Sol_140F0821R0011.pdf

PDF 943 KB Posted

Attached to
IL-CRAB ORCHARD NWR-GAOA-VIST CENTER BLD
Solicitation number
140F0821R0011
Issued by

About this file

This solicitation is for the construction of a visitor center addition at Crab Orchard National Wildlife Refuge in Illinois. The U.S. Fish and Wildlife Service is seeking a contractor to build the addition in the general location of the existing refuge headquarters. The requirement is being procured as a firm fixed price contract under FAR Part 15. The response due date is September 3, 2021. The project magnitude is between $1,000,000 and $5,000,000. The work must commence within 15 days of the notice to proceed and be completed within 395 calendar days. A 20% bid bond and 100% payment and performance bonds are required. The NAICS code is 236220 and the small business size standard is $39.5 million. The solicitation is posted on SAM.gov and questions must be submitted by email to the point of contact by the question cutoff date.

View the file

Other files

File Type Posted
Sol_140F0821R0011_Amd_0004.pdf PDF
CRO323E2_ADD01_0004.pdf PDF
CRO309M4_ADD01_0004.pdf PDF
Mechanical_Louver_ADD01_0004.pdf PDF
27_41_00_ADD01_0004.pdf PDF
Crab_Orchard_Outdoor_Classroom_0004.pdf PDF
CRO257C0_ADD01_0004.pdf PDF
CRO316E0_ADD01_0004.pdf PDF
198212_06_ADD01_Narrative_0004.pdf PDF
CRO256C0_ADD01_0004.pdf PDF
CRO271A1_ADD01_0004.pdf PDF
CRO260C0_ADD01_0004.pdf PDF
CRO284A4_ADD01_0004.pdf PDF
CRO305M0_ADD01_0004.pdf PDF
CRO258C0_ADD01_0004.pdf PDF
CRO267A0_ADD01_0004.pdf PDF
Transmittal_Addendum_01_0004.pdf PDF
CRO321E2_ADD01_0004.pdf PDF
CRO266U0_ADD01_0004.pdf PDF
CRO320E4_ADD01_0004.pdf PDF
CRO261C0_ADD01_0004.pdf PDF
Sol_140F0821R0011_Amd_0003.pdf PDF
Sol_140F0821R0011_Amd_0002.pdf PDF
140F0821R0011_Q_and_A_-_Responses_2_0002.pdf PDF
140F0821R0011_Q_and_A_-_Responses_0001.pdf PDF
Sol_140F0821R0011_Amd_0001.pdf PDF
CRO1253_rev_40-73.pdf PDF
CRO1253_rev_1-19.pdf PDF
A02_Bid_Schedule_base_bid_with_add_1.pdf PDF
A04_CRO_Spec_101_rev_pdf.pdf PDF
CRO1253_rev_30-39.pdf PDF
A04_BSD_Metal_Building_Systems.pdf PDF
B03_Wage_Rates.pdf PDF
B08_Past_Performance_Questionnaire.pdf PDF
CRO1253_rev_20-29.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior

FISH AND WILDLIFE SERVICE

JOINT ADMINISTRATIVE OPERATIONS | U.S. Fish & Wildlife Service Great American Outdoors Act (GAOA)

Construction/A&E Acquisition Operations

NOTICE TO OFFERORS

Solicitation Number: 140F0821R0011

Description: Construction of a Visitor Center Addition at Crab Orchard NWR

General Information:

Date Posted: August 3, 2021 Response Date: September 3, 2021 Question cut-off date: 7 calendar days prior to the proposal response due date Set-Aside: Total Small Business Set-Aside NAICS Codes: 236220 – Commercial and Institutional Building Construction Small Business Size Standard - $39.5 million dollars

Instruction to Offerors:

Before submitting an offer, please read the entire solicitation package carefully. In order for an offerors proposal to be considered for award, the following documents MUST be included in your proposal:

- Signed copy of the SF 1442

- Acknowledgment of any/all issued solicitation amendments

Interested contractors must be registered in SAM (System for Award Management, www.sam.gov) and complete online representations and certifications before the solicitation response due date.

Offer Due Date: September 3, 2021 @ 5:00 PM PT

Basis for Award:

FAR Part 15 – Best Value - Trade-Off. Evaluation Factors as detailed in Section M.

Project Magnitude: Between $1,000,000 and $5,000,000

Bonding Requirements: 20% Bid Bond, 100% Payment Bond, 100% Performance Bond

Mail Original Bid Bond to: US Fish and Wildlife Service, Contracting Attn: Shannon Blackburn 300 Westgate Center Drive Hadley, MA 01035

Email Offer and Copy of Bid Bond to: mark_tapp@fws.gov

For Further Information:

Solicitation Contact:

Mark Tapp, mark_tapp@fws.gov will be your main point of contact for this solicitation.

Any and all questions should be submitted via email only; no verbal questions will be accepted.

Please be sure to include the solicitation number in your email proposal and in the subject line of any email submitted. (Example: 140F0821R0011 – Crab Orchard – Proposal/Question) http://www.sam.gov/

The cut off for submitting questions and inquiries to this solicitation is 7 calendar days prior to the proposal response due date. Nothing in this solicitation is changed unless an amendment is posted in www.SAM.gov as an amendment prior your submission of your proposal.

http://www.beta.sam.gov/

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

0040529744

U.S. FISH AND WILDLIFE SERVICE

2800 COTTAGE WAY

SACRAMENTO CA 95825

F08

Mark Tapp 4046794012

1x 08/03/2021

140F0821R0011

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

This opportunity is only available to Small Businesses. The U.S. Fish & Wildlife

Service has a requirement for the construction of a new Visitor Center Addition at Crab Orchard National Wildlife Refuge, Marion, IL (Williamson County). This requirement is being procured in accordance with FAR Part 15, Contracting by

Negotiation. This will be a Firm Fixed Priced Contract.

The Solicitation is posted to https://.sam.gov/ under Contract Opportunities.

Interested contractors must be registered in SAM (System for Award Management, www.sam.gov) and complete Online Representations and Certifications.

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

15 395 calendar days and complete it within ________________ ________________ calendar days after receiving

09/03/2021

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

U.S. FISH AND WILDLIFE SERVICE

2800 COTTAGE WAY

SACRAMENTO CA 95825

F08

Mark Tapp

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 47

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

140F0821R0011

Delivery: 10/30/2022

Delivery Location Code: 0008349589

FWS CRAB ORCHARD NWR

8588 ROUTE 148

MARION IL 62959-5822 US

00010 Visitor Center Addition

Period of Performance: 10/01/2021 to 10/30/2022

The NAICS code is 236220 - Commercial and

Institutional Building Construction and the size standard is $39.5 million. The project magnitude will be between $1,000,000.00 and $5,000,000.00.

The work will commence within 15 days of Notice to Proceed and be completed within 395 days.

Bonding Requirements: 20% Bid Bond, 100% Payment

Bond, 100% Performance Bond

Direct questions in writing to Mark Tapp, mark_tapp@fws.gov

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

140F0821R0011 – Construction of a Visitor Center Addition at Crab Orchard NWR

1 | P a g e

Solicitation 140F0821R0011 Project for the construction of a Visitor Center Addition at Crab Orchard National

Wildlife Refuge in Marion, IL (Williamson County)

Table of Contents

Section Title Page B Services/Price Schedule 2 C Description/Specifications 2 D Packaging and Marking 2 E Inspection and Acceptance 2 F Deliveries of Performance 2 G Contract Administration Data 3 H Special Contract Requirements 6 I Contract Clauses 15 J List of Attachments 33 K Representations and Certifications 33 L Instructions to Offerors 41 M Evaluation Factors 46

2 | P a g e

SECTION B – SERVICES/PRICE SCHEDULE

B.1 BRIEF DESCRIPTION OF SERVICES

The Crab Orchard National Wildlife Refuge is planning construction of a new Visitors Center Addition in the general location of the existing Refuge Headquarters in Williamson County, Illinois.

B.2 TYPE OF CONTRACT

The contract type awarded will be a firm fixed price contract.

B.3 PRICE SCHEDULE

See attachment.

(End of Section B)

SECTION C – DESCRIPTION/SPECIFICATIONS

The Contractor shall furnish all labor, materials, equipment, and supervision required for the location described in the Contract as shown in the contract drawings and specifications.

(End of Section C)

SECTION D – PACKAGING AND MARKING

D.1 PAYMENT OF POSTAGE AND FEES

All postage and fees related to submitting information forms, reports, etc., to the CO or the COR shall be paid by the contractor.

D.2 MARKING

All information submitted to the Contracting Officer or the Contracting Officer's Representative shall clearly indicate the Contract Number of the contract for which the information is being submitted.

(End of Section D)

SECTION E--INSPECTION AND ACCEPTANCE

CLAUSES

52.246-12 Inspection of Construction (AUG 1996) 52.246-13 Inspection-Dismantling, Demolition, or Removal of Improvements (AUG 1996) 52.246-21 Warranty of Construction. (MAR 1994)

(End of Section E)

SECTION F--DELIVERIES OR PERFORMANCE

52.242-14 Suspension of Work (APR 1984)

52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984) The Contractor shall be required to

(a) commence work under this contract within ten (10) calendar days after the date the Contractor receives the notice to proceed, 3 | P a g e

(b) prosecute the work diligently, and

(c) complete the entire work ready for use not later than (number of calendar days specified for each Contract requirement). The time stated for completion shall include final cleanup of the premises.

(End of Clause)

(End of Section F)

SECTION G – CONTRACT ADMINISTRATION DATA

G.1 CONTRACTING STAFF

Contracting Officer Mark Tapp Contracting Officer, Construction/A&E Operations Joint Administrative Operations | U.S. Fish & Wildlife Service mark_tapp@fws.gov | office (404) 679-4021

All communications pertaining to contractual and/or administrative matters under this contract shall be sent to:

Contract Specialist Mark Tapp Contracting Specialist, Construction/A&E Operations Joint Administrative Operations| U.S. Fish & Wildlife Service mark_tapp@fws.gov | office (404)679-4012

Contracting Officer's Representative Name:

Daniel Richardson Civil Engineer daniel_richardson@fws.gov | 612-713-5270

G.2 CONTRACTING OFFICER'S REPRESENTATIVE DEFINITION

The “Contracting Officer’s Representative (COR)” is the on-the-ground representative for the Contracting Officer that monitors and enforces the terms and conditions of the contract.

G.3 PROJECT INSPECTOR DEFINITION

“Project Inspector” is the designated Government personnel that performs the on-the-job Government inspection of work accomplished by the Contractor.

G.4 RESPONSIBILITIES OF THE CONTRACTING OFFICER'S REPRESENTATIVE AND

PROJECT INSPECTOR

G.4.1 The COR’s authorities and responsibilities are defined in the COR’s Designation Letter. The COR is authorized to clarify technical requirements, and to review and approve work which is clearly within the scope of work. The COR is NOT authorized to issue changes or modify the scope of work in any way.

G.4.2 The Project Inspector is responsible for verifying the Contractor’s compliance with the technical specifications, drawings, work schedule, and labor provisions at the site of the work.

G.5 1452.201-70 AUTHORITIES AND DELEGATIONS (SEPT 2011)

mailto:Ryan_boisvert@fws.gov mailto:Justine_pasiecnik@fws.gov mailto:daniel_richardson@fws.gov

4 | P a g e

(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.

(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award.

The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor.

Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.

(c) The COR is not authorized to perform, formally or informally, any of the following actions:

(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;

(2) Waive or agree to modification of the delivery schedule;

(3) Make any final decision on any contract matter subject to the Disputes Clause;

(4) Terminate, for any reason, the Contractor's right to proceed;

(5) Obligate in any way, the payment of money by the Government.

(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum.

The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.

(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph

(d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.

(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.

(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within their or her appointment, shall be at the Contractor's risk.

G.6 CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM

(a) For each construction contracts of $750,000 or more, and for each construct terminated for default regardless of the contract value, the U.S. Fish and Wildlife Service (FWS) will submit an electronic record of contractor performance on this contract in the Contract Performance Assessment Reporting System (CPARS) at https://www.cpars.gov/. The FWS has implemented the Contractor Performance Assessment Reporting System (CPARS) to submit performance evaluations. One or more past performance evaluations will be conducted on this contract in order to record contractor performance.

5 | P a g e

(b) The past performance evaluation process is a paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the CPARS for Government use in evaluating past performance as part of a source selection action.

(c) The Contractor (you) must furnish the Contracting Officer with the name, position title, phone number, and email address for each person designated to have access to past performance evaluation(s) for this contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the FWS Assessing Official. The report information must at all times be protected as source selection sensitive information not releasable to the public.

(d) When your Contractor Representative(s) (Past Performance Points of Contact) are registered in CPARS, they will receive an automatically-generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at http://www.cpars.gov.

The CPARS User Manual, registration for On Line Training for Contractor Representatives, and a practice application may also be found at this site.

