This is a Request for Proposal (RFP) for maintenance repairs of unpaved roads at Big South Fork National River and Recreation Area in Oneida, Tennessee. The National Park Service Southeast Region is seeking qualified contractors to deliver a minimum of 16,100 tons of TDOT 903-specification crusher run limestone aggregate and perform tailgate-spreading operations across designated road segments. The work requires uniform distribution of aggregate at an average lift of three inches with tolerances of plus or minus one-half inch, and contractors must provide all traffic control and manage encounters with public vehicles on narrow roads (minimum clearances of nine feet width and eleven feet height on some roads). The solicitation is a Women-Owned Small Business (WOSB) set-aside under NAICS code 237310 with a small business size standard of $45,000,000. Firms must have active SAM.gov registration and maintain required liability insurance ($500,000 worker's compensation, $100,000 per person/$500,000 per occurrence general liability, and $1,000,000 property damage). Performance and payment bonds at 100 percent of contract amount are required.

The RFP was issued May 7, 2026, with proposals due June 6, 2026, at 1:00 PM Eastern Time. A mandatory site visit is scheduled for May 18, 2026, at 1:00 PM EDT with Stephen L. Wilmot (423-215-6591). All questions must be submitted by May 20, 2026, at 1:00 PM EDT to edward_dingle@ios.doi.gov. The contract is Firm Fixed Price with a performance period from June 15, 2026, to August 14, 2026. Award will be made on a Lowest Price Technically Acceptable basis evaluating technical ability and approach, past performance (three relevant projects within five years), and price. Contractors must demonstrate proven track record delivering minimum 16,100 tons of limestone aggregate meeting TDOT specifications and must submit detailed safety plans, construction schedules, and management approaches. Davis-Bacon prevailing wages apply for Scott County, Tennessee. The solicitation includes comprehensive FAR clauses covering inspection, warranty, payment terms, disputes, and environmental compliance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(See ).

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

SOLICITATION

1. SOLICITATION NO.

5. REQUISITION/PURCHASE REQUEST NO.

CODE

6. PROJECT NO.

8. ADDRESS OFFER TO

4. CONTRACT NO.

7. ISSUED BY

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

11. The contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and

b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than

STANDARD FORM 1442 (REV. 12/2022)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

is, is not required.

local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.

calendar days and complete it within calendar days after receiving

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

12b. CALENDAR DAYS

2. TYPE OF SOLICITATION

NEGOTIATED (RFP) REQUEST FOR PROPOSAL

3. DATE ISSUED PAGE OF

SEALED BID (IFB) INVITATION FOR BID

9. FOR

INFORMATION CALL

PAGES

140P5126R0008

NPS SER EAST MABO

100 Alabama St., SW 1924 Building Atlanta GA 30303-8701

0044039611

PSE

Edward Dingle 4045075747

05/07/2026

06/06/2026

14 60

SITE LOCATION: The project site is located at Big South Fork National River and Recreation Area (BISO)

4564 Leatherwood Road Onieda, Tennessee 37841.

PROJECT TITLE: Provide all material, labor, and supervision to provide Maintenance Repairs of Unpaved

Roads by delivering a minimum of 16,100 tons of TDOT 903-specification crusher run limestone aggregate

(¾-inch down to fines) or an NPS-approved equivalent. Tailgate-spread aggregate in a uniform and continuous manner across the full width of travel along each designated road segment unless otherwise directed by the COR. Spot dumping, segregation, or uneven distribution is not permitted. Aggregate shall be tailgate-spread to achieve a uniform average lift of three (3) inches, with an allowable tolerance of plus or minus one-half (0.5) inch. The contractor shall use hauling equipment capable of safely accessing all roadways. Most roads maintain approximate clearances of ten (10) feet width and twelve

(12) feet height; however, Duncan Hollow Road, Alfred Smith Road, Jack Ridge Road, and Big Island Road contain tighter segments with minimum clearances of nine (9) feet width and eleven (11) feet height. The contractor is solely responsible for selecting appropriate equipment and ensuring safe passage without resource damage. The contractor must provide all traffic control necessary to safely deliver materials, including managing encounters with public vehicles on narrow roads. The National Park Service will not

Continued...

1 91

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

OFFER (Must be fully completed by offeror)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AWARD (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

CODE FACILITY CODE

15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

21. ITEMS ACCEPTED:

22. AMOUNT

26. ADMINISTERED BY

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31c. DATE

STANDARD FORM 1442 (REV. 12/2022) BACK

31b. UNITED STATES OF AMERICA

BY

31a. NAME OF CONTRACTING OFFICER (Type or print)

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30b. SIGNATURE 30c. DATE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

23. ACCOUNTING AND APPROPRIATION DATA

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT

27. PAYMENT WILL BE MADE BY

10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )

20b. SIGNATURE 20c. OFFER DATE

Continued...

