Silverliner VI Rail Cars RFP - SEPTA
The Southeastern Pennsylvania Transportation Authority (SEPTA) has issued Request for Proposal No. 25-00300-AMJP for the procurement of 234 Silverliner VI Electric Multiple Unit (EMU) Rail Cars configured as 117 married pairs for commuter railroad service on SEPTA's Railroad Division and Amtrak's Northeast Corridor and Harrisburg Line. The procurement includes a base order of 234 rail cars plus four option orders: Option 1 for 46 cars, Option 2 for 46 cars, Option 3 for spares for the option cars, and Option 4 to configure 30 of the first 46-car option orders as an Airport configuration. Proposers must submit pricing for both the base order and all four option orders to be considered responsive. The scope encompasses complete rail car design, manufacturing, pilot car delivery, testing, training materials, maintenance manuals, spare parts, special tools, and warranty provisions with warranty periods ranging from 3 to 15 years depending on components. Proposals are due by 4:30 PM on October 30, 2026, with questions due by September 25, 2026. The delivery schedule calls for pilot cars 42 months (1,260 days) from Notice to Proceed, with base order deliveries from 2030-2033 (9 married pairs in 2030, 36 in 2031, 36 in 2032, 36 in 2033) and option order deliveries in 2034-2035 (36 married pairs in 2034, 10 in 2035).
Technical specifications require maximum dimensions of 85 feet 1.5 inches length by 10 feet 6 inches width, target empty weight not exceeding 145,000 pounds per car, net energy usage not exceeding 7.3 kWh per mile per married pair, operation on 11,500-volt catenary systems, 40-year design life with annual average mileage of 61,000 miles per car, environmental operation range of -15°F to 120°F, pantograph interchangeability with existing Silverliner V cars, 90-minute battery operation capability, and integration with SEPTA's Vehicle Management Information System (VMIS) and Ansaldo positive train control (PTC) system. The procurement requires full compliance with Federal Railroad Administration (FTA) regulations, Buy America provisions mandating 70% domestic content with final assembly in the United States, and Pennsylvania Steel Products Procurement Act requiring 75% U.S. steel content. Award will be based on "best value" evaluation considering technical approach, relevant experience and past performance, program management and manufacturing approach, and price, with neither price nor technical factors being solely determinative. Best and Final Offer (BAFO) submissions must be accompanied by a $5,000,000 proposal bond, cashier's check, certified check, treasurer's check, or official bank check. The successful contractor must provide performance bonds ranging from 10% to 25% of contract sum during different project phases, maintenance bond of 5% for warranty period, and comprehensive insurance including commercial general liability of $5 million per occurrence, automobile liability of $1 million per occurrence, professional liability of $25 million, and umbrella/excess liability of $100 million. The procurement includes liquidated damages provisions ranging from $100 to $7,722 daily depending on violations with a cap of 10% of contract sum, and an economic price adjustment mechanism allowing escalation or de-escalation up to 20% of base price based on Producer Price Index. Disadvantaged Business Enterprise (DBE) participation is required per 49 CFR Part 26, and proposers must comply with Title VI of the Civil Rights Act, Equal Employment Opportunity laws, and Immigration Reform and Control Act of 1986.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSAL FOR THE PURCHASE
OF SILVERLINER VI RAIL CARS
TABLE OF CONTENTS
SECTIONS
NOTICE OF REQUEST FOR PROPOSALS
INSTRUCTIONS TO PROPOSERS
APPENDICES
CONTRACT AND GENERAL CONDITIONS FOR SILVERLINER-VI RAILCARS
Request for Proposal
RFP 25-00300-AMJP
August 2026
Southeastern Pennsylvania Transportation Authority
SECTION 1
NOTICE OF REQUEST FOR PROPOSALS
SECTION 1: NOTICE OF REQUEST FOR PROPOSALS
NR 1. RFP 25-00300-AMJP – Silverliner Rail Cars NR 2. Proposal Submission NR 3. Proposal Acceptance Period NR 4. Questions
RFP Section 1 Page 1 of 2
SECTION 1: NOTICE OF REQUEST FOR PROPOSALS
NR 1. RFP 25-00300-AMJP – Silverliner Rail Cars
A. The Southeastern Pennsylvania Transportation Authority (SEPTA) is soliciting proposals for the purchase of two hundred and thirty four (234) Rail Cars with four Option Orders.
• Base Order: two hundred and thirty-four (234) Rail Cars and supporting equipment
• Option 1: Forty-six (46) Rail Cars
• Option 2: Forty-six (46) Rail Cars
• Option 3: Spares for the option Rail Cars
• Option 4: Configure 30 of the first 46-car option orders as an Airport configuration
B. Proposers are required to submit pricing for the Base Order and all Option Orders in order for the proposal to be considered responsive.
C. SEPTA will evaluate each proposal in accordance with the criteria specified in Section 2, Instructions to Proposers. Recommendation for award, if made, to the SEPTA Board will be for the proposal that provides the best value to SEPTA. The proposals submitted shall be identified as Request for Proposal No. 25-00300-AMJP – Silverliner VI Rail Cars.
D. Proposers are advised that SEPTA is utilizing the Request for Proposal method for this Contract.
This procedure affords all proposers the opportunity to submit requests for modifications to the Contract and General Conditions, other terms and provisions, as well as modifications to the Technical Specification.
