Signed_Sealed_NM FLAP SJU 10(1)_Plans.pdf
PDF 17 MB Posted
- Attached to
- NM FLAP SJU 10(1) Cottonwood Campground Bridge
- Solicitation number
- 6982AF21B000023
About this file
This document contains details of a federal contract opportunity for the NM FLAP SJU 10(1) Cottonwood Campground Bridge project. The project scope involves constructing a bridge to span an arroyo at a campground entrance, reconstructing the roadway alignment, and other associated earthwork. It is advertised as a total small business set-aside. The construction work will require approximately 3,950 cubic yards of embankment, 2,120 cubic yards of class 3 riprap, 1,220 cubic yards of class 4 riprap, 194 cubic yards of structural concrete, and other items. The proposed bridge is 105 feet long with two 12-foot lanes and 4-foot shoulders. The work must consider numerous environmental and cultural resource constraints. The cost is estimated between $1.5 million to $3.5 million. Construction is anticipated from fall 2021 to April 2022. The solicitation number is 6982AF21B000023 and bids are due through the Department of Transportation Federal Highway Administration. Anticipated contract award is late November 2021.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
8/30/2021
08/31/2021 for:
Sheet 1 of 2
A2
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
ABBREVIATIONS DRAINAGE SYMBOLS
GEOLOGIC SYMBOLS
DI
FENCE & CATTLEGUARD SYMBOLS
Cattleguard (Existing, Proposed)
Fence w/ Gate (Existing, Proposed)
Fence (Existing, Proposed)
Material Source
Boring Location (Existing, Proposed)
Riprap Apron (Proposed)
Underdrain (Existing, Proposed)
With Drop Inlet (Existing, Proposed)
With Headwalls (Existing, Proposed)
With End Sections (Existing, Proposed)
Pipe Culvert (Existing, Proposed)
Box Culvert (Existing, Proposed)
Bridge (Existing, Proposed)
Spring
River
Wetland
Large Creek
Lake, Pond or Reservoir
Drainage or Small Creek
Flow Arrow
Ditch (Existing, Proposed)
SPRING
D jt.J int.
incr.
incl.
IDI
hwy.
HW
horiz.
hex.
HES
hdwl.H gdr.
galv.
ga.G ftg.
fin.
FES
Fed.
f.f.F ext.
exp. jt.
exc.
EW
et ux et al
ER
EQ or eq.
EOP
engr(s).
emb.
elev.
El. 94.066 e
EE
dwg(s).
DLC
Dist.
dist.
diaph.
diag.
dia. or D
DI
DHV
decr.D culv.
CTSM
ctrs.
CS
cr.
corr.
cont.
constr. jt.
constr.
conc.
col.
Co.
CMP
clr.
c-c
CBCC
brg.
br.
BP
BM
BK
beg.
b.f.B asph.
appr.
alt.
AH
aggr.
ADT
abut.A west vertical point of intersection vehicles per hour vertical design speed typical point of tangent to spiral transverse temporary construction easement temporary bench mark tangent township tangent length symmetrical structural straight stiffener standard station point of spiral to tangent street specification spacing, Spaces or Spaced shoulder section point of spiral to curve seasonal average daily traffic south route right reference hub retaining wall
Reservation reservoir required reinforcement reconstruction roadway road right-of-way range radius quantities pavement point of tangent pounds per square inch project point on tangent point on spiral point on curve plate point of intersection perforate point of compound curve point of curve outside diameter other face on centers number negative normal crown north mountain(s) monument minimum maximum material maintenance magnetic low water left lump sum longitudinal latitude lamination length of curve
WW
VPI
vph vert.
VV
typ.
TS
transv.
TCE
TBM
tan.
T.
TT
sym.
struc.
str.
stiff.
std.
sta.
ST
st.
spec.
spa.
shldr.
sec.
SC
SADT
SS
rte.
Rt. or RT
RH
ret. wall
Res.
res.
reqd.
reinf.
reconst.
rdwy.
rd.
R/W
R.
RR
quant., QtyQ pvmt.
PT
psi proj.
POT
POS
POC
pl.
PI
perf.
PCC
PCP
OD
o.f.
o.c.O
no. or # neg.
NC
NN
mtn(s).
mon.
min.
max.
matl.
maint.
mag.M
LW
Lt. or LT
LPSM
long.
lat.
lam.