AMENDMENT

NUMBER

DATE.

NPS SER EAST MABO

100 Alabama St., SW 1924 Building Atlanta GA 30303-8701

PSE

Edward Dingle

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

supply flaggers or escorts for Big South Fork

National River and Recreation Area (BISO)

Onieda, Tennessee per the statement of work.

This procurement will be a Women-Owned Small

Business (WOSB) set-aside. This NAICS code for this procurement will be 237310, Commercial and

Institutional Building Construction with a small business size standard of $45,000,000.00.

The product service code for this procurement is N063: Installation of Equipment- Alarm, Signal, and Security Detection Systems.

All interested offers MUST have an active vendor record in SAM.gov, be a small business under the identified NAICS code and NOT have any exclusions such as a delinquent federal debt or debarment.

SITE VISIT: A site visit is scheduled for May

18,2026 at 1:00 pm EDT. Contractors are required to RSVP with the government point of contact for this requirement. The park POC for this site visit is: Mr. Stephen L. Wilmot at

(423) 215-6591 (cell) or stephen_wilmot@nps.gov. All questions must be directed via email by May 20, 2026 1:00pm EDT to edward_dingle@ios.doi.gov.

Type of Contract: Firm Fixed Price Contract.

Davis Bacon prevailing wages for Scott County, Tennessee will apply for this requirement See attachment 0003 or TN20260147 on WDOL.gov.

Provide all labor, tools, equipment, materials, and supervision required to provide Maintenance

Repairs of Unpaved Roads in accordance with the statement of work, Davis Bacon Wage

Determination, and Terms and Conditions.

No onsite work shall take place until a Notice to Proceed (NTP) is provided. NTP will not be provided until the following items are received/approved:

1. Receipt of Payment and Performance Bonds, if applicable

Continued...

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

2. Receipt of Certificate of Liability

Insurance

3. Receipt and Approval of Contract Specific

Safety Plan

4. Receipt and Approval of Work Schedule

5. Receipt and Approval of Material Submittals

6. Schedule and Completion of PreCon

Delivery: 08/14/2026

Delivery Location Code: 0011283035

NPS, Big South Fork Ntl River

4564 Leatherwood Road

Oneida TN 37841 US

Period of Performance: 06/15/2026 to

08/14/2026

00010 Provide Maintenance Repairs of Unpaved Roads for Big South Fork National River and

Recreation Area (BISO) Onieda, Tennessee per the attached statement of work (SOW).

Product/Service Code: Z2LB

Product/Service Description: REPAIR OR

ALTERATION

OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS

TABLE OF CONTENTS PART

I – THE SCHEDULE

SECTION A –SF 1442 (Solicitation/Contract Form) SECTION B –Supplies or Services and Price Cost (See SF 1442 (block 17 for offer) SECTION C --Specifications ................Work and Schedule Considerations SECTION D-Packaging and Marking ................Postage and Markings SECTION E -- Inspection and Acceptance .............. Inspection of Construction ...............Warranty of Construction SECTION F -- Deliveries or Performance ............... Suspension of Work SECTION G -- Contract Administration Data ...............Contract Administration ...............Authorities & Delegations (subcontracting & Site Administration) SECTION H -- Special Contract Requirements ...............EO – Prohibition of Text Messaging while Driving ...............Progress Meetings ...............Operation of Facility during Construction ...............Contractor Employees

PART II – CONTRACT CLAUSES

SECTION I -- Contract Clauses ...............Clauses by Reference ...............Release of Claims - Department of Interior ...............Liability Insurance - Department of Interior ................System for Award Management ...............Accident Prevention ...............Specifications and Drawings for Construction

PART III – LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J – List of Attachments ............... Statement of Work (Attachment 1) ............... Price Schedule (Attachment 2) ............... Wage Determination (Attachment 3) ................ SF24 Bid Bond (Attachment 4) ............... Limitation on Subcontracting Worksheet (Attachment 5) ………… Past Performance Questionnaire (Attachment 6) ................. Site Visit Information (Attachment 7) ………… SF1413 Statement and Acknowledgment (Attachment 8)

PART IV – REPRESENTATIONS AND INSTRUCTIONS

SECTION K - Representations, Certifications, and Other Statements of Offerors ................Representations, Certifications SECTION L -- Instructions, Conditions and Notices to Bidders ................Instruction to Offeror for Proposal Submission SECTION M -- Evaluation Factors for Award ................Evaluation Factors for Award

Section A: Solicitation/contract form

SITE LOCATION: The project site is located at Big South Fork National River and Recreation Area (BISO) 4564 Leatherwood Road Onieda, Tennessee 37841.

