140F0821R0011_Q_and_A_-_Responses_2_0002.pdf

PDF 182 KB Posted

Attached to
IL-CRAB ORCHARD NWR-GAOA-VIST CENTER BLD
Solicitation number
140F0821R0011
Issued by

About this file

This document contains responses to questions regarding a solicitation for construction of a visitor center addition at Crab Orchard National Wildlife Refuge. The solicitation seeks a general contractor to provide site superintendent and project manager services onsite at all times in a dual role. The covered patio area must be sprinkler protected. Wall types A and B require 8-inch metal studs. Black locust veneer is required to match existing construction. Sprinkler protection is needed for the exterior patio due to combustible construction. Audiovisual system specifications are included in specification section 27-41-50. Clarification is provided on room wall finishes and a drawing elevation.

View the file

Other files

File Type Posted
Sol_140F0821R0011_Amd_0004.pdf PDF
CRO323E2_ADD01_0004.pdf PDF
CRO309M4_ADD01_0004.pdf PDF
Mechanical_Louver_ADD01_0004.pdf PDF
27_41_00_ADD01_0004.pdf PDF
Crab_Orchard_Outdoor_Classroom_0004.pdf PDF
CRO257C0_ADD01_0004.pdf PDF
CRO316E0_ADD01_0004.pdf PDF
198212_06_ADD01_Narrative_0004.pdf PDF
CRO256C0_ADD01_0004.pdf PDF
CRO271A1_ADD01_0004.pdf PDF
CRO260C0_ADD01_0004.pdf PDF
CRO284A4_ADD01_0004.pdf PDF
CRO305M0_ADD01_0004.pdf PDF
CRO258C0_ADD01_0004.pdf PDF
CRO267A0_ADD01_0004.pdf PDF
Transmittal_Addendum_01_0004.pdf PDF
CRO321E2_ADD01_0004.pdf PDF
CRO266U0_ADD01_0004.pdf PDF
CRO320E4_ADD01_0004.pdf PDF
CRO261C0_ADD01_0004.pdf PDF
Sol_140F0821R0011_Amd_0003.pdf PDF
Sol_140F0821R0011_Amd_0002.pdf PDF
140F0821R0011_Q_and_A_-_Responses_0001.pdf PDF
Sol_140F0821R0011_Amd_0001.pdf PDF
CRO1253_rev_40-73.pdf PDF
CRO1253_rev_1-19.pdf PDF
A02_Bid_Schedule_base_bid_with_add_1.pdf PDF
A04_CRO_Spec_101_rev_pdf.pdf PDF
Sol_140F0821R0011.pdf PDF
CRO1253_rev_30-39.pdf PDF
A04_BSD_Metal_Building_Systems.pdf PDF
B03_Wage_Rates.pdf PDF
B08_Past_Performance_Questionnaire.pdf PDF
CRO1253_rev_20-29.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Crab Orchard NWR Visitor Center Addition Solicitation # 140F0821R0011

Questions and Answers 2

1. Can you confirm that both the superintendent and the Project Manager is to be onsite at all times?

Response: We need a Site Superintendent on site at all times.

2. Can the Project Manager and Superintendent position be a dual hat position?

Response: The Site Superintendent/Project Manager positions can be a dual hat position if that is what you need to do.

3. Can the Superintendent dual hat as the Safety Manager?

Response: The Site Superintendent/Safety Manager can be a dual hat position also.

4. The drawing shows a covered outside patio area. Is this area required to be protected with automatic sprinklers? If so, it will need to be a dry pipe type system. We would then need a room or area to house the control valve, dry pipe valve, air compressor, etc. This would need to be in a heated area.

Response: The covered patio area is required to be sprinklered as the wood ceiling is combustible and the width exceeds 4 feet.

5. Sheet A6.0 (25 of 71) shows the wall types A & B as 8” metal stud walls. However on sheet S4.1 the structural wall details show 6” metal studs. What is the required stud thickness for wall types A & B?

Response: The required stud width for wall types A and B is 8 inches.

6. For Evaluation Factor #1 is the GC Experience Summary for each project the same as the items 1-8 for the project information? What needs to be included in the GC Experience Summary?

Response: The GC Experience Summary for each project shall provide the information from items 1 through 8.

7. For white oak veneer acceptable in lieu of the black locust veneer at millwork?

Response: White oak is not an acceptable substitute for black locust as we are matching existing construction.

8. Reference Sheet 18 of 71 (Reflected Ceiling Plan). The plans indicate the exterior patio to have T&G wood decking. Because this appears to be combustible construction we would be required to provide sprinkler protection for this area. The existing system we are tying into is a wet system and the dimensions of the patio would not make dry sidewall type sprinklers an option.

Please clarify if sprinkler protection is required for this exterior patio, and if so, how is it to be protected from freezing?

Response: Answered previously, required per code.

9. Reference The table of contents includes 27-41-00 Audio/Visual Systems but this was not included in the spec book. Can you confirm that an A/V spec is needed? Also, the spec book included 32-17-23, but was not included in the list in the table of contents.

Response: Included in addendum information from designer.

10. Note 4 on sheet A1.0 (15 of 71) states TV and Bracket by GC, see specifications. There are no specifications on the TV or Bracket. Can this be provided?

Response: Included in spec 27-41-50.

11. Elevation in exhibit 140 on sheet A1.0 has 8 on 30. This shows the elevation in the restroom. I believe this should be elevation 4 on 30

Response: Agree, if we can get in addendum, or can fix with RFI during construction. Simple clarification

12. A9.0 room finish schedule shows WP on the south and west walls of the Janitor room

147. This abbreviation is not called out on the finish plan. What is the WP material?

Response: Wall Protection (WP): Non-PVC, PETG resilient sheets

1. Surface Burning Characteristics: Provide assemblies with flame spread index of 25 or less and smoke developed index of 450 or less, when tested in accordance with ASTM E84.

2. Chemical and Stain Resistance: Provide material that shows resistance to stain when tested in accordance with applicable provisions of ASTM D-543.

3. Fungal and Bacterial Resistance: Provide material that does not support fungal or bacterial growth as tested in accordance with ASTM G-21 and ASTM G 22

4. GREENGUARD Certified: Provide GREENGUARD Certified sheet. Sheet shall meet the requirements of GREENGUARD Certification Standards for LowEmitting Products and GREENGUARD Product Emission Standard for Children & Schools.

5. Color Consistency: Provide components matched in accordance with SAE J-1545 - (Delta E) with a color difference no greater than 1.5 units using CIE Lab, CIE CMC, CIE LCh, Hunter Lab or similar color space scale systems.

6. Sheet Size: 36 by 96 inches

7. Thickness: 0.040 inch

8. Finish: As selected

9. Accessories:

a. Plastic Top Caps, Vertical Divider Bars and Inside Corners: Extruded from chemical and stain resistant non-PVC thermoplastic.

b. Sealant: Silicone type, Color: Match sheet material

c. Adhesive: As recommended by manufacturer.

10. Product:

a. Inpro Corporation; G2 Series Sheets: www.inprocorp.com https://gcc02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.inprocorp.com%2F&data=04%7C01%7Cmark_tapp%40fws.gov%7Ca0aadea9477e4c3d109d08d96bc3e498%7C0693b5ba4b184d7b9341f32f400a5494%7C0%7C0%7C637659311354592314%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=qnb3Tb0MQekvgNwAPEOex%2BpzX7LclNSHQF7x3%2BdHfNA%3D&reserved=0

File details come from the government source that posted it. Updated .