1305M326Q0358_General_Decision.pdf

PDF 86 KB Posted

Attached to
Roof Replacement Cheektowaga, NY
Solicitation number
1305M326Q0358
Issued by

About this file

This is a Davis-Bacon wage determination document (General Decision Number NY20260050) issued by the U.S. Department of Labor for building construction projects in Erie County, New York, effective as of May 18, 2026.

The document establishes prevailing wage rates and fringe benefits for various construction trades required on federal construction contracts in the specified jurisdiction. Rates are categorized by trade classification, with union rates predominating across most trades. Key classifications include: boilermakers ($39.35/hour base, $33.18 fringe); various masonry trades ranging from $32.53-$39.44 base rate; carpenters ($34.73 base); electricians ($36.73-$44.50 depending on specialization); elevator mechanics ($62.39 base); power equipment operators in eight groups ($39.14-$49.98 base); ironworkers ($35.49 base); laborers in six groups ($30.43-$32.43 base); glaziers ($34.68 base); painters ($25.95-$34.00 depending on method); plumbers/pipefitters ($42.20 base); roofers ($34.96-$35.11 base); sheet metal workers ($39.50 base); and truck drivers ($32.00-$47.18 depending on type). The determination includes multiple effective dates ranging from 1999 through 2025, with most rates updated within the past two years. The document notes applicability of Executive Orders 13706 (paid sick leave) and 13658 (minimum wage floor of $13.65/hour through December 31, 2026). Wage rates are indexed by union local numbers where applicable, and the determination permits addition of unlisted classifications after contract award through standard labor standards procedures.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

"General Decision Number: NY20260050 05/18/2026

State: New York

Construction Types: Building

Counties: New York Counties of Erie

Modification Number Publication Date 0 01/02/2026 1 05/18/2026

BOIL0007-001 01/01/2025

Rates Fringes

BOILERMAKER.........................................$ 39.35 33.18

BRNY0045-004 07/01/2021

Rates Fringes

CEMENT MASON........................................$ 32.53 22.10

MARBLE SETTER.......................................$ 36.85 30.80

TILE FINISHER.......................................$ 34.71 17.54

TERRAZZO FINISHER...................................$ 34.71 17.54

TILESETTER & TERRAZZO WORKER........................$ 38.85 32.20

BRICKLAYER..........................................$ 39.44 32.11

BRNY0045-004 07/01/2023

Rates Fringes

CEMENT MASON........................................$ 32.53 22.10

MARBLE SETTER.......................................$ 36.85 30.80

TILE FINISHER.......................................$ 34.71 17.54

TERRAZZO FINISHER...................................$ 34.71 17.54

TILESETTER & TERRAZZO WORKER........................$ 38.85 32.20

BRICKLAYER..........................................$ 39.44 32.11

BRNY0045-004 07/01/2024

Rates Fringes

CEMENT MASON........................................$ 32.53 22.10

MARBLE SETTER.......................................$ 36.85 30.80

TILE FINISHER.......................................$ 34.71 17.54

TERRAZZO FINISHER...................................$ 34.71 17.54

TILESETTER & TERRAZZO WORKER........................$ 38.85 32.20

BRICKLAYER..........................................$ 39.44 32.11

BRNY0045-004 07/01/2025

Rates Fringes

CEMENT MASON........................................$ 32.53 22.10

MARBLE SETTER.......................................$ 36.85 30.80

TILE FINISHER.......................................$ 34.71 17.54

TERRAZZO FINISHER...................................$ 34.71 17.54

7/23/26, 5:47 PM SAM.gov https://sam.gov/wage-determination/NY20260050/1 1/14

TILESETTER & TERRAZZO WORKER........................$ 38.85 32.20

BRICKLAYER..........................................$ 39.44 32.11

CARP0276-014 07/01/2024

Rates Fringes

CARPENTER...........................................$ 34.73 28.61

ELEC0041-003 04/01/2014

Rates Fringes

CABLE SPLICER.......................................$ 36.73 23.39

ELECTRICIAN.........................................$ 44.50 36.06

ELEC0041-003 05/26/2025

Rates Fringes

CABLE SPLICER.......................................$ 36.73 23.39

ELECTRICIAN.........................................$ 44.50 36.06

ELEC0041-004 05/26/2025

Rates Fringes

COMMUNICATIONS SYSTEM (SOUND WIREMAN) WORK COVERS

LOW VOLTAGE CONSTRUCTION, INSTALLATION,

MAINTENANCE, AND REMOVAL OF TELEDATA FACILITIES

(VOICE, DATA AND VIDEO) INCLUDING OUTSIDE PLANT,

TELEPHONE AND DATA INSIDE WIRE, INTERCONNECT,

TERMINAL EQUIPMENT, CENTRAL OFFICES, PABX FIBER

OPTIC CABLE AND EQUIPMENT, RAILROAD COMMUNICATIONS,

MICRO WAVES, V-SAT, BYPASS, CATV, WAN (WIDE AREA

NETWORKS); LAN (LOCAL AREA NETWORKS) AND ISDN

(INTEGRATED SYSTEMS DIGITAL NETWORK). ALSO,

INSTALLATION OF SOUND SYSTEMS, NURSES CALL SYSTEMS,

INTERCOM SYSTEMS, STAFF REGISTRY/LOCATING/SIGNALING

SYSTEMS, ANTENNA SYSTEMS AND ASSOCIATED DEVICES;

INSTALLATION OF SECURITY SYSTEMS AND APPARATUS, AND

CABLING FROM VDT'S TO COMPUTERS. THIS WORK DOES

NOT APPLY TO NEW CONSTRUCTION, OR TO THE

INSTALLATION OF RACEWAY SYSTEMS AND BOXES FOR THE

ABOVE WORK..........................................$ 44.50 36.05

COMMUNICATIONS SYSTEM (MASTER TECHNICIAN) WORK

COVERS LOW VOLTAGE CONSTRUCTION, INSTALLATION,

MAINTENANCE, AND REMOVAL OF TELEDATA FACILITIES

(VOICE, DATA AND VIDEO) INCLUDING OUTSIDE PLANT,

TELEPHONE AND DATA INSIDE WIRE, INTERCONNECT,

TERMINAL EQUIPMENT, CENTRAL OFFICES, PABX FIBER

OPTIC CABLE AND EQUIPMENT, RAILROAD COMMUNICATIONS,

MICRO WAVES, V-SAT, BYPASS, CATV, WAN (WIDE AREA

NETWORKS); LAN (LOCAL AREA NETWORKS) AND ISDN

(INTEGRATED SYSTEMS DIGITAL NETWORK). ALSO,

INSTALLATION OF SOUND SYSTEMS, NURSES CALL SYSTEMS,

INTERCOM SYSTEMS, STAFF REGISTRY/LOCATING/SIGNALING

SYSTEMS, ANTENNA SYSTEMS AND ASSOCIATED DEVICES;

INSTALLATION OF SECURITY SYSTEMS AND APPARATUS, AND

CABLING FROM VDT'S TO COMPUTERS. THIS WORK DOES

NOT APPLY TO NEW CONSTRUCTION, OR TO THE

INSTALLATION OF RACEWAY SYSTEMS AND BOXES FOR THE

ABOVE WORK..........................................$ 44.50 36.05

COMMUNICATIONS SYSTEM (INSTALLER) WORK COVERS LOW

VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE,

AND REMOVAL OF TELEDATA FACILITIES (VOICE, DATA AND

VIDEO) INCLUDING OUTSIDE PLANT, TELEPHONE AND DATA

INSIDE WIRE, INTERCONNECT, TERMINAL EQUIPMENT,

CENTRAL OFFICES, PABX FIBER OPTIC CABLE AND

https://sam.gov/wage-determination/NY20260050/1 2/14

EQUIPMENT, RAILROAD COMMUNICATIONS, MICRO WAVES,

V-SAT, BYPASS, CATV, WAN (WIDE AREA NETWORKS); LAN

(LOCAL AREA NETWORKS) AND ISDN (INTEGRATED SYSTEMS

DIGITAL NETWORK). ALSO, INSTALLATION OF SOUND

SYSTEMS, NURSES CALL SYSTEMS, INTERCOM SYSTEMS,

STAFF REGISTRY/LOCATING/SIGNALING SYSTEMS, ANTENNA

SYSTEMS AND ASSOCIATED DEVICES; INSTALLATION OF

SECURITY SYSTEMS AND APPARATUS, AND CABLING FROM

VDT'S TO COMPUTERS. THIS WORK DOES NOT APPLY TO

NEW CONSTRUCTION, OR TO THE INSTALLATION OF RACEWAY

SYSTEMS AND BOXES FOR THE ABOVE WORK................$ 22.90 21.38

COMMUNICATIONS SYSTEM (CABLER) WORK COVERS LOW

VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE,

AND REMOVAL OF TELEDATA FACILITIES (VOICE, DATA AND

VIDEO) INCLUDING OUTSIDE PLANT, TELEPHONE AND DATA

INSIDE WIRE, INTERCONNECT, TERMINAL EQUIPMENT,

CENTRAL OFFICES, PABX FIBER OPTIC CABLE AND

EQUIPMENT, RAILROAD COMMUNICATIONS, MICRO WAVES,

V-SAT, BYPASS, CATV, WAN (WIDE AREA NETWORKS); LAN

(LOCAL AREA NETWORKS) AND ISDN (INTEGRATED SYSTEMS

DIGITAL NETWORK). ALSO, INSTALLATION OF SOUND

SYSTEMS, NURSES CALL SYSTEMS, INTERCOM SYSTEMS,

STAFF REGISTRY/LOCATING/SIGNALING SYSTEMS, ANTENNA

SYSTEMS AND ASSOCIATED DEVICES; INSTALLATION OF

SECURITY SYSTEMS AND APPARATUS, AND CABLING FROM

VDT'S TO COMPUTERS. THIS WORK DOES NOT APPLY TO

NEW CONSTRUCTION, OR TO THE INSTALLATION OF RACEWAY

SYSTEMS AND BOXES FOR THE ABOVE WORK................$ 14.20 14.02

ELEC1249-003 05/05/2025

Rates Fringes

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC

SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE

NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC

MONITORING SYSTEMS AND ROAD WEATHER INFORMATION

SYSTEMS MECHANIC FOOTNOTE: A. NEW YEAR'S DAY,

MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,

THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S

DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR

THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY

FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED

THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER

THE HOLIDAY.........................................$ 42.29 30.66

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC

SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE

NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC

MONITORING SYSTEMS AND ROAD WEATHER INFORMATION

SYSTEMS LINEMAN & TECHNICIAN FOOTNOTE: A. NEW

YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR

DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS

PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY,

ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES

AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF

NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY

BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 52.86 35.60

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC

SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE

NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC

MONITORING SYSTEMS AND ROAD WEATHER INFORMATION

SYSTEMS GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER

UNIT) FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL

DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,

CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY,

DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF

https://sam.gov/wage-determination/NY20260050/1 3/14

THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR

OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE

WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY...$ 47.57 31.03

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC

SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE

NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC

MONITORING SYSTEMS AND ROAD WEATHER INFORMATION

SYSTEMS GROUNDMAN (TRUCK DRIVER) FOOTNOTE: A.

NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,

LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS

PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY,

ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES

AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF

NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY

BEFORE OR THE DAY AFTER THE HOLIDAY.................$ 42.29 30.66

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC

SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE

NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC

MONITORING SYSTEMS AND ROAD WEATHER INFORMATION

SYSTEMS FLAGMAN FOOTNOTE: A. NEW YEAR'S DAY,

MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,

THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S

DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR

THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY

FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED

THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER

THE HOLIDAY.........................................$ 31.72 29.87

ELEC1249-004 05/05/2025

Rates Fringes ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation).......................................$ 49.25 31.15

ELECTRICIAN, LINE CONSTRUCTION: MECHANIC

(Substation:).......................................$ 49.25 31.15 ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :).....................................$ 49.25 31.15 ELECTRICIAN, LINE CONSTRUCTION: LINEMAN &

TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails;

Pipetype cable ins..................................$ 61.56 36.21 ELECTRICIAN, LINE CONSTRUCTION: LINEMAN &

TECHNICIAN (Substation:)............................$ 61.56 36.21 https://sam.gov/wage-determination/NY20260050/1 4/14

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK

DRIVER (TRACTOR TRAILER UNIT) (Substation:).........$ 49.25 31.15

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK

DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :).....................................$ 49.25 31.15

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK

DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails;

Pipetype cable installat............................$ 49.25 31.15

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK

DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :).........................$ 49.25 31.15

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING

MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails;

Pipetype cab........................................$ 55.40 31.78

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING

MACHINE OPERATOR (Substation:)......................$ 55.40 31.78

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING

MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)....$ 55.40 31.78 ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation).......................................$ 35.34 30.12

ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN

(Substation:).......................................$ 35.34 30.12 ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead https://sam.gov/wage-determination/NY20260050/1 5/14 and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :).....................................$ 35.34 30.12

ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER

(Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails;

Pipetype cable installation)........................$ 64.59 42.92

ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER

(Substation:).......................................$ 63.14 33.82

ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES;

RAILROAD CATENARY INSTALLATION AND MAINTENANCE,

THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED

TRANSMISSION CONDUIT AND CABLE INSTALLATIONS

(INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT

BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE

OF GROUND FAULT PROTECTION AND FIBER OPTIC

CAPABILITIES), PIPETYPE CABLE INSTALLATION AND

MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE

BONDING OF RAILS; PIPETYPE CABLE INSTALLATION

GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT)

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY,

PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY,

INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,

CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT

OF THE UNITED STATES AND ELECTION DAY FOR THE

GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE

WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE

HOLIDAY.............................................$ 49.25 31.15

ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND

MAN TRUCK DRIVER FOOTNOTE: A. PAID HOLIDAYS:

NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD

FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING

DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE

PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR

THE GOVERNOR OF NEW YORK STATE, PROVIDED THE

EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER

THE HOLIDAY.........................................$ 49.25 31.15

ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND

UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND

ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK

INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE,

FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT

BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE

OF GROUND FAULT PROTECTION AND FIBER OPTIC

CAPABILITIES : LINEMAN AND TECHNICIAN FOOTNOTE:

A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY,

MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR

DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION

DAY FOR THE PRESIDENT OF THE UNITED STATES AND

ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE,

PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO

DAYS AFTER THE HOLIDAY..............................$ 61.56 36.21

https://sam.gov/wage-determination/NY20260050/1 6/14

ELEC1249-008 01/01/2025

Rates Fringes

ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV

FIBEROPTICS CABLE AND EQUIPMENT INSTALLER

REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT

OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD

FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR

DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER

THANKSGIVING, CHRISTMAS DAY.........................$ 38.73 6.93

ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV

FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW

YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY,

DECORATION DAY, INDEPENDENCE DAY, LABOR DAY,

VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER

THANKSGIVING, CHRISTMAS DAY.........................$ 20.53 6.39

ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV

FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A.

NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY,

DECORATION DAY, INDEPENDENCE DAY, LABOR DAY,

VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER

THANKSGIVING, CHRISTMAS DAY.........................$ 40.81 6.99

ELEV0014-001 01/01/2025

Rates Fringes

ELEVATOR MECHANIC FOOTNOTE: A.VACATION:

6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR

ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR

HOURLY RATE FOR ALL HOURS WORKED. B. PAID

HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY;

INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY;

THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING

DAY; AND CHRISTMAS DAY..............................$ 62.39 38.44

ENGI0017-001 07/01/2025

Rates Fringes

POWER EQUIPMENT OPERATORS: GROUP 8 MASTER MEACHANIC

NOTE: HAZARDOUS WASTE PREMIUM $2.50

TUNNEL WORK $1.00 FOOTNOTES: A. PAID HOLIDAYS:

NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,

LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY,

PROVIDED THE EMPLOYEE HAS WORKED THE DAY BEFORE AND

THE DAY AFTER THE HOLIDAY...........................$ 45.47 35.40

POWER EQUIPMENT OPERATORS: GROUP 7 ANY TOWER CRANES

NOTE: HAZARDOUS WASTE PREMIUM $2.50

TUNNEL WORK $1.00 FOOTNOTES: A. PAID HOLIDAYS:

NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,

LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY,

PROVIDED THE EMPLOYEE HAS WORKED THE DAY BEFORE AND

THE DAY AFTER THE HOLIDAY...........................$ 49.98 35.40

POWER EQUIPMENT OPERATORS: GROUP 6 ANY CRANE 400

TONS AND OVER NOTE: HAZARDOUS WASTE PREMIUM

$2.50 TUNNEL WORK $1.00 FOOTNOTES: A.

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,

INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,

CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE

DAY BEFORE AND THE DAY AFTER THE HOLIDAY............$ 49.48 35.40

POWER EQUIPMENT OPERATORS: GROUP 5 ANY CRANE 200 -

399 TONS NOTE: HAZARDOUS WASTE PREMIUM $2.50

TUNNEL WORK $1.00 FOOTNOTES: A. PAID

HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,

INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,

CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE

DAY BEFORE AND THE DAY AFTER THE HOLIDAY............$ 48.98 35.40

https://sam.gov/wage-determination/NY20260050/1 7/14

POWER EQUIPMENT OPERATORS: GROUP 4 ANY CRANE 61 -

199 TONS NOTE: HAZARDOUS WASTE PREMIUM $2.50

TUNNEL WORK $1.00 FOOTNOTES: A. PAID

HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,

INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,

CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE

DAY BEFORE AND THE DAY AFTER THE HOLIDAY............$ 48.48 35.40

POWER EQUIPMENT OPERATORS: GROUP 3 ANY CRANE UP TO

60 TONS NOTE: HAZARDOUS WASTE PREMIUM $2.50

TUNNEL WORK $1.00 FOOTNOTES: A. PAID

HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,

INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,

CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE

DAY BEFORE AND THE DAY AFTER THE HOLIDAY............$ 47.48 35.40

POWER EQUIPMENT OPERATORS: GROUP 2 AGGREGATE BIN,

CMI AND SIMILAR TYPE CONCRETE SPREADS, CEMENT BIN,

CHIPPING MACHINE AND CHIP SPREADER, COMPRESSORS (4

OR LESS), COMPRESSORS: (ANY SIZE, BUT SUBJECT TO

OTHER PROVISIONS FOR COMPRESSORS, DUST COLLECTORS,

GENERATORS, MECHANICAL HEATERS, PUMPS, WELDING

MACHINES (FOUR OF ANY TYPE OR COMBINATION),

CONCRETE MIXER (1/2 CU. YD. AND UNDER), FIREMAN,

FORM TAMPER, FUEL TRUCK, HEATING BOILER (USED FOR

TEMPRORY HEAT), JEEP TRENCHER, POWER HEATERMAN,

POWER PLANT IN EXCESS OF 10 K.W., PUMP (4"" OR

OVER), REVINIUS WIDENER, STEM CLEANER, STUMP

CHIPPING MACHINE, WELDING MACHINE (1 MACHINE OVER

300 AMPS OR 2 OR 3 MACHINES REGARDLESS OF AMPS).

NOTE: HAZARDOUS WASTE PREMIUM $2.50

TUNNEL WORK $1.00 FOOTNOTES: A. PAID HOLIDAYS:

NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,

LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY,

PROVIDED THE EMPLOYEE HAS WORKED THE DAY BEFORE AND

THE DAY AFTER THE HOLIDAY...........................$ 39.14 35.40

POWER EQUIPMENT OPERATORS: GROUP 1 AIR HOIST, ALL

BOOM TYPE EQUIPMENT (100 FT. OR LESS), ALL PAN AND

CARRY-ALLS, ARCHER HOIST, ASPHALT ROLLER ASPHALT

SPREADER OR PAVER, AUTOMATIC FINE GRADE MACHINE

(CMI AND SIMILAR TYPE), ARCHER HOIST, BACKHOE AND

PULL HOE (TRACTOR MOUNTED AND RUBBER MOUNTED), BACK

FILLING MACHINE, BELT PLACE (CMI AND SIMILAR),

BENDING MACHINE (PIPE), BITUMINOUS SPREADER AND

MIXER, BLACK TOP PLANT (AUTOMATED), BLACK TOP PLANT

(NON-AUTOMATED), BLAST OR ROTARY DRILL (TRUCK OR

TRACK MOUNTED), BLOWER FOR BURNING BRUSH, BOILER

(WHEN USED FOR POWER), BOOM TRUCKS, BORING MACHINE,

BULLDOZER, CABLEWAY CAGE HOIST, CAISSON AUGER,

CENTRAL MIX PLANT (AND ALL CONCRETE BATCHING

PLANTS), CHERRY PICKER (OVER 5 TONS), CHERRY PICKER

(UNDER 5 TONS), CHIPPING MACHINE AND CHIP SPREADER,

CONCRETE CURB AND GUTTER MACHINES, CONCRETE CURING

MACHINE, CONCRETE MIXER (OVER 1/2 CU. YD.) CONCRETE

PAVEMENT SPREADERS AND FINISHERS, CONCRETE PAVER,

CONCRETE PUMP, CONCRETE SAW (SELF-PROPELLED),

CONVEYOR, CORE DRILL, CRANE, CRUSHER, DERRICK

OPERATOR, DRAGLINE, DREDGE, DRILL RIG (TRACTOR

MOUNTED), DUAL DRUM PAVER, ELECTRIC PUMP USED IN

CONJUNCTION WITH WELL POINT SYSTEMS, ELEVATING

GRADER SELF- PROPELLED OR TOWED), ELEVATOR

EXCAVATOR (ALL PURPOSE, HYDRAULCALLY OPERATED) FARM

TRACTOR WITH ACCESSORIES, FINE GRADE MACHINE,

FORKLIFT, FRONT END LOADER, GENERATOR (10 OUTLETS

OR MORE), GRADALL, GRADER, GROUT OR GUNITE MACHINE,

HEAD TOWER, HOIST-ONE DRUM, HOISTING ENGINE,

HYDRAULIC BOOM, HYDRAULIC HAMMER, (SELF PROPELLED),

https://sam.gov/wage-determination/NY20260050/1 8/14

HYDRAULIC PIPE JACK MACHINE (OR SIMILAR TYPE

MACHINE), HYDRAULIC SYSTEM PUMPS, HYDRO CRANE,

HYDRO HAMMER (OR SIMILAR TYPE), INDUSTRIAL TRACTOR,

JERSEY SPREADER, KOLMAN PLANT LOADER (AND SIMILAR

TYPE LOADERS), LOCOMOTIVE, LUBRICATION TRUCK,

MAINTENANCE ENGINEER, MAINTENANCE LUBRICATION UNIT

OR TRUCK, MINE HOIST, MIXR FOR STABILIZED BASE

(SELF-PROPELLED), MONORAIL, MOTORIZED HYDRAULIC PIN

PULLER, MOTORIZED HYDRAULIC SEEDER MUCKING MACHINE,

MULCHING MACHINE, MULTIPLE DRUM HOIST (MORE THAN 1

DRUM IN USE), OVERHEAD CRANE, PEINE CRANE (OR

SIMILAR TYPE), PILE DRIVER, PLANT ENGINEER,

PNEUMATIC MIXER, POST HOLE DIGGER, POWER BOOM, PUMP

CRETE, PUSH OR SNATCH CAT, QUARRY MASTER OR

EQUIVALENT ROAD WIDENER, ROCK BIT SHARPENER (ALL

TYPES), ROLLER (ALL), ROLLING MACHIN (PIPE),

ROTOMILL, SCOOPMOBILE, SHOVEL, SIDE BOOM, SKIMMER,

SLIP FORM PAVER (CMI AND SIMILAR TYPE, FIRST AND

SECOND OPERATOR), SNORKEL, STRATO-TOWER, STUMP

CHIPPING MACHINE, TIRE TRUCK AND REPAIR, TOWED

ROLLER, TRACTOR DRAWN BELT TYPE GRADER/LOADER,

TRACTOR SHOVEL, TRACTOR WITH TOWED ACCESSORIES,

TRACTORS (WHEN USING WINCH POWER), TRACTORS,

TRENCHER, TRUCK CRANE, TUNNEL SHOVEL, TUBE FINISHER

(CMI AND SIMILAR TYPE), VIBRATORY COMPACTOR, VIBRO

TAMP, WELL DRILLING MACHINE, WELL POINT, WINCH,

WINCH TRUCK WITH ""A"" FRAME. NOTE: HAZARDOUS

WASTE PREMIUM $2.50 TUNNEL WORK $1.00

FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY,

MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,

THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE

EMPLOYEE HAS WORKED THE DAY BEFORE AND THE DAY

AFTER THE HOLIDAY...................................$ 44.23 35.40

IRON0006-015 07/01/2024

Rates Fringes

IRONWORKER: SHEETER.................................$ 35.49 32.30

IRONWORKER..........................................$ 35.49 32.30

LABO0210-001 07/01/2023

Rates Fringes

LABORERS: GROUP 6 HAZARDOUS WASTE WORKER...........$ 32.43 28.25

LABORERS: GROUP 5 ASBESTOS REMOVAL, DELEADER.......$ 31.93 28.25

LABORERS: GROUP 4 STONE CUTTER, CURB SETTER AND

FLAG LAYER..........................................$ 31.18 28.25

LABORERS: GROUP 3 WORKER ON ANY SWING SCAFFOLD,

BLASTER, PLUMBING LABORER, WAGON DRILLER, BOTTOM

(CAISSON OR COFFERDAM), LASER SETTER, ASPHALT

RAKERS, ASPHALT SCREED MAN..........................$ 30.71 28.25

LABORERS: GROUP 2 MORTAR MIXER, ASPHALT SMOOTHERS,

PNEUMATIC GAS ELECTRIC TOOL OPERATOR INCLUDING ALL

FORMS OF BUSTERS, JACKHAMMERS, AND CHIPPING GUNS

OVER 8' IN DEPTH....................................$ 30.60 28.25

LABORERS: GROUP 1 BASIC, BOAT SAFETY MAN, FLAGMAN,

TOOL ROOM MAN, NURSERYMAN DEMOLITION WORKER; TOP

MAN; WRECKER; IBC BARRIERS EXCEPT ON STRUCTURERS;

GUARD RAIL. ASPHALT SHOVELERS, FOUNDATION LABORERS

OVER 8' IN DEPTH, HOD CARRIERS, PLASTER TENDER,

PLASTER SCAFFOLD BUILDER, PNEUMATIC GAS, ELECTRIC

OPERATOR, INCLUDING ALL FORMS OF BUSTERS,

JACKHAMMERS, CHIPPING GUNS AND STEEL BURNERS........$ 30.43 28.25

https://sam.gov/wage-determination/NY20260050/1 9/14

PAIN0004-007 05/01/2025

GLAZIER.............................................$ 34.68 27.64

PAIN0004-018 05/01/2017

Rates Fringes

PAINTERS: TAPERS ((AREA NORTH OF WHITEHAVEN ROAD,

GRAND ISLAND, NEW YORK))............................$ 26.45 23.69

PAINTERS: SPRAYING, PAPERHANGERS, SAND BLASTING,

SWINGING SCAFFOLD ((AREA NORTH OF WHITEHAVEN ROAD,

GRAND ISLAND, NEW YORK))............................$ 25.95 23.69

PAINTERS: LEAD ABATEMENT ((AREA NORTH OF WHITEHAVEN

ROAD, GRAND ISLAND, NEW YORK)).....................$ 25.95 23.69

PAINTERS ((AREA NORTH OF WHITEHAVEN ROAD, GRAND

ISLAND, NEW YORK))..................................$ 25.95 23.69

PAIN0004-024 05/01/2025

Rates Fringes

PAINTERS: TAPING/DRYWALL (ENTIRE COUNTY, (EXCLUDING

AREA NORTH OF WHITEHAVEN ROAD, GRAND ISLAND, NEW

YORK))..............................................$ 34.00 28.51

PAINTERS: SPRAY, SANDBLASTING, SWING SCAFFOLD OR

ANY HANGED RIGGING PLATFORM, EPOXY (ENTIRE COUNTY,

(EXCLUDING AREA NORTH OF WHITEHAVEN ROAD, GRAND

ISLAND, NEW YORK))..................................$ 33.00 28.21

PAINTERS: BRUSH & ROLL (ENTIRE COUNTY, (EXCLUDING

AREA NORTH OF WHITEHAVEN ROAD, GRAND ISLAND, NEW

YORK))..............................................$ 33.00 28.21

PLAS0009-001 04/01/2025

Rates Fringes

PLASTERER...........................................$ 33.05 25.09

PLAS0111-001 07/01/2025

Rates Fringes

CEMENT FINISHER.....................................$ 33.65 31.47

PLUM0022-008 04/29/2024

Rates Fringes

PIPEFITTER: (ZONE 1) ERIE- ALL TOWNSHIPS IN THE

COUNTY..............................................$ 42.20 29.80

ROOF0074-001 06/01/2024

Rates Fringes

ROOFERS: SLATE & TILE (ERIE COUNTY).................$ 35.11 26.03

ROOFERS: COMPOSITION (ERIE COUNTY)..................$ 34.96 26.03

SHEE0071-001 05/27/2024

Rates Fringes

SHEET METAL WORKER (ERIE COUNTY)....................$ 39.50 29.18

SUNY1999-001 06/18/1999

Rates Fringes

SPRINKLER FITTER....................................$ 15.94 3.88

TEAM0449-004 07/01/2025

https://sam.gov/wage-determination/NY20260050/1 10/14

TRUCK DRIVERS: INCLUDES SINGLE AXLE DUMP AND

OFF-HIGHWAY DUMP TRUCKS (ERIE COUNTY) WORK ON A

HAZARDOUS WASTE SITE THEN ADDITIONAL $2.00 PER

HOUR. EUCLIDS ADD $0.25 TO JOURNEYMAN RATE

FOOTNOTE: A. HEALTH AND WELFARE $438.61 PER WEEK

B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY,

INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,

CHRISTMAS DAY PROVIDED THE EMPLOYEE HAS WORKED THE

WORKING DAY BEFORE AND AFTER THE HOLIDAY............$ 47.18 15.09

TEAM0449-007 06/01/2025

Rates Fringes

TRUCK DRIVERS:: DUMP TRUCK ONLY, EXCLUDES SINGLE

AXLE DUMP AND OFF-HIGHWAY DUMP TRUCKS FOOTNOTE: A.

PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY,

INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,

CHRISTMAS DAY PROVIDED THE EMPLOYEE HAS WORKED THE

WORKING DAY BEFORE AND AFTER THE HOLIDAY............$ 32.00 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually.

Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).

The body of each wage determination lists the classifications https://sam.gov/wage-determination/NY20260050/1 11/14 and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than �SU�, �UAVG�, �SA�, or �SC� denotes that a union rate was prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.

0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.

Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:

UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.

The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The �SU� identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007 6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.

�SU� wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).

https://sam.gov/wage-determination/NY20260050/1 12/14

State Adopted Rate Identifiers

The �SA� identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.

The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the �SA� identifier took effect under state law in the state from which the rates were adopted.

WAGE DETERMINATION APPEALS PROCESS

1) Has there been an initial decision in the matter? This can be:

a) a survey underlying a wage determination

b) an existing published wage determination

c) an initial WHD letter setting forth a position on a wage determination matter

d) an initial conformance (additional classification and rate) determination On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:

Branch of Wage Surveys Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210 Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.

Requests can be submitted via email to BCWD-Office@dol.gov or by mail to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

https://sam.gov/wage-determination/NY20260050/1 13/14

Washington, DC 20210.

END OF GENERAL DECISION

https://sam.gov/wage-determination/NY20260050/1 14/14

File details come from the government source that posted it. Updated .