(e) Within 60 days after the end of a performance period, the FWS Assessing Official (AO) for the contract will complete an interim or final past performance evaluation, and the report will be accessible at http://www.cpars.gov. Contractor Representatives may then provide comments in response to the evaluation, or return the evaluation without comment. Comments are limited to the space provided in CPARS and your comments must focus on objective facts in the AO's rating, narrative and your performance of the contract. In addition to the ratings and supporting narratives, review the accuracy of all information in the evaluation, as it includes key fields that will be used by the Government to identify the Contractor in future source selection actions. If you elect not to provide comments, acknowledge receipt of the evaluation by indicating "No comment" in Block 22 along with signing and dating Block 23 of the form. Without a statement in Block 22, you will be unable to sign and submit the evaluation back to the Government. If you do not sign and submit the CPAR within 30 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment." Your response is due within 30 calendar days after receipt of the CPARS.

(f) The following guidelines apply concerning your use of the past performance evaluation:

(1) Protect the evaluation as "source selection information." After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason the form cannot be viewed and/or submitted through CPARS, contact the AO for instructions.

(2) Strictly control access to the evaluation within your organization, and ensure the evaluation is never released to persons or entities outside of their control.

(3) Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.

(g) If you wish to discuss a past performance evaluation, send a request in writing to the AO no later than seven days following the date the FWS submits an evaluation to CPARS.

(h) If the parties cannot resolve any disagreement in the content of the past performance evaluation, the original evaluation as well as your comments will be referred to the Reviewing Official (RO). The RO will make a final determination on the performance evaluation.

6 | P a g e

(i) The completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting future source selection actions after it has been finalized.

(End of clause)

(End of Section G)

SECTION H – SPECIAL CONTRACT REQUIREMENTS

H.1 PROJECT MANAGEMENT

The Contractor shall have a competent Project Manager on-site for this contract, to supervise all phases of the contract, for the duration of on-site performance and until final inspection and acceptance of the work.

The Project Manager shall have the authority to act for the Contractor and their name shall be submitted in writing to the Contracting Officer. The Contractor shall be responsible for the actions of the Project Manager who is acting on their behalf. Notification of deficiencies and problems, made to the Project Manager by the Government, shall effectively be notice to the Contractor of those deficiencies and problems.

H.2 SPECIAL CONTRACT REQUIREMENTS

H.2.2 Rights of Entry The Contractor shall obtain all necessary permission and permits to enter private property to make ground surveys, establish reference points, and 'set' monuments. The Contractor shall assume responsibility for damage to property as a result of its actions in performing work under this contract.

H.2.3 Damages

a. The Contractor shall assume all risks of injury to persons or property in connection with the performance of work under this contract and shall indemnify and save harmless the Government against all claims, causes of action, cost and expense, because of bodily injuries or death or damages to property arising from work activities of the Contractor.

b. The Contractor shall not cut, remove, or knock down fences or leave any gate open without specific permission of the land owner or person in charge of the property.

c. The Contractor shall not use any materials which are poisonous or hazardous to animals.

d. The Contractor shall exercise extreme care so as to prevent the start or spread of fire and to prevent any damage to property. The Contractor shall leave the property as undisturbed as possible prior to departure.

H.2.4 Accident Prevention

a. The Contractor shall, at all times, exercise reasonable precautions and provide for protecting the lives and health of employees and other persons in the performance of work under this contract. Specifically, the Contractor shall comply with all applicable provisions of federal, state, local, safety, health, and sanitation laws, codes and regulations.

b. The Contractor shall maintain an accurate record of and shall report to the Contracting Officer in the manner and on forms prescribed by the Contracting Officer, all causes of death, occupational diseases, traumatic injuries, lost-time accidents, or damage to property arising out of or in the course of employment incidental to performance of the work under this contract.

H.2.5 Clean-Up

7 | P a g e

a. Except for monuments, witness posts and reference posts established by the Contractor, in accordance with the provisions of the contract, the Contractor shall remove all flags, markers, paneling, targets, stakes, rubbish, unused material, and any other materials belonging to the Contractor or used under the Contractor's direction during the performance of work under this Contract.

b. In the event the Contractor does not remove all materials and in terms discussed above, the Government may remove those items at the expense of the Contractor. Any monies due the Contractor may be offset by reasonable charges for this removal. If sureties are involved, they may also be liable for the costs for this removal effort.

H.2.6 Meetings and Progress Reports

a. During the execution of field operations under this contract, the Contractor shall meet periodically with the Contracting Officer or the COR at the site at mutually agreed times. The purpose of the meetings is to obtain information on the progress of the field work.

b. The Contractor shall submit a monthly report summarizing work completed operations in progress, and schedule of future activities. The reports shall discuss both field activities and office activities, and shall be submitted within two working days after the end of the reporting period.

c. Progress reports will be submitted by the COR and/or Project Leaders on an as needed basis.

H.2.7 Special Instructions

a. Accuracy - The Contractor's attention is directed to the fact that the precision, accuracy, and completeness of the work called for by this contract is essential. The detailed requirements of the contract will be rigidly interpreted and applied in determining the acceptability of the field work accomplished, monuments 'set' and referenced, and data delivered.

b. Performance of Work by the Government - Nothing in this contract shall be construed or interpreted to prohibit or restrict the Government's right to have Government employees perform work of the type covered by this contract.

H.3 WORK HOURS

Contractor shall schedule work hours around the time the refuge is open. (8AM PST – 5PM PST).

H.4 DRAWINGS

H.4.1 Typical Drawings Any drawings titled typical are general only and dimensions of each structure will be fixed by the Contracting Officer to adapt the design to existing conditions at the structure location.

H.4.2 Reduced Size Drawings Drawings appearing in Contract packages may be photographically reduced in size. Accordingly, measurements and dimensions should not be taken or be based on any numerical scales shown. To review full-size drawings, contact the Contracting Officer.

H.5 PRESERVATION OF HISTORICAL AND ARCHEOLOGICAL DATA

H.5.1 Public Law 93-291, May 24, 1974, provides for the preservation of scientific, prehistorical, and archeological data (including relics and specimens) which might otherwise be lost due to alteration of the terrain as a result of any Federal construction project.

8 | P a g e

H.5.2 The Contractor agrees that should any contractor employee, in the performance of this contract, discover evidence of possible scientific, prehistorical, historical, or archeological data the contractor will notify the Contracting Officer immediately in writing giving the location and nature of the findings.

H.5.3 Where appropriate by reason of discovery, the Contracting Officer may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted in accordance with the applicable clauses in the Contract Clauses Section of this contract.

H.5.4 The Contractor agrees to insert this requirement in all subcontracts which involve the performance of work on the terrain of the site.

H.6 CONTRACTOR PERSONNEL SECURITY AND SUITABILITY REQUIREMENTS

H.6.1 At least two weeks before start of contract performance, the Contractor must identify all contractor and subcontractor personnel who will require [physical and/or logical] access for performance of work under this contract. Physical Access means routine, unescorted or unmonitored access to non-public areas of a federally controlled facility. Logical Access means routine, unsupervised access to a Level 3 or 4 Federally controlled information system. The Contractor must make their personnel available at the place and time specified by the COR or DOI Access Card Sponsor in order to initiate screening and background investigations. The following forms and inquiries, or their equivalent, will be used to initiate the credentialing process:

- OPM Standard Form 85 or 85P

- OF 306

- National Criminal History Check (NCHC) (local procedures may require the fingerprinting to be done at a police station; in that case, any charges are to be borne by the contractor)

- Release to Obtain Credit Information

- PIV card application (web-based)

H.6.2 Contractor employees must give, and authorize others to give, full, frank, and truthful answers to relevant and material questions needed to reach a suitability determination. Refusal or failure to furnish or authorize provision of information may constitute grounds for denial or revocation of credentials.

Government personnel may contact the contractor personnel being screened or investigated in person, by telephone or in writing, and the contractor must ensure they are available for such contact. Alternatively, if an individual has already been credentialed by another agency through OPM, and that credential has not yet expired, further investigation may not be necessary. In that case, the contactor must provide the COR with documentation that supports the individual’s credentialed status.

H.6.3 Contractor employees who have been successfully adjudicated will be issued DOI Access Cards, which must be activated as a USAccess Credentialing Center. Those contractor employees not located within a reasonable travel time of a USAccess Credentialing Center will be screened and issued alternate credentials, such as temporary access badges.

H.6.4 During performance of the contract, the Contractor must keep the COR apprised of changes in personnel to ensure that performance is not delayed by compliance with credentialing processes. Cards that have been lost, damaged, or stolen must be reported to the COR and Issuing Office within 24 hours.

If reissuance of expired credentials is needed, it must be coordinated through the COR.

At the end of contract performance, or when a contractor employee is no longer working under this contract, the Contractor must ensure that all identification cards are returned to the COR.