PROJECT TITLE: Provide all material, labor, and supervision to provide Maintenance Repairs of Unpaved Roads by delivering a minimum of 16,100 tons of TDOT 903-specification crusher run limestone aggregate (¾-inch down to fines) or an NPS-approved equivalent. Tailgate-spread aggregate in a uniform and continuous manner across the full width of travel along each designated road segment unless otherwise directed by the COR. Spot dumping, segregation, or uneven distribution is not permitted. Aggregate shall be tailgate-spread to achieve a uniform average lift of three (3) inches, with an allowable tolerance of plus or minus one-half (0.5) inch. The contractor shall use hauling equipment capable of safely accessing all roadways. Most roads maintain approximate clearances of ten (10) feet width and twelve (12) feet height; however, Duncan Hollow Road, Alfred Smith Road, Jack Ridge Road, and Big Island Road contain tighter segments with minimum clearances of nine (9) feet width and eleven (11) feet height. The contractor is solely responsible for selecting appropriate equipment and ensuring safe passage without resource damage. The contractor must provide all traffic control necessary to safely deliver materials, including managing encounters with public vehicles on narrow roads. The National Park Service will not supply flaggers or escorts for Big South Fork National River and Recreation Area (BISO) Onieda, Tennessee per the statement of work.

NOTICE TO PROSPECTIVE OFFEROR’S

SUBMISSION OF DOCUMENTS: Your offer must include the following Sections and Forms:

SF-1442, SOLICITATION, OFFER AND AWARD. PLEASE NOTE: The SF-1442 must be signed, and dated, and Blocks 14 through 20c must be completed.

SF-1442, ITEM 17, Offeror is cautioned to review acceptance time stated in Item 13d before completing this item. Proposals offering less than specified time will cause the proposal to be rejected.

SECTION B, Price Schedule

SECTION K, REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS

SUBMIT AN OFFER TO THE FOLLOWING ADDRESS:

OFFERS SHALL BE SUBMITTED VIA EMAIL ONLY TO: edward_dingle@ios.doi.gov

PERFORMANCE/PAYMENT BONDS - Successful offeror will be required to furnish Performance and Payment bonds on Standard Forms 25 and 25A based on total contract amounts in the following ranges: 100% performance bond, 100% payment bond.

Offerors understand that the Government will inspect, accept, and possess the completed work and release the bonding when the work is completed and accepted under FAR 28.203-5.

A formal site visit is scheduled for this request for proposal (See attached 0007).

All questions regarding this solicitation must be submitted in writing to the Contracting Officer. Questions must be submitted by May 20, 2026, at 1:00 P.M. Eastern Time. Questions submitted after this time may NOT be considered.

Proposal is due on June 06, 2026, at 1:00 P.M. Eastern Time.

mailto:edward_dingle@ios.doi.gov

Section B – Price Schedule

The Contractor must provide all material, labor, and supervision to provide Maintenance Repairs of Unpaved Roads by delivering a minimum of 16,100 tons of TDOT 903-specification crusher run limestone aggregate (¾-inch down to fines) or an NPS-approved equivalent. Tailgate-spread aggregate in a uniform and continuous manner across the full width of travel along each designated road segment unless otherwise directed by the COR. Spot dumping, segregation, or uneven distribution is not permitted. Aggregate shall be tailgate-spread to achieve a uniform average lift of three (3) inches, with an allowable tolerance of plus or minus one-half (0.5) inch. The contractor shall use hauling equipment capable of safely accessing all roadways. Most roads maintain approximate clearances of ten (10) feet width and twelve

(12) feet height; however, Duncan Hollow Road, Alfred Smith Road, Jack Ridge Road, and Big Island Road contain tighter segments with minimum clearances of nine (9) feet width and eleven (11) feet height. The contractor is solely responsible for selecting appropriate equipment and ensuring safe passage without resource damage. The contractor must provide all traffic control necessary to safely deliver materials, including managing encounters with public vehicles on narrow roads. The National Park Service will not supply flaggers or escorts for Big South Fork National River and Recreation Area (BISO) Onieda, Tennessee per the statement of work.

