This addendum modifies drawings and specifications for the construction of a visitor center addition to the Crab Orchard National Wildlife Refuge in Illinois. Key changes to the drawings include revising door and frame details to hollow metal, adding an outdoor classroom panelboard fed from Panel B, and showing the outdoor classroom in the one line diagram. Specification revisions clarify conduit requirements for electric vehicle chargers and add panel schedules. The related solicitation is for the construction project and is issued by the U.S. Fish and Wildlife Service with number 140F0821R0011 and an estimated value over $25,000.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
!"#$%&'()($*(+"(,-.$/01"2,#1,+3$4516
*78$978:$;#<&.5$/=#5$>#?(0'&0@3$*2+1.5+25$ABC8DEDC8:
,#)F$D7D6B::67CBG$$H$$$$I(JF$D7D6B::6DGAK$$$H$$$LLL6,-L(61.M
/NNO9NP;$QC8
/&@&+,$D:3$DCD8
R*S$T0.U#1,$Q$D8EVRECCK
!%*/$T0.U#1,$Q$8GWD8D6C7
>0('$X01"(0?$9*V$E$Y2+2,.0$>#5,#0
WAWW$4ZE8KW
;/V4X93$4Z$7DGAG
R0.MF$ !"#$%&'()($*(+"(,-.$/01"2,#1,+3$4516
$ *78978:$;#<&.5$/=#5&#
$ >#?(0'&0@3$*2+1.5+25$ABC8D
!.F$ /))$[2??#0+
1. !"#$I.)).L25@$/??#5?&M$+"())$'#1.M#$($\(0,$.I$,"#$1.5,0(1,$?.1&M#5,+$(5?$M.?2I2#+$,"#$ .02@25()$'2??25@$?.1&M#5,+$?(,#?$]&5#3$DCD8$(+$5.,#?$'#).L6$$/1-5.L)#?@#$0#1#2\,$.I$ ,"2+$(??#5?&M$.5$,"#$[2?$R.0M6$$R(2)&0#$,.$?.$+.$M(^$+&'U#1,$'2??#0$,.$?2+<&()2I21(,2.56$$
2. !"#$I.)).L25@$2,#M+$(0#$($\(0,$.I$,"2+$(??#5?&M_$,"#0#I.0#3$\(0,$.I$,"#$I25()$1.5,0(1,F
`POS!4X9$>Z/V4R4>/!4X9SF
1) Question: The drawing shows a covered outside patio area. Is this area required to be protected with automatic sprinklers? If so, it will need to be a dry pipe type system. We would then need a room or area to house the control valve, dry pipe valve, air compressor, etc. This would need to be in a heat-ed area.
Response: The covered patio area is required to be sprinklered as the wood ceiling is combustible and the width exceeds 4 feet.
2) Sheet A6.0 (25 of 71) shows the wall types A & B as 8” metal stud walls. However on sheet S4.1 the structural wall details show 6” metal studs. What is the required stud thickness for wall types A & B?
Response: The required stud width for wall types A and B is 8 inches.
3) For Evaluation Factor #1 is the GC Experience Summary for each project the same as the items 1-8 for the project information? What needs to be included in the GC Experience Summary?
Response:
4) Is white oak veneer acceptable in lieu of the black locust veneer at millwork?
Response: White oak is not an acceptable substitute for black locust as we are matching existing construction.
5) Question: There are two OA wall louvers shown on detail 4/19 West Elevation and noted on the me-chanical drawings - M26 aConnect OA duct to architectural louver”. The intent is for these louvers to match the louvers used on the Headquarters building.
$ V#+\.5+#F$Z.&=#0+$E$P52,#?$O5#0,#1"$;.?#)$RZENEK3$B7b$J$B7b3$%^5(0$ACC$I252+"3$>.).52()$V#?3$$ $ $ 25+#1,$+10##53$L#)?#?$1.5+,0&1,2.53$C68DAb$1.5+,0&1,2.53$+##$(,,(1"#?$\0.?&1,$$ $ $ $ $ ?(,($+"##,6
,#)F$D7D6B::67CBG$$H$$$$I(JF$D7D6B::6DGAK$$$H$$$LLL6,-L(61.M
/NNO9NP;$QC8
>c/9dOS$!X$!cO$TVX]O>!$;/9P/ZF
2) S\#1$S#1,2.5$CCEC8E8C$!/[ZO$XR$>X9!O9!S
• /??$S#1,2.5$D:EK8ECC$/PN4X$Y4SP/Z$SeS!O;fffffffffffffffA
• /??$S#1,2.5$BDE8:EDB$T/YO;O9!$;/V%49dSfffffffffffffff6D
3) S\#1$S#1,2.5$D:EK8ECC$/PN4X$Y4SP/Z$SeS!O;
• V#\)(1#$#J2+,25@$+#1,2.5$L2,"$0#=2+#?$+#1,2.53$g(,,(1"#?h6$/??#?$/Y$V(1-$E$+&'E+#1,2.5$ D6C76
>c/9dOS$!X$!cO$NV/*49dSF
4) S"##,$K$g>868h
• S2,#$T0#\(0(,2.5$i$V#M.=()+$T)(5Fj$T0.=2?#$(5?$25+,())$(??2,2.5()$#0.+2.5$1.5,0.)$')(5-#,$ ().5@$5.0,"$(5?$L#+,$+2?#+$.I$#J2+,25@$\(0-25@$).,$(5?$?02=#$(+$25?21(,#?$.5$0#E2++&#?$+"##,6
5) S"##,$A$g>86Dh
• Y2+2,.0$>#5,#0$Z(^.&,$i$d0(?25@$T)(5Fj$V#I#0$,.$N#,(2)$:kA3$>.510#,#$>.))(0_$>)(02I21(,2.5$\0.E =2?#?$0#@(0?25@$+\#12I21(,2.5+$I.0$\0.=2+2.5$(5?$25+,())(,2.5$.I$V>T$\2\#6$
6) S"##,$7$g>86Bh
• Y2+2,.0$>#5,#0$d0(?25@$i$S##?25@$T)(5+Fj$V#=2+#?$5.,#$(,$?#,(2)$8$0#(?25@$aR&,&0#$KClJ:Cl$ T(=2)2.5b$,.$0#(?$aX&,?..0$>)(++0..M$E$S##$S\#16$S#1,2.5$8BEBKE8G$[2?$/??2,2=#$DE8b
6) S"##,$W$g>86Ah
• /??#?$+"##,$5&M'#0$gScOO!$W$.I$:8h6$
7) S"##,$G$g>867h
• /??#?$+"##,$5&M'#0$gScOO!$G$.I$:8h6
8) S"##,$8A$g/86Ch
• V#=2+#?$N..0$8KB6D$I0.M$()&M25&M$?..0$(5?$I0(M#$,.$".)).L$M#,()$?..0$(5?$I0(M#6
9) S"##,$8G$g/B6Ch
• N#,(2)$Kk8G$*#+,$O)#=(,2.5F$V#=2+#?$N..0$8KB6D$I0.M$()&M25&M$?..0$(5?$I0(M#$,.$".)).L$ M#,()$?..0$(5?$I0(M#6
10) S"##,$BD$g/W6Ch
• N..0$S1"#?&)#F$V#=2+#?$N..0$8KB6D$I0.M$()&M25&M$?..0$(5?$I0(M#$,.$".)).L$M#,()$?..0$(5?$ I0(M#6
• R0(M#$!^\#+F$/??#?$R0(M#$!^\#$8/$g(\\)21(')#$,.$?..0$8KB6Dh6
11) S"##,$AB$g;86Dh
• /??$-#^$5.,#$;B86
12) S"##,$A:$g;768h
• /??$1#2)25@$I(5$+1"#?&)#6
13) S"##,$7K$gOD68h
• Revise end point of conduits for EV chargers to end at designated stall.
• Revise Keynote 55 to clarify conduit requirements.
• Add keynote E59 for panelboard in Outdoor Classroom.
14) S"##,$7W$gOK6Dh
• Add breaker in Panel B to feed Outdoor Classroom.
• Add Outdoor Classroom Panel Schedule.
,#)F$D7D6B::67CBG$$H$$$$I(JF$D7D6B::6DGAK$$$H$$$LLL6,-L(61.M
/NNO9NP;$QC8
15) S"##,$7G$gOA6Ch
• Add Outdoor Classroom Panel in one line diagram.
• Add keynote 5 for feeder size.
16) S"##,$:8$gO768h
• Add detail for Pedestal Mounted Equipment.
O9N$XR$/NNO9NP;$QC8
| QUESTION CLARIFICATIONS: |
| CHANGES TO THE PROJECT MANUAL: |
| CHANGES TO THE DRAWINGS: |