LL
EROSION & SEDIMENT CONTROL SYMBOLS
joint interior increment inclusive,including inside diameter highway high water horizontal hexagon homestead entry survey headwall girder galvanized gage (gauge) footing finish flared end section federal fill face exterior expansion joint excavation edge of water and wife and others edge of road equation edge of pavement
Engineer(s) embankment elevation elevation with number superelevation rate east drawing(s) donation land claim district distance diaphragm diagonal diameter drop inlet design hour volume decrement culvert contingent sum centers point of curve to spiral creek corrugated continuous construction joint construction concrete column county corrugated metal pipe clear center to center concrete box culvert bearing bridge balance point bench mark back beginning,begin both faces asphalt approach alternate ahead aggregate average daily traffic abutment diameter curve delta centerline
Ø
Riprap
Rolled Erosion Control Product
Diversion Berm
Check Dam
Bonded Fiber Matrix Mulching
Fiber Roll (Slope Protection)
Temporary Inlet Protection
Silt Fence
Fiber Roll (Ditch and/or Cut Slope)
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d S
Y M S J U .d g n
NUMBER
SHEET
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
NM
COTTONWOOD CAMPGROUND BRIDGE
NM FLAP SJU 10(1)
Sheet 2 of 2
A3
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
Asphalt Concrete Pavement
Roadway Aggregate, Method 2
Grouted Riprap
Existing Berm Material
36 31
36 31
6 1
ˆ
Treeline
Tree
MAPPING SYMBOLS
LANDSCAPING & VEGETATION SYMBOLS PROJECT SPECIFIC SYMBOLS
RIGHT-OF-WAY SYMBOLS
ROADWAY SYMBOLS
SIGN SYMBOLS
UTILITY SYMBOLS
Retaining Wall (Existing, Proposed)
Median & Side Barrier (Existing, Proposed)
Guardwall (Existing, Proposed)
Guardrail (Existing, Proposed)
GUARDRAIL, BARRIER & WALL SYMBOLS
Post Mounted (Existing, Proposed)
Portable (Proposed)
Delineator (Existing, Proposed)
Commercial (Existing, Proposed)
Signs
Telephone
Power
Fiber Optic
CATV
Overhead Utility Line (Existing, Proposed)
Water
Telephone
Sanitary Sewer
Power
Oil
Gas
Fiber Optic
CATV
Underground Utility (Existing, Proposed)
Telephone Pedestal (Existing, Proposed)
Telephone Booth (Existing, Proposed)
Street Light (Existing, Proposed)
Support Pole Anchor (Existing, Proposed)
Support Pole (Existing, Proposed)
Surface (Existing, Proposed)
Underground (Existing, Proposed)
Irrigation Ditch
999.9
Roadway Obliteration
Roadway Centerline (With Station ticks)
Proposed
Existing
Edge of Roadway
Toe of Fill
Transition
Top of Cut
Slope Stake Limits
Clearing/Construction Limits
Survey Control Point
Trail
Spot Elevation
Double Track
Single Track
Railroad
North Arrow
Coordinate Grid Tick
Building (Existing, Proposed)
Section Corner (Found)
Section Corner (Found, Projected)
Section Corner (Found, Projected)
Right-of-Way Line (Proposed)
Right-of-Way Line (Existing)
Property Line
Parcel Number
Monument (As described)
Temporary (Proposed)
Permanent (Proposed)
Permanent (Existing)
Easements
National Wildlife Refuge
National Park
National Forest
Bureau of Land Management
Bureau of Indian Affairs
Section
Section
Section
Township or Range Line
City
County
State
National
Boundaries
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d S
Y M S J U .d g n
NUMBER
SHEET
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
NM
COTTONWOOD CAMPGROUND BRIDGE
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
SURVEY CONTROL
A4
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d C
T L S J U .d g n
NUMBER
SHEET
NM
COTTONWOOD CAMPGROUND BRIDGE
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d S
T E S J U .d g n
NUMBER
SHEET
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
NM
COTTONWOOD CAMPGROUND BRIDGE
NM FLAP SJU 10(1)
A5
600'300'0
Scale in Feet
Rd 4280
Rd 4280
Rd
R d
Cottonwood Campground
To NM-511 2.9 miles
SITE MAP
Staging Area
Cottonwood Campground Bridge
NM FLAP SJU 10(1)
End Bridge Construction
16+18.91
Realign Road 4280
Cottonwood Campground Bridge
NM FLAP SJU 10(1)
End Project
20+20.00
Realign Road 4280
Cottonwood Campground Bridge
NM FLAP SJU 10(1)
Begin Project
11+50.00
Cottonwood Campground Bridge
NM FLAP SJU 10(1)
Begin Bridge Construction
15+30.60
TYPICAL SECTIONS
A6
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d T
Y P S J U
.d g n
NUMBER
SHEET
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
NM
COTTONWOOD CAMPGROUND BRIDGE
NM FLAP SJU 10(1)
NO SCALE
6" Roadway Aggregate
2%
(top of asphalt)
Profile Grade
Prime Coat
1:4 1:4
See Detail A
30°
0.58'
Aggregate
Roadway
DETAIL A
5'
22' Average
Existing native soil
Slope Stake Limit
2% sides of roadway)
(Detail applies to both left and right
Shoulder up with roadway aggregate
Construct 30° pavement edge (safety edge)
1:4
NOTE:
MAX
1:3
MAX
1:3 ground
Existing
Slope Stake Limit
Clearing and Construction Limit
(between lifts)
Tack Coat
Existing Pavement Width Varies
12'
Traveled WayTraveled Way
12' 4'
Shldr.
