully describe the accident in the space provided. If property damage involved, give estimated dollar amount of damage and/or repair costs involved. If additional space is needed continue on a separate sheet and attach to this report. Give the sequence of events that describe what happened leading up to and including the accident. Fully identify personnel and equipment involved and their role(s) in the accident. Ensure that relationships between personnel and equipment are clearly specified. Ensure questions below regarding direct cause(s), indirect cause(s), and actions taken are answered. NOTE! Review questions in Section 4 (Fully Explain What Allowed or Caused the Incident - Incident Information) below before completing.

Exact Location of Accident: Enter facts needed to locate the accident scene (e.g. installation/project name, building/room number, street, direction and distance from closest landmark, etc.).

Were Hazardous Material(s) Involved Yes No

Contractor Incident Report System (CIRS) 9

If Yes, Explain What Hazardous Materials Were Involved and Why: Check or Bold appropriate block and list name(s) and quantities of hazardous materials spilled/released during the mishap. List why the hazardous chemicals were being used.

Activity at the time of incident: What type of work/task was being performed by the injured when the injury took place or property damage occurred.

Personal Protective Equipment– Check/Bold appropriate items and list PPE which was being used by the injured person at the time of the accident (e.g. protective clothing, shoes, glasses, goggles, respirator, safety belt, harness, etc.)

Section 4 Fully Explain What Allowed or Caused the Incident - Incident Information Direct Cause(s): The direct cause is that single factor which most directly lead to the accident. See examples below.

Indirect Cause(s): Indirect cause are those factors, which contributed to, but did not directly initiate the occurrence of the accident.

Examples for Direct and Indirect Cause:

1. Employee was dismantling scaffold and fell 12 feet from unguarded opening.

Direct cause: Failure to provide fall protection at elevation Indirect causes: Failure to enforce safety requirements: improper training/motivation of employee (possibility that employee was not knowledgeable of fall protection requirements or was lax in his attitude toward safety); failure to ensure provision of positive fall protection whenever elevated; failure to address fall protection during scaffold dismantling in phase hazard analysis.

2. Private citizen had stopped his vehicle at intersection for red light when vehicle was struck in rear by contractor vehicle. (note contractor vehicles was in proper safe working condition.)

Direct cause: Failure of contractor driver to maintain control of and stop contractor vehicle within safe distance.

Indirect cause: Failure of employee to pay attention to driving (defensive driving).

Additional Action Taken: Fully describe all the actions taken, anticipated, and recommended to eliminate the cause(s) and prevent reoccurrence of similar accidents/illnesses. Continue in the additional box and or on additional sheets of paper if necessary to fully explain and attach to the completed report form.

Please Include a Begin Date and Estimated Completion Date in Description

(1) Begin: Enter the date when the corrective action(s) identified above will begin.

(2) Est. End Date - Enter the date when the corrective action(s) identified above will be completed.

Section 5 Contributing Factors Incident Information: Check/Bold appropriate items fill in information where required Other Contributing Factors: Describe in detail any additional contributing factors not listed in previous information provided.

Section 6 Attached Documents: Provide the appropriate information for each document/file attached or uploaded.

Injured Data Person # Complete Pages 5 and 6 for each injured person At the upper right hand corner of page 5 and 6 differentiate between each person by using a numerical value (e.g. Person #1, Person #, Person #3, etc.)

Section 1 Injured Data: Fill in all applicable information, Check/bold appropriate responses.

Section 2 General Information:

Check/bold appropriate responses

Section 3 Injury/Illness Fatality Information: Check/bold appropriate responses Part of Body Affected: Enter the most appropriate primary and when applicable, secondary, etc. body part(s) affected (e.g. arm: wrist: abdomen: single eye; jaw: both elbows: second finger: great toe: collar bone: kidney, etc.).

Contractor Incident Report System (CIRS) 10

Nature of Injury/Illness: Describes the manner in which the injury or illness was inflicted or produced. It attempts to answer the broad question of “how” work injuries and illnesses occurred. (e.g. Fall, Struck By, Caught By, Repetitive Motion, Rubbed or Abraded By, etc.)

Event or Exposure: Describes what was produced by the injury or illness was produced or inflicted. (e.g. Infectious Parasitic Diseases, Traumatic Injuries and Disorders, Open Wounds, Burns, Intracranial Injuries, etc.)

Source of Injury Illness: Identifies the object, substance, bodily motion, or exposure, which directly produced or inflicted the previously identified injury or illness. (e.g. Acids, Chemical Products, Furniture and Fixtures, Machinery, Structures and Surfaces, Tools Instruments and Equipment, etc.)