NR 2. Proposal Submission A. Each Proposal must be submitted per the requirements in Section 2, Instructions to Proposers, by the close of business (4:30 PM) on Friday, October 30, 2026. Please direct all correspondence to:
Michael Piselli Manager, Contract Administration SEPTA - Procurement and Supply Chain 1234 Market Street, 11th Floor Philadelphia, PA 19107-3780
B. No Proposal bonding is required; however, the Best and Final Offer (BAFO) must be accompanied by either a: (1) BAFO Proposal Bond; (2) Cashiers' check; (3) Certified check; (4) Treasurer's check; and/or (5) Official bank check; in the amount of not less than $5,000,000 (USD) drawn in favor of the Southeastern Pennsylvania Transportation Authority. The Proposal Bond must be issued by a qualified surety company currently authorized under 31 CFR Part 223 as possessing a Certificate of Authority as described thereunder and authorized to issue bonds at least up to the dollar amount of the Proposal Bond required hereunder.
RFP Section 1 Page 2 of 2
NR 3. Proposal Acceptance Period A. The Proposal shall be binding upon the Proposer for one hundred and twenty (120) calendar days following the Best and Final Offer. Any proposal on which the Proposer shortens the acceptance period will be rejected, although the acceptance period may be extended by mutual agreement between SEPTA and the Proposer.
NR 4. Questions A. Prior to submitting proposals, each prospective Proposer should examine the RFP Documents carefully and submit in writing any requests for an interpretation or correction of any ambiguity, inconsistency, or error therein. This should include a list of any items for which the Proposer requires clarification before it can determine its ability to comply, stating the specifics of the clarification requested (e.g., describing what the Proposer does not understand about the specification, or what the Proposer believes may be an error and why it is believed to be an error);
and, if the Proposer believes a specification is in conflict with another specification or other requirement of the Work, identify the sections it believes are in conflict and why; and any other clarification with sufficient description to enable SEPTA to provide the appropriate clarification.
B. All questions or requests for clarification pertaining to this Request for Proposal must be submitted in writing to SEPTA - Procurement & Contracts Department, Attn: Michael Piselli 1234 Market Street - 11th Floor, Philadelphia, PA 19107-3780 or email at mpiselli@septa.org. All questions must be received no later than the close of business (4:30 PM) on Friday September 25, 2026.
mailto:jcoombs@septa.org
SECTION 2
INSTRUCTIONS TO PROPOSERS
SECTION 2: INSTRUCTIONS TO PROPOSERS
IP 1. General IP 2. Form of Proposal
IP 2.1 Technical Proposal Submission IP 3. Obtaining Proposal Documents IP 4. Responsibility Requirements
IP 4.1 Responsibility of Proposer IP 4.2 Responsibility of SEPTA
IP 5. Submission of Proposals IP 5.1 Price Proposal IP 5.2 Restrictions on Contact with Authority Employees IP 5.3 Oral Presentations and Demonstrations IP 5.4 Disclosure of Proposals
IP 6. Other Information Included with Technical Proposal IP 6.1 Disadvantaged Business Enterprise (DBE) IP 6.2 Steel Products Procurement Act of 1978 IP 6.3 Buy America Provision
IP 7. Addenda IP 8. Equal Employment Opportunity (EEO) IP 9. Rights Reserved By SEPTA
IP 9.1 Modifications to SEPTA’s Form of Contract IP 9.2 Insurance IP 9.3 Performance Bond IP 9.4 Additional Guarantee IP 9.5 Proposal Acceptance Period IP 9.6 Taxes IP 9.7 Performance Evaluation IP 9.8 Buy America Pre-Award Audit for Rolling Stock IP 9.9 “Or Equal” Items IP 9.10 Non-Collusion Requirement
IP 10. Project Schedule IP 11. Proposal Format
IP 11.1 Technical Approach IP 12. Selection Process
IP 12.1 Evaluation Criteria IP 12.2 Evaluation and Selection Process IP 12.3 Award
IP 13 SEPTA Bid/Proposal Protest Procedure
SECTION 2: INSTRUCTIONS TO PROPOSERS
IP 1. General
A. You (hereinafter referred to as “Proposer”) are requested to submit a formal proposal (hereinafter referred to as “Proposal”) for the required Material and/or Equipment detailed in the Contract Documents (hereinafter referred to as “Project”) in accordance with this Request for Proposal (RFP). Any information in addition to that required by this RFP which Proposer feels will help in the evaluation of its Proposal is to be submitted with its Proposal. Any Proposal submitted must comply with the requirements of this RFP as herein stated including all applicable Federal, State and Local laws, and is to be signed by an officer legally authorized to bind Proposer to the Contract (hereinafter referred to as “Contract”) and shall be submitted to SEPTA in writing, in the time and in the manner described herein. Following is the RFP Quantity & Delivery Schedule:
SILVERLINER VI RAIL CARS QUANTITY & DELIVERY SCHEDULE
Calendar Year Delivery Qty of Married Pairs (MP) Optional qty of MPs
2030 9 N/A 2031 36 N/A 2032 36 N/A 2033 36 N/A 2034 n/a 36 2035 n/a 10 Totals 117 MP (234 Cars) 46 MP (92 Cars)
Note: The schedule above will vary with NTP date.
IP 2. Form of Proposal
A. Prospective proposers shall submit proposals for the Base Order and four (4) Option Orders:
• Base Order: two hundred and thirty-four (234) Rail Cars and supporting equipment
• Option 1: Forty-six (46) Rail Cars
• Option 2: Forty-six (46) Rail Cars
• Option 3: Spares for the option Rail Cars
• Option 4: Configure 30 of the first 46-car option orders as an Airport configuration
B. Each Proposal (consisting of the Base Order and the four Option Orders) shall be submitted in two
(2) separate sealed envelopes/packages, one containing the Technical Proposal and one containing the Price Proposal.
1. The Technical Proposal envelope/package shall contain one (1) original printed copy (see IP 2.1) and one (1) electronic copy in PDF and Excel Format.
2. The Price Proposal envelope/package shall contain one (1) original printed copy and one (1) electronic copy in PDF and Excel Format.
3. The envelopes/packages shall be sealed and identified on the face with the name of the Proposer and the RFP No (Request for Proposal No. 25-00300-AMJP – Silverliner VI Rail Cars).
IP 2.1 Technical Proposal Submission
A. In a separate binder(s), each Proposer shall provide the following technical information. This binder shall contain alpha-numeric designated tabs, corresponding to the paragraphs and elements listed within IP 11 – Technical Proposal Format. The response to each paragraph should be contained within its respective tab. For example, the Proposer’s documentation on how acceleration requirements will be met should be presented within Tab 2. Each tab should include all information requested in its entirety and be fully self-contained, and not reference attachments distributed throughout the proposal. Each Technical Proposal shall demonstrate that all proposed equipment integrates and satisfies the functional requirements in the Technical Specification. General statements or overall descriptions may be used to supplement the material presented. If any exceptions to the Technical Specification are to be made, the Technical Proposal shall include a complete tabulation of every exception to the Technical Specification in the form of a compliance matrix (see IP 11.1 Technical ApproachChapter 0, Tab 29 – Compliance Matrix ).
B. The Technical Proposal should be clear and concise and completely explain how the Proposer will meet the stated objectives. Brevity and clarity are desired. Statements merely indicating that the Proposer will meet specific requirements are not acceptable. The Technical Proposal will be judged on the completeness, clarity and technical content of the proposal as elaborated in IP 12. Selection Process.
C. If more than one type of car is offered, the Proposer shall submit a separate and complete Technical and Price Proposal (or separate and completely referenced sections within one Technical Proposal) for each car being offered. The Proposer is responsible for duplicating the required Proposal submission forms and documents for each respective proposal.
D. The proposal shall not exceed two 3 ½” binders of 8 ½ by 11 inches pages single sided (excluding illustrations or drawings). Font size shall be 10 pt. or greater. A limited number of 11 by 17 inch fold-out drawings are permitted, in addition to the drawings specifically requested below. Supplier promotional brochures need not be included, unless pertinent technical information is provided by them. Drawings shall be of a print quality that is easily readable in English.
IP 3. Obtaining Proposal Documents A. All required proposal forms are included with this RFP.
IP 4. Responsibility Requirements
IP 4.1 Responsibility of Proposer
A. SEPTA will only award a Contract to a firm which it has determined to be responsible. The Proposer shall furnish adequate documentation, as determined by SEPTA, within twenty (20) days of receipt of SEPTA's written request to permit SEPTA to determine the responsibility of the Proposer. A responsible contractor is one which meets the following standards:
1. Integrity and Ethics – Has a satisfactory record of integrity and ethics, in compliance with 49 U.S.C. Section 5325(j) (2) (A);
2. Debarment and Suspension – Is neither debarred nor suspended from Federal programs under DOT regulations, “Non procurement Suspension and Debarment,” 2CFR Parts 180 and 1200, or under FAR at 48CFR Chapter 1 Part 9.4 or any Commonwealth of Pennsylvania funded programs;
3. Affirmative Action and DBE – Is in compliance with the Common Grant Rules’ affirmative action and DOT’s Disadvantaged Business Enterprise requirements, 49 CFR Part 26;
4. Public Policy – Is in compliance with the public policies of the Federal Government, as required by 49 U.S.C. Section 5325 (j) (2) (B) and Commonwealth of Pennsylvania public policies;
5. Administrative and Technical Capacity – has the necessary organization, experience, accounting, and operational controls and technical skills, or the ability to obtain them in compliance with 79 U.S.C Section 5325 (j) (2) (D);
6. Licensing and Taxes – Is in compliance with applicable licensing and tax laws and regulations
7. Financial Resources – has, or can obtain, sufficient financial resources to perform the contract, as required by 49 U.S.C. Section 5325 (j) (2) (D);
8. Production Capability – Has, or can obtain, the necessary production, construction and technical equipment and facilities;
9. Timeliness – Is able to comply with the required delivery or performance schedule, taking into consideration all existing commercial and governmental rail car commitments; and,
10. Performance Record – Is able to provide a satisfactory current and past performance record.
IP 4.2 Responsibility of SEPTA
A. SEPTA will provide the following for the duration of the Contract:
1. Project Manager – SEPTA will provide a Project Manager (hereinafter referred to as "SEPTA's Project Manager") and management team which shall provide the technical direction of the Project. The SEPTA team shall also monitor and review the progress of the Proposer's services in order to aid in the program coordination. The participation by SEPTA's Project Manager shall not relieve the Proposer from its obligations under the terms of the Contract.
2. Contract Administrator – SEPTA will also provide an administrator for the Contract (hereinafter referred to as "SEPTA's Contract Administrator"). All changes to contract requirements which need to be performed under the Contract must receive the prior written authorization of SEPTA's Contract Administrator
IP 5. Submission of Proposals A. Proposals shall be submitted to:
Michael Piselli Manager, Contract Administration SEPTA - Procurement and Supply Chain 1234 Market Street, 11th Floor
Philadelphia, PA 19107-3780
IP 5.1 Price Proposal
A. The Price Proposal shall be submitted to SEPTA as a separate sealed document. Price Proposals which exclude or restrict cost items necessary for a Proposer to perform the SEPTA required scope of services are not acceptable and may be considered by SEPTA as non-responsive to the RFP.
B. The Price Proposal shall be submitted on Contract Exhibit 1 - Price Schedule along with any other additional information required to make it complete. The Price Proposal must include pricing for the Options.
C. The requirements of the Contract included as part of this RFP should be carefully reviewed by the Proposer prior to preparation of its Price Proposal. In preparation of its Price Proposal, the Proposer must assume that SEPTA will not make any modifications to the terms of the Contract as attached.
IP 5.2 Restrictions on Contact with Authority Employees
A. Prospective Proposers are advised that until the award of any Contract pursuant to this RFP, they are not permitted to contact SEPTA employees about a matter related to this solicitation unless they have received the permission of the Point of Contact for this RFP, Michael Piselli.
IP 5.3 Oral Presentations and Demonstrations
A. SEPTA may require Proposers to give oral presentations regarding their proposals and/or to exhibit or demonstrate the items they are proposing after the Proposal Submittal Date.
IP 5.4 Disclosure of Proposals
A. Upon submission, proposals and other materials submitted by Proposers become records subject to the Freedom of Information Law of the Commonwealth of Pennsylvania (FOIL). SEPTA may deny the public access to such records or applicable portions thereof which (a) are trade secrets or are maintained for the regulation of commercial enterprise which, if disclosed, would cause substantial injury to a competitive position of the subject enterprise, (b) are specifically exempted from disclosure by State and Federal Statute, or (c) are otherwise exempted from disclosure under FOIL.
B. Proposers should mark confidential only those portions of their proposals which they believe are not required to be disclosed under FOIL. Labeling information as confidential will result in the applicability of the trade secrets provisions of FOIL. FOIL includes procedures for determining, in response to a request for access to materials labeled "Trade Secrets", whether such materials are in fact trade secrets under FOIL. If materials are in fact trade secrets, access will be denied. If the materials are not in fact trade secrets and are otherwise publicly accessible records, access must be granted.
IP 6. Other Information Included with Technical Proposal A. If the Proposer is a joint venture, limited liability company, partnership, newly formed entity or holding company (Proposers Entity), then a copy of any written contract or understanding which exists between the members of the Proposer Entity” shall be included as part the Technical Proposal. If no written contract or understanding exists, then the Proposer Entity shall include in its Technical Proposal a written statement explaining how the Proposer Entity will fulfill the requirements of the Contract included within this RFP. Such explanation shall fully discuss and identify the responsibility of the Proposer Entity for performing the services, providing the required insurance and bonding providing coverage for the indemnification of SEPTA required by the Contract. It shall clearly explain which parties of the Proposer Entity will interface with SEPTA on a design and technical basis, which major sections of the Technical Specifications will be handled by each party including post-delivery technical support and warranty, and which member of the Proposer Entity or partner will be responsible to resolve disputes between the Proposer Entity and
SEPTA.
IP 6.1 Disadvantaged Business Enterprise (DBE)
A. SEPTA hereby notifies all Proposers that Disadvantaged Business Enterprises (DBE) will be afforded full opportunity to submit Proposals in response to this RFP and will not be subject to discrimination on the basis of race, color, sex, age, physical handicap or national origin in consideration for an award.
B. SEPTA solicits and encourages DBE participation as a prime Contractor, joint venture partner, and/or as a subcontractor for the Project. DBE's will be afforded full consideration and will not be subject to discrimination. All respondents will be required to comply with FTA's DBE requirements for transit vehicle manufacturers found in 49 CFR Part 26.
IP 6.2 Steel Products Procurement Act of 1978
A. By submitting a proposal it specifically agrees to fully comply with the Commonwealth of Pennsylvania's Steel Product Procurement Act of 1978 (Act No. 3 of 1978, March 3 P.L. 6 (73 P.S.
'1881 et seq.)), as amended.
B. The Commonwealth of Pennsylvania's Steel Product Procurement Act of 1978, as amended, defines "steel products" as products rolled, formed, shaped, drawn, extruded, forged, cast, fabricated or otherwise similarly processed, or processed by a combination of two or more of such operations, from steel made in the United States of America by the open hearth, basic oxygen, electric furnace, Bessemer or other steel making process, and shall include cast iron products and shall include machinery and equipment listed in the United States Department of Commerce Standard Industrial Classification 25 (furniture and fixture), 35 (machinery, except electrical), and 37 (transportation equipment) and made of, fabricated from, or containing steel components. If a product contains both foreign and United States steel, such product shall be determined to be a United States steel product only if at least 75 percent of the cost of the articles, materials and supplies have been mined, produced or manufactured, as the case may be, in the United States. NOTE*: Transportation equipment shall be determined to be a United States steel product if it complies with 49 U.S.C.
5325(j) [formerly Section 165 of the Federal Surface Transportation Assistance Act of 1982, as amended] and the applicable regulations in 49 CFR Part 661. [Buy America]
C. The Proposer understands and agrees that, whether or not it sets forth any exceptions on its Price Proposal with the Steel Product Procurement Act, the Proposer is bound by its original Price Proposal and is not permitted to change its Price Proposal after proposal opening. In addition, if the Proposer does not set forth any exceptions with the Steel Product Procurement Act requirements, the Proposer understands and agrees that it is not eligible for a waiver of those requirements.
IP 6.3 Buy America Provision
A. In order to qualify as a domestic end-product, the cost of components produced in the United States must exceed 70 percent (70%), as defined in 49 CFR Part 661, of the cost of all components and subcomponents, and final assembly must take place in the United States.
B. The Proposer understands and agrees that, pursuant to 49 CFR Part 661.13, whether or not it certifies that it will comply with the applicable Buy America requirement, the Proposer is bound by its original certification or if given the opportunity, its certification submitted with its Best and Final Offer (BAFO), and is not permitted to change its certification after BAFO opening. In addition, if the Proposer certifies that it will comply with the applicable Buy America requirements, the Proposer understands and agrees that it is not eligible for a waiver of those requirements.
C. On November 15, 2021, President Biden signed into law the Infrastructure Investment and Jobs Act (“IIJA”), Pub. L. No. 117-58, which includes the Build America, Buy America Act (“the Act”).
Pub. L. No. 117-58, §§ 70901-52. The Act strengthens Made in America Laws and will bolster America’s industrial base, protect national security, and support high-paying jobs. The Act requires that no later than May 14, 2022—180 days after the enactment of the IIJA—the head of each covered Federal agency shall ensure that “none of the funds made available for a Federal financial assistance program for infrastructure, including each deficient program, may be obligated for a project unless all of the iron, steel, manufactured products, and construction materials used in the project are produced in the United States.”
IP 7. Addenda A. The contents of all addenda to Proposers are to be incorporated in the proposal and will become part of the contract documents. Addenda should be acknowledged on the Acknowledgement of Addenda Form and included as part of the technical proposal.
IP 8. Equal Employment Opportunity (EEO) A. In connection with the performance of the Agreement, the Awardee shall not discriminate against any employee or applicant for employment because of race, color, age, creed, religion, sex or national origin. The Awardee shall take affirmative action to ensure that applicants are employed, and that employees are treated during employment, without regard to their race, color, creed, religion, sex, age or national origin. Such action shall include, but not be limited to, the following:
employment, upgrading, demotion or transfer; recruitment or recruitment advertising, layoff or termination; rate of pay or other forms of compensation; and selection for training, including apprenticeship.
IP 9. Rights Reserved By SEPTA A. SEPTA expressly reserves the right to reject any and all Proposals and/or to negotiate separately with any firm in any manner deemed appropriate to serve its best interest. If an award is made as a result of the Proposals, SEPTA will award the Contract to the prospective contractor who SEPTA has determined to be responsive and responsible, and whose Proposal represents the “best value” to SEPTA by providing a combination of both price/cost and technical evaluation factors which SEPTA determines is in the best interests of and the most advantageous to SEPTA. SEPTA is not liable for any expenses incurred by any Proposer(s) in the development of its Proposal or any subsequent activity related to the Proposal.
B. Any Contract to be entered into pursuant to this RFP is subject to financial assistance grants between SEPTA, the United States Department of Transportation, Federal Transit Administration (FTA), and the Pennsylvania Department of Transportation, and must conform to the requirements thereof.
IP 9.1 Modifications to SEPTA’s Form of Contract
A. If an award of Contract is made as a result of this RFP, the proposed form of Contract which the Proposer will be required to execute is included, and the Proposers are urged to review the Contract fully. SEPTA may, at its sole discretion consider modifications to the terms of the proposed Contract, provided the Proposer specifically requests such modifications during the questions period of this procurement.
B. The Contract requires that all tasks described in the RFP shall be the Proposer's sole responsibility and shall be performed by the Proposer and its subcontractors/sub-consultants. As part of the negotiation process (see IP 12. Selection Process), SEPTA may elect to consolidate the services described in the RFP and the Proposal into a single document. The single document shall then become an Attachment to the Contract instead of the RFP and Proposal.
IP 9.2 Insurance
A. The Proposer shall be required to provide insurance as subject to the requirements of the Contract.
IP 9.3 Performance Bond
A. The successful Proposer shall be required to furnish a Performance Bond no later than ten (10) days after Intent of Notice of Award, in accordance with the requirements of the Contract. The acceptable bond form is AIA Document A311. A sample is attached to the Contract in Exhibit E.
IP 9.4 Additional Guarantee
A. SEPTA reserves the right, at its sole discretion, to require Proposer to provide additional guarantee from parent, affiliated or related corporation.
IP 9.5 Proposal Acceptance Period
A. The Proposal shall be binding upon the Proposer for one hundred and twenty (120) calendar days following the "Best and Final Offer". Any proposal on which the Proposer shortens the acceptance period will be rejected, although the acceptance period may be extended by mutual agreement between SEPTA and the Proposer.
IP 9.6 Taxes
A. Pennsylvania Sales and Use Tax: As an agency and instrumentality of the Commonwealth of Pennsylvania, SEPTA is exempt from the payment of Federal Excise Taxes and Pennsylvania Sales and Use Taxes (71 P.S. Sec. 7071 et seq.) on material, equipment or other personal property purchases and contracts for its exclusive use or consumption: therefore, the Proposer shall not include these taxes in the computation of its price proposal. SEPTA will furnish exemption certificates, as required, upon the request of the Proposer.
B. City of Philadelphia and School District of Philadelphia Taxes: The Proposer as a result of any contract entered into pursuant to this Request for Proposal, may be subject to certain business taxes imposed by the City of Philadelphia and/or the School District of Philadelphia. The Proposer is solely responsible for making its own investigation to determine whether or not it is subject to the above-mentioned city and school district taxes, and for paying any such tax if applicable. Proposers are hereby informed that SEPTA is obligated by law to furnish to the City of Philadelphia Department of Collections, upon its request, the name and address of any person or firm with whom it has a contract for goods and services. For information the following phone number is provided:
Business and Earnings and School Income Tax (215) 686-6600.
IP 9.7 Performance Evaluation
A. SEPTA's Procurement Manual requires the formal performance evaluation of all Material/Equipment Contracts over $100,000.
IP 9.8 Buy America Pre-Award Audit for Rolling Stock
A. The successful Proposer will be required to provide SEPTA, or its designated independent third party reviewer, with sufficient documentation prior to contract award as to allow SEPTA, or its designated independent third party reviewer, to verify the accuracy of the Proposer’s Buy America Certification.
B. The documentation supplied by the Proposer must list (a) component and subcomponent parts of the rolling stock to be purchased identified by manufacturer of the parts, their country of origin and costs; and (b) the location of the final assembly point for the rolling stock, including a description of the activities that will take place at the final assembly point and the cost of final assembly.
C. SEPTA, or its designated independent third party reviewer, will also perform a post-delivery audit of the business as actually manufactured in accordance with 49 CFR Part 663, and the Proposer shall supply sufficient documentation to verify compliance.
D. The Proposer shall not restrict SEPTA, or its designated independent third party reviewer(s), from stating component manufacturer and country of origin information in any Buy America Audit Reports.
IP 9.9 “Or Equal” Items
A. Whenever in the Technical Specification an article or material is defined by using a trade name or the name and catalog number of a particular manufacturer or vendor, or a limited description, the term "OR EQUAL" if not written thereafter shall be implied. Any reference to a particular manufacturer's product either by trade name or limited description is only for purposes of setting a standard of performance, quality, composition, construction or size.
B. The term "OR EQUAL" means any other manufactured product or article which is equivalent in material, workmanship and service and is as efficient and economical in operation in the opinion of SEPTA.
C. The Proposer shall furnish the “OR EQUAL” documentation for SEPTA’s review.
D. SEPTA's opinion as to whether the proposed alternate is "EQUAL" to the specified items for SEPTA's specified use and purposes shall be final and conclusive.
IP 9.10 Non-Collusion Requirement
A. In the event Proposer is deemed the lowest responsive, responsible Proposer for this project, and as part of the proposal signed herewith, Proposer hereby agrees to sign an Affidavit of Non- Collusion in form acceptable to SEPTA prior to the award, if any, of the Contract. A sample Affidavit of Non-Collusion is attached to the Contract in Exhibit E.
IP 10. Project Schedule Event Calendar Days From NTP
Shipment of First Pilot Cars 1,260 Days (42 Months) Acceptance of First
Production Married Pair 1,530 Days (51 Months)
Acceptance of 40th Production Married Pair
1,890 Days (63 Months)
Acceptance of 80th Production Married Pair
2,280 Days (76 Months)
Acceptance of Last Production Married Pair
2,640 Days (88 Months)
IP 11. Proposal Format
A. Technical Proposals shall contain the following:
1. Part A – Proposal Cover Form: Proposer shall complete and submit the Proposal Cover Form that is provided in Exhibit E of the Contract.
2. Part B – Acknowledgment of Addenda: Proposer shall complete and submit the Acknowledgement of Addenda Form that is provided in Exhibit E of the Contract.
3. Part C – Executive Summary: Proposer shall submit an Executive Summary providing an overview of the complete proposal. The Executive Summary shall be clear and concise and discuss how the Proposer intends to meet the requirements of this RFP.
4. Part D – Technical Proposal: Proposer shall submit a Technical Proposal which shall include all of the following:
• A statement from the Proposer that all technical specifications and technical requirements have been reviewed and that the Proposer's team is capable of and commits to performing all of them except as noted pursuant to Part E, below.
• A detailed Technical Approach which addresses and responds to all issues identified in IP
11.1 Technical Approach.
5. Part E – Contract Terms and Conditions Exceptions: Proposer shall submit a statement of exceptions which the Proposer takes to any of the Contract and General Conditions.
6. Part F – Insurance and Security Instruments: Proposer shall submit letters from acceptable insurance companies and a sample irrevocable letter of credit from a qualified bank or banks, which satisfactorily establishes to SEPTA that such companies/banks will issue the necessary insurance policies and irrevocable letters of credit (form to be approved by SEPTA) as required in the Contract and General Conditions.
7. Part G – Lobbying Certification: Proposer shall complete and submit the Disclosure of Lobbying Activities Form that is provided in Exhibit A of the Contract.
8. Part H – Certifications:
a. Proposer shall complete and submit the Buy America Certificate that is provided in Exhibit D of the Contract.
b. Proposer shall complete and submit the DBE Approval Certification that is provided in Exhibit D of the Contract.
c. Proposer shall submit a copy of their Certificate of Compliance with Immigration Reform and Control Act of 1986, attached in Exhibit D of the Contract.
d. Proposer shall complete and submit the Certification Regarding Lobbying that is provided in Exhibit D of the Contract.
B. Price Proposals shall contain the following:
1. Part I – Price Schedules: Proposers shall complete and submit Exhibit I, Price Schedule, Exhibit II, Milestone and Progress Payment Schedule, and Exhibit III, Spare Parts Price Schedule.
• All blank spaces shall be filled in and no changes shall be made in the wording of the forms.
• All prices shall be in U.S. dollars.
• For the Milestone and Progress Payment Schedule, the payment percentages provided will be for SEPTA consideration and finalized during the negotiation process.
• As part of the proposal, Contractor shall identify subsystems for which the LLRU cannot be identified on the car or cannot be exchanged on the car. For these items BTEs must be supplied and a separate price must be supplied for each subsystem BTE.
IP 11.1 Technical Approach
A. The Technical Proposal submitted shall comprise a technical description of the Silverliner VI Rail Cars and their major subsystems and components. This proposal shall demonstrate that all the equipment integrates and satisfies the functional requirements in the Technical Specification. The proposal shall not exceed two 3 ½” binders of 8 ½ by 11 inches pages single sided (excluding illustrations or drawings). A limited number of 11 by 17 inch paper fold out drawings are permitted, with the exception of the drawings requested below. Supplier promotional brochures are not to be included unless pertinent technical information is provided within them.
B. Note that the Technical Specification requires the Proposer to submit a complete Management Plan and Project Schedule for SEPTA review and approval after the Notice to Proceed (NTP) is issued.
The Proposal submittals for this Section are to be conceptual in nature, intended to demonstrate a general understanding of the requirements of the Technical Specification and demonstrate the Proposer's ability to properly perform this Work.
C. Tabs are numbered to the corresponding section of the Technical Specification, where applicable.
Separate tabs in the Technical Proposal must be provided for the following:
Tab 1 – Program Management/Manufacturing Approach
A. Provide a Program Organization Chart along with a description of the parties shown thereon and the authority of all key program personnel. Provide resumes for all key personnel listed, including appropriate subcontractor personnel.
B. Describe the design team organization showing the management structure, various disciplines, and the interface among the disciplines.
C. Provide a Critical Path Schedule (CPM) for all major phases and showing key contract management, design, manufacturing, assembly, testing, delivery and other CDRL milestones outlined in the RFP documents. Assume March 1, 2027 as the start date for the Contract award and the NTP. Clearly identify the schedule’s critical path. Include in the proposed schedule any contingency time for unexpected delays and SEPTA’s review and approval time durations for Conceptual Design Review, Preliminary Design Review, Final Design Review and First Article Inspections. Provide a detailed schedule for the first six Vehicles and a summary schedule for the remaining Vehicles.
D. Identify the methods to be used to control program delays and cost overruns, including Proposer’s demonstrated experience identifying and controlling risks and opportunities on past projects.
E. Describe the design responsibility of the Proposer and major subcontractors (by name), and how the design work will interface among these groups.
F. Supply a sample document used in the procurement of Supplier equipment and or services that states in detail the requirements of said Supplier in their responsibility to meet requirements found within the Technical specification such as materials and workmanship, provisions for manuals, training and multi-level drawing requirements.
G. Describe the approach for systems integration as required by the equipment being purchased, including the Proposer’s responsible party responsible for managing and assuring the integration of all systems into the total car design.
H. Identify the proposed location and staffing of the Proposer’s program management office, manufacturing plants and final assembly plant. Describe the activities to be performed at these locations, and how activities and management responsibilities will be coordinated among these facilities.
I. Describe the intended design interface between the Proposer’s team and SEPTA’s technical staff for the program management and design refinement process specified in Section 25 of the Technical Specification.
J. Describe the plan and approach to be used by the Proposer for configuration management and safety certification of critical components, systems and subsystems, and the process to include technical changes into pre-delivery production cars, retrofit of delivered cars and required changes to maintenance and parts catalogs.
K. Describe the quality assurance program stipulated in Section 22 of the Technical Specification, including approach, organization, sample procedures, sample documentation, and feedback mechanisms to ensure that problems are not repeated. Particular attention shall be paid to describing the Proposer’s quality control/quality assurance role at the final assembly site.
L. List all work at the carbody manufacturer, brake supplier, door control supplier and final assembly location which are expected to take place during the period of the Contract, the quantity of work and delivery dates for same. Describe the plant capacity for these locations and indicate the capacity available for this work including personnel.
M. Describe the group responsible for preparation of workflow plans, schedules procedures, quality control, material control, etc., at the final assembly location. If more than one party is being considered, provide information for each
N. Describe in detail the Proposers plans for staffing adequate personnel for on-site engineering, acceptance testing, warranty support, retrofits and stocking warranty spares at SEPTA.
O. Describe in detail the Proposer plans for ensuring that the cars comply with all laws and regulations including those of the 49 CFR 38 Subpart E – Commuter Rail Cars and Systems, and the requirements and recommended practices of the American Public Transportation Association.
Tab 2 – Design Approach
A. Describe the approach and measures to be taken to ensure that the car will comply with all laws and regulations including those of Pennsylvania, Federal Railroad Administration (FRA), and the requirements of the Code of Federal Regulations (CFR) and applicable American Public Transportation Association (APTA) standards.
B. Describe the approach to be used for industrial design both in areas of human factors (maintainability, operator areas, and passenger areas) and overall vehicle design.
C. Describe the vehicle general arrangement, both exterior and interior, doorway layout and how the design complies with the Technical Specification.
D. Describe how the Proposer will ensure that the vehicle design complies with the dimensional, operating and environmental conditions of Section 2 of the Technical Specification.
E. Describe approach and measures to be taken to improve energy efficiency and meet or exceed minimum requirements for equipment efficiency. Perform and submit energy consumption simulations and predictions as detailed in EN 50591.
F. Identify the car weight and the weight of its major components. Identify the target weight commitments to be conformed into Section 2 of the Technical Specification to serve as the basis for the design and imposition of liquidated damages. Provide supporting diagrams or tabulations showing that weight and load criteria targets provided are consistent with other proposed information.
G. Describe the approach to be used to maintain the total weight of the car within the target and rejection weight limits, including lateral and longitudinal imbalances, and minimum weight distribution from axle to axle. Identify the critical variables affecting weight which will be monitored throughout the design evolution of the car.
H. Describe the organizational approach to weight management for the vehicle design.
I. Provide a description of the proposed vehicle performance as detailed in Section 2 of the Technical Specification including acceleration, braking curves, and top speed.
J. Describe the approach to be used to achieve the noise, vibration, and ride quality requirements of the Technical Specification.
K. Describe the approach to be used to achieve the electromagnetic interference and compatibility requirements of the Technical Specification.
L. Describe how the proposed vehicle meets the towing requirements of the Technical Specification including rescue scenarios involving existing SEPTA railroad equipment utilizing 26 style brake architecture.
Tab 3 – Carbody Structure
A. Describe the carbody structure and the materials to be used.
B. Describe the design approach to be used for the carbody and identify the critical design variables, analytic techniques and tests for the major carbody design elements.
C. Describe how secondary structural connection techniques will be performed for supports and framing attached to the carbody structure to meet the Technical Specification.
D. Describe the proposed methods to be used to achieve the carbody strength and collision energy absorption as required by the Technical Specification, including applicable CFR structural requirements.
E. Describe the required procedures for maintaining the carbody including maintenance intervals.
F. Describe the repairability of the proposed carbody.
Tab 4 – Coupler and Drawbar
A. Describe the mechanical, pneumatic, and electrical coupler equipment including coupling and uncoupling devices.
Tab 5 – Operator’s Cab
A. Provide a general arrangement of the cab layout in both plan and elevated side view with Operator’s cab seat included in respect to the position of the console.
B. Provide a detail arrangement of the total console layout including all proposed control positions while describing how their location was chosen based on expected frequency of use and ergonomic considerations.
C. Provide details on the proposed field of view from the Operator’s cab.
Tab 6 – Passenger Doors
A. Describe the doors and door control system for each proposed supplier.
B. Describe the door safety and interlocking features, and interior and exterior emergency opening handle design and required operating forces.
C. Provide details on obstruction detection.
D. Describe crew door control interactions.
Tab 7 – Heating, Ventilation, and Air Conditioning (HVAC)
A. Describe the proposed HVAC system arrangement in respect to air conditioning, baseboard heat/overhead heat percentages in respect to supply and control.
B. Describe the proposed tonnage for each proposed supplier.
C. Provide information to describe all maintenance access points for both interior and exterior locations of the HVAC units including any/all special tooling and portable diagnostic equipment.
D. Provide heating and cooling load calculations. Identify the type of refrigerant being used.
E. Provide general arrangement of interior air supply ducts and routes to passenger seating areas and cab.
F. Provide details on the control system and means for future adjustments of settings.
Tab 8 – Lighting
A. Describe the proposed lighting system and lighting controls for both interior and exterior lights.
B. Describe emergency lighting controls and independent power supply equipment to be used.
Tab 9 – Auxiliary Power
A. Describe the proposed equipment for both the high and low voltage systems for each proposed supplier including approach to cooling.
B. Provide a description of the scheme for the ground fault detection system.
C. Describe the proposed equipment for the battery systems for each proposed supplier.
D. Describe the maintenance shop power system for each proposed supplier.
E. Describe the design approach load shedding and layover mode.
Tab 10 – Propulsion and High Voltage System
A. Describe the propulsion system’s control and system for each proposed supplier.
B. Describe the proposed spin/slide control system, including methods used to minimize stopping distance under low available rail adhesion and its coordination with the friction brake system.
C. Describe the propulsion system’s management of wheel diameter including automatic wheel diameter adjustment.
D. Describe efficiency measures including maximization of regenerative braking capacity and energy monitoring.
E. Describe the proposed pantograph design including grounding methods.
E. Describe the main transformer and high voltage system design.
F. Describe the proposed fault protection and ground return system.
Tab 11 – Truck Assemblies
A. Provide a description of the proposed trucks in respect to type of manufacture (cast/fabricated) and axle bearing configuration.
B. Provide details on the proposed trucks including information such as general arrangement drawings, structural material description, suspension (primary and secondary) description, natural frequency characteristics, allowable static and dynamic movement, clearances, and fully assembled weight.
C. Describe the proposed mounting arrangement for the friction brake equipment.
Tab 12 – Friction Brakes Subsystem
A. Describe the friction brake system’s control and pneumatic system for each proposed supplier.
B. Describe the proposed spin/slide control system, including methods used to minimize stopping distance under low available rail adhesion and its coordination with the propulsion system.
Tab 13 – Communication Subsystems
A. List all main components found within the communications system and describe their use.
B. Describe how the Passenger Information System (PIS) and Automatic Vehicle Location (AVL) System will be integrated into the vehicle.
C. Describe the onboard video surveillance system, including camera locations and coverage, and equipment mounting.
D. Describe the proposed destination signs, route map, and information sign systems, including the location of displays and equipment.
E. Describe the application and traits of the assistive listening subsystem.
F. Describe the approach to integrating the automatic passenger counting system.
Tab 14 – Interior and Exterior Appointments
A. Identify the general vehicle layout with emphasis on equipment lockers and seating areas; include steps to be taken to minimize the loss of passenger interior space.
B. Identify the vehicle passenger capacity (in both number of seats and passenger standing area).
C. Identify all seats by type, size and location for each seating area.
D. Identify all interior aspects pertaining to interior linings, floor & floor coverings, ceilings, ducts, including end door clear width and height (after all trim and encasements have been applied).
E. Describe the method of ADA-compliant mobility aid access and mobility aid berthing locations.
F. Describe all bicycle storage locations and mounting provisions.
G. Describe the clear width, height, and locations of passenger side doorways.
H. Describe the approach to user experience/user interface design with regard to signage and decals.
I. Describe the approach to an integrated industrial design, mock-up, and virtual reality scenario design process.
J. Describe the proposed roof access from the vehicle.
Tab 15 – Test Program
A. Describe the mobilization plan and approach for conducting the tests required in Section 15 of the Technical Specification and how requirements for on-track qualification and service testing are incorporated.
B. Provide a preliminary plan of test sequencing, including the duration assuming track availability of four hours/day on five days/week.
C. Describe the methods by which ongoing test results will be cycled through the design process to ensure that the design modifications are implemented into all cars.
Tab 16 – Materials and Workmanship
A. Provide assurances that all materials, processes and workmanship will be in accordance with the requirements of Section 16 of the Technical Specification.
B. Describe the approach to corrosion control as required by the Technical Specification.
Tab 17 – Network and Trainline Control
A. Describe the design approach to meeting the discrete trainline network requirements of the Technical Specification.
B. Describe how the proposed system meets the vehicle Ethernet network requirements of the
C. Describe the reliability of the proposed networks and trainlines including reliability across the coupler.
D. Describe the proposed approach to discrete trainlines.
Tab 18 – Monitoring and Diagnostics
A. Provide a complete description of how the proposed design will meet the criteria associated with the Vehicle Monitoring and Diagnostic Subsystem (VMDS).
B. Describe how the proposed design will meet the Train to Wayside Data Transfer (TWDT) requirements including the wayside software TWDT components.
C. Describe the approach to fault and attribute management.
D. Describe the proposed ride quality monitor system.
Tab 19 – Software Engineering
A. Provide a description of software configuration control that will be used by the Proposer and how it will be applied to installed equipment and spare parts.
B. Describe the proposer’s approach to Software Engineering and documentation.
C. Describe the…