ALL PRICING MUST BE AFFIXED TO ATTACHMENT 0002 – PRICE SCHEDULE. A COST BREKDWON MUST BE

PROVIDED.

Section C – Specifications/Drawings

C.1 The Contractor shall furnish the necessary personnel, material, equipment, services, and facilities (except as otherwise specified). To perform per the Project Specifications and Construction Design Plan Documents:

Attachment 0001 – Statement of Work

All provisions, clauses, terms, and conditions in specifications and the Solicitation and Contract apply with equal force and binding effect, and contractor is expected to comply with same throughout the specified performance period and any extension, if granted.

Section D – Packaging and Marking

D.1 Payment of Postage and Fees

The Contractor shall pay all postage and fees related to submitting documents to the Contracting Officer (CO) or the Contracting Officer’s Representative (COR).

D.2 Marking

All documents submitted to the CO or COR shall clearly indicate the Contract Number of the contract for which the information is being submitted.

Section E – Inspection and Acceptance

E.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE

The following contract clauses pertinent to this section are hereby incorporated by reference (by Citation Number, Title, and Date) in accordance with the clauses at FAR 52.252-2 CLAUSES INCORPORTATED BY REFERENCE in Section I of this contract. See FAR 52.252-2 for an internet address (if specified) for electronic access to the full text of a clause.

Number Title 52.246-13 Inspection-Dismantling, Demolition, or Removal of Improvements Aug 1996

E.2 FAR 52.246-12 Inspection of Construction (AUG) 1996

(a) Definition. “Work” includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.

(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the CO and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.

(c) Government inspections and tests are for the Government’s sole benefit of and do not—

(1) Relieve the Contractor of responsibility for providing adequate quality control measures;

(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;

(3) Constitute or imply acceptance; or

(4) Affect the Government’s continuing rights after acceptance of the completed work under paragraph (i) of this section.

(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the CO’s written authorization.

(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the CO. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes re-inspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.

(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.

(g) If the Contractor does not promptly replace or correct rejected work, the Government may—

(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or

(2) Terminate for default the Contractor’s right to proceed.

(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the CO shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was delayed, an extension of time.

(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the CO determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.

(End of clause)

E.3 52.246-21 WARRANTY OF CONSTRUCTION ( M a r ) 1994

(a) In addition to any other warranties in this contract, the Contractor warrants, except as provided in paragraph (i) of this clause, that work performed under this contract conforms to the contract requirements and is free of any defect in equipment, material, or design furnished, or workmanship performed by the Contractor or any subcontractor or supplier at any tier.

(b) This warranty shall continue for a period of 1 year from the date of final acceptance of the work. If the Government takes possession of any part of the work before final acceptance, this warranty shall continue for a period of 1 year from the date the Government takes possession.

(c) The Contractor shall remedy at the Contractor’s expense any failure to conform, or any defect. In addition, the Contractor shall remedy at the Contractor’s expense any damage to Government owned or controlled real or personal property, when that damage is the result of

(1) The Contractor’s failure to conform to contract requirements; or

(2) Any defect of equipment, material, workmanship, or design furnished.

(d) The Contractor shall restore any work damaged in fulfilling the terms and conditions of this clause. The Contractor’s warranty with respect to work repaired or replaced will run for 1 year from the date of repair or replacement.

(c) The CO shall notify the Contractor, in writing, within a reasonable time after the discovery of any failure, defect, or damage.

(f) If the Contractor fails to remedy any failure, defect, or damage within a reasonable time after receipt of notice, the Government shall have the right to replace, repair, or otherwise remedy the failure, defect, or damage at the Contractor’s expense.

(g) With respect to all warranties, express or implied, from subcontractors, manufacturers, or suppliers for work performed and materials furnished under this contract, the Contractor shall–

(1) Obtain all warranties that would be given in normal commercial practice;

(2) Require all warranties to be signed, in writing, for the benefit of the Government, if directed by the CO; and

(3) Enforce all warranties for the benefit of the Government, if directed by the CO.

(h) If the Contractor’s warranty under paragraph (b) of this clause has expired, the Government may bring suit at its expense to enforce a subcontractor’s, manufacturer’s, or supplier’s warranty.

(i) Unless a defect is caused by the negligence of the Contractor or subcontractor or supplier at any tier, the Contractor shall not be liable for the repair of any defects of material or design furnished by the Government nor for the repair of any damage that result from any defect in Government-furnished material or design.

(j) This warranty shall not limit the Government’s rights under the Inspection and Acceptance clause of this contract with respect to latent defects, gross mistakes, or fraud.

Section F – Deliveries or Performance

F.1 52.242-14 SUSPENSION OF WORK (Apr) 1984

(a) The CO may order the Contractor, in writing, to suspend, delay, or interrupt all or any part of the work of this contract for the period of time that the CO determines appropriate for the convenience of the Government.

(b) If the performance of all or any part of the work is, for an unreasonable period of time, suspended, delayed, or interrupted (1) by an act of the CO in the administration of this contract, or (2) by the CO’s failure to act within the time specified in this contract (or within a reasonable time if not specified), an adjustment shall be made for any increase in the cost of performance of this contract (excluding profit) necessarily caused by the unreasonable suspension, delay, or interruption, and the contract modified in writing accordingly. However, no adjustment shall be made under this clause for any suspension, delay, or interruption to the extent that performance would have been so suspended, delayed, or interrupted by any other cause, including the fault or negligence of the Contractor, or for which an equitable adjustment is provided for or excluded under any other term or condition of this contract.

(c) A claim under this clause shall not be allowed–

(1) For any costs incurred more than 20 days before the Contractor shall have notified the CO in writing of the act or failure to act involved (but this requirement shall not apply as to a claim resulting from a suspension order); and

(2) Unless the claim, in an amount stated, is asserted in writing as soon as practicable after the termination of the suspension, delay, or interruption, but not later than the date of final payment under the contract.

Section G – Contract Administration Data

G.1 Contracting Officer’s Representative(s) for this contract will be:

TBD

G.2 Contract Officer responsible for administering this contract:

Edward Dingle, Jr.

Contracting Officer National Park Service 100 S.W. Alabama Street Atlanta, Georgia 30303 Work: (404) 507-5747 edward_dingle@ios.doi.gov

G.3 TECHNICAL DIRECTION

The performance of the work required in this contract shall be subject to the COR’s or his or her designee’s technical direction and surveillance. As used in this contract, “technical direction” is direction to the Contractor which requires pursuit of certain lines of inquiry, filing in details or otherwise serving to accomplish the contract specifications. The technical direction, to be valid:

(a) Must be issued in writing consistent with the general scope of the work stated in the contract;

(b) May not constitute a new assignment of work changes to the expressed terms, conditions, or specifications incorporated into this contract; Shall not constitute a basis for extension of the contract delivery schedule.

Nothing contained in this part authorizes the Contractor to incur costs in excess of the contract price or other limitation of funds stated in the contract due to extra work performed in response to informal directions, suggestions, or instructions (oral or written) given by representatives of the CO, unless before commencing such work, the Contractor: 1) directly notifies the CO; 2) requests a formal contract modification; and 3) receives written authorization to proceed from the CO.

G.4 CORRESPONDENCE

Any correspondence initiated by the Contractor shall include the Contract Number and shall be addressed to the CO (original and one copy) at the address provided in the clause entitled “Contractor Administration”.

G.5 CONTRACT PAYMENTS

The Contractor shall submit invoices to the CO for the percentage of work completed. The Contractor and COR at the site must agree on the percentage of work completed.

G.6 JOB SITE ADMINISTRATION

The COR will be available at the site to inspect the work as it progresses. The COR is not authorized to make technical decisions or give technical directions; the Contractor or the Contractor’s Superintendent must contact the COR regarding such decisions and directions.

The Contractor shall have a competent superintendent (the Contractor’s Superintendent) who is (i) deemed acceptable to the Government; (ii) authorized to act on the Contractor’s behalf; and (iii) to be present on the job site at all times when contract work is mailto:edward_dingle@ios.doi.gov being performed.

G.7 PAYROLL RECORDS

The Prime Contractor is responsible for furnishing the CO with one (copy of the Weekly Payroll Form WH-347 or equivalent) to include payroll records for his or her subcontractor’s. Payroll records shall be submitted in 7 days after the payroll period closes and numbered in consecutive order. The Prime Contractor shall review all subcontractors’ payroll and ensure that all employees are paid under the Wage Determination, which is a part of this contract.

The Prime Contractor shall ensure that compliance is met. The Contractor is subject to the Wage and Hour Department, U.S.

Department of Labor.

G.8 SUBCONTRACTING

The Prime Contractor shall complete a Standard Form (SF1413) for each subcontractor and submit the form to the CO. No subcontractor shall be allowed on the site without a signed SF 1413. The Prime shall be held responsible for ensuring that his or her subcontractor’s DO NOT subcontract any portion of this work. The Prime Contractor is responsible to ensure that all subcontractors carry sufficient insurance under this contract.