9 | P a g e

H.6.5 This requirement must be incorporated into any subcontracts that require subcontractor personnel to have routine unsupervised access to a federally controlled facility for more than 180 calendar days or any unsupervised access to a federally controlled Level 3 or 4 information system.

H.7 PROPOSED KEY PERSONNEL

Unless specifically deleted in writing by the Contracting Officer at time of award, any proposed key personnel, minimum qualifications for incoming or replacement key personnel, subcontractors, processes, procedures or materials are hereby incorporated into the contract resulting from the solicitation, and performance shall be limited to individuals, qualifications, firms, procedures, and materials that were specifically identified in proposals or agreed to in negotiations. The Contractor shall obtain the Contracting Officer’s written consent before making any substitutions or changes.

H.8 ENVIRONMENTAL IMPACT

All waste materials generated by any work under the contract performed on a Government installation shall at all times be handled, transported, stored, and disposed of by the contractor and by their subcontractors in accordance with all applicable Federal, state, and local laws, ordinances, regulations, court orders, and other types of rulings having the effect of the law, including, but not limited to Executive Order 12088, 13 October 1978, Federal Compliance with Pollution Control Standards; the Federal Water Pollution Control Act, as amended (33 U.S.C. 1251 ET SEQ); the Clean Air Act as amended (42 U.S.C. Sec 7401 ET SEQ); the Endangered Species Act, as amended (16 U.S.C. Sec 1531, ET SEQ); the Toxic Substances Control Act, as amended (15 U.S.C. Sec 2601, ET SEQ); the National Historic Preservation Act, as amended (16 U.S.C. Sec 470, ET SEQ); the Solid Waste Disposal Act, as amended (42 U.S.C. 6901 ET SEQ); and the Archaeological and Historic Preservation Act, as amended (16 U.S.C. Sec 469, ET SEQ). Should the United States Government be held liable for any neglect or improper actions by the contractor or any subcontractor regarding removal or disposal of any hazardous waste, the contractor shall reimburse the Government for all such liability.

H.9 HAZARDOUS MATERIALS

Any material suspected of being hazardous that is encountered during performance of a project shall immediately be brought to the attention of the Contracting Officer, at which time a determination will be made as to whether hazardous material testing shall be performed. If the Contracting Officer directs the contractor to perform tests, and/or the material is found to be of a hazardous nature requiring additional protective measures, a contract modification may be required, subject to equitable adjustment under the terms of the contract. The contractor is advised that friable and/or non-friable asbestos-containing material may be encountered in project areas. Friable asbestos-containing material is any material that contains more than one percent asbestos by weight, and that hand pressure can crumble, pulverize or reduce to powder when dry. Non-friable asbestos containing materials are materials in which asbestos fibers are bound by a matrix material, saturation, impregnation or coating. Non-friable asbestos-containing materials do not normally release airborne asbestos fiber during routine handling and end-use.

However, excessive fiber concentrations may be produced during uncontrolled abrading, sanding, drilling, cutting, machining, removal, demolition, or other similar activities. 29 CFR 1910.1001 shall be referenced in the event asbestos-containing materials are encountered. Friable asbestos-containing materials are not authorized for use in new construction or maintenance projects.

H.10 GREEN PROCUREMENT REQUIREMENTS

In the performance of this service or construction contract, the Contractor shall make maximum use of products identified on the mandatory environmental purchasing list at the following links, if applicable:

10 | P a g e

• U.S. EPA Comprehensive Procurement Guidelines published at www.epa.gov/cpg/products.htm.

• USDA Biobased product listings published at www.biopreferred.gov.

• Energy Star® product listings published at www.energystar.gov/products.

• FEMP Low Standby Power product listings published at http://energy.gov/eere/femp/covered-product- categories

Contractor shall comply with all reporting requirements stated in the applicable clause(s):

• 52.223-1 Biobased Product Certification

• 52.223-2 Affirmative Procurement of Biobased Products under Service and

Construction Contracts

• 52.223-4 Recovered Material Certification

• 52.223-9 Estimate of Percentage of Recovered Material Content for EPA

Designated Items

• 52.223-15 Energy Efficiency in Energy Consuming Products

• 52.223-17 Affirmative Procurement of EPA Designated Items in Service and

Construction Contracts

H.11 UNAUTHORIZED PERSONNEL

The contractor shall inform all personnel working under their jurisdiction (including subcontractor and visiting supplier personnel) that access to areas outside of the immediate work area; excluding direct haul and access routes, contracting and Civil Engineering offices and points of supply and storage; is prohibited. Circulation of said personnel will be limited to official business only. Persons in violation of the above will be apprehended and appropriately disciplined.

H.12 WAGE RATES

Applicable wage determination in accordance with the Davis Bacon Act and/or the Service Contract Act shall apply and will be included when required. Please review award document for the applicable wage rates and have them posted on the job site at all times.

H.13 INDEMNIFICATION

The contractor is an 'independent contractor' and shall obtain all necessary insurance to protect themself from liability arising out of this contract. The contractor hereby agrees to indemnify and hold the Government harmless in connection with, any loss or liability from damage to or destruction of property or from injuries to or death of persons (including the agents and employees of both parties) if such damage, destruction, injury or death arises out of, or is caused by performance of work under this contract, unless such damage, destruction, injury or death is caused solely by the negligence of the Government, its agents or employees. The contractor agrees to include this clause, appropriately modified, in all subcontracts to be performed under this contract.

(End of Section H)

SECTION I--CONTRACT CLAUSES

I.1 IBR Clause

52.252-2 Clauses Incorporated by Reference (FEB 1998) http://www.epa.gov/cpg/products.htm http://www.biopreferred.gov/ http://www.energystar.gov/products http://energy.gov/eere/femp/covered-product-categories http://energy.gov/eere/femp/covered-product-categories

11 | P a g e

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

Federal Acquisition Regulation (FAR) Clauses: https://www.acquisition.gov/browse/index/far (FAR clauses begin with 52) Department of Interior Acquisition Regulation (DIAR) Clauses: https://www.acquisition.gov/diar

I.2 Clauses Incorporated by Reference 52.202-1 Definitions (JUN 2020) 52.203-3 Gratuities (APR 1984) 52.203-5 Covenant against Contingent Fees (MAY 2014) 52.203-6 Restrictions on Subcontractor Sales to the Government (JUN 2020) 52.203-7 Anti-Kickback Procedures (JUN 2020) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (MAY

2014) 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (MAY 2014) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions (JUN 2020) 52.203-13 Contractor Code of Business Ethics and Conduct (JUN 2020) 52.203-14 Display of Hotline Poster(s) (JUN 2020) 52.203-17 Contractor Employee Whistleblower Rights & Requirements to Inform Employees of

Whistleblower Rights (JUN 2020) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements

(JAN 2017)

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (MAY 2011) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) 52.204-13 System for Award Management Maintenance (OCT 2018) 52.204-14 Service Contract Reporting Requirements (OCT 2016) 52.204-18 Commercial and Government Entity Code Maintenance (AUG 2020) 52.204-19 Incorporation by Reference of Representations and Certifications (DEC 2014) 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or

Provided by Kaspersky Lab and Other Covered Entities (JUL 2018) 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance

Services or Equipment (AUG 2020) 52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (JUN 2020) 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (OCT

2018) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015) 52.210-1 Market Research (JUN 2020) 52.215-2 Audit and Records -- Negotiation (JUN 2020) 52.215-8 Order of Precedence—Uniform Contract Format (OCT 1997)

52.219-6 Notice of Total Small Business Set-Aside (NOV 2020) 52.219-8 Utilization of Small Business Concerns (OCT 2018) 52.219-28 Post Award Small Business Program Rerepresentation (NOV 2020) 52.222-3 Convict Labor (JUN 2003) 52.222-4 Contract Work Hours and Safety Standards -- Overtime Compensation (MAY 2018) 52.222-6 Construction Wage Rate Requirement (AUG 2018) https://www.acquisition.gov/browse/index/far https://www.acquisition.gov/diar

12 | P a g e

52.222-7 Withholding of Funds (MAY 2014) 52.222-8 Payrolls and Basic Records (AUG 2018) 52.222-9 Apprentices and Trainees (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-12 Contract Termination - Debarment (MAY 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations

(MAY 2014)

52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (MAY 2014) 52.222-21 Prohibition of Segregated Facilities (APR 2015) 52.222-26 Equal Opportunity (APR 2016) 52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015)

