This is a Statement of Work attachment containing the National Weather Service Manual 30-4106 on Lightning Protection, Grounding, Bonding, Shielding, and Surge Protection Requirements, dated April 25, 2017. The manual provides comprehensive design, engineering, acquisition, installation, and maintenance guidance for lightning protection systems at NWS facilities and equipment. All contractors performing work involving lightning protection system installation must comply with these requirements as part of their contract statement of work.
The manual establishes minimum requirements based on IEEE Standard 1692 for communications installations and NFPA 780 for lightning protection system installation. Key technical requirements include surge protection device (SPD) installation at facility service entrances and electronic equipment entrances, with specific characteristics such as response times less than 5 nanoseconds, maximum continuous operating voltage ratings, and leakage current limits. The document specifies earth electrode system design with ground resistance targets of less than 1.0 ohm to remote earth, conductor sizing requirements using American Wire Gauge standards, and bonding methods including exothermic welds and mechanical connections. Additional requirements address external line and cable protection using ferrous conduit, internal cable routing in conduit for runs exceeding 6 feet, lightning protection system components including air terminals and down conductors, and specialized protection for antenna towers, radomes, radar towers, and fences. The manual includes detailed installation specifications for waveguides, coaxial lines, signal reference structures, and electronic multipoint and single-point grounding systems, with multiple appendixes providing checklists, audit procedures, and supplementary technical guidance.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of Commerce National Oceanic & Atmospheric Administration National Weather Service
NATIONAL WEATHER SERVICE MANUAL 30-4106
April 25, 2017
Maintenance, Logistics, and Facilities
Facilities Management, NWSPD 30-41
LIGHTNING PROTECTION, GROUNDING, BONDING, SHIELDING, AND SURGE
PROTECTION REQUIREMENTS
NOTICE: This publication is available at: http://www.nws.noaa.gov/directives/.
OPR: W/OF2 (W. Freeman) Certified by: W/OF2 (M. Burkes)
Type of Issuance: Routine
SUMMARY OF REVISIONS: This directive supersedes NWSM 30-4106, “Lightning
Protection, Grounding, Bonding, Shielding, and Surge Protection Requirements”, dated July 16, 2014. Changes made to reflect the NWS Headquarters reorganization effective April 1, 2015. It includes the following major additions:
a. See “record of changes” on the following page.
Signed 4/11/2017
Deirdre Reynolds Jones. Date
Director, Office of Facilities http://www.nws.noaa.gov/directives/
NWSM 30-4106 April 25, 2017
U.S. Department of Commerce
National Oceanic and Atmospheric Administration
National Weather Service
Lightning Protection, Grounding, Bonding, Shielding, and Surge Protection
Requirements
NWSM 30-4106
NWSM 30-4106 April 25, 2017
(This page intentionally left blank.)
NWSM 30-4106 Technical Manual Deficiency Report
INSTRUCTIONS: Use the form provided here to comment on the content of this manual, suggest improvements, or identify deficiencies. Please be as specific as possible in describing deficiencies and recommended solutions. You may complete the form electronically within Adobe Reader and then either submit the form electronically or in hard copy as follows:
Electronic Submission: E-mail the completed form to Will.Freeman@noaa.gov Hard-Copy Submission: Print the completed form and mail to:
National Weather Service
Facilities Management Branch W/OF2 c/o Will Freeman
1325 East-West Highway, SSMC2
Silver Spring, MD 20910-3280
PAGE
PARA/FIG/
TABLE NO.
COMMMENT
RECOMMENDED SOLUTION:
TYPE OF COMMENT: Deficiency Improvement
REMARKS:
Name of Submitter:
Address:
City/State/Zip:
Date Submitted:
NWS USE ONLY
Date Rcvd Control No. Comment Publication Date
Record of Changes
Change
No.
Date
Title or Brief Description
Entered By
1 1.2 Added: IEEE Std. 1692 as a required reference document & Motorola R56B as a required reference document Page 1-1 (page 27 of 184)
LPGI &
Affiliates
2 1.2 Added: definition of a “low resistance as a value = 1.0 ohms”, a value necessary to minimize lightning induced GPR Page 1-1 (page 27 of 184)
LPGI &
Affiliates
3 Added an Appendix A1: Lightning Audit and Safety Checklist as a required audit for the protection of equipment and personnel pages 120 of 184 through page 130 of 184
LPGI &
Affiliates
4 2.5.2.1 C Added: “Arrester response time shall be less than 5 nanoseconds in order to capture the lightning current spike” Page 2-5 (39 of 184)
LPGI &
Affiliates
5 Added a Chapter 3: Radial Grounding, Electrical Protection, Equipment Specifications and Installation Guidelines for NWS Fac Facilities pages 100 of 184 through page 112 of 184
LPGI &
Affiliates
6 2.7.5.4 Added: “Nonmetallic fuel storage tanks shall not be installed.”
Page 2-15 (page 49 of 184)
LPGI &
Affiliates
7 Added: Figures 3-1, 3-2, 3-3, and 3-4 pages 109 of 184 through page 112 of 184
LPGI &
Affiliates
8 2.5.1 Surge Levels Added: less than five (5) nanoseconds is required without malfunction Page 2-3 (page 37 of 184)
LPGI &
Affiliates
9 2.5.2 Added: Silicone Avalanche Diode (SAD) and Metal Oxide Varistor (MOV) Page 2-4 (page 38 of 184)
LPGI &
Affiliates
10 2.5.4.3 C Added: Silicone Avalanche Diode (SAD) with a response time of less than 5 nanoseconds Page 2-8 (page 42 of 184)
LPGI &
Affiliates
11 2.6.3 C Added: Silicone Avalanche Diode (SAD) with a response time of less than 5 nanoseconds Page 2-10 (page 44 of 184)
LPGI &
Affiliates
12 Index expanded to accommodate additions and changes to NSW Manual
LPGI &
Affiliates
NWSM 30-4106 APRIL 25 2017
ii
TABLE OF CONTENTS
Section Title Page
Chapter 1 Introduction........................................................................................................ 1-1
1.1 Purpose and Scope ............................................................................................... 1-1
1.2 Minimum Requirements for Lightning Protection .............................................. 1-1
1.3 Organization of the Manual ................................................................................. 1-1
1.4 Applicable Documents......................................................................................... 1-3
1.5 Acronyms and Abbreviations .............................................................................. 1-5
1.6 Acknowledgments ............................................................................................... 1-6
Chapter 2 Lightning Protection Design, Engineering, Acquisition, Installation, and
Maintenance for NWS Facilities and Equipment ........................................... 2-1
2.1 Surge and Transient Protection Requirements .................................................... 2-1
2.1.1 Existing Electronic Equipment Designs ................................................ 2-1
2.1.2 Installation by Others ............................................................................. 2-1
2.2 External Lines and Cables ................................................................................... 2-1
2.2.1 Fiber-optic Lines .................................................................................... 2-1
2.2.2 Balanced Pair Lines ............................................................................... 2-1
2.2.3 Ferrous Conduit ..................................................................................... 2-2
2.2.4 Ferrous Conduit Penetration of Facility ................................................ 2-2
2.2.5 Existing Unused Metallic Conduit, Conductors, and Cables ................. 2-2
2.3 Interior Lines and Cables ..................................................................................... 2-2
2.4 Electronic Equipment Transient Susceptibility Levels ........................................ 2-2
2.5 Power Line Surges ............................................................................................... 2-3
2.5.1 Surge Levels .......................................................................................... 2-3
2.5.2 Facility AC Surge Protection Device .................................................... 2-4
2.5.2.1 Characteristics ...................................................................... 2-4
2.5.2.2 Packaging ............................................................................. 2-5
2.5.2.3 Installation ............................................................................ 2-6
2.5.3 Surge Protection Devices for Distribution and Branch Panels .............. 2-7
2.5.4 Electronic Equipment Power Entrance .................................................. 2-7
2.5.4.1 Characteristics ...................................................................... 2-7
2.5.4.2 Packaging ............................................................................. 2-8
2.5.4.3 DC Power Supply Transient Suppression ............................ 2-8
2.6 Conducted Signal, Data, and Control Line Transients ........................................ 2-8
2.6.1 Transient Levels ..................................................................................... 2-9
2.6.1.1 Surge Protective Device Testing Compliance ..................... 2-9
2.6.2 Protection Design................................................................................... 2-9
2.6.3 Characteristics...................................................................................... 2-10
2.6.4 Location of Landline Transient Protection .......................................... 2-10
2.6.5 Installation of Suppression Components at Electronic Equipment ...... 2-11
2.6.6 Externally Mounted Electronic Equipment ......................................... 2-11
2.6.7 Axial Landlines .................................................................................... 2-11 i
TABLE OF CONTENTS (Continued)
2.6.7.1 Protection Design ............................................................... 2-11
2.6.7.2 Metal Bulkhead Connector Plates ...................................... 2-12
2.6.7.3 Installation of Suppression Components
at Facility Entrances ........................................................... 2-12
2.6.7.4 Installation of Suppression Components
at Electronic Equipment Entrances ..................................... 2-13
2.6.8 Location of Transient Protection .......................................................... 2-13
2.6.9 Fiber-optic Cable .................................................................................. 2-13
2.7 Lightning Protection System Requirements ....................................................... 2-13
2.7.1 Materials ............................................................................................... 2-14
2.7.2 Main Conductors .................................................................................. 2-14
2.7.2.1 Structural Steel Used as Main Conductors ......................... 2-14
2.7.3 Hardware .............................................................................................. 2-14
2.7.3.1 Fasteners ............................................................................. 2-14
2.7.3.2 Fittings ................................................................................ 2-14
2.7.4 Guards .................................................................................................. 2-14
2.7.5 Bonds.................................................................................................... 2-14
2.7.5.1 Metallic Bodies Subject to Direct Lightning Discharge ... 2-15
2.7.5.2 Metallic Bodies Subject to Induced Charges ...................... 2-15
2.7.5.3 Exhaust Stack Grounding ................................................... 2-15
2.7.5.4 Above-Ground Fuel and Oil Storage Tanks ....................... 2-15
2.7.6 Conductor Routing ............................................................................... 2-15
2.7.6.1 Down Conductors on Fiberglass Mounting Poles .............. 2-16
2.7.7 Down Conductor Terminations ............................................................ 2-16
2.7.8 Buildings .............................................................................................. 2-16
2.7.8.1 Air Terminals...................................................................... 2-16
2.7.8.2 Number of Down Conductors ............................................ 2-16
2.7.8.3 Metal Parts of Buildings ..................................................... 2-16
2.7.8.4 Roof-Mounted Antennas .................................................... 2-17
2.7.8.5 Radomes Not Mounted on Towers ..................................... 2-17
2.7.8.6 Upper Air Buildings ........................................................... 2-17
2.7.9 Antenna Towers ................................................................................... 2-18
2.7.9.1 Number of Down Conductors ............................................ 2-18
2.7.9.2 Towers Without Radomes .................................................. 2-18
2.7.9.3 Radomes ............................................................................. 2-18
2.7.9.4 Towers With Radomes ....................................................... 2-18
2.7.9.5 Antenna Protection ............................................................. 2-19
2.7.9.6 Tower Guying ..................................................................... 2-19
2.7.9.7 Waveguide, Coaxial Line, and Conduit Protection ............ 2-20
2.7.9.8 Staircase/Ladder Protection ................................................ 2-21
2.7.10 Fences ................................................................................................... 2-21 vi
2.7.10.1 Fences and Gates ................................................................ 2-21
2.7.10.2 Overhead Power Line Considerations................................ 2-21
2.7.11 Radar Towers ....................................................................................... 2-22
2.7.11.1 Main Ground Plate and Power Distribution ....................... 2-23
2.7.11.2 Roof, Structural Steel, Reinforcing, and Other
Metal Element Bonding ..................................................... 2-23
2.7.11.3 Signal, Communications, Coaxial Cables, and
Control Line Protection ...................................................... 2-23
2.7.11.4 Signal Grounding ............................................................... 2-23
2.7.11.5 Multipoint Grounding ........................................................ 2-23
2.7.11.6 Single-Point Grounding ..................................................... 2-24
2.8 Earth Electrode System Requirements .............................................................. 2-24
2.8.1 Site Survey ........................................................................................... 2-24
2.8.2 Design .................................................................................................. 2-24
2.8.2.1 Chemical Enhancements .................................................... 2-25
2.8.2.2 Chemical Rods ................................................................... 2-25
2.8.2.3 Engineered Soils ................................................................ 2-26
2.8.2.4 Coke Breeze ....................................................................... 2-26
2.8.2.5 Ground Dissipation Plates (Noncorrosive Soils) ............... 2-27
2.8.2.6 Installation in Corrosive Soils ............................................ 2-28
2.8.3 Configuration ....................................................................................... 2-28
2.8.4 Ground Rods ........................................................................................ 2-28
2.8.4.1 Material and Size ............................................................... 2-28
2.8.4.2 Spacing ............................................................................... 2-28
2.8.4.3 Depth of Rods .................................................................... 2-28
2.8.4.4 Location ............................................................................. 2-28
2.8.4.5 Chemical Enhancement ..................................................... 2-29
2.8.5 Interconnections ................................................................................... 2-30
2.8.6 Access Well ......................................................................................... 2-30
2.9 Electronic Multipoint Ground System Requirements ........................................ 2-30
2.9.1 Facilities Requiring a Signal Reference Structure ............................... 2-31
2.9.1.1 Equipotential Planes in New Facilities .............................. 2-31
2.9.1.2 SRS Methods in Existing Facilities ................................... 2-32
2.9.1.3 Bonding Electronic Equipment to the SRS ........................ 2-32
2.9.1.4 Facilities Without SRS ....................................................... 2-33
2.9.2 Ground Plates, Cables, and Protection ................................................ 2-33
2.9.2.1 Ground Plates and Busses .................................................. 2-33
2.9.2.2 Ground Conductors ............................................................ 2-34
2.9.2.3 Protection ........................................................................... 2-34
2.9.3 Building Structural Steel ...................................................................... 2-35
2.9.3.1 Metal Building Elements ................................................... 2-35 iv
2.9.4 Interior Metallic Piping Systems .......................................................... 2-35
2.9.4.1 Ground Connections ........................................................... 2-35
2.9.5 Electronic Supporting Structures ......................................................... 2-35
2.9.5.1 Conduit ............................................................................... 2-36
2.9.5.2 Cable Trays and Wireways ................................................. 2-36
2.9.6 Multipoint Grounding of Electronic Equipment .................................. 2-36
2.9.6.1 Electronic Signal Return Path ............................................ 2-37
2.9.6.2 Shield Terminations of Coaxial and Other Cables ............. 2-37
2.9.7 Electronic Equipment Containing Both Low- and High-
Frequency Circuits ............................................................................... 2-37
2.10 Electronic Single-Point Ground System Requirements ..................................... 2-37
2.10.1 Ground Plates ....................................................................................... 2-37
2.10.2 Isolation ................................................................................................ 2-37
2.10.3 Resistance ............................................................................................. 2-38
2.10.4 Ground Conductor Size ........................................................................ 2-38
2.10.4.1 Main Ground Conductor..................................................... 2-39
2.10.4.2 Trunk and Branch Ground Conductors .............................. 2-39
2.10.4.3 Electronic Equipment Ground Conductors ........................ 2-39
2.10.4.4 Interconnections ................................................................. 2-39
2.10.5 Labeling ................................................................................................ 2-39
2.10.6 Equipment Requiring Electronic SPGs ................................................ 2-39
2.10.6.1 Electronic SPGs .................................................................. 2-39
2.10.6.2 Electronic SPG Terminals .................................................. 2-39
2.10.6.3 Isolation .............................................................................. 2-39
2.10.6.4 Electronic Signal Lines and Cables .................................... 2-40
2.10.6.5 Termination of Individual Shields ...................................... 2-40
2.10.6.6 Termination of Overall Shields .......................................... 2-40
2.10.6.7 Single-Point Grounding of Electronic Equipment .............. 2-40
2.11 National Electrical Code Grounding Compliance .............................................. 2-43
2.11.1 Grounding Electrode Conductors ......................................................... 2-43
2.11.2 Equipment Grounding Conductors ...................................................... 2-45
2.11.3 Color-Coding of Conductors ................................................................ 2-45
2.11.3.1 Ungrounded Conductors ..................................................... 2-45
2.11.3.2 Grounded Conductors ......................................................... 2-45
2.11.3.3 Equipment Grounding Conductors ..................................... 2-46
2.11.3.4 Conductor Routing ............................................................. 2-46
2.11.3.5 Non-Current-Carrying Metal Equipment Enclosures ......... 2-46
2.12 Other Grounding Requirements ......................................................................... 2-47
2.12.1 Electronic Cabinet, Rack, and Case Grounding ................................... 2-47
2.12.1.1 Mounting Surfaces ............................................................. 2-47
2.12.2 Receptacles ........................................................................................... 2-47 vi
2.12.3 Equipment Power Isolation Requirements .......................................... 2-48
2.12.4 Portable Operational Equipment.......................................................... 2-49
2.12.5 Fault Protection .................................................................................... 2-49
2.12.5.1 Metal Control Shafts .......................................................... 2-49
2.12.5.2 Shielded Compartments ..................................................... 2-49
2.12.6 AC Power Filters ................................................................................. 2-49
2.12.7 Grounding of RF Transmission Lines and Antennas ........................... 2-49
2.12.7.1 Satellite Ground Station Antenna Grounding
(Directly to Building EES) ................................................. 2-49
2.12.7.2 Satellite Ground Station Antenna Grounding
(Connecting to the Ground Test Well) ............................... 2-50
2.12.7.3 Rooftop Antennas With an Existing LPS .......................... 2-50
2.12.7.4 Rooftop Antennas Without an Existing LPS ..................... 2-50
2.13 Bonding Requirements ...................................................................................... 2-50
2.13.1 Resistance ............................................................................................ 2-50
2.13.2 Methods ............................................................................................... 2-51
2.13.2.1 Exothermic Welds .............................................................. 2-51
2.13.2.2 Welds ................................................................................. 2-51
2.13.2.3 Dissimilar Metals ............................................................... 2-51
2.13.2.4 Mechanical Connections .................................................... 2-52
2.13.3 Bonding Straps and Jumpers ............................................................... 2-54
2.13.4 Fasteners .............................................................................................. 2-55
2.13.5 Metal Elements Requiring Bonding .................................................... 2-55
2.13.5.1 Earth Electrode Risers ........................................................ 2-55
2.13.5.2 Counterpoise Cables .......................................................... 2-55
2.13.5.3 Underground Metallic Pipes and Tanks ............................. 2-55
2.13.5.4 Steel Frame Buildings ........................................................ 2-56
2.13.5.5 Interior Metallic Pipes ........................................................ 2-56
2.13.5.6 Electrical Supporting Structures ........................................ 2-56
2.13.5.7 Flat Bars ............................................................................. 2-56
2.13.6 Temporary Bonds ................................................................................ 2-56
2.13.7 Inaccessible Locations ......................................................................... 2-56
2.13.8 Coupling of Dissimilar Metals ............................................................. 2-56
2.13.9 Surface Preparation .............................................................................. 2-56
2.13.9.1 Paint Removal .................................................................... 2-56
2.13.9.2 Inorganic Film Removal .................................................... 2-56
2.13.9.3 Area To Be Cleaned ........................................................... 2-57
2.13.9.4 Final Cleaning .................................................................... 2-57
2.13.9.5 Completion of the Bond ..................................................... 2-57
2.13.9.6 Refinishing of the Bond ..................................................... 2-57
2.13.9.7 Machined Surfaces ............................................................. 2-57 ix
2.13.9.8 Surface Platings or Treatments .......................................... 2-57
2.13.10 Bond Protection ................................................................................... 2-58
2.13.10.1 Paint ................................................................................... 2-58
2.13.10.2 Inaccessible Locations ....................................................... 2-58
2.13.10.3 Compression Bonds in Protected Areas ............................. 2-58
2.13.10.4 Corrosion Protection .......................................................... 2-58
2.13.10.5 Vibration ............................................................................ 2-58
2.13.11 Bonding Across Shock Mounts ........................................................... 2-58
2.13.12 Enclosure Bonding ............................................................................... 2-58
2.13.12.1 Subassemblies .................................................................... 2-59
2.13.12.2 Equipment .......................................................................... 2-59
2.13.13 Connector Mounting ............................................................................ 2-59
2.13.14 Shield Terminations ............................................................................. 2-59
2.13.15 RF Gaskets ........................................................................................... 2-59
2.14 Shielding Requirements ..................................................................................... 2-60
2.14.1 Conductor and Cable Shielding ........................................................... 2-60
2.14.1.1 Signal Lines and Cables ..................................................... 2-60
2.14.1.2 Termination of Individual Shields ..................................... 2-60
2.14.1.3 Termination of Overall Shields .......................................... 2-60
2.14.1.4 Wire and Cable Routing ..................................................... 2-63
2.15 Electrostatic Discharge Minimization, Control, and Prevention ....................... 2-63
2.15.1 Hard and Soft Grounds ........................................................................ 2-64
2.15.1.1 Hard Grounds ..................................................................... 2-64
2.15.1.2 Soft Grounds ...................................................................... 2-64
2.15.1.3 Panel-to-Understructure Resistance ................................... 2-65
2.16 Additional Guidelines ........................................................................................ 2-65
Chapter 3 Radial Grounding, Electrical Protection Equipment Specifications and
Installation Guidelines for NWS Facilities…………………………………...……………..3-1
3.1 Purpose ................................................................................................................ 3-1
3.2 Applicability ...................................................................................................... 3-63
3.3 Tower and Equipment Building Installation Recommendations ....................... 3-63
3.3.1 Grounding System Design and Grounding System Eval. Method ...... 3-64
3.3.2 Design of Ideal Tower and Equipment Building Earth Grounding ..... 3-64
3.3.3 Placing Ground Rods and Bonding to Metallic Objects ...................... 3-64
3.3.4 Grounding Conductor Requirements Inside Equipment Bldg ............. 3-65
3.3.5 AC Power Grounding Electrode and DC Rectifier.............................. 3-64
3.3.6 Transient Voltage Surge Suppression (TVSS) .................................... 3-64 viii
3.3.7 Coaxial Cable, Waveguide and Bulkhead Panel ................................. 3-65
3.3.8 Communication Facility Isolation from a Lightning Induced Ground
Potential Rise (GPR)............................................................................ 3-65
3.3.9 Equipment Building Lightning Protection System ............................. 3-65
3.4 Personnel Safety .............................................................................................. 3-63 ix
Appendix A Lightning Safety Checklist for NWS Sites ...................................................... A-1
Appendix A1 Lightning Audit and Safety Checklist for NWS Sites………………………A1-1
Appendix B Lightning Protection Checklist ........................................................................ B-1
Appendix C Lightning Protection Rationale........................................................................ C-1
Appendix D Grounding Requirements for Nonstructural Metal Elements...................... D-1
Appendix E Electrical Ground Loops .................................................................................. E-1
Appendix F Typical ESD Event and EMI Meter .................................................................F-1
Appendix G “Fall of Potential” Method for Resistance Measurements............................ G-1
Appendix H Types of Lightning Protection Systems............................................................ H-1
Appendix I Alternative Lightning Protection System for Upper Air Building
(Catenary Type) ..................................................................................................... I-1
GLOSSARY................................................................................................................... Glossary-1
INDEX................................................................................................................................. Index-1 x
LIST OF FIGURES
Figure Title Page
Figure 2-1 Bonding of Grounding Conductor to Its Enclosed Conduit for Used Conductors ............................................................................................ 2-3
Figure 2-2 Waveguide, Coaxial Line, and Conduit Penetration (for NWS Facility Only) . 2-12
Figure 2-3 Lightning Protection for Upper Air Buildings (Franklin Rod Design) .............. 2-17
Figure 2-4 Lightning Protection for Radomes and Radar Antenna
Platforms (Crown of Thorns) ............................................................................. 2-19
Figure 2-5 Multiple Guy Wire and Anchor Grounding ....................................................... 2-20
Figure 2-6 Grounding a Fence ............................................................................................. 2-22
Figure 2-7 Fall of Potential Method for Measuring Ground Resistance ............................. 2-25
Figure 2-8 Ground Rod and Chemical Enhancement Material Installation ........................ 2-26
Figure 2-9 Grounding Trench Detail ................................................................................... 2-27
Figure 2-10 Ground Plate Detail ............................................................................................ 2-29
Figure 2-11 Concrete Grounding Access Well ...................................................................... 2-31
Figure 2-12 Facility Grounding System ................................................................................ 2-32
Figure 2-13 Grounding Ring Used for a Signal Reference Grid ........................................... 2-33
Figure 2-14 Electronic Single-Point Ground System Installation ......................................... 2-38
Figure 2-15 Single-Point Grounding for an Individual Unit or Piece of
Electronic Equipment ......................................................................................... 2-41
Figure 2-16 Single-Point Electronic Ground Bus Bar Installation in Rack or Cabinet ......... 2-42
Figure 2-17 Separately Derived System ................................................................................ 2-44
Figure 2-18 Order of Assembly for Bolted Connections ....................................................... 2-47
Figure 2-19 Bonding of Connectors to Mounting Surface .................................................... 2-48
Figure 2-20 Grounding of Overall Cable Shields to Connectors and Penetrating Walls ....... 2-61
Figure 2-21 Grounding of Overall Cable Shield to Terminal Strip ....................................... 2-63
Figure 3-1 Ideal Lightning-Dissipating Single-Point Grounding System………………….
Figure 3-2 Master Ground Bar (MGB) bonding sequence using PANI methodology……..
Figure 3-3 Current flow from a lightning induced GPR without any isolation protection
Figure 3-4 No Current flow from a lightning induced GPR using isolation protection xi
LIST OF TABLES
Table Title Page
Table 2-1 Line-to-Ground Surge Levels for 120/240, 120/208 Y and 277/480 Y Service Line ................................................................................ 2-4
Table 2-2 NEMA Enclosure Types ...................................................................................... 2-6
Table 2-3 Conducted Landline Transient Levels ................................................................. 2-9
Table 2-4 Size of Electronic Multipoint Ground Conductors ............................................ 2-34
Table 2-5 Minimum Number of Twists for Power Conductors ......................................... 2-46
Table 2-6 Acceptable Couplings Between Dissimilar Metals ........................................... 2-52
Table 2-7 Torque Requirements for Bolted Bonds ............................................................ 2-53
Table 2-8 Metal Connections for Aluminum and Copper Jumpers ................................... 2-55
Table 2-9 Minimum Separation Distance Between Signal and Power Cables .................. 2-64
CHAPTER 1
Introduction
1-1
CHAPTER 1
Introduction
1.1 Purpose and Scope
This manual provides design, engineering, acquisition, installation, and maintenance direction and guidance for implementation of effective lightning protection for use by technical staff both at the headquarters and regional levels. The design and installation direction and guidance in this document provide a systematic approach to minimizing electrical hazards to personnel, damage to facilities and electronic equipment from lightning, transients, electrostatic discharge (ESD), power faults, and electromagnetic interference. These electrical provisions shall apply to any new construction or major renovation being performed after the date of the adoption of this manual. Existing electrical installations that do not comply with the provisions of this manual shall be permitted to continue in use without any corrections. If major renovations (defined in the
Glossary) are to be made to existing electrical systems, or major renovations to existing buildings are undertaken, or major additions are planned, then compliance with the manual is required.
1.2 Minimum Requirements for Lightning Protection
National Weather Service (NWS) facilities and systems are located in such diverse physical and electrical environments that each may require different design and installation methods. However, all should meet the minimum NWS requirements for safe lightning protection. Users should become familiar with the information contained herein and apply it to specific design and installation requirements for new facilities, as well as for maintaining and retrofitting existing facilities.
The minimum requirements for bonding and grounding are those specified by IEEE Std. 1692:
"IEEE Guide for the Protection of Communication Installations from Lightning Effects", and the
National Fire Protection Association’s NFPA 70, National Electrical Code. The minimum requirements for lightning protection are those specified by IEEE Std. 1692: "IEEE Guide for the
Protection of Communication Installations from Lightning Effects", and the NFPA 780, Standard for Installation of Lightning Protection Systems. These guidelines provide information intended to aid engineers in design and installation methods for lightning protection of NWS facilities. A critical link in the proper operation of electronic equipment is to have an effective low-resistance facility grounding system. An effective low-resistance facility grounding system design required to minimize lightning strike current or lightning induced Ground Potential Rise (GPR) is less than one (1.0) ohm to remote earth.
All contractors performing work at an NWS facility involving installation of a lightning protection system shall meet the requirements of this manual, if it is part of the contract statement of work (SOW).
1.3 Organization of the Manual
Chapter 2 of this manual specifies requirements for surge and transient protection, lightning protection, earth electrode system (EES), electronic multipoint ground system (MPG), electronic single-point ground system (SPG), electrostatic discharge (ESD) minimization, control and prevention requirements for cables, and National Electrical Code (NEC) compliance.
Additional information is provided in eight appendixes:
1-2
Appendixes A, A1 and B include checklists and audit outline for lightning safety and lightning protection.
Appendixes C through I provide information supplementary to the main text.
1-3
A glossary and index are also included at the end of the manual.
Comments and suggestions from users of this manual are welcome and may be submitted in electronically or in hard copy using the Technical Manual Deficiency Report immediately following the title page of this manual.
1.4 Applicable Documents
The following documents are applicable to the subject of this manual. Unless stated otherwise, National Weather Service organizations performing operations shall use the latest available issue or revision of each document listed.
American National Standards Institute (ANSI)/Institute of Electrical and Electronics
Engineers
ANSI/IEEE C62.41 Recommended Practice on Surge Voltages in Low Voltage
AC Power Circuits
ANSI/IEEE C62.45 IEEE Guide on Surge Testing for Equipment Connected to
Low-Voltage AC Power Circuits
ANSI/IEEE 1100
Emerald Handbook
ANSI/IEEE 142
Green Handbook
Recommended Practice for Powering and Grounding
Electronic Equipment
Grounding of Industrial and Commercial Power Systems
Motorola R56B Standards and Guides for Communication Sites
IEEE STD 100 IEEE Standard Dictionary of Electrical and Electronics
Terms
IEEE STD 1692 IEEE Guide for the Protection of Communication
Installations from Lightning Effects
IEEE STD 367 IEEE Recommended Practice for Determining the
Electrical Power Station Ground Potential Rise and
Induced Voltage From a Power Fault
Federal Aviation Administration
FAA-STD-019c Lightning Protection, Grounding, Bonding and Shielding
Requirements for Facilities
FAA-STD-019d Lightning and Surge Protection, Grounding, Bonding and
Shielding Requirements for Facilities and Electronic
Equipment
Military Documents
NOTE: If the guidance in this manual differs from that specified in a referenced document, the guidance in this manual shall govern.
1-4
MIL-HDBK 419A Grounding, Bonding, and Shielding for Electronic
Equipment and Facilities
1-5
National Fire Protection Association (NFPA)
NFPA 70 National Electrical Code
NFPA 780 (2004 Edition) Standard for the Installation of Lightning Protection
Systems
Underwriters Laboratories, Inc.
UL 96 Standard for Lightning Protection Components
UL 96A Standard for Installation Requirements for Lightning
Protection Systems
UL 1449 (2nd Edition) Standard for Safety for Transient Voltage Surge
Suppressors
1.5 Acronyms and Abbreviations
The following list contains all approved acronyms and abbreviations used within the National
Weather Service Facilities Lightning Protection Manual.
AC alternating current
AIC amperes interrupting capacity
AWG American wire gauge
DC direct current
EES earth electrode system
EGC equipment grounding conductor
EMI electromagnetic interference
EPP equipotential plane
ESD electrostatic discharge
FAA Federal Aviation Administration
GE grounding electrode
GEC grounding electrode conductor
GFCI ground fault circuit interrupter for personnel protection
GFPE ground fault protection for equipment
GP groundable point
GPS Global Positioning System
HVAC heating, ventilation, and air conditioning kcmil kilocircularmil
LPS lightning protection system m meter mA milliamp
1-6
MCOV maximum continuous operating voltage
MPG (Electronic) Multipoint Ground System
MIC meteorologist in charge mm millimeter
MSDS Material Safety Data Sheet
NEC National Electrical Code
NEMA National Electrical Manufacturers Association
NLSI National Lightning Safety Institute
NFPA National Fire Protection Association nS nanoseconds
NWS National Weather Service
PVC polyvinyl chloride
RF radio frequency
RGS rigid galvanized steel
RMS root mean square
SGS Satellite Ground Station
SPD surge protection device
SPG (Electronic) Single-Point Ground
SRG signal reference grid
SRS signal reference structure
UL Underwriters Laboratories Inc.
V Volt
W Watt
1.6 Acknowledgments
The National Weather Service would like to thank the Grounding and Surge Protection (GASP) workgroup within the Federal Aviation Administration and the National Lightning Safety Institute
(NLSI) for their assistance in developing this manual.
CHAPTER 2
Lightning Protection Design, Engineering, Acquisition, Installation, and Maintenance for NWS Facilities and Equipment
2-1
CHAPTER 2
Lightning Protection Design, Engineering, Acquisition, Installation, and Maintenance for NWS Facilities and Equipment
2.1 Surge and Transient Protection Requirements
Lines, cables, and facilities will be protected against the effects of lightning. Ferrous conduit should be used to shield external lines and cables to minimize inductive coupling of transients from lightning discharges. Guard wires should be used to protect buried cables from direct lightning strikes. This will minimize inductive coupling of transients from nearby lightning strikes. Fiber-optic lines and balanced metallic lines should be used when feasible. Electrical and electronic equipment will be protected against conducted and radiated surges and transients from all power, signal, control and/or status lines. Integrated circuits, transistors, diodes, solid-state voltage regulators, capacitors, miniature relays, miniature switches, and miniature transformers, etc., are susceptible to damage and operational upset caused by transients. Transient suppression will be provided at the entrance to any National Weather Service (NWS) facility and all electronic equipment for protection against conducted electrical transients. A surge protection device (SPD), capable of shunting energy represented by the surge levels in Table 2-1 (see Section 2.5.1), should be installed at the facility’s electric power service entrance. All manufacturer SPDs should be listed and labeled according to the Underwriters Laboratories Inc. (UL) standard UL 1449 (2nd edition), and should be tested according to Institute of Electrical and Electronics Engineers standard IEEE C62.45.
2.1.1 Existing Electronic Equipment Designs
For existing electronic equipment designs, equipment-level transient suppression is required. It may be either internal or external to the equipment it is protecting but must follow the grounding, bonding, and shielding methods indicated herein.
2.1.2 Installation by Others
Electronic equipment not installed by its manufacturer or supplier will have all items of material required for installation of transient protection delivered to the site.
2.2 External Lines and Cables
2.2.1 Fiber-optic Lines
Fiber-optic lines are not susceptible to environmental interference or induction fields produced by lightning. Fiber-optic lines should replace metallic conductors when economically and technically feasible. Ferrous conduit shielding and suppression components are not required for fiber-optic conductors unless these lines use metallic or electrically conductive sheaths or strength members.
2.2.2 Balanced Pair Lines
When possible, signals in metallic conductors routed externally between facility shelters and buildings to externally mounted electronic equipment should be designed as balanced, two-conductor, twisted, shielded circuits.
2-2
2.2.3 Ferrous Conduit
In this manual, ferrous conduit is defined as rigid galvanized steel (RGS) conduit. Buried alternating current (AC) power conductors or cables to a facility should be enclosed in watertight, ferrous conduit. The buried ends of this conduit will be bonded to the earth electrode system
(EES) with a bare copper conductor No. 2 AWG, minimum. Conduit joints and fittings will be electrically continuous with a bonding resistance of less than 5 milliohms between joined parts.
Conduit enclosing AC power service entrance conductors will be terminated using conductive fittings from the distribution transformer case and to the service entrance cabinet as the situation dictates. Conduit enclosing signal, control, status, power, or other conductors to electronic equipment will be terminated using conductive fittings. Any metallic conduit entering the facility must be bonded to the EES to minimize transient conductance.
2.2.4 Ferrous Conduit Penetration of Facility
Direct connections will be made from the conduit to a bulkhead connector plate or ground plate
(installed externally or immediately after entering the building) that is connected directly to the
EES using exothermic welds and a minimum No. 4/0 AWG stranded copper conductor. This will be done at each location where above-ground conduits first penetrate a shelter or a building’s exterior wall.
2.2.5 Existing Unused Metallic Conduit, Conductors, and Cables
Bonding of the grounding conductor to its enclosed conduit should be done as shown in the example in Figure 2-1.
2.3 Interior Lines and Cables
All permanently installed interior cables and conductors exceeding 6 feet in length will be enclosed end-to-end in conduit. (Temporary extension cables used for performing maintenance work are excluded.)
2.4 Electronic Equipment Transient Susceptibility Levels
Commercial off-the-shelf (COTS) electronic equipment supplied as part of the facility should be provided with transient protection. This protection will reduce surges and transients to below the equipment susceptibility level determined by the manufacturer. The equipment susceptibility level is the online transient level that may cause damage, degradation, or upset to the connected electronic equipment. The combined facility and equipment entrance protection will be coordinated to limit transients at the equipment entrance to a level below the equipment susceptibility level. The following characteristics should be evaluated. All manufactured electronic equipment must meet the transient susceptibility levels specified in IEEE C62.41.
a. Component Damage Threshold. The transient level sufficient to render the component nonfunctional or operationally deficient.
b. Component Degradation Level. The transient voltage or energy level sufficient to shorten the useful life of the component.
c. Operational Upset Level. The transient voltage or energy level sufficient to cause an unacceptable change in operating characteristics for a duration in excess of 10 milliseconds for analog equipment or a change of logical state for digital equipment.
2-3
Figure 2-1. Bonding of Grounding Conductor to Its Enclosed Conduit for Used Conductors
2.5 Power Line Surges
A surge protection device (SPD) will be provided at the main service disconnecting means to reduce transients conducted to electronic equipment. SPDs may be installed on the load side or line side at the service entrance. Additional SPDs may need to be provided at power line entrances to electronic equipment. SPDs at the main service disconnecting means, as well as at electronic equipment power line entrances, will be functionally compatible.
2.5.1 Surge Levels
Surge levels and the number of occurrences for selection or design of facility AC arresters are provided in Table 2-1. The table defines line-to-ground surge currents and the number of occurrences for low voltage (less than 600 VAC) services. In the table, the 8/20 microsecond current waveform defines a transient reaching peak value in 8 microseconds and decays to 50 percent of that peak value in 20 microseconds. SPDs should be able to tolerate surges of shorter duration i.e., less than five (5) nanoseconds without malfunction.
Remove Insulation at Contact Point
Split Bolt Conductor
Insulated Circuit Grounding Conductor Ground Conductor to Busing
Ground Bushing
Conduit
Source: FAA-STD-019d LM1
2-4
Table 2-1. Line-to-Ground Surge Levels for 120/240, 120/208 Y and 277/480 Y Service Line
Surge Current Amplitude
8 by 20 Microsecond Waveform
(*4 by 10 Microsecond)
Number of Surges
(Lifetime)
10 kA 1,500
20 kA 700
30 kA 375
40 kA 50
50 kA 8
60 kA 6
70 kA 4
100 kA* 2
180-240 kA* 1
2.5.2 Facility AC Surge Protection Device
A facility AC surge protection device should be installed on the load side of the facility service disconnect. The SPD may be a combination of solid-state circuits i.e., silicone avalanche diode
(SAD), metal oxide varistor (MOV), or other devices that fire faster than 5 nanoseconds. For services with a neutral, SPD elements will be connected to protect all surge modes of coupling:
line to ground (L-G), line to neutral (L-N), and neutral to ground (N-G). For services without a neutral, SPD elements will be installed on the primary side, line to line (L-L) and each line to ground (L-G), of any NWS-owned distribution transformer.
Examples:
a. 3-phase, 4-wire DELTA-WYE neutral grounded system: The SPD will be connected for 7 modes of coupling: (L-N) 3, (L-G) 3, and (N-G) 1.
b. 3-phase, 3-wire DELTA grounded system: The SPD will be connected (L-L) 3, (L-G) 3 for 6 modes of coupling.
Using these examples, all possible entry points of overvoltage and surge currents are secured.
2.5.2.1 Characteristics
Minimum functional and operational characteristics of facility SPDs installed at the service disconnect will be as follows:
a. Maximum Continuous Operating Voltage (MCOV). MCOV is the maximum voltage that can be applied across SPD terminals with the device remaining in an off
(nonconducting) state. The MCOV of the SPD will not be less than 115 percent of nominal root mean square (RMS) line voltage.
b. Leakage Current. Leakage current across the device terminals will not exceed 100 microamps at MCOV.
2-5
c. Turn-on Voltage. Turn-on voltage is the minimum voltage across SPD terminals that will cause the arrester to turn on and conduct. Turn on voltage should not exceed
125 percent of MCOV. The arrester response time shall be less than five (5) nanoseconds in order to capture the entire lightning current spike.
d. Discharge (Clamp) Voltage. Clamp voltage is the maximum voltage appearing across an arrester output terminal while conducting surge currents. Clamp voltage should not exceed 160 percent of MCOV.
e. Overshoot Voltage. Overshoot voltage will not exceed 2 times the SPD clamp voltage for more than 10 ns. Overshoot voltage is the surge voltage level appearing across the SPD terminals before the device turns on and clamps the surge to the specified…