4'
Shldr.
4' Clear Zone4' Clear Zone
6" Roadway Aggregate
2%
(top of asphalt)
Profile Grade
Prime Coat
1:4 1:4
See Detail A
2%
MAX
1:3
MAX
1:3
Clearing and Construction Limit
(between lifts)
Tack Coat
12'
Traveled WayTraveled Way
12' 4'
Shldr.
4'
Shldr.
4' Clear Zone4' Clear Zone
10'
Gravel Pad
4" Roadway Aggregate
Overlap 6" Gravel seeding limits
Topsoil and
MAX
1:
2'
Shldr 4'
:2
1.0' deep ditch
12+55.00 TO 13+38.00
SPECIAL DITCH END CONDITION
15'
Slope Stake Limit
Campground
Cottonwood LC
18+50.00 TO 20+20.00
11+50.00 TO 12+50.00
COTTONWOOD CAMPGROUND
EXISTING TYPICAL SECTION
Campground
Cottonwood LC
3" Asphalt Concrete Pavement Placed in Two Lifts
12+50.00 TO 18+50.00
COTTONWOOD CAMPGROUND
EXISTING TYPICAL SECTION
TRANSITION TO 19+77.50
19+00.00 TO 19+40.00
COTTONWOOD CAMPGROUND
TYPICAL SECTION
pavement
Asphalt concrete
3" Asphalt Concrete Pavement Placed in Two Lifts
19+77.50 TO 20+20.00
TRANSITION to 19+00.00
16+34.11 TO 18+62.50
15+30.60 TO 16+18.91 BRIDGE (SEE S SHEET)
11+50.00 TO 15+15.40
COTTONWOOD CAMPGROUND
TYPICAL SECTION
4.
3.
2.
1.
Station to Station
LENGTH OF PROJECT
(ft)
Roadway
(ft)
Bridge
TOTAL (mi)
TOTAL (mi)
TOTALS (ft)
0.165
Slab (ft)
Approach
16+34.11 to 20+20.00
16+18.91 to 16+34.11
15+30.60 to 16+18.91
15+15.40 to 15+30.60
11+50.00 to 15+15.40
0.142
751.29
385.89
365.40
0.017
88.31
88.31
0.006
30.40
15.20
15.20
Campground
Cottonwood LC to top asphalt)
Fog Seal (applied to top asphalt)
Fog Seal (applied
13+38.00 LT.
Field grade proposed ditch into existing ditch at
See the cross sections for cut and fill slope ratios.
See Plans for layout and dimensions.
adequate drainage and stability.
slope ratios may be adjusted by the CO to assure excavation and embankment
The gradient and width of roadway ditches and the
Topsoil
Limits and Seeding and Seeding Limits
Topsoil and Seeding Limits
TopsoilTopsoil
Limits and Seeding pavement over 6" roadway aggregate
Approximately average 2" asphalt concrete
Existing aggregate depth varies.
TYPICAL SECTIONS
A7
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d T
Y P S J U
.d
NUMBER
SHEET
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
NM
COTTONWOOD CAMPGROUND BRIDGE
NM FLAP SJU 10(1)
6" Roadway Aggregate
2%
(top of asphalt)
Profile Grade
Prime Coat
1:4 1:4
See Detail A
2%
(between lifts)
Tack Coat
12'
Traveled WayTraveled Way
12'
100+00.00 TO 100+93.00
APPROACH ROAD
TYPICAL SECTION
LC Approach Road
3" Asphalt Concrete Pavement Placed in Two Lifts
Clearing and Construction Limit
2%
2%
Clearing and Construction Limit
12'
Traveled WayTraveled Way
12' 4'
Shldr.
4'
Shldr.
4' Clear Zone4' Clear Zone
Campground
Cottonwood LC
(top of approach slab)
Profile Grade
16+18.91 TO 16+34.11
15+15.40 TO 15+30.60
APPROACH SLAB
COTTONWOOD CAMPGROUND
TYPICAL SECTION
A32(typ.)
New Mexico Type
Metail Railing
1.5'1.5'
1:3 MAX
for additional Detail
See Sheet G1 and G2 for additional Detail
See Sheet G1 and G2
VARIE
S
(See Bridge Plans)
6" Approach Slab to top asphalt)
Fog Seal (applied and Seeding Limits
Topsoil and Seeding Limits
Topsoil and Seeding Limitsand Seeding Limits
Topsoil Topsoil
NO SCALE
Sheet and Description
B3 B4 B5 S2
Survey, Erosion Control, Grading, and Removals
Permanent Sign, Drainage, and Miscellaneous
Surfacing and Permanent
Pavement Markings Bridge Allowance
Bid
Schedule
A0010 15101-0000 MOBILIZATION LPSM ALL
A0020 15214-1000 SURVEY AND STAKING, BRIDGE LPSM All ALL
A0030 15225-0000 SLOPE, REFERENCE, AND CLEARING AND
GRUBBING CONTROL MILE 0.16 0.16
A0040 15236-2000 SURVEY CONTROL, GRADE FINISHING MILE 0.33 0.33
A0050 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0060 15401-0000 CONTRACTOR TESTING LPSM ALL
A0070 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0080 15701-0000 SOIL EROSION CONTROL (TEMPORARY
CONSTRUCTION CONTROLS) LPSM All ALL
A0090 15720-0000 STORM WATER POLLUTION PREVENTION PLAN LPSM All ALL
A0100 15802-0000 WATERING FOR DUST CONTROL LPSM All ALL
A0110 20101-0000 CLEARING AND GRUBBING ACRE 1.99 0.11 2.10
A0120 20301-2400 REMOVAL OF SIGN EACH 5 5
A0130 20302-0700 REMOVAL OF FENCE LNFT 35 30 65
A0140 20303-1600 REMOVAL OF PAVEMENT, ASPHALT SQYD 1,379 71 1,450
A0150 20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS LPSM All ALL
A0160 20420-0000 EMBANKMENT CONSTRUCTION CUYD 7,020 480 7,500
A0170 20801-0000 STRUCTURE EXCAVATION CUYD 5 5 Contract Quantity
A0180 20803-0000 STRUCTURAL BACKFILL CUYD 34 34 Contract Quantity
A0190 21101-2000 ROADWAY OBLITERATION, METHOD 2 SQYD 1,026 74 1,100
A0200 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3 CUYD 864 136 1,000
A0210 25101-0400 PLACED RIPRAP, METHOD A, CLASS 4 CUYD 920 130 1,050
A0220 25110-0400 GROUTED RIPRAP, METHOD A, CLASS 4 CUYD 192 58 250
A0230 25125-0000 BOULDER (BARRIER BOULDER) EACH 52 52
A0240 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 1,139 61 1,200
A0250 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 568 32 600
A0260 40601-0000 FOG SEAL TON 1.31 0.10 1.41
A0270 41102-1000 PRIME COAT, METHOD 1 SQYD 3,044 156 3,200
A0280 41105-0000 BLOTTER TON 5 5
A0290 41201-0000 TACK COAT TON 1.31 0.10 1.41
A0300 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) CUYD 200 200 Contract Quantity
A0310 55235-0000 EXPANSION JOINTS LNFT 83 83 Contract Quantity
A0320 55302-3300 PRECAST, PRESTRESSED CONCRETE AASHTO Contract Quantity
GIRDER LNFT 430 430
A0330 55401-1000 REINFORCING STEEL LB 5,500 5,500 Contract Quantity
A0340 55401-2000 REINFORCING STEEL, EPOXY COATED LB 35,060 35,060 Contract Quantity
A0350 55601-0900 BRIDGE RAILING, STEEL (METAL RAILING, Contract Quantity
TYPE A32, STAINED) Apply weathering
LNFT 234 234 agents.
MileStone: 100% Submittal
Date Completed: 08/26/21
Report Date: 08/26/21
A
M
E
N
D
Line
Item
No.
Pay Item
Number
SUMMARY OF QUANTITIES - Schedule A -A u g -2
:1
P
M
Remarks and/or
Determination of Estimated
Quantity
Pay Item Description Unit
Estimated
Quantities
C
U s e rs
\u d a tt a \D e s k to p \C o tt o n w o o d C a m p g ro u n d \S h e e ts
\S O
Q
R
IM
O S O
Q .x ls m
]S h e e t
STATE PROJECT
B1NM FLAP SJU 10(1)NM
SHEET
NUMBER
Sheet and Description
B3 B4 B5 S2
Survey, Erosion Control, Grading, and Removals
Permanent Sign, Drainage, and
Miscellaneous
Surfacing and Permanent
Pavement Markings Bridge Allowance
Bid
Schedule
A0360 56401-1000 BEARING DEVICE, ELASTOMERIC EACH 10 10 Contract Quantity
A0370 56501-0300 DRILLED SHAFT, 30-INCH DIAMETER LNFT 155 155 Contract Quantity
A0380 56505-0000 CROSSHOLE SONIC LOGGING EACH 6 6 Contract Quantity
A0390 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM
CAPACITY HOUR 20
A0400 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM
RATED CAPACITY HOUR 20
A0410 62201-2750 MOTOR GRADER HOUR 20
A0420 62301-0000 GENERAL LABOR HOUR 60
A0430 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES HOUR 10
A0440 62406-0300 PLACING CONSERVED TOPSOIL, 4-INCH
DEPTH ACRE 1.73 0.17 1.90
A0450 62510-2000 SEEDING, HYDRAULIC METHOD ACRE 1.73 0.17 1.90
A0460 62515-2000 MULCHING, HYDRAULIC METHOD ACRE 1.73 0.17 1.90
A0470 63301-0000 SIGN SYSTEM EACH 3 3
A0480 63308-3000 OBJECT MARKER, TYPE 3 EACH 4 4
A0490 63309-0000 DELINEATOR EACH 10 10
A0500 63312-0000 SPEED HUMP EACH 2 2
A0510 63316-1000 REMOVE AND RESET SIGN EACH 8 8
A0520 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID LNFT 6,234 66 6,300
A0530 63405-0855 PAVEMENT MARKINGS, TYPE B, SPEED HUMP
MARKINGS EACH 4 4
A0540 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM All ALL
A0550 63701-0000 FIELD OFFICE EACH 1 1
-A u g -2
:1
P
M
MileStone: 100% Submittal
Date Completed: 08/26/21
Report Date: 08/26/21
C
U s e rs
\u d a tt a \D e s k to p \C o tt o n w o o d C a m p g ro u n d \S h e e ts
\S O
Q
R
IM
O S O
Q .x ls m
]S h e e t
(2
SUMMARY OF QUANTITIES - Schedule A
A
M
E
N
D
Line
Item
No.
Pay Item
Number Pay Item Description Unit
Estimated
Quantities Remarks and/or
Determination of Estimated
Quantity
STATE PROJECT
B2NM FLAP SJU 10(1)NM
SHEET
NUMBER
B3
SUMMARIES
GRADING, AND REMOVALS
SURVEY, EROSION CONTROL,
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d T
A B S J U
.d
NUMBER
SHEET
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
NM
COTTONWOOD CAMPGROUND BRIDGE
B4
AND MISCELLANEOUS
PERMANENT SIGN, DRAINAGE,
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d T
A B S J U
.d
NUMBER
SHEET
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
NM
COTTONWOOD CAMPGROUND BRIDGE
B5
PAVEMENT MARKINGS
SURFACING AND PERMANENT
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d T
A B S J U
.d
NUMBER
SHEET
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
NM
COTTONWOOD CAMPGROUND BRIDGE
UTILITY
PEDESTAL
5 5685
UTILITY
PEDESTAL
WATER FAUCET
STOP
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d P
N P S J U
.d g n
NUMBER
SHEET
Superelevation Diagram
NM
COTTONWOOD CAMPGROUND BRIDGE
NM FLAP SJU 10(1)
,7
.4
V P I
E L
,6
.1
-5.000% +0.500%
110' VC
V P I
E L
,6
.5
+0.500% -5.000%
100' VC
V P I
E L
,6
.8
-5.000% +1.200%
100' VC
,6
.4
D e p th U n k n o w n
B u r r ie d P o w e r L in e
K=20
K=16.1
K=18.2
NOGAP
1000.000000
RTE010
086 SSD=246'
P C
.9
P T
.4
P C
.1
P T
.8
P C
.1
P T
.1
P C
.6
P T
.1
200'100'0
Scale in Feet
NOTES:
C1
8+00 9+00
13+00 14+0012+0011+0010+00 16+00 17+0015+00 19+00 20+0018+00 22+0021+00
Proposed grade
Existing ground
Curve Data
Curve = RTE010-1
Curve = RTE010-1
PI 13+39.75
D
R = 450.00'
T = 170.78'
L = 326.44'
Curve = RTE010-2
PI 17+45.12
D
R = 350.00'
T = 92.93'
L = 181.67'
Curve = RTE010-3
PI 19+08.36
D
R = 350.00'
T = 41.20'
L = 82.03'
-5%
0%
+5%
-5%
0%
+5%
LT & RT Edge of Travelway
Proposed grade and axis of rotation
11+50 20+20-2% LT & RT
Campground Bridge
End Cottonwood
16+18.91
Match existing elev.
Begin Project
11+50.00
Match existing elev.
End Project
20+20.00
Elev. 5698.76
Campground Bridge
Begin Cottonwood
15+30.60
Elev. 5699.20
Campground Bridge
End Cottonwood
16+18.91
Limits of construction
E: 2767753.01
N: 2114365.18
NM FLAP SJU 10(1)
Begin Project
11+50.00
E: 2768585.93
N: 2114259.67
NM FLAP SJU 10(1)
End Project
20+20.00
Edge of Pavement
Campground Bridge
Begin Cottonwood
15+30.60
Toe of fill
Edge of Pavement
Curve = RTE010-2
Toe of fill
20+12, 16.0' LT
16.0' RT
20+00, Curve = RTE010-3
Existing Fence
Remove
20+20, 13.9' LT, Match Existing
R
Match Existing
11.90' RT
11+50
Match Existing
13.22' LT
11+50
16.00' LT
12+00
16.00' RT
12+00
Method 2
Roadway Obliteration, Method 2
Roadway Obliteration, Top of cut existing ditch.
Field grade proposed ditch into 3.
See D-Sheets for additional details.2.
See S-Sheets for Bridge Plans.1.
3.
Remove Existing Fence
Curve = RTE010-4
PI 20+37.39
D
R = 600.00'
T = 24.76'
L = 49.49'
Campground
C Cottonwood L
PLAN AND PROFILE COTTONWOOD CAMPGROUND
Curve = RTE010-4
Aggregate, Method 2
Roadway
20+20, 11.1' RT Match Existing
Elev. 5698.69
Begin Approach Slab
15+15.40
Elev. 5699.28
End Approach Slab
16+34.11
Remove Existing Fence
Remove Existing Fence
Approach Road Sheet
See Plan and Profile embankment construction.
material and place as
Remove existing berm
Low Water Crossing Pavement
Protect in Place Existing Concrete
See Sheet T5
Speed Hump the asphalt removal item.
Sawcut is incidental to
Sawcut pavement.
removal item.
is incidental to the asphalt
Sawcut pavement. Sawcut
Park staff before construction begins.
Existing gate will be removed by NM
Boulders, Typ.). See Sheet G3
Install Boulders (Barrier
Protect in Place Existing Minor Retaining Wall Elements
See Sheet T5
Speed Hump
PT 18+33.86
PC 18+67.16
PT 19+49.19
20+00
PC 20+12.63
PT 20+62.12
U T
IL
IT
Y
P E
D E S T
A L
U T
IL
IT
Y
P E
D E S T
A L
S T
O P
S T
O P
W A T E R F
A U
C E T
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d P
N P
A S J U
.d g n
NUMBER
SHEET
Superelevation Diagram
NM
COTTONWOOD CAMPGROUND BRIDGE
NM FLAP SJU 10(1)
V P I
E L
,6
.8
-0.862%
30' VC
,6
.6
E L
,6
.8
V P I
-3.500%
30' VC
E L
.4
V P I
.3
.3
C a m p g r o u n d
C o tt o n w o o d
E L
.0
A p p r o a c h R o a d
-2.818%
-3.565%
K=20
K=11
D1
-4%
0%
4%
Proposed grade and axies of rotation
LT EOP
RT EOP
100+00 101+00
100+17.39
100+88 100+93
100+39
100+52
100+91 100+93
Existing ground
Proposed grade
Match existing
100+93
100'50'0
Scale in Feet
R = 40'
R = 100'
End approach road
100+93
100+00
100+00
3.2% LT
-2.8% RT
-2.0% RT
-1.3% LT Match
-2.1% RT Match
PLAN AND PROFILE APPROACH ROAD
-4%
0%
4%
= Approach Road 100+00
Cottonwood Campground 19+25.36 removal item.
is incidental to the asphalt
Sawcut pavement. Sawcut begins.
NM Park staff before construction
Existing gate will be removed by
UTILITY
PEDESTAL
5 5685
UTILITY
PEDESTAL
WATER FAUCET
STOP
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d E
R S S J U
.d g n
NUMBER
SHEET
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
NM
COTTONWOOD CAMPGROUND BRIDGE
NM FLAP SJU 10(1)
P C
.9
P T
.4
P C
.1
P T
.8
P C
.1
P T
.1
P C
.6
P T
.1
200'100'0
Scale in Feet NOTES:
Use this plot to develop SWPPP according to Section 157.1.
CONTROL PLAN
EROSION AND SEDIMENT
E1
251-A
AA
Plan View
Section A-A
NOTES:
PL01
PL02
PL03
PL04
PL05
PL06
PL07
PL12
PL11
PL17
PL08
PL09
G1
Top of slope
Bottom of slope
Existing ground
2.5'
10.5'
BERM REINFORCEMENT
RIPRAP
PL14
PL13
PL15
PL16
B B
Limits of construction
3.5' (min.)
PL10
5'
1:1.5 Max Slope east side of berm
Place soil from excavation at
Method A, Class 4
Grouted riprap, Method A, Class 4
Placed riprap, Method A, Class 4
Placed riprap, Section B-B
Top of slope
Bottom of slope
Existing ground
2.5'
5'
2.5' (min.)
5'
'1:2 Max slope
Method A, Class 3
Placed riprap, slope to place riprap
Excavate existing
200'100'0
Scale in Feet
See sheet G3 for additional Detail
Method A, Class 3
Placed riprap, Limits of construction existing berm material
Remove and Recompact activity on the West bank.
No construction
See note 2
Separation Geotextile Class 1 Type A (Non-woven)
See note 2
Separation Geotextile Class 1 Type A (Non-woven)
3.
of riprap (typ.)
along edge delineators
Install is completed.
Regrade arroyo channel after riprap construction 4.
Key into existing rock.3.
(Non-woven) conforming to Section 714.01.
Furnish Separation Geotextile Class 1 Type A 2.
the Placed riprap item.
Excavation for placement of riprap is incidental to 1.
Protect Existing buried cable in place
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d s p A .D
G N .d g
SPECIAL
U.S. CUSTOMARY SPECIAL
NUMBER
SHEET
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
NM
COTTONWOOD CAMPGROUND BRIDGE
NM FLAP SJU 10(1)
5 5685
UTILITY
PEDESTAL
WATER FAUCET
21298
5690.87
SW-01
21299
5698.36
SW-02
5 5730
STOP
251-B
Existing Ground
Excavation 1:
21:2
Riprap Key-In Detail
Existing Ground
-7.76%
Point Northing Easting Elevation Description
NOTES:
S1
S4
See Riprap Key-In Detail
Existing Ground
G2
S4
S3
Limits of construction
Plan
2'
Placed Riprap, Class 3
S6
S8
.5
3'
S5
S2
S7
S9
S10
Detail
See Riprap Key-In
S1
SF1
SF2
SF3
SF4
SF5
SF5
SF4
SF3
SF2
SF1
S10
S9
S8
S7
S6
S5
S4
S3
S2
S1
Match Existing
Match Existing
Match Existing
Match Existing
Match Existing
Match Existing
Match Existing
Match Existing
Match Existing
Match Existing
Match Existing
Match Existing
Match Existing
Match Existing
Match Existing
5691.00
5691.00
5694.00
5694.00
5693.00
5693.00
5690.00
5685.13
5693.00
5695.01
5693.07
5687.00
5687.00
5692.00
5692.00
2114343.01
2114342.17
2114345.17
2114346.00
2114348.95
2114349.48
2114275.40
2114278.82
2114369.58
2114361.65
2114357.15
2114357.53
2114359.59
2114354.70
2114352.61
2768096.31
2768094.32
2768087.91
2768086.99
2768086.18
2768096.20
2768121.41
2768136.61
2768139.31
2768087.67
2768070.73
2768149.48
2768150.16
2768085.70
2768084.59
Point Data Table
See note 2
Geotextile filter See note 2
Geotextile filter
Placed Riprap, Method A, Class 3
Placed Riprap, Method A, Class 3
Placed Riprap, Method A, Class 3
50'25'0
Scale in Feet
CHANNEL REALIGNMENT
RIPRAP
Furnish riprap conforming to Section 705.02. 3.
summary tables for class and type.
Furnish geotextile filter conforming to Section 714.01. See 2.
riprap item.
Excavation for placement of riprap is incidental to the Placed 1.
B
B
A
A
Section A-A
Typical Section
Section B-B
Ditch Profile along edge of riprap (typ.)
Install delineators
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d s p A .D
G N .d g
NUMBER
SHEET
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
NM
COTTONWOOD CAMPGROUND BRIDGE
NM FLAP SJU 10(1)
21298
5690.87
SW-01
21299
SW-02
Edge of pavement
Boulder (typ.)
Boulder (typ.)
0.5' to 2'
5' max. spacing 5' max. spacing between boulders
Proposed roadway for structural section details See typical section height boulder of3
Proposed roadway
NOTES:
(Without roadside ditch) (With roadside ditch)
A
A
7.7.
pavement Clear from pavement Clear from
BARRIER BOULDER PLACEMENT
Elevation
Plan
SECTION A-A SECTION A-A
randomly in clusters Place Boulders
251-C
2' min.
m in m in . with ground (typ.)
native material and blend Fill up to boulder with m in
5' min. 5' min.
BOULDER PLACEMENT DETAIL
placement detail, this sheet Boulder, see Boulder placement detail, this sheet Boulder, see Boulder details for structural section See typical section
8.
8.
6.
7.
6.
detail, this sheet Boulder, see Boulder placement
Finished grade
G3
25% to be approx. 4' x 4' x 4'
25% to be approx. 2' x 2' x 2'
50% to be approx. 3' x 3' x 3'
PLACEMENT
BOULDER (BARRIER BOULDER)
.3 m in
NO SCALE
Boulder.
See Section 251 for measurement and payment for width x height).
Vary adajcent boulders in size and dimension (length x will be 5' min. or as determined by CO.
Distance from edge of pavement to face of boulders traffic use.
directions between the boulders to deter vehicular is complete, rip surfaces 10" in depth in opposite After embankment, excavation, and boulder placement the plans.
of the roadway, apply to either side as called out on The boulder placement plan, while shown on one side the terrain.
the characteristics of boulders indigenous to Boulders to be provided from local source. Match
Vary number of boulders as directed by CO.
Place boulders randomly within the maximum spacing.
Place boulders weathered side up.
Park.
Place as directed by the CO in coordination with NM State Boulder locations shown on the plans are approximate.
9.
8.
7.
6.
5.
4.
3.
2.
1.
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d s p B .d
NUMBER
SHEET
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
NM
COTTONWOOD CAMPGROUND BRIDGE
STATE
NM
PROJECT
CAMPGROUND BRIDGE
COTTONWOOD
NM FLAP SJU 10(1)
SHEET
NO.