General Location Description: Describes where the injury occurred (e.g. Industrial Facilities, Operational Industrial Building Plant , Roadway, etc.)

Injury Activity Code: Describes what the injured person was doing when the injury occurred. (e.g. Operating Type of Equipment, Construction Activity Being Performed, Industrial Operation Being Conducted, etc.)

Section 4 License:

Are Appropriate License and Certification/Medical Current: Did the injured employee have the appropriate license/certification or medical evaluations completed to conduct the work/task being performed.

Describe/Explain: Describe the required (licensing/certification/medical evaluation) for job/task being performed, date when license was issued, and expiration date. (e.g. “Powdered Actuated Tools, Hilti DX-350, License issued 11/29/2011, expires 3-years from issue date.” “Respirator Semi Annual Medical Evaluation, conducted 12/30/2011, expires on 12/30/2013”, etc.)

Attach Image of License or Certification: Self-Explanatory

Section 5 Training:

Was all the contract-required training provided to the employee: Self-Explanatory

Explain: If no, to the previous questions explain why the employee was not trained.

Section 6 Attached Documents:

Self-Explanatory use this for photos, drawings, diagrams, or other relevant documents.

Property Damage Section 1 Involved Person Data: Fill in all applicable information, Check/bold appropriate responses.

Section 2 Attached Documents:

Self-Explanatory use this for photos, drawings, diagrams, or other relevant documents.

Section 3 Property Damaged:

Check/bold appropriate responses. Other Headings Self-Explanatory.

Section 4 License:

Are Appropriate License and Certification/Medical Current: Did the equipment operator have the appropriate license/certification or medical evaluations completed to conduct the work/task being performed.

Describe/Explain: Describe the required (licensing/certification/medical evaluation) for job/task being performed, date when license was issued, and expiration date. (e.g. “State Issued Driver, License issued 11/29/2011, expires on MM/DD/YYY)” “Scissor Lift, JLG Model 260MRT conducted 12/30/2011, does not expire.”)

Attach Image of License or Certification: Self-Explanatory

Section 5 Training:

Was all the contract-required training provided to the employee: Self-Explanatory

Contractor Incident Report System (CIRS) 11

Date:

undefined:

undefined_2:

Cage Code:

Installation of Incident:

Contracting ActivityROICC Office:

Phone:

Date of Accident:

Time of Accident:

Describe the accident in detail in your words Use the back of page if you need additional space:

Exact Location of Accident:

Were Hazardous Materials Involved Yes No If Yes Explain What Hazardous Materials Were Involved and Why Who Provided Cleanup Onsite Base Public:

Activity of the injured person at the time of incident:

Personal Protective Equipment CheckBold Response List PPE Used Wrong PPE for job Not related to Mishap Not Required Available and not used Available and used:

Direct Cause:

Indirect Cause:

Additional Action Taken Please Include a Begin Date and Est End Date in Description:

Additional Action Taken Please Include a Begin Date and Est End Date in Description Use the back of page if you need additional space:

Other Contributing Factors:

Attached DocumentsFiles NameDescriptionRow1:

Date AddedRow1:

Uploaded ByRow1:

Attached DocumentsFiles NameDescriptionRow2:

Date AddedRow2:

Uploaded ByRow2:

Attached DocumentsFiles NameDescriptionRow3:

Date AddedRow3:

Uploaded ByRow3:

Attached DocumentsFiles NameDescriptionRow4:

Date AddedRow4:

Uploaded ByRow4:

Attached DocumentsFiles NameDescriptionRow5:

Date AddedRow5:

Uploaded ByRow5:

Attached DocumentsFiles NameDescriptionRow6:

Date AddedRow6:

Uploaded ByRow6:

Attached DocumentsFiles NameDescriptionRow7:

Date AddedRow7:

Uploaded ByRow7:

Attached DocumentsFiles NameDescriptionRow8:

Date AddedRow8:

Uploaded ByRow8:

Attached DocumentsFiles NameDescriptionRow9:

Date AddedRow9:

Uploaded ByRow9:

Attached DocumentsFiles NameDescriptionRow10:

Date AddedRow10:

Uploaded ByRow10:

Attached DocumentsFiles NameDescriptionRow11:

Date AddedRow11:

Uploaded ByRow11:

Attached DocumentsFiles NameDescriptionRow12:

Date AddedRow12:

Uploaded ByRow12:

Attached DocumentsFiles NameDescriptionRow13:

Date AddedRow13:

Uploaded ByRow13:

Attached DocumentsFiles NameDescriptionRow14:

Date AddedRow14:

Uploaded ByRow14:

Attached DocumentsFiles NameDescriptionRow15:

Date AddedRow15:

Uploaded ByRow15:

Attached DocumentsFiles NameDescriptionRow16:

Date AddedRow16:

Uploaded ByRow16:

Age:

Prime Contractor Company Name:

Subcontractor Company Name:

Part of Body Affected:

Nature of Injury or Illness:

Event or Exposure:

Source of Injury or Illness:

General Location Description:

Injury Activity Code:

Are Appropriate License and CertificationMedical Current CheckBold Yes No Describe or Explain:

Attach Image of License or Certification NameDescriptionRow1:

Date AddedRow1_2:

Uploaded ByRow1_2:

Attach Image of License or Certification NameDescriptionRow2:

Date AddedRow2_2:

Uploaded ByRow2_2:

Attach Image of License or Certification NameDescriptionRow3:

Date AddedRow3_2:

Uploaded ByRow3_2:

Attach Image of License or Certification NameDescriptionRow4:

Date AddedRow4_2:

Uploaded ByRow4_2:

Was all the contractrequired training provided to the employee CheckBold Yes No Explain:

Attached Documents NameDescriptionRow1:

Date AddedRow1_3:

Uploaded ByRow1_3:

Attached Documents NameDescriptionRow2:

Date AddedRow2_3:

Uploaded ByRow2_3:

Attached Documents NameDescriptionRow3:

Date AddedRow3_3:

Uploaded ByRow3_3:

Attached Documents NameDescriptionRow4:

Date AddedRow4_3:

Uploaded ByRow4_3:

Attached Documents NameDescriptionRow5:

Date AddedRow5_2:

Uploaded ByRow5_2:

Attached Documents NameDescriptionRow6:

Date AddedRow6_2:

Uploaded ByRow6_2:

Attached Documents NameDescriptionRow7:

Date AddedRow7_2:

Uploaded ByRow7_2:

Attached Documents NameDescriptionRow8:

Date AddedRow8_2:

Uploaded ByRow8_2:

Attached Documents NameDescriptionRow9:

Date AddedRow9_2:

Uploaded ByRow9_2:

Age_2:

Contractor:

Contractor_2:

Attached Documents NameDescriptionRow1_2:

Date AddedRow1_4:

Uploaded ByRow1_4:

Attached Documents NameDescriptionRow2_2:

Date AddedRow2_4:

Uploaded ByRow2_4:

Attached Documents NameDescriptionRow3_2:

Date AddedRow3_4:

Uploaded ByRow3_4:

Attached Documents NameDescriptionRow4_2:

Date AddedRow4_4:

Uploaded ByRow4_4:

Attached Documents NameDescriptionRow5_2:

Date AddedRow5_3:

Uploaded ByRow5_3:

Attached Documents NameDescriptionRow6_2:

Date AddedRow6_3:

Uploaded ByRow6_3:

Attached Documents NameDescriptionRow7_2:

Date AddedRow7_3:

Uploaded ByRow7_3:

Attached Documents NameDescriptionRow8_2:

Date AddedRow8_3:

Uploaded ByRow8_3:

Property TypeRow1:

Property ID Row1:

Detailed DescriptionRow1:

Property Owned ByRow1:

Estimated Cost USDRow1:

Lost Use DaysRow1:

Property TypeRow2:

Property ID Row2:

Detailed DescriptionRow2:

Property Owned ByRow2:

Estimated Cost USDRow2:

Lost Use DaysRow2:

Property TypeRow3:

Property ID Row3:

Detailed DescriptionRow3:

Property Owned ByRow3:

Estimated Cost USDRow3:

Lost Use DaysRow3:

Property TypeRow4:

Property ID Row4:

Detailed DescriptionRow4:

Property Owned ByRow4:

Estimated Cost USDRow4:

Lost Use DaysRow4:

Property TypeRow5:

Property ID Row5:

Detailed DescriptionRow5:

Property Owned ByRow5:

Estimated Cost USDRow5:

Lost Use DaysRow5:

Property TypeRow6:

Property ID Row6:

Detailed DescriptionRow6:

Property Owned ByRow6:

Estimated Cost USDRow6:

Lost Use DaysRow6:

Property TypeRow7:

Property ID Row7:

Detailed DescriptionRow7:

Property Owned ByRow7:

Estimated Cost USDRow7:

Lost Use DaysRow7:

Property TypeRow8:

Property ID Row8:

Detailed DescriptionRow8:

Property Owned ByRow8:

Estimated Cost USDRow8:

Lost Use DaysRow8:

Property TypeRow9:

Property ID Row9:

Detailed DescriptionRow9:

Property Owned ByRow9:

Estimated Cost USDRow9:

Lost Use DaysRow9:

Property TypeRow10:

Property ID Row10:

Detailed DescriptionRow10:

Property Owned ByRow10:

Estimated Cost USDRow10:

Lost Use DaysRow10:

Property TypeRow11:

Property ID Row11:

Detailed DescriptionRow11:

Property Owned ByRow11:

Estimated Cost USDRow11:

Lost Use DaysRow11:

Property TypeRow12:

Property ID Row12:

Detailed DescriptionRow12:

Property Owned ByRow12:

Estimated Cost USDRow12:

Lost Use DaysRow12:

Are Appropriate License and CertificationMedical Current CheckBold Yes No Describe or Explain_2:

Attach Image of License or Certification NameDescriptionRow1_2:

Date AddedRow1_5:

Uploaded ByRow1_5:

Attach Image of License or Certification NameDescriptionRow2_2:

Date AddedRow2_5:

Uploaded ByRow2_5:

Attach Image of License or Certification NameDescriptionRow3_2:

Date AddedRow3_5:

Uploaded ByRow3_5:

Attach Image of License or Certification NameDescriptionRow4_2:

Date AddedRow4_5:

Uploaded ByRow4_5:

Attach Image of License or Certification NameDescriptionRow5:

Date AddedRow5_4:

Uploaded ByRow5_4:

Attach Image of License or Certification NameDescriptionRow6:

Date AddedRow6_4:

Uploaded ByRow6_4:

Attach Image of License or Certification NameDescriptionRow7:

Date AddedRow7_4:

Uploaded ByRow7_4:

Attach Image of License or Certification NameDescriptionRow8:

Date AddedRow8_4:

Uploaded ByRow8_4:

Was all the contractrequired training provided to the employee CheckBold Yes No Explain_2:

Contractor Significant Incident Report CSIR_9:

9:

Contractor Significant Incident Report CSIR_10:

10:

Contractor Significant Incident Report CSIR_11:

11:

Prime Contractor:

Contract Number:

Task Order:

Name Last First:

Email Address:

Date Notified:

Radio Button141: 3

Check Box142: Off

Check Box143: Off

Check Box144: Off

Check Box145: Off

Check Box146: Off

Check Box147: Off

Check Box148: Off

Check Box149: Off

Check Box150: Off

Check Box151: Off

Check Box152: Off

Check Box153: Off

Check Box154: Off

Check Box155: Off

Check Box156: Off

Check Box158: Off

Check Box159: Off

Check Box160: Off

Check Box161: Off

Check Box162: Off

Check Box163: Off

Check Box164: Off

Check Box165: Off

Check Box166: Off

Check Box167: Off

Check Box168: Off

Check Box169: Off

Check Box170: Off

Check Box171: Off

Check Box172: Off

Check Box173: Off

Check Box174: Off

Check Box175: Off

Check Box176: Off

Check Box177: Off

Check Box178: Off

Check Box179: Off

Check Box180: Off

Check Box181: Off

Check Box182: Off

Text183:

Check Box184: Off

Check Box185: Off

Check Box186: Off

Check Box187: Off

Check Box188: Off

Check Box189: Off

Check Box190: Off

Check Box191: Off

Check Box192: Off

Check Box193: Off

Check Box194: Off

Check Box195: Off

Check Box196: Off

Check Box197: Off

Check Box198: Off

Check Box199: Off

Check Box200: Off

Check Box201: Off

Check Box203: Off

Check Box204: Off

Check Box205: Off

Check Box206: Off

Check Box207: Off

Check Box208: Off

Check Box209: Off

Text210:

Check Box211: Off

Check Box212: Off

Check Box213: Off

Check Box214: Off

Check Box215: Off

Check Box216: Off

Check Box218: Off

Check Box219: Off

Check Box220: Off

Check Box221: Off

Check Box222: Off

Check Box223: Off

Check Box224: Off

Check Box225: Off

Check Box226: Off

Check Box229: Off

Check Box230: Off

Check Box231: Off

Check Box232: Off

Check Box233: Off

Check Box234: Off

Check Box235: Off

Check Box236: Off

Check Box237: Off

Check Box238: Off

Check Box239: Off

Check Box240: Off

Check Box241: Off

Check Box242: Off

Check Box243: Off

Check Box244: Off

Check Box245: Off

Check Box246: Off

Check Box247: Off

Check Box248: Off

Check Box249: Off

Check Box250: Off

Check Box251: Off

Check Box252: Off

Check Box253: Off

Check Box254: Off

Check Box255: Off

Check Box257: Off

Check Box258: Off

Check Box259: Off

Text260:

Check Box261: Off

Check Box263: Off

Check Box264: Off

Check Box265: Off

Check Box157: Off

Check Box1: Off

Section 01 35 26 Page 1

SECTION 01 35 26

GOVERNMENTAL SAFETY REQUIREMENTS

JB Charleston (Dec 2021)

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASME INTERNATIONAL (ASME)

ASME B30.3 (2019) Tower Cranes

ASME B30.5 (2021) Mobile and Locomotive Cranes

ASME B30.7 (2021) Winches

ASME B30.8 (2020) Floating Cranes and Floating Derricks

ASME B30.9 (2021) Slings

ASME B30.20 (2021) Below-the-Hook Lifting Devices

ASME B30.22 (2016) Articulating Boom Cranes

ASME B30.23 (2016) Personnel Lifting Systems

ASME B30.26 (2015; Reaffirmed in 2020) Rigging Hardware

AMERICAN SOCIETY OF SAFETY PROFESSIONALS (ASSP)

ASSP A10.22 (2007; R 2017) Safety Requirements for Rope-

Guided and Non-Guided Workers’ Hoists

ASSP A10.34 (2021) Protection of the Public on or

Adjacent to Construction Sites

ASSP A10.44 (2020) Control of Energy Sources

(Lockout/Tagout) for Construction and Demolition Operations

ASSP Z244.1 (2016; R 2020) The Control of Hazardous

Energy Lockout, Tagout and Alternative Methods

ASSP Z359.0 (2018) Definitions and Nomenclature Used for

Fall Protection and Fall Restraint Standards

ASSP Z359.1 (2020) The Fall Protection Code

ASSP Z359.2 (2017) Minimum Requirements for a

Comprehensive Managed Fall Protection Program

Section 01 35 26 Page 2

ASSP Z359.3 (2019) Safety Requirements for Lanyards and

Positioning Lanyards

ASSP Z359.4 (2013) Safety Requirements for Assisted-

Rescue and Self-Rescue Systems, Subsystems and Components

ASSP Z359.6 (2016) Specifications and Design Requirements for Active Fall Protection Systems

ASSP Z359.7 (2019) Qualification and Verification Testing of Fall Protection Products

ASSP Z359.11 (2021) Safety Requirements for Full Body

Harnesses

ASSP Z359.12 (2019) Connecting Components for Personal

Fall Arrest Systems

ASSP Z359.13 (2013) Personal Energy Absorbers and Energy

Absorbing Lanyards

ASSP Z359.14 (2021) Safety Requirements for Self-

Retracting Devices for Personal Fall Arrest and Rescue Systems

ASSP Z359.15 (2014) Safety Requirements for Single Anchor

Lifelines and Fall Arresters for Personal Fall Arrest Systems

ASSP Z359.16 (2016) Safety Requirements for Climbing

Ladder Fall Arrest Systems

ASSP Z359.18 (2017) Safety Requirements for Anchorage

Connectors for Active Fall Protection Systems

ASSP Z490.1 (2016) Criteria for Accepted Practices in

Safety, Health, and Environmental Training

ASTM INTERNATIONAL (ASTM)

ASTM F855 (2020) Standard Specifications for Temporary

Protective Grounds to Be Used on De-energized Electric Power Lines and Equipment

INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)

IEEE 1048 (2016) Guide for Protective Grounding of

Power Lines

IEEE C2 (2017; Errata 1-2 2017; INT 1 2017) National

Electrical Safety Code

Section 01 35 26 Page 3

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 10 (2022) Standard for Portable Fire

Extinguishers

NFPA 241 (2022) Standard for Safeguarding

Construction, Alteration, and Demolition Operations

NFPA 306 (2019) Standard for Control of Gas Hazards on

Vessels

NFPA 51B (2019) Standard for Fire Prevention During

Welding, Cutting, and Other Hot Work

NFPA 70 (2020) National Electrical Code

NFPA 70E (2021) Standard for Electrical Safety in the

Workplace

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements Manual

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

10 CFR 20 Standards for Protection Against Radiation

29 CFR 1910 Occupational Safety and Health Standards

29 CFR 1910.146 Permit-required Confined Spaces

29 CFR 1910.147 Control of Hazardous Energy (Lock out/Tag out)

29 CFR 1915 Confined and Enclosed Spaces and Other

Dangerous Atmospheres in Shipyard Employment

29 CFR 1919 Gear Certification

29 CFR 1926 Safety and Health Regulations for

Construction

29 CFR 1926.1400 Cranes and Derricks in Construction

29 CFR 1926.16 Rules of Construction

29 CFR 1926.450 Scaffolds

2…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .