This is a Combined Synopsis/Solicitation for roof replacement construction services issued as RFQ 1305M326Q0358 by the National Weather Service (NWS) Upper Air Observation Station (UAIB) in Cheektowaga, New York. The solicitation is set-aside for small business concerns under NAICS code 238160 with a size standard of $19.0 million. The Government intends to award a firm fixed-price purchase order on an all-or-none basis with Net 30 payment terms to the lowest priced, technically acceptable quoter without discussions. The single contract line item (CLIN 0001) requires construction services to demolish and remove approximately 1,100 square feet of existing flat roofing systems down to the concrete deck and install new EPDM roofing membranes with a minimum 20-year manufacturer warranty. The contractor must provide all supervision, labor, tools, materials, equipment, and incidentals necessary to complete the work.

Quotes must be submitted electronically to Casey.Keating@noaa.gov by 2:30 PM MT/MST on August 6, 2026. Award is anticipated to occur after the quote submission deadline. The period of performance shall not exceed 180 calendar days from issuance of the Notice to Proceed, with initial submittals required within 10 calendar days of award. A payment bond or irrevocable letter of credit will be required unless the quote is under $35,000. The contractor must obtain and submit a Tenant Construction or Alteration Application to the Niagara Frontier Transportation Authority prior to performing work. Davis-Bacon wage requirements apply under General Decision NY20260050, Modification No. 1, and the contract incorporates numerous FAR and Commerce Acquisition Regulation clauses by reference, including provisions related to construction wage rates, Buy American materials requirements, sexual harassment prevention, environmental compliance, and electronic payment submission through the Invoice Processing Platform.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMBINED SYNOPSIS/SOLICITATION

UF UA Observatory Roof Replacement, Buffalo, NY Construction Service

THERE IS NO INCUMBENT; THIS IS A NEW REQUIREMENT.

(i) This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with part 12. This announcement constitutes the only solicitation. Quotes are being requested and a separate written solicitation will not be issued.

Solicitation number 1305M326Q0358 is issued as a request for quotation (RFQ), to complete roof replacement on two of the three remaining roofs at the facility. Work includes demolition and total removal of approximately 1,100 sq ft of an existing flat roofing system down to the concrete deck. Work to be performed at the National Weather Service (NWS) Upper Air Observation Station (UAIB) in Cheektowaga, NY outlined in the attached Statement of Work.

This acquisition is set-aside for small business concerns. The associated NAICS code is 238160. The small business size standard is $19.0M.

The Government intends to award a low priced, technically acceptable, single award firm fixed-price purchase order on an all or none basis with payment terms of Net 30.

This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov.

(ii) A list of line-item number(s) and items, quantities, and units of measure (including option(s), if applicable).

CLIN 0001 –

Construction Services, non-personal, to provide all supervision, labor, tools, materials and equipment (unless otherwise provided herein) necessary to complete the roof replacements as per the attached Statement of Work (SOW) at the National Weather Service (NWS) Upper Air Observation Station (UAIB) in Cheektowaga, NY. The quoter shall provide all labor, supervision, materials, equipment, disposal, and incidentals necessary to complete the work.

(iii) Description of requirements for the items to be acquired, including documentation supporting any brand name descriptions (see 12.102).

See attached Statement of Work and Department of Labor Davis-Bacon Act General Decision:

NY20260050, Modification No. 1, dated 05/1/2026, which can be found on:

https://sam.gov/content/wage-determinations

INVOICES TO BE BILLED IN ARREARS VIA IPP. QUOTE PRICING MAY BE PROVIDED ON

ATTACHED SF18 FORM OR ON COMPANY LETTERHEAD.

(iv) Date(s) and place(s) of acceptance and f.o.b. point (see part 47).

Period of performance shall be:

The period of performance for this contract shall not exceed one hundred eighty (180) calendar days from the date of issuance of Notice to Proceed (NTP) by the Contracting Officer (CO). The Government shall provide approval of the contractor’s proposed construction schedule (submitted with the proposal) prior to the issuance of the NTP. Initial submittals required within 10 calendar days from the date of award.

Place of Performance is

W

FO

S F

U A

IB

SF

4:

R O

O F

SL

O

PE

https://sam.gov/content/wage-determinations

NWS UAIB (BUF)

140 Amherst Villa Road Cheektowaga, NY 14225-9998 Erie County

(v) A list of solicitation provisions that apply to the acquisition (see 12.205(a)) can be found on the Request for Quote Form SF18 attachment in Section 5 Other Contract Terms and Conditions.

RFO 52.237-1 Site Visit (Apr 1984) (Deviation Jan 2026) Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

(End of provision)

A site visit is highly recommended but not required. Vendors are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

Please contact Gerald.Dube@noaa.gov at 607-242-8345 to set up a time to visit the site. All questions during the site visit should be submitted electronically to Casey.Keating@noaa.gov.

(vi) A list of contract clauses that apply to the acquisition (see 12.205(b)) can be found on the Request for Quote Form SF18 attachment in Section 4 Contract Terms and Conditions.

(vii) Quotes are required to be received in the contracting office no later than 2:30 MT/MST on 08/062026. All quotes must be submitted electronically via email to casey.keating@noaa.gov.

THE GOVERNMENT DOES NOT ACCEPT RESPONSIBILITY FOR NON-RECEIPT OF QUOTES.

IT IS THE CONTRACTOR’S RESPONSIBILITY TO REQUEST AND RECEIVE A

CONFIRMATION OF THE QUOTE RECEIPT.

(viii) Any other additional information required by 5.101(c).

A PAYMENT BOND OR IRREVOCABLE LETTER OF CREDIT WILL BE REQUIRED

UNLESS YOUR QUOTE IS UNDER $35,000.00. TO BE PROVIDE WITHIN 10 DAYS FROM

AWARD.

Per NOAA Deviation 2025-02/03: System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Contracting officers will not consider those representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.

mailto:Gerald.Dube@noaa.gov mailto:casey.keating@noaa.gov

REQUEST FOR QUOTATION

(THIS IS NOT AN ORDER)

THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE

15. DATE OF QUOTATION

16. SIGNER

a. NAME (Type or print)

c. TITLE (Type or print)

b. TELEPHONE

AREA CODE

NUMBER

STANDARD FORM 18 (REV. 6/1995)

Prescribed by GSA-FAR (48 CFR) 53.215-1(a)

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition not usable

8. TO:

b. COMPANYa. NAME

c. STREET ADDRESS

d. CITY e. STATE f. ZIP CODE

9. DESTINATION

a. NAME OF CONSIGNEE

b. STREET ADDRESS

d. STATE e. ZIP CODE

7. DELIVERY

FOB DESTINATION

OTHER

(See Schedule)

10. PLEASE FURNISH QUOTATIONS TO THE

ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS (Date)

IMPORTANT: This is a request for information and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or service. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotation must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State and local taxes)

ITEM NUMBER

(a)

SUPPLIES/SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

12. DISCOUNT FOR PROMPT PAYMENT

a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS

NUMBER PERCENTAGE

NOTE: Additional provisions and representations are are not attached.

13. NAME AND ADDRESS OF QUOTER

a. NAME OF QUOTER

b. STREET ADDRESS

c. COUNTY

d. CITY e. STATE f. ZIP CODE

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

PAGE OF PAGES

1. REQUEST NUMBER 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NUMBER 4. CERT. FOR NAT. DEF.

UNDER BDSA REG. 2

AND/OR DMS REG. 1

RATING

5a. ISSUED BY 6. DELIVER BY (Date)

NAME TELEPHONE NUMBER

AREA CODE NUMBER

c. CITY

5b. FOR INFORMATION CALL (NO COLLECT CALLS)

587 AERO DRIVE

WAD-SAP

325 BROADWAY, SOU6

BOULDER CO 80305

1305M326Q0358

CASEY KEATING

578-2579

BUFFALO WFO NEW YORK /

14225

07/23/2026

08/06/2026 1430 MD

180 Days After Notice to Proceed

BUFFALO

NY

NOTICE: THE GOVERNMENT DOES NOT ACCEPT

RESPONSIBILITY FOR NON-RECEIPT OF

QUOTES. IT IS THE CONTRACTOR’S

RESPONSIBILITY TO REQUEST A CONFIRMATION

OF THE QUOTE RECEIPT.

UNIQUE ENTITY ID ______________________

CAGE CODE ____________

OFFEROR MAY SUBMIT THE QUOTE ON THIS

SF-18 FORM OR THEIR OWN COMPANY FORM.

QUOTES WILL BE EVALUATED BASED ON (RFO

52.212-2) IN ATTACHED CLAUSES &

PROVISIONS. VENDORS WHO DO NOT PROVIDE

Continued...

1 48

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

1305M326Q0358

ALL EVALUATION CRITERIA PER 52.212-1 AND

52.212-2 WILL NOT BE ACCEPTED.

THE OFFEROR MUST BE CURRENTLY REGISTERED IN THE

SYSTEM FOR AWARD MANAGEMENT (SAM) TO BE

ELIGIBLE FOR AN AWARD.

QUOTES RECEIVED FROM CONTRACTORS WHO ARE NOT

ACTIVE IN SAM WILL NOT BE CONSIDERED.

TOTAL SMALL BUSINESS SET-ASIDE, FIRM-FIXED

PRICE PURCHASE ORDER TO BE AWARDED TO THE LOW

PRICED, TECHNICALLY ACCEPTABLE QUOTE.

THE GENERAL DECISION (GD) NY20260050, REVISION

1 POSTED ON 05/18/2026 WILL BE INCORPORATED AND

MAY BE VIEWED AT WWW.SAM.GOV

BONDING/LOC WILL BE REQUIRED UNLESS YOUR QUOTE

IS UNDER $35K. TO BE PROVIDE WITHIN 10 DAYS

FROM AWARD.

0001 Construction Services, non-personal, to provide all supervision, labor, tools, materials and equipment (unless otherwise provided herein) necessary to complete the roof replacement as per the Statement of Work at the National

Weather Service (NWS) Upper Air Observation

Station (UAIB) in Cheektowaga, NY. The quoter shall provide all labor, supervision, materials, equipment, disposal, and incidentals necessary to complete the work.

Product/Service Code: Z2AA

1305M326Q0358 BASE

Section 2 - Combined Synopsis/Solicitation Section 3 - Line Items and Attachments Section 4 - Contract Terms and Conditions Section 5 - Other Contract Terms and Conditions Section 6 - Instructions to Offerors Section 7 - Evaluation

Section 2 - Combined Synopsis/Solicitation

Statement of Work SOW

1.0 GENERAL

1.1 BACKGROUND

The National Weather Service (NWS) Eastern Region (ER) has a requirement for Roof Replacement.

The NWS ER provides weather, water, forecasts and warnings for the eastern portion of the United States, including adjacent waters and ocean areas, for the protection of life and property and the enhancement of the national economy. This Upper Air Inflation balloon launch Building (UAIB) is used to make timely meteorological observations which aids in this effort. Weather balloons are typically launched twice (2) per day; 6:00 am and 6:00 pm, occasionally with a greater frequency during select hazardous weather events.

New roof installations are necessary to prevent asset failures that could result in downtime, safety issues, and operational shutdowns. Focus is on preventing water intrusion from the exterior.

The upper roof portion on the building was replaced in 2025 following decommissioning of equipment on the roof. This center section was replaced with an Ethylene-Propylene-Diene-Monomer (EPDM) synthetic rubber membrane system.

This contract will replace two (2) of the three (3) remaining roofs on the single building. Both of these roofs are the lower roof portions of the building.

This work involves two (2) lower roofs and the top of the vestibule. The existing roofs have a Built-Up Roofing (BUR) System with asphalt-saturated sheeting and a gravel top layer. These roofs are on the left and right sections of the building (lower roofs) and on top of a vestibule at the rear entrance of the building.

1.2 SCOPE

1.2.1 The scope of work is to replace two (2) existing flat roofing systems with new roofing systems and also the top of the vestibule.

1.2.2 Work includes demolition and total removal of approximately 1,100 sq ft of an existing flat roofing system down to the concrete deck. The building will remain completely functional and must be fully protected at all times during the construction work. All ingress/egress to facility and pedestrian walkways must be maintained with overhead protection when construction is occurring at/over these areas.

The building will remain completely operational with staff during this work. All employees, visitors, building interiors and Government equipment must be fully protected at all times during this construction work.

1.3 OBJECTIVE

The purpose of this contract is to replace existing roofs which are beyond their life expectancy. A planned replacement is necessary to prevent outside environmental conditions from entering the building per industry standards. The new roofing system shall be 100% reliable and warranted by the roofing manufacturer for a minimum of twenty (20) years.

1.4 APPLICABLE DOCUMENTS

1.4.1 COMPLIANCE DOCUMENTS

The following documents provide specifications, standards, or guidelines that must be complied with in order to meet the requirements of this contract:

29 CFR 1910, Occupational Safety and Health Standards and 29 CFR Part 1926 (Occupational Safety and Health Administration 1970)

NFPA 241, Standard for Safeguarding Construction, Alteration, and Demolition Operations (National Fire Protection Agency 2022)

NFPA 70E, Standard for Electrical Safety in the Workplace (National Fire Protection Agency 2024)

NFPA 780, Standard for the Installation of Lightning Protection Systems (National Fire Protection Agency 2026)

UL 96A, Standard for Installation Requirements for Lightning Protection Systems (Underwriters Laboratories 2023)

National Weather Service Manual 30-4106, Lighting Protection, Grounding, Bonding, Shielding, and Surge Protection Requirements (dated April 25, 2017)

1.4.2 REFERENCE DOCUMENTS

The following documents may be helpful to the contractor in performance of their work:

• ATTACHMENT 1A: Drawing - building footprint o lower portion of the building, work areas

• ATTACHMENT 1B: Site Photos (Roof) o Photos showing existing site conditions; these do not provide a comprehensive depiction of all as-built conditions.

¿ aerial view location ¿ building views ¿ roof access stairs ¿ roof conditions ¿ gutters ¿ lightning protection ¿ vestibule

• ATTACHMENT 2A: NWS Manual 30-4106, dated April 25, 2017 o Lighting Protection, Grounding, Bonding, Shielding, and Surge Protection Requirements

• ATTACHMENT 2B: UL Lightning Protection Guide o Marking and Application

• ATTACHMENT 3A: JM White EPDM NR 60 mil o product datasheet

• ATTACHMENT 3B: JM Single Ply Product Reference Guide for EPDM o membranes o cover boards o accessories o cleaners o adhesives o primers o sealants o fasteners

• ATTACHMENT 3C: JM EPDM Accessories Guide o general o peel and stick

• ATTACHMENT 4: JM Peak Advantage, EPDM o guarantee requirements

• ATTACHMENT 5A: NFTA Tenant Construction or Alteration Application and Instructions

• ATTACHMENT 5B: NFTA Tenant Construction or Alteration Application

2.0 SPECIFIC REQUIREMENTS AND TASKS

The contractor is to supply all needed ladders, stepladders, flashlights and any other required miscellaneous equipment during the site visit for their own use.

The contractor shall evaluate existing conditions on-site prior to any work being performed. The contractor is to perform a visual inspection of all the roofs, roof penetrations, gutters, lightning protection and site conditions prior to the start of work (including submittals and ordering materials);

field verification will take precedence over any discrepancy within the Statement of Work. The COR and/or LPOC is to be contacted and briefed prior to starting any work. The contractor is not to make any modifications to Government owned equipment under this contract without advance approvals.

The contractor and/or subcontractor shall exhibit proof of previous experience performing equivalent work with a minimum of two (2) projects in their bid proposal package. Example projects are to be similar in both size and scope. Contractors shall be licensed and insured to perform this type of work.

The contractor shall provide the labor, tools, supplies, materials, transportation, services, and supervision required to perform all work outlined in this Statement of Work (SOW).

If there are discrepancies in this document, the Contactor shall ask for clarification from the COR prior to bid. If no clarification is requested, the CO’s judgement shall rule.

The contractor shall discuss their sequence of work with the COR and LPOC to avoid any disruptions during their planned roofing work. The LPOC will initiate internal notifications to building occupants and those affected by any planned tasks.

The NWS has no designated area to store any hazardous or flammable chemicals used in the course of the contractor’s work tasks and these are not to be stored on site.

The contractor shall clean up all work areas at the end of each day.

The Davis Bacon Act for Erie County, NY for Construction Type Building is applicable and the responsibility of the contractor to be in compliance.

2.1 TASK ONE: PRODUCT SUBMITTALS

2.1.1 Site Verification and Information: The Contractor is solely responsible for obtaining all necessary information during their site visit. Please note that Government-supplied information regarding existing materials is based on visuals and is provided for informational purposes only. The Contractor must field-verify all details prior to product selection, submittal, ordering, and installation.

2.1.2 Submittal Process: The Contractor must submit all products planned for use to the COR via email.

Please ensure the specific product selection is highlighted and clearly shown. The Contractor may not proceed with work or procure materials until the Government has reviewed these submittals.

2.1.3 Submittal Register: The contractor shall prepare and maintain a submittal register and provide a copy to the COR.

2.1.4 Compliance and Risk: Any work performed prior to review is at the Contractor’s own risk. If the CO determines that such work does not comply with the contract, the Contractor will be responsible for all costs and time required for remediation. The CO reserves the right to halt work if submittals have not been reviewed and the Government will not be liable for any associated costs or delays.

2.1.5 Deviations: A general review of submittals does not permit departure from contract requirements.

The Contractor must identify all deviations or changes in writing. Without such notice, the review will not apply to those deviations.

2.1.6 Safety Data Sheets (SDS): Provide an SDS to the COR and LPOC for all products and chemicals to be used on-site. These will be reviewed and filed by the LPOC in their office.

2.1.7 Pre-Demolition Testing: Prior to any demolition, the Contractor must perform earth resistance testing on the existing lightning protection system (LPS) at all ground ring hand holes with the COR or

LPOC present. The building’s LPS is designed for an earth resistance <5 ohms. The Contractor must provide a submittal including a diagram of these results in which these readings will serve as a baseline for final testing comparison upon project completion.

2.2 TASK TWO: DEMOLITION

2.2.1 The summary of work as aligned with the Construction Specifications Institute (CSI) MasterFormat Specification Library as follows:

• Demolition of the existing roof system down to the deck per Section 02 41 00 Demolition.

• Repairs per Section 01 73 29 Cutting and Patching.

2.2.2 Removal Details: The Contractor shall remove all roofing materials down to the concrete deck and any roof-mounted lightning protection cables and air terminals.

• Existing Conditions: The current roof system consists of a Built-Up Roofing (BUR) System with asphalt-saturated sheeting and gravel top layer. These lower roofs are at either side of the building and on top of a vestibule. The center portion of the building of the roof with a higher elevation was recently replaced with an Ethylene-Propylene-Diene-Monomer (EPDM) synthetic rubber membrane system and is not part of this project. The contractor is responsible to re-connect the lightning protection system.

• Equipment and Accessories: The Contractor shall inspect any roof vents, roof drains and gutters.

Remove roof accessories as necessary to complete the new roof installation, replace if damaged.

2.2.3 Logistics: The contractor shall make arrangements for use of their own dumpster. No trash or debris is to be placed into Government trash receptacle(s) or left behind. Contractor shall provide all required rigging and crane services for removal of existing units and exterior ductwork from the roof.

2.2.4 Site Protection: The contractor shall supply temporary roof protection for the duration of the project. Schedule work to avoid negative impact from precipitation or severe weather events to maximize the integrity of the roof substrate that will remain. The contractor is responsible for preventing water intrusion and must repair any interior damage "in kind," including corner-to-corner painting.

2.2.5 Disposals: The contractor is responsible for transport of all removed roofing materials to a commercial transfer site.

2.3 TASK THREE: ROOF REPAIR AND SURFACE PREPARATION

2.3.1 The summary of work as aligned with the Construction Specifications Institute (CSI) MasterFormat Specification Library as follows:

• Modifications and repairs to concrete form deck systems per Section 03 01 30.71Rehabilitation of Cast-in-Place Concrete.

• Standard rough carpentry per Section 06 10 00 Rough Carpentry.

2.3.2 This work includes the total removal of the existing flat roofing system down to the concrete deck.

Replacement will include minor deck repairs, rough carpentry, and roof insulation (including taper). All associated sheet metal components and accessories necessary for a warranted installation are included in this scope.

2.3.3 Inspection and Substrate Preparation: The contractor shall prepare and inspect the concrete decking, blocking and masonry. Inform the LPOC and/or COR of any damage, corrosion or untreated substrate penetrations. Repairs shall be completed using industry-standard methods, such as patching, filling, or partial replacement.

2.3.4 The contractor shall clear and clean all gutters of any roofing materials and stones.

2.4 TASK FOUR: ROOF INSTALLATION

2.4.1 The summary of work as aligned with the Construction Specifications Institute (CSI) MasterFormat Specification Library as follows:

• Roof membrane, insulation, membrane flashings, associated components and accessories per Section 07 53 23 EPDM Roofing.

• Sheet metal, components, and accessories per Section 07 60 00 Flashing and Sheet Metal.

• Pre-manufactured accessories per Section 07 72 00 Roof Accessories.

• Replacement of sealant systems per Section 07 92 00 Sealants for Roofing and Sheet Metal.

2.4.2 Material Specifications: The system shall be a fully adhered, 60 mil, color white Johns Manville EPDM roofing, or equivalent. All components, including membranes, flashing, cleaners, primers, adhesives, sealants and accessories must be compatible and from the same manufacturer. Refer to Attachments 3A, 3B, and 3C for product details.

2.4.3 System Requirements: Provide a new vapor barrier, firestop board, rigid insulation and EPDM system. This must include all flashings, coping, pipe seals, pitch pockets, scuppers, gutters, waterproofing, and drainage components to match existing conditions.

2.4.4 Any standard industry tasks necessary to ensure a waterproof installation are included in this contract, even if not specifically mentioned.

2.4.5 Warranty: All products and installation methods must meet manufacturer standards for a full warranty and guarantee. This requirement takes precedence over other product specifications.

2.4.6 Lightning Protection System (LPS): Install new cables and air terminals to match the existing system, as necessary. Connections to existing components must use exothermic welds in accordance with UL96A. A UL Master Label Certificate is required upon completion. Refer to Attachments 2A and 2B for details.

2.4.7 Testing: Perform earth resistance testing at all ground ring hand holes with the COR and/or LPOC to confirm readings are <5 ohms or match pre-project levels.

2.5 TASK FIVE: ROOF INSPECTION, GOVERNMENT WALKTHROUGH, MANUFACTURER’S WARRANTY

The following are requirements regarding inspections and warranty documentation for the roof portion of the project:

2.5.1 Intermittent Inspections: The Contractor shall request intermittent inspections, as required by the roof material manufacturer. A Government representative must be present during all such inspections.

2.5.2 Final Walkthrough: As soon as is practical, the contractor shall schedule a final warranty walkthrough. This must include the COR and/or LPOC, and manufacturer’s representative to ensure the installation meets all contract requirements, industry practices, and manufacturer criteria.

2.5.3 Warranty Requirements: The new roofing systems shall include a minimum (20) twenty-year membrane warranty and a (20) twenty-year manufacturer guarantee or equivalent to the JM Peak Advantage Protection Plan. This coverage must include a wind rider for 120 MPH winds and a hail rider for up to 2-inch diameter hail. Please refer to Attachment 4 for further details.

2.6 TASK SIX: CLOSEOUT DOCUMENTS

2.6.1 The Contractor shall provide documentation for the UL lightning protection system re-certification.

2.6.2 The Contractor shall supply one (1) complete electronic soft copy set and two (2) complete hard copy sets of O&M manuals and as-built drawings. One hard copy set to remain with the LPOC; the other hardcopy set and electronic soft copy are to be delivered to:

National Weather Service Office of Logistics - Facilities 630 Johnson Avenue, Suite 202 Bohemia, NY 11716

3.0 CONTRACTOR PERSONNEL

3.1 QUALIFIED PERSONNEL

3.1.1 The contractor shall provide qualified personnel to perform all of the requirements specified in this

SOW.

3.1.2 Roofers shall be certified in the application of roofing materials and products by the roof manufacturer.

3.1.3 Field personnel shall be trained in OSHA 29 CFR 1910, NFPA 70E, and the proper use of PPE.

3.1.4 Field personnel on-site must be trained in hazard recognition and working around operating equipment.

3.1.5 Field personnel working on the rooftop must be trained on hazard recognition and safety when working near a roof edge.

3.1.6 Only qualified personnel may work on electric circuit parts or equipment that has not been deenergized. NEC 70 defines “qualified person” as one who has skills and knowledge related to the construction and operation of the electrical equipment and installations and received safety training to recognize and avoid hazards involved. The qualified personnel shall be properly trained regarding working safely on energized circuits and shall be familiar with the proper use of special precautionary techniques, personal protective equipment (PPE), insulating and shielding materials and insulated tools as stated in 29 CFR 1910.333(c)(2).

3.1.7 All work shall be performed and completed in a workmanship-like manner and in accordance with the latest proven practices of the trade by thoroughly skilled and experienced workers.

3.2 PROJECT MANAGER

3.2.1 The contractor shall provide a one (1) Project Manager who shall be responsible for all contractor work performed under this SOW.

3.2.2 The Project Manager shall be a single point of contact for the Contracting Officer (CO) and the Contracting Officer Representative (COR). The name of the Project Manager, and the name(s) of any alternate(s) who shall act for the contractor in the absence of the Project Manager, shall be provided to the Government as part of the contractor's proposal. The Project Manager and all designated alternates shall be able to read, write, speak and understand English. Additionally, the contractor shall not replace the Project Manager without prior approval from the CO.

3.2.3 The Project Manager shall be available to the COR via telephone between the hours of 8:00 a.m.

and 5:00 p.m. EST, Monday through Friday, and shall respond to a request for discussion or resolution of any technical problems within two (2) hours of notification.

3.3 EMPLOYEE IDENTIFICATION

3.3.1 Contractor employees visiting Government facilities shall wear a Company identification badge that, at a minimum, displays the contractor’s name, the employee’s photo, the employee’s name, and badge expiration date. Contractor employees shall comply with all Government escort rules and requirements. All contractor employees shall identify themselves as contractor employees when their status is not readily apparent and shall display all identification and visitor badges in plain view above the waist at all times.

3.3.2 Contractors shall sign in and out of each location upon their arrival and departure daily.

3.4 EMPLOYEE CONDUCT

3.4.1 The contractor’s employees shall comply with all applicable Government regulations, policies, and procedures (e.g., fire, safety, sanitation, environmental protection, security, “off limits” areas, etc.) when visiting or working at Government facilities. The Project Manager shall ensure contractor employees understand and abide by Department of Commerce (DOC) established rules, regulations and policies concerning safety and security.

3.5 REMOVING EMPLOYEES FOR MISCONDUCT OR SECURITY REASONS

3.5.1 The Government may, at its sole discretion (in coordination with the CO where practical), direct the contractor to remove any contractor employee from DOC facilities for misconduct or security reasons. Removal does not relieve the contractor of the responsibility to continue providing the services required under the contract. The CO will provide the contractor with a written explanation to support any request to remove an employee.

4.0 OTHER APPLICABLE CONDITIONS

4.1 GOVERNMENT POINT OF CONTACT (POCs)

4.1.1 Name(s) of the Contracting Officer’s Representative (COR) and Local Point of Contact (LPOC).

Point of Contact (POC) List (provided for coordination after award of contract)

4.1.2 The LPOC is assigned for site access, escort, and face to face coordination only. All contract related questions, interpretations, project coordination, technical interaction and direction shall be through the COR and CO only.

4.2 PERIOD OF PERFORMANCE

The period of performance for this contract shall not exceed one hundred eighty (180) calendar days from the date of issuance of Notice to Proceed (NTP) by the Contracting Officer (CO). The Government shall provide approval of the contractor’s proposed construction schedule (submitted with the proposal) prior to the issuance of the NTP. Initial submittals required within 10 calendar days from the date of award.

4.3 PLACE OF PERFORMANCE

4.3.1 The primary place of performance will be at a Department of Commerce location.

4.3.2 The selected location and address of the Upper Air Inflation Building under this contract is as follows:

National Weather Service Cheektowaga, NY

NWS UAIB (BUF)

140 Amherst Villa Road Cheektowaga, NY 14225-9998

Note: The UAIB is a stand-alone building located within the property line of the Buffalo Niagara International Airport.

Note: This project will require the contractor to submit a Tenant Construction or Alteration Application which must be filed with the Niagara Frontier Transportation Authority for review and approval and/or issuance of a construction permit. This shall be in advance of any physical work performed at the site.

4.4 HOURS OF OPERATION

4.4.1 Contractor employees shall generally perform all work between the hours of 8:00 AM and 5:00 PM EST, Monday through Friday (except Federal holidays) unless otherwise approved by the CO, COR or LPOC. Weekend work may be considered due to inclement weather or expedience/completion of tasks on a case-by-case basis.

4.4.2 Any off-hour work must be requested at least forty-eight hours (48) in advance, not counting weekends.

4.4.3 Contractor is to plan all tasks with weather forecasts in mind; do not expose the interior of the building to water intrusion from the exterior. Start/Stop of roofing tasks shall be planned between the hours of 8:00 AM and 5:00 PM EST. Do not start work that cannot be finished within this window. Any exceptions must be approved in advance.

4.5 FEDERAL HOLIDAY SCHEDULE

Contractor agrees to observe all Federal Holidays, and any other day off work designated by Federal Statute, Executive Order, or Presidential Proclamation.

4.6 PROJECT PLAN & SCHEDULE

4.6.1 The contractor shall provide a draft Project Plan & Schedule at the Post Award Conference for Government review and initial comment. The contractor shall provide a final Project Plan & Schedule to the COR no later than thirty (30) business days after Post Award Conference.

4.6.2 All notifications pertaining to a contractor’s visit must be approved by the Government in advance of their visit. The contractor shall confirm a site inspection date a minimum of three (3) business days prior to start with the COR and/or LPOC.

4.6.3 Inclement weather in the forecast could necessitate a delay in start of work in order to ensure continuity of weather forecasting operations at DOC/NOAA/NWS.

4.6.4 Unplanned utility disruptions to commercial power and other NWS operational issues could delay start of work; loss of commercial power and/or if the building is being supplied by emergency power generation.

4.7 POST AWARD CONFERENCE

4.7.1 The contractor shall attend a Post Award Conference with the COR and LPOC no later than thirty

(30) calendar days after the date of award. The purpose of the Post Award Conference (chaired by the COR) is to discuss technical and contracting objectives of this contract and review the contractor's draft project plan. The Post Award Conference will be held via a teleconference.

4.8 SITE COMPLETION: PROGRESS UPDATES, FIELD ACTIVITY REPORTS, PHOTOGRAPHS

4.8.1 The contractor shall issue to the COR and LPOC a brief daily verbal progress update (prior to leaving the site) summarizing all work performed and identification of any critical issues before leaving the customer site. Contractor shall also note any environmental concerns and off-line equipment.

4.8.2 The contractor shall issue a written Weekly Field Activity Report (signed typewritten report on company letterhead) listing status of each piece of equipment, site conditions, tasks completed, and percent completion of the project, along with any applicable notes and observations to the COR within three (3) business days. These shall include ten (10) photos representative of the completed work.

4.8.3 At the completion of all daily field work, the contractor shall remove from the area all trash, rubbish, packing material, and debris caused by its operations, leaving the job site clean.

4.9 PROGRESS REPORTS

4.9.1 The Project Manager shall provide a Monthly Progress Report to the COR via electronic mail within three (3) business days after the following month’s work. This report shall include: (1) a summary of all contractor work performed, (2) schedule status, (3) an updated project schedule against original milestones, (4) an assessment of technical progress, and (5) any contractor concerns or recommendations. The final progress report shall include, at minimum, ten (10) photos representative of the completed project. This applies to both the ROOF & HVAC portions of this project.

4.10 ACCIDENT PREVENTION

4.10.1 Site Safety

• Any worker injuries shall be brought to the attention of the COR and LPOC immediately.

• Workers shall deposit soiled solvent cleaning rags and waste materials in metal containers approved for that purpose; dispose of such items off-site at end of each day’s work.

• Contractor shall apply lockout/tagout (LOTO) procedures to the equipment’s power source when applicable.

• Contractor shall not release refrigerant into the atmosphere.

• Contractor tools that exhaust fumes cannot be located near building intakes while in use.

• Storage containers containing fuel cannot be used or left on the roof deck.

• The contractor shall provide and maintain work environments and procedures which will:

o Safeguard the public and Government personnel, property, materials, supplies and equipment exposed to contractor operations and activities.

o Utilize appropriate safety barricades and signage.

o All work shall be performed utilizing proper safety precautions.

4.10.2 Contractor’s Accident Prevention Plan, including the Activity Hazard Analysis (AHA) is to include analyses of the potential impact of inspection, and maintenance and repair work on their personnel and on others involved in and adjacent to the work zone.

5.0 GOVERNMENT TERMS & DEFINITIONS

CFR Code of Federal Regulations CO Contracting Officer COR Contracting Officer’s Representative DOC Department of Commerce EPA Environmental Protection Agency ER Eastern Region LOTO Lockout/Tagout LPOC Local Point of Contact NEXRAD Next Generation Weather Radar NOAA National Oceanic and Atmospheric Administration NWS National Weather Service

OEM Original Equipment Manufacturer P/N Part Number POC Point of Contact RDA Radar Acquisition Data RADAR Radio Detection and Ranging SDS Safety Data Sheet SOW Statement of Work TPMS Transition Power Maintenance Shelter TPOC Technical Point of Contact WFO Weather Forecast Office

6.0 GOVERNMENT FURNISHED RESOURCES

6.0.1 The Government will provide the contractor with access to the job site as necessary for performance of the work.

6.0.2 The Government will provide the contractor with electrical outlets for power tools use.

6.0.3 The Government will provide the contractor with any known deficiencies prior to the site visit.

7.0 CONTRACTOR FURNISHED PROPERTY

7.0.1 The contractor shall furnish all materials, equipment, and services necessary to fulfill the requirements of this contract.

7.0.2 The contractor shall provide and service a portable restroom rental services for their work crews.

7.0.3 Contractor tools that exhaust fumes cannot be located near building intakes while in use.

7.0.4 Storage containers containing fuel cannot be used or left on the roof deck.

7.0.5 The contractor shall make arrangements for delivery, use, and removal of their own dumpster(s).

• The NWS and airport on-site trash dumpster shall NOT be used by the contractor for the disposal of any construction debris.

8.0 GOVERNMENT ACCEPTANCE PERIOD

8.0.1 The COR will review deliverables prior to acceptance and provide the Contractor with notification via electronic mail that provides documented reasons for non-acceptance.

8.0.2 The COR will have the right to reject or require correction of any deficiencies found in the deliverables that are contrary to the information contained in the contractor’s accepted proposal. In the event of a rejected deliverable, the contractor will be notified in writing by the COR of the specific reasons for rejection.

8.0.3 The COR will have three (3) business days to review deliverables and make comments. The contractor shall have seven (7) business days to make corrections and re-deliver.

9.0 DELIVERABLES

9.0.1 The contractor shall leave worksite(s) in a clean condition.

9.0.2 The Project Manager shall provide deliverable(s) and/or report(s) to the COR via electronic mail.

9.0.3 This report shall include a summary of all contractor work performed and any contractor concerns or recommendations. Contractor shall consider items in BOLD as having mandatory due dates.

9.0.4 The Deliverables Table lists important milestones and response times requiring contractor action on this contract. This is inclusive of each work location. Contractor shall consider items in BOLD as having mandatory due dates. See Attachment 6.

*** END ***

Deliverable Due Date/First Instance Due Recurring

Section 3 - Line Items and Attachments

List of Line Items

Item Number Description Quantity Unit Unit Price Amount

Construction Services, non-personal, to provide all supervision, labor, tools, materials and equipment (unless otherwise provided herein) necessary to complete the roof replacement as per the Statement of Work at the National Weather Service (NWS) Upper Air Observation Station (UAIB) in Cheektowaga, NY. The quoter shall provide all labor, supervision, materials, equipment, disposal, and incidentals necessary to complete the work.

Product/Service Code: Z2AA

List of Attachments

Attachment Number Title

1A 142010-26-0138 BUF UA Observatory Roof Replacement Statement of Work Attachment 1A

1B 142010-26-0138 BUF UA Observatory Roof Replacement Statement of Work Attachment 1B

2A 142010-26-0138 BUF UA Observatory Roof Replacement Statement of Work Attachment 2A

2B 142010-26-0138 BUF UA Observatory Roof Replacement Statement of Work Attachment 2B

3A 142010-26-0138 BUF UA Observatory Roof Replacement Statement of Work Attachment 3A

3B 142010-26-0138 BUF UA Observatory Roof Replacement Statement of Work Attachment 3B

4 142010-26-0138 BUF UA Observatory Roof Replacement Statement of Work Attachment 4

5A 142010-26-0138 BUF UA Observatory Roof Replacement Statement of Work Attachment 5A

5B 142010-26-0138 BUF UA Observatory Roof Replacement Statement of Work Attachment 5B

6 142010-26-0138 BUF UA Observatory Roof Replacement Statement of Work Attachment 6

7 1305M326Q0358 General Decision

Section 4 - Contract Terms and Conditions

RFO 52.203-17 Contractor Employee Whistleblower Rights. (NOV 2023)

RFO 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements.

(JAN 2017)

RFO 52.204-13 System for Award Management-Maintenance. (OCT 2018) (Deviation JAN 2026)

RFO 52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (JAN 2025) (Deviation JAN 2026)

RFO 52.209-10 Prohibition on Contracting With Inverted Domestic Corporations. (NOV 2015) (Deviation JAN 2026)

RFO 52.219-6 Notice of Total Small Business Set-Aside. (NOV 2020) (Deviation JAN 2026)

FAR 52.222-3 Convict Labor. (JUN 2003)

RFO 52.222-6 Construction Wage Rate Requirements. (AUG 2018) (Deviation JAN 2026)

FAR 52.222-7 Withholding of Funds. (MAY 2014)

FAR 52.222-8 Payrolls and Basic Records. (JUL 2021)

FAR 52.222-10 Compliance With Copeland Act Requirements. (FEB 1988)

RFO 52.222-11 Subcontracts (Labor Standards). (MAY 2014) (Deviation JAN 2026)

RFO 52.222-12 Contract Termination - Debarment. (MAY 2014)

RFO 52.222-13 Compliance With Construction Wage Rate Requirements and Related Regulations.

(MAY 2014)

FAR 52.222-14 Disputes Concerning Labor Standards. (FEB 1988)

RFO 52.222-15 Certification of Eligibility. (MAY 2014)

RFO 52.222-19 Child Labor-Cooperation with Authorities and Remedies. (JAN 2025) (Deviation JAN 2026)

RFO 52.222-36 Equal Opportunity for Workers with Disabilities. (JUN 2020) (Deviation JAN 2026)

RFO 52.222-50 Combating Trafficking in Persons. (OCT 2025) (Deviation JAN 2026)

RFO 52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026. (JAN 2022)

FAR 52.222-62 Paid Sick Leave Under Executive Order 13706. (JAN 2022)

RFO 52.223-23 Sustainable Products. (MAY 2024) (Deviation JAN 2026)

RFO 52.226-8 Encouraging Contractor Policies To Ban Text Messaging While Driving. (MAY 2024)

RFO 52.227-4 Patent Indemnity--Construction Contracts. (DEC 2007)

RFO 52.228-14 Irrevocable Letter of Credit. (NOV 2014)

RFO 52.232-5 Payments Under Fixed-Price Construction Contracts. (MAY 2014)

RFO 52.232-27 Prompt Payment for Construction Contracts. (JAN 2017)

RFO 52.232-33 Payment by Electronic Funds Transfer - System for Award Management. (OCT 2018)

RFO 52.232-40 Providing Accelerated Payments to Small Business Subcontractors. (MAR 2023)

RFO 52.233-3 Protest after Award. (AUG 1996) (Deviation JAN 2026)

RFO 52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004) (Deviation JAN 2026)

RFO 52.236-5 Material and Workmanship. (APR 1984) (Deviation JAN 2026)

RFO 52.236-7 Permits and Responsibilities. (NOV 1991) (Deviation JAN 2026)

RFO 52.236-8 Other Contracts. (APR 1984) (Deviation JAN 2026)

RFO 52.236-17 Layout of Work. (APR 1984) (Deviation JAN 2026)

RFO 52.237-2 Protection of Government Buildings, Equipment, and Vegetation. (APR 1984)

RFO 52.240-91 Security Prohibitions and Exclusions. (Deviation JAN 2026)

RFO 52.242-14 Suspension of Work. (APR 1984)

RFO 52.243-5 Changes and Changed Conditions. (APR 1984) (Deviation JUN 2025)

RFO 52.244-6 Subcontracts for Commercial Products and Commercial Services. (OCT 2025) (DEVIATION April 2026)

RFO 52.246-12 Inspection of Construction. (AUG 1996)

RFO 52.246-21 Warranty of Construction. (MAR 1994)

CAR 1352.201-70 Contracting Officer's Authority. (MAR 2010)

CAR 1352.209-73 Compliance with the laws. (APR 2010)

CAR 1352.209-74 Organizational conflict of interest. (APR 2010)

FAR Deviations 52.222-9 Apprentices and Trainees (JUL 2005) (DEVIATION FEB 2025)

DEPARTMENT OF COMMERCE CLAUSES FULL TEXT INFORMATION

FOR FULL TEXT OF COMMERCE ACQUISITION CLAUSES OR PROVISIONS YOU MAY TO GO THE

FOLLOWING WEBSITE:

http://www.ecfr.gov/cgi-bin/textidx?

sid=2d08a6e69af3b9bb1a7be4eae370d256&c=ecfr&tpl=/ecfrbrowse/Title48/48cfrv5_02.tpl#1300

Standard Language UTILIZATION OF FEDCONNECT FOR CONTRACT ADMINISTRATION

The Department of Commerce will utilize the FedConnect® web portal in administering this award. The contractor must be registered in FedConnect® and have access to the FedConnect® website located at https://www.fedconnect.net/Fedconnect/. For assistance in registering or for other FedConnect® questions please call the FedConnect® Help Desk at (800) 899-6665 or email at support@fedconnect.net. There is no charge for registration in or use of FedConnect®.

RFO 52.212-4 Terms and Conditions-Commercial Products and Commercial Services. (NOV 2023) (Deviation JAN 2026)

(a) Definitions. The clause at Federal Acquisition Regulation (FAR) 52.202-1, Definitions, is incorporated by reference.

(b) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post acceptance rights-

(1) Within a reasonable time after the defect was discovered or should have been discovered; and

(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.

(c) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C.

3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.

(d) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.

(e) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal, or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause FAR 52.233-1, Disputes, which is incorporated in this contract by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.

(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence. Examples of occurrences include acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. When an excusable delay occurs, the Contractor shall-

(1) Notify the Contracting Officer in writing as soon as possible;

(2) Remedy the delay as quickly as possible; and

(3) Notify the Contracting Officer when the occurrence is over.

(g) Invoice. The Government will handle invoices according to the Prompt Payment Act (31 U.S.C. 3903) and 5 CFR part 1315. The Contractor shall submit invoices to the address designated in the contract to receive invoices. An invoice must include the information required by 5 CFR part 1315.9(b).

(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees, and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark, or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.

(i) Payment-

(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.

(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act ( 31 U.S.C. 3903) and prompt payment regulations at 5 CFR part 1315.

(3) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date that appears on the payment check or the specified payment date if an electronic funds transfer payment is made.

(4) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall-

(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the-

(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);

(B) Affected contract number and delivery order number, if applicable;

(C) Affected line item or subline item, if applicable;

(D) Contractor point of…