G.9 1452.201-70 Authorities and Delegations (Sep 2011)

(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.

(b) The Contracting Officer will designate a Contracting Officer’s Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor’s performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.

(c) The COR is not authorized to perform, formally or informally, any of the following actions:

(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;

(2) Waive or agree to modification of the delivery schedule;

(3) Make any final decision on any contract matter subject to the Disputes Clause;

(4) Terminate, for any reason, the Contractor's right to proceed;

(5) Obligate in any way, the payment of money by the Government.

(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.

(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.

(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.

(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.

Section H – Special Contract Requirements

H.1 Executive Order 13513 Prohibition on Text Messaging and Using Electronic Equipment Supplied by the Government While Driving as prescribed in Federal Leadership on Reducing Text Messaging While Driving.

Prohibition on Text Messaging and Using Electronic Equipment Supplied by the Government while Driving (Oct 2009)

This Executive Order introduces a Federal Government-wide Prohibition on the use of text messaging while driving on official business or while using Government–supplied equipment. Additional guidance enforcing the ban will be issued at a later date. In the meantime, please adopt and enforce policies that immediately ban text messaging while driving company-owned or –rented vehicles, government-owned or leased vehicles, or while driving privately owned vehicles when on official government business or when performing any work for or on the behalf of the government.

(End of order)

H.2 GENERIC GENDER TERMINOLOGY

Except where stipulated by the Federal Acquisition Regulations, the use of terms such as he, she, his, and her are not to be interpreted as implying other than neutral gender terms such as “it” or “their”.

H.3 SAFETY

The Contractor is responsible for establishing and maintaining compliance with all applicable laws, regulations, rules, and standards, including without limitation, those regulations, rules, and standards, promulgated for the administration and enforcement of the following laws: the Occupational Safety and Health Act (OSHA) or Federally approved State equivalent(s); the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) as amended by Superfund Amendments and Reauthorization Act (SARA); Emergency Planning and Community Right-to-Know Act (EPCRA); Clean Air Act (CAA); Clean Water Act (CWA) and Toxic Substances Control Act (TSCA); and Solid Waste Disposal Act (SWDA), as amended by Resource Conservation and Recovery Act (RCRA).

H.4 PROGRESS MEETINGS

(a) The Contractor shall be available to meet with the CO or his or her representative at the job site during construction to discuss work progress.

(b) Meetings will be scheduled by the CO with timely notification to the Contractor.

At the progress meetings, the Contractor shall give the CO progress reports on the project. If the work is behind schedule, the Contractor must (i) discuss the work and any causes of work delay(s); (ii) present a plan to bring the work back into conformance with the schedule; or, if necessary (iii) to propose a revised work schedule.

H.5 Payrolls

The Contractor must furnish copies of his weekly payrolls to the CO. Payroll submission is required weekly, 7 calendar days after close of payroll period.

H.6 OPERATION OF FACILITY DURING CONSTRUCTION

Construction activities must not interrupt the facility’s function and day-to-day operations during construction. Contractor must coordinate with the COR for any temporary measures. All temporary measures employed shall be at the Contractor’s expense and shall be removed upon completion of the contract.

H.7 WORK HOURS

Normal work hours are from 7:00 a.m. through 3:30 p.m., Monday through Friday. Contractor will not be permitted to work at the job site on Saturday, Sunday, or legal holidays unless the CO authorizes otherwise.

H.8 USE OF PREMISES

(a) Before any camp, quarry, borrow pit, storage, detour, or bypass site, other than shown on the drawings, is opened, or operated on Government land or lands administered by the Government, written permission shall be obtained through the CO. A camp is interpreted to include the campsite or trailer parking area of any employee working on the project for Contractor. Such permission, if granted, will be without charge to Contractor.

(b) Unless provided otherwise, the Contractor shall provide and maintain sanitation facilities for the workforce at the site. Solid waste shall be disposed of under applicable federal, state, and local regulations.

H.9 MAXIMUM WORK WEEK

The maximum work week that will be approved is 40 hours. The Contractor’s proposed hours of work are to include daily starting and stopping times.

H.10 EXCAVATION AND UTILITY CLEARANCES

The Chief of Maintenance, for each park, shall ensure that the Contractor is provided with necessary excavation and utility clearances. The Contractor shall request such clearances and staking in writing to the CO no less than ten calendar days before the date which she or he anticipates commencement of work. Contractor will not proceed with excavation of any kind until such clearances have been issued. Clearances will be valid from the date of issue or completion of, or otherwise directed by the issuing authority.

H.11 DISPOSAL

Contractor will dispose debris, rubbish, and non-usable material resulting from under this contract in a manner that meets federal, state, and local law.

H.12 CONTRACTOR EMPLOYEES

a) The Contractor will dispose all debris, rubbish and non-useable material from the site and all federal property in a manner that meets federal, state, county, and local laws.

b) The Contractor shall furnish sufficient personnel to perform, supervise and manage all work.

c) The Contractor employees shall conduct themselves in a proper, efficient, courteous, and business-like manner.

d) The Contractor shall remove from the site any individual whose continued employment the CO deems to be contrary to public interest or inconsistent with the policies of the National Park Service.

H.13 PERMITS

Contractor shall, without additional expense to the government, obtain all appointments, licenses, and permits required to perform work under this contract. Contractor will provide evidence of all permits and licenses to the CO before the work commences and will always display them on the job site.

H.14 QUALITY OF WORK

Workmanship shall be of the highest quality and the best trade practices. Contractor shall conform to all requirements of the state and county code, ANSI A 10.6, and applicable codes of the National Fires Protection Association. All replacement materials shall conform to the manufacturer specifications and standards. Substitute items shall be equal to or better that the original material and must be approved by the Government.

H.15 COMPLETION OF WORK

The time stated for completion of the project includes all materiel procurement, payroll records, corrections of all discrepancies (Punch List Items), and final clean up on premises as stated in the clause “Execution and Commencement of Work”, FAR 52.216-23 (APR 1984) Section F.

H.16 MATERIAL APPROVAL SUBMITTALS

The submittals contemplated by the clause entitles “Materials and Workmanship”, FAR 52.236-5 (APR 2025), Section I, shall be submitted to the CO through the COR in five (5) copies. The Denver Service Center Form (DSC-1) entitled “Transmittal USDI, National Park Service”, shall be used. Contractor shall re-submit any disapproved submittals in 7 calendar days of disapproval.

H.17 ARCHEOLOGICAL FINDINGS

Petroglyphs, artifacts, burial grounds or remains, structural features, ceremonial, domestic, and archeological objects of any nature, historic or prehistoric, found within the construction area, are the property of and will be removed and only by the Government.

Should Contractor’s operations uncover, or his or her employees find any archeological remains, Contractor shall suspend operations at the site of discovery; notify CO immediately of the findings; and continue operation in other areas. Included with the notification shall be a brief statement of the location and details of the findings. Should the temporary suspension of work at the site result in delays, or the discovery site require archeological studies resulting in delays or additional work for the contractor, he or she will be compensated by an equitable adjustment under the General Provision of the Contract.

H.18 DOI ELECTRONIC INVOICING Electronic Invoicing and Payment Requirements – Invoice Processing Platform (IPP) (Feb) 2021

"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice [Contracting Officer to edit and include the documentation required under this contract]: Contractors Invoice

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

(End of Local Clause) https://www.ipp.gov/ mailto:IPPCustomerSupport@fiscal.treasury.gov

H.19 CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM DEC 2015

1) FAR 42.1102 directs all federal agencies to collect past performance information on contracts. The Department of the Interior has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.11.

2) The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report.

3) We request that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm’s past performance evaluation(s) for the contract no later than 30 days after award.

Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official. The report information must be protected as source selection sensitive information not releasable to the public.

4) When your Contractor Representative(s) (Past Performance Points of Contact) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at http://www.cpars.csd.disa.mil/. The CPARS User Manual, registration for Online Training for Contractor Representatives, and a practice application may be found at this site.

5) Within 60 days after a performance period ends, the CO will complete an interim or final past performance evaluation, and the report will be accessible at http://www.cpars.csd.disa.mil/.

a) Contractor Representatives may then provide comments in response to the evaluation or return the evaluation without comment.

b) Comments are limited to the space provided in Block 22. Your comments should focus on objective facts in the Assessing Official’s narrative and should provide your views on the causes and ramifications of the assessed performance.

c) In addition to the ratings and supporting narratives, blocks 1 – 17 should be reviewed for accuracy, as these include key fields that will be used by the Government to identify your firm in future source selection actions.

d) If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating “No comment” in Block 22, and then signing and dating Block 23 of the form. Without a statement in Block 22, you will be unable to sign and submit the evaluation back to the Government.

e) If you do not sign and submit the CPAR within 30 days, it will automatically be returned to the Government and will be annotated: “The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment.”

f) Your response is due within 30 calendar days after receipt of the CPAR.

6) The following guidelines apply concerning your use of the past performance evaluation:

a) Protect the evaluation as “source selection information.” After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the CO for instructions.

b) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.

c) Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.

7) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the CO no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 30-day review period.

8) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.

(End of Clause) http://www.cpars.csd.disa.mil/ http://www.cpars.csd.disa.mil/

SECTION I – CONTRACT CLAUSES

I.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEB 1998

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the CO will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): http://www.arnet/far.gov.

Clause Title Date 1452.203-70 Restriction on Endorsements Jul 1996 1452.215-70 Examination of Records by the Department of the Interior Apr 1984 1452.224-1 Privacy Act Notification (July 1996) Deviation Jul 1996 1452.236-70 Prohibition Against Use of Lead-based Paint Jul 1996 52.202-1 Definitions Jun 2020 52.203-3 Gratuities Apr 1984 52.203-5 Covenant Against Contingent Fees May 2014 52.203-6 Restrictions on Subcontractor Sales to the Government June 2020 52.203-7 Anti-Kickback Procedures Jun 2020 52.203-8 Cancellation, Rescission, and Recovery of Funds for

Illegal or Improper Activity May 2014

52.203-12 Limitation on Payments to Influence Certain Federal Transactions

Jun 2020

52.203-16 Preventing Personal Conflicts of Interest Jun 2020 52.203-17 Contractor Employee Whistleblower Rights and

Requirement to Inform Employees of Whistleblower Rights

Nov 2023

52.203-19 Prohibition on Requiring Certain Internal Confidentiality or statements

Jan 2017

52.204-9 Personal Identify Verification of Contractor Personnel Jan 2011 52.204-10 Reporting Executive Compensation and First-Tier

Subcontract Awards Apr 2025

52.204-13 System for Award Management Maintenance Apr 2025 52.204-19 Incorporation by Reference of Representations and

Certifications Dec 2014

52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded.

Apr 2025

52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters

Apr 2025

52.215-10 Price Reduction for Defective Cost or Pricing Data Aug 2011 52.215-12 Subcontractor Certified Cost or Pricing Data Apr 2025 52.216-24 Limitation of Government Liability Apr 1984 52.219-6 Notice of Total Small Business Set-Aside Apr 2025 52.219-8 Utilization of Small Business Concerns Apr 2025 52.219-28 Post-Award Small Business Program Representation Apr 2025 52.222-1 Notice to the Government of Labor Disputes Apr 2025 52.222-3 Convict Labor Apr 2025

52.222-4 Contract Work Hours and Safety Standards -Overtime Compensation

Apr 2025

52.222-6 Construction Wage Rate Requirements Apr 2025 52.222-8 Payrolls and Basic Records Apr 2025 52.222-10 Compliance with Copeland Act Requirements Apr 2025 52.222-11 Subcontracts (Labor Standards) Apr 2025 52.222-12 Contract Termination-Debarment May 2014 52.222-13 Compliance with Construction Wage Rate Requirements and

Related Regulations May 2014

52.222-14 Disputes Concerning Labor Standards Apr 2025 52.222-15 Certification of Eligibility May 2014 52.222-16 Approval of Wage Rates Apr 2025 52.222-35 Equal Opportunity for Veterans Apr 2025

52.222-36 Equal Opportunity for Workers with Disabilities Apr 2025 52.222-37 Employment Reports on Veterans Apr 2025

52.222-50 Combating Trafficking in Persons Apr 2025

52.222-54 Employment Eligibility Verification Apr 2025

52.222-55 Minimum Wagesfor Contractor Workers Under Executive Order 14026

Apr 2025

52.222-62 Paid Sick Leave Under Executive Order 13706 Apr 2025 52.223-3 Hazardous Material Identification and Material Safety Data Apr 2025 52.223-5 Pollution Prevention and Right-to-Know Information May 2024 52.225-9 Buy American – Construction Materials Apr 2025 52.225-10 Notice of Buy American Act Requirement – Construction

Materials May 2014

52.225-11 Buy American-Construction Materials under Trade Agreements

Apr 2025

52.226-1 Utilization of Indian Organizations and Indian Owned Economic Enterprises

Apr 2025

52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving

May 2024

52.227-4 Patent Indemnity-Construction Contracts Dec 2007 52.228-2 Additional Bond Security Oct 1997 52.228-5 Insurance - Work on a Government Installation Jan 1997 2.228-11 Individual Surety – Pledge of Assets Feb 2021