52.222-35 Equal Opportunity for Veterans (JUN 2020) 52.222-36 Equal Opportunity for Workers with Disabilities (JUN 2020) 52.222-37 Employment Reports on Veterans (JUN 2020) 52.222-40 Notification of Employee Rights Under National Labor Relations Act (DEC 2010) 52.222-50 Combating Trafficking in Persons (OCT 2020) 52.222-54 Employment Eligibility Verification (OCT 2015) 52.222-55 Minimum Wages under Executive Order 13658 (NOV 2020) 52.222-62 Paid Sick Leave under Executive Order 13706 (JAN 2017) 52.223-2 Affirmative Procurement of Biobased Products under Service and Construction

Contracts (SEP 2013) 52.223-3 Hazardous Material Identification and Material Safety Data Alt 1 (FEB 2021) 52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011) 52.223-6 Drug-Free Workplace (MAY 2001) 52.223-11 Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons

(Jun 2016) 52.223-12 Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air

Conditioners (JUN 2016) 52.223-15 Energy Efficiency in Energy Consuming Products (MAY 2020) 52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction

Contracts (AUG 2018) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN 2020) 52.223-20 Aerosols (JUN 2016) 52.223-21 Foams. (JUN 2016) 52.225-13 Restrictions on Certain Foreign Purchases (FEB 2021) 52.227-1 Authorization and Consent (JUN 2020) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (JUN 2020) 52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007) 52.228-2 Additional Bond Security (OCT 1997) 52.228-5 Insurance – Work on a Government Installation (JAN 1997) 52.228-12 Prospective Subcontractor Requests for Bonds (MAY 2014) 52.228-14 Irrevocable Letter of Credit (NOV 2014) 52.229-3 Federal, State, and Local Taxes (FEB 2013) 52.232-5 Payments under Fixed-Price Construction Contracts (MAY 2014) 52.232-16 Progress Payments (JUN 2020) 52.232-17 Interest (MAY 2014)

13 | P a g e

52.232-23 Assignment of Claims (MAY 2014) 52.232-27 Prompt Payment for Construction Contracts (JAN 2017) 52.232-33 Payment by Electronic Funds Transfer – System for Award Management (OCT 2018) 52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013) 52.233-1 Disputes (MAY 2014) Alt 1 (DEC 1991) 52.233-3 Protest after Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.236-2 Differing Site Conditions (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-5 Material and Workmanship (APR 1984) 52.236-6 Superintendence by the Contractor (APR 1984) 52.236-7 Permits and Responsibilities (NOV 1991) 52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements

(APR 1984)

52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984) 52.236-13 Accident Prevention (NOV 1991)

Alternate I (NOV 1991) 52.236-14 Availability and Use of Utility Services (APR 1984) 52.236-15 Schedules for Construction Contracts (APR 1984) 52.236-17 Layout of Work (APR 1984) 52.236-21 Specifications and Drawings for Construction (FEB 1997)

Alternate I (APR 1984) Alternate II (APR 1984)

52.236-26 Preconstruction Conference (FEB 1995) 52.242-13 Bankruptcy (JUL 1995) 52.242-14 Suspension of Work (APR 1984) 52.243-4 Changes (JUN 2007) 52.244-2 Subcontracts (JUN 2020) 52.244-6 Subcontracts for Commercial Items (NOV 2020) (DEVIATION APR 2020) 52.245-1 Government Property (JAN 2017) - Alt 1 (APR 2012) 52.245-9 Use and Charges (APR 2012) 52.246-21 Warranty of Construction (MAR 1994) 52.248-3 Value Engineering – Construction (OCT 2020) 52.249-2 Termination for Convenience of the Government (Fixed-Price) (APR 2012)--Alternate

I (SEP 1996)

52.249-3 Termination for Convenience of the Government (Dismantling, Demolition, or

Removal of Improvements) (APR 2012) 52.249-10 Default (Fixed-Price Construction) (APR 1984)

Alternate I (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991)

I.3 Clauses incorporated by Full Text

52.225-9 – BUY AMERICAN–CONSTRUCTION MATERIALS (MAY 2014)

14 | P a g e

(a) Definitions. As used in this clause--

“Commercially available off-the-shelf (COTS) item”—

(1) Means any item of supply (including construction material) that is—

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

“Component” means an article, material, or supply incorporated directly into a construction material.

“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

“Cost of components” means--

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued);

or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

“Domestic construction material” means—

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if—

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of

15 | P a g e the same class or kind for which non-availability determinations have been made are treated as domestic; or (ii) The construction material is a COTS item.

“Foreign construction material” means a construction material other than a domestic construction material.

“United States” means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements the 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows: none

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American statute.

(1)

(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

16 | P a g e

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .