This addendum modifies drawings and specifications for the construction of a visitor center addition to the Crab Orchard National Wildlife Refuge in Illinois. Key changes to the drawings include revising door and frame details to hollow metal, adding an outdoor classroom panelboard fed from Panel B, and showing the outdoor classroom in the one line diagram. Specification revisions clarify conduit requirements for electric vehicle chargers and add panel schedules. The related solicitation is for the construction project and is issued by the U.S. Fish and Wildlife Service with number 140F0821R0011 and an estimated value over $25,000.

View the file

Other files

File Type Posted
Sol_140F0821R0011_Amd_0004.pdf PDF
CRO323E2_ADD01_0004.pdf PDF
CRO309M4_ADD01_0004.pdf PDF
Mechanical_Louver_ADD01_0004.pdf PDF
27_41_00_ADD01_0004.pdf PDF
Crab_Orchard_Outdoor_Classroom_0004.pdf PDF
CRO257C0_ADD01_0004.pdf PDF
CRO316E0_ADD01_0004.pdf PDF
CRO256C0_ADD01_0004.pdf PDF
CRO271A1_ADD01_0004.pdf PDF
CRO260C0_ADD01_0004.pdf PDF
CRO284A4_ADD01_0004.pdf PDF
CRO305M0_ADD01_0004.pdf PDF
CRO258C0_ADD01_0004.pdf PDF
CRO267A0_ADD01_0004.pdf PDF
Transmittal_Addendum_01_0004.pdf PDF
CRO321E2_ADD01_0004.pdf PDF
CRO266U0_ADD01_0004.pdf PDF
CRO320E4_ADD01_0004.pdf PDF
CRO261C0_ADD01_0004.pdf PDF
Sol_140F0821R0011_Amd_0003.pdf PDF
Sol_140F0821R0011_Amd_0002.pdf PDF
140F0821R0011_Q_and_A_-_Responses_2_0002.pdf PDF
140F0821R0011_Q_and_A_-_Responses_0001.pdf PDF
Sol_140F0821R0011_Amd_0001.pdf PDF
CRO1253_rev_40-73.pdf PDF
CRO1253_rev_1-19.pdf PDF
A02_Bid_Schedule_base_bid_with_add_1.pdf PDF
A04_CRO_Spec_101_rev_pdf.pdf PDF
Sol_140F0821R0011.pdf PDF
CRO1253_rev_30-39.pdf PDF
A04_BSD_Metal_Building_Systems.pdf PDF
B03_Wage_Rates.pdf PDF
B08_Past_Performance_Questionnaire.pdf PDF
CRO1253_rev_20-29.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

!"#$%&'()($*(+"(,-.$/01"2,#1,+3$4516

*78$978:$;#<&.5$/=#5&#3$>#?(0'&0@3$*2+1.5+25$ABC8DEDC8:

,#)F$D7D6B::67CBG$$H$$$$I(JF$D7D6B::6DGAK$$$H$$$LLL6,-L(61.M

/NNO9NP;$QC8

/&@&+,$D:3$DCD8

R*S$T0.U#1,$Q$D8EVRECCK

!%*/$T0.U#1,$Q$8GWD8D6C7

>0('$X01"(0?$9*V$E$Y2+2,.0$>#5,#0

WAWW$4ZE8KW

;/V4X93$4Z$7DGAG

R0.MF$ !"#$%&'()($*(+"(,-.$/01"2,#1,+3$4516

$ *78978:$;#<&.5$/=#5&#

$ >#?(0'&0@3$*2+1.5+25$ABC8D

!.F$ /))$[2??#0+

1. !"#$I.)).L25@$/??#5?&M$+"())$'#1.M#$($\(0,$.I$,"#$1.5,0(1,$?.1&M#5,+$(5?$M.?2I2#+$,"#$ .02@25()$'2??25@$?.1&M#5,+$?(,#?$]&5#3$DCD8$(+$5.,#?$'#).L6$$/1-5.L)#?@#$0#1#2\,$.I$ ,"2+$(??#5?&M$.5$,"#$[2?$R.0M6$$R(2)&0#$,.$?.$+.$M(^$+&'U#1,$'2??#0$,.$?2+<&()2I21(,2.56$$

2. !"#$I.)).L25@$2,#M+$(0#$($\(0,$.I$,"2+$(??#5?&M_$,"#0#I.0#3$\(0,$.I$,"#$I25()$1.5,0(1,F

`POS!4X9$>Z/V4R4>/!4X9SF

1) Question: The drawing shows a covered outside patio area. Is this area required to be protected with automatic sprinklers? If so, it will need to be a dry pipe type system. We would then need a room or area to house the control valve, dry pipe valve, air compressor, etc. This would need to be in a heat-ed area.

Response: The covered patio area is required to be sprinklered as the wood ceiling is combustible and the width exceeds 4 feet.

2) Sheet A6.0 (25 of 71) shows the wall types A & B as 8” metal stud walls. However on sheet S4.1 the structural wall details show 6” metal studs. What is the required stud thickness for wall types A & B?

Response: The required stud width for wall types A and B is 8 inches.

3) For Evaluation Factor #1 is the GC Experience Summary for each project the same as the items 1-8 for the project information? What needs to be included in the GC Experience Summary?

Response:

4) Is white oak veneer acceptable in lieu of the black locust veneer at millwork?

Response: White oak is not an acceptable substitute for black locust as we are matching existing construction.

5) Question: There are two OA wall louvers shown on detail 4/19 West Elevation and noted on the me-chanical drawings - M26 aConnect OA duct to architectural louver”. The intent is for these louvers to match the louvers used on the Headquarters building.

$ V#+\.5+#F$Z.&=#0+$E$P52,#?$O5#0,#1"$;.?#)$RZENEK3$B7b$J$B7b3$%^5(0$ACC$I252+"3$>.).52()$V#?3$$ $ $ 25+#1,$+10##53$L#)?#?$1.5+,0&1,2.53$C68DAb$1.5+,0&1,2.53$+##$(,,(1"#?$\0.?&1,$$ $ $ $ $ ?(,($+"##,6

,#)F$D7D6B::67CBG$$H$$$$I(JF$D7D6B::6DGAK$$$H$$$LLL6,-L(61.M

/NNO9NP;$QC8

>c/9dOS$!X$!cO$TVX]O>!$;/9P/ZF

2) S\#1$S#1,2.5$CCEC8E8C$!/[ZO$XR$>X9!O9!S

• /??$S#1,2.5$D:EK8ECC$/PN4X$Y4SP/Z$SeS!O;fffffffffffffffA

• /??$S#1,2.5$BDE8:EDB$T/YO;O9!$;/V%49dSfffffffffffffff6D

3) S\#1$S#1,2.5$D:EK8ECC$/PN4X$Y4SP/Z$SeS!O;

• V#\)(1#$#J2+,25@$+#1,2.5$L2,"$0#=2+#?$+#1,2.53$g(,,(1"#?h6$/??#?$/Y$V(1-$E$+&'E+#1,2.5$ D6C76

>c/9dOS$!X$!cO$NV/*49dSF

4) S"##,$K$g>868h

• S2,#$T0#\(0(,2.5$i$V#M.=()+$T)(5Fj$T0.=2?#$(5?$25+,())$(??2,2.5()$#0.+2.5$1.5,0.)$')(5-#,$ ().5@$5.0,"$(5?$L#+,$+2?#+$.I$#J2+,25@$\(0-25@$).,$(5?$?02=#$(+$25?21(,#?$.5$0#E2++&#?$+"##,6

5) S"##,$A$g>86Dh

• Y2+2,.0$>#5,#0$Z(^.&,$i$d0(?25@$T)(5Fj$V#I#0$,.$N#,(2)$:kA3$>.510#,#$>.))(0_$>)(02I21(,2.5$\0.E =2?#?$0#@(0?25@$+\#12I21(,2.5+$I.0$\0.=2+2.5$(5?$25+,())(,2.5$.I$V>T$\2\#6$

6) S"##,$7$g>86Bh

• Y2+2,.0$>#5,#0$d0(?25@$i$S##?25@$T)(5+Fj$V#=2+#?$5.,#$(,$?#,(2)$8$0#(?25@$aR&,&0#$KClJ:Cl$ T(=2)2.5b$,.$0#(?$aX&,?..0$>)(++0..M$E$S##$S\#16$S#1,2.5$8BEBKE8G$[2?$/??2,2=#$DE8b

6) S"##,$W$g>86Ah

• /??#?$+"##,$5&M'#0$gScOO!$W$.I$:8h6$

7) S"##,$G$g>867h

• /??#?$+"##,$5&M'#0$gScOO!$G$.I$:8h6

8) S"##,$8A$g/86Ch

• V#=2+#?$N..0$8KB6D$I0.M$()&M25&M$?..0$(5?$I0(M#$,.$".)).L$M#,()$?..0$(5?$I0(M#6

9) S"##,$8G$g/B6Ch

• N#,(2)$Kk8G$*#+,$O)#=(,2.5F$V#=2+#?$N..0$8KB6D$I0.M$()&M25&M$?..0$(5?$I0(M#$,.$".)).L$ M#,()$?..0$(5?$I0(M#6

10) S"##,$BD$g/W6Ch

• N..0$S1"#?&)#F$V#=2+#?$N..0$8KB6D$I0.M$()&M25&M$?..0$(5?$I0(M#$,.$".)).L$M#,()$?..0$(5?$ I0(M#6

• R0(M#$!^\#+F$/??#?$R0(M#$!^\#$8/$g(\\)21(')#$,.$?..0$8KB6Dh6

11) S"##,$AB$g;86Dh

• /??$-#^$5.,#$;B86

12) S"##,$A:$g;768h

• /??$1#2)25@$I(5$+1"#?&)#6

13) S"##,$7K$gOD68h

• Revise end point of conduits for EV chargers to end at designated stall.

• Revise Keynote 55 to clarify conduit requirements.

• Add keynote E59 for panelboard in Outdoor Classroom.

14) S"##,$7W$gOK6Dh

• Add breaker in Panel B to feed Outdoor Classroom.

• Add Outdoor Classroom Panel Schedule.

,#)F$D7D6B::67CBG$$H$$$$I(JF$D7D6B::6DGAK$$$H$$$LLL6,-L(61.M

/NNO9NP;$QC8

15) S"##,$7G$gOA6Ch

• Add Outdoor Classroom Panel in one line diagram.

• Add keynote 5 for feeder size.

16) S"##,$:8$gO768h

• Add detail for Pedestal Mounted Equipment.

O9N$XR$/NNO9NP;$QC8

QUESTION CLARIFICATIONS:
CHANGES TO THE PROJECT MANUAL:
CHANGES TO THE DRAWINGS: