Site_Drawing.docx

DOCX document 8 MB Posted

Attached to
Cosme WTP Lime Softening Byproduct (Lime Sludge) Excavating and Removal
Solicitation number
REQ- 24 - 224
Issued by
Pinellas County, Florida

About this file

The file Site_Drawing.docx appears to be an image file (image1.emf) related to the Cosme Water Treatment Plant (WTP) Lime Softening Byproduct Excavation and Removal project for the City of St. Petersburg, Florida. The project involves the comprehensive removal of approximately 9,999 cubic yards of dry sludge from a pond, with an estimated daily removal capacity of 400-500 cubic yards. The scope of work includes providing all necessary labor, materials, tools, and equipment for excavation, removal, disposal, and off-site fill placement. The City of St. Petersburg will be responsible for the excavation permit, while the contractor must obtain and manage all other required permits, including hauling permits.

The project details suggest a focused environmental remediation effort with specific operational parameters. While precise pricing and funding sources are not explicitly outlined in the provided documentation, the project appears to be a municipal infrastructure maintenance initiative. The contractor will be responsible for comprehensive project management, including supervision, manpower allocation, equipment provision, hauling, and disposal of the lime softening byproduct. The project's scale and specificity indicate a targeted approach to managing industrial waste and maintaining water treatment facility infrastructure.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

image1.emf

File details come from the government source that posted it. Updated .