U.S. DEPARTMENT OF TRANSPORTATION
COTTONWOOD CAMPGROUND RD. OVER ARROYO
BRIDGE NO. 9988
SAN JUAN COUNTY, NEW MEXICO
DRAWING NO.
DATE
August 2021 of 29
BRIDGE DRAWINGPROJECT TEAM LEADER
M. FOLWELL
SCALE
C. AGUILAR
CHECKED BYDRAWN BY
DESIGNED BY
D. BEAN
REVISIONS
BY
DATENO.
REVISIONSBY
c p w w o r k in g c e n tr a l0 d R
G A .d g n
P T
.4
P C
.1
L
15+00 grade
Proposed grade
Proposed structure
Location of
L
16+00
E L .7
.1
F il l fa c e A b u t .1
B e g in B r id g e
E L .2
.3
F il l fa c e A b u t .2
E n d B r id g e caisson (typ.)
30"Ø Drilled
FIX EXP
Mexico Type A32
Metal Railing New
El. 5693.50
Low chord
2'-0" min. Freeboard
EL. 5687.77
Q Water surface
-5.000%
V P I
E L ,6
.5
100' VC
L L
S h ld r
L a n e ty p
S h ld r
L a n e
"L
L = 181.67'
T = 92.93'
R = 350.00'
PI 17+45.12
Curve = RTE010-2
L = 326.44'
T = 170.78'
R = 450.00'
PI 13+39.75
Curve = RTE010-1
C Access Road
C Access Road) ground line (at Existing
A rr o y o
(Taken at C Access Road)
0.500%
Abut. No. 1
C Brg.
Abut. No.2
C Brg.
Q
Q
Q
Q
Q Vm
WS EL.
1.7
(cfs) (ft/s)
5687.17
172 3.0 5687.77
217 3.3 5687.92
267 3.6 5688.07
PLAN
ELEVATION
DATA TABLE
HYDRAULIC
L
PROFILE GRADE DIAGRAM
Elevations are at profile grade C Access Road
No Scale
GENERAL PLAN AND ELEVATION
1"=20'-0" E. SCHAWO
RG3231-A
S1
INDEX OF DRAWINGS
DRAWING NO. DESCRIPTIONSHEET NO.
85'-0" (C Brg. to C Brg.)L L
" (Back to Back of Backwall)16 1188'-3
12 Spaces @ 6'-3"=75'-0"5'-0"=15'-0" 3 Spa.@4'-0"
2'-0" 2'-0" 4'-0"
5'-0"=15'-0" 3 Spa.@
16+17.25
C Bridge Abut. No. 2L
15+32.25
C Bridge Abut. No. 1L
S29
S26 THRU S28
S22 THRU S25
S17 THRU S21
S16
S15
S14
S13
S12
S11
S10
S9
S8
S7
S6
S5
S4
S3
S2
S1
Bridge Railing, Steel Length = 117'-0"
25Q Scour Depth = 0.25 ft.
1'-6"
G3 for details
See sheet G1 thru
Riprap
EL. 5687.92
Q Water surface
(Typ.)
Elev. = 5665.78
Est. Tip
Elev. = 5663.71
Est. Tip
0.5%
Post SpacingPost Spacing
Berm Elev.=5692.50Berm Elev.=5692.00 details
G1 for
See Sheet
Riprap
15+15.40
Begin App. Slab
16+34.11
End of App. Slab
E 2,768,205.70
N 2,114,337.91
16+18.36
End Bridge
E 2,768,120.62
N 2,114,318.78
15+31.15
Begin Bridge
BRIDGE NUMBER PLATE
EXPANSION JOINT
TYPE A32 RAILING
REBAR LIST
APPROACH SLAB DETAILS
WINGWALL DETAILS
ABUTMENT DIAPHRAGM
TOP OF DECK ELEVATIONS
DECK REINFORCING PLAN BOTTOM BARS
DECK REINFORCING PLAN TOP BARS
INTERMEDIATE DIAPHRAGM
PRECAST, PRESTRESSED CONCRETE AASHTO GIRDER
BEARING DETAILS
FRAMING PLAN
TYPICAL SECTION
ABUTMENT CAP DETAILS
DRILLED SHAFT DETAILS
FOUNDATION LAYOUT
GENERAL NOTES & ESTIMATED QUANTITIES
GENERAL PLAN AND ELEVATION
13'-9" Wingwall
Pay Limits (Typ)
Structural Backfill, Pay Limits (Typ)
Structural Excavation, RG3231-AC
RG3231-Z THRU AB
RG3231-V THRU Y
RG3231-Q THRU U
RG3231-P
RG3231-O
RG3231-N
RG3231-M
RG3231-L
RG3231-K
RG3231-J
RG3231-I
RG3231-H
RG3231-G
RG3231-F
RG3231-E
RG3231-D
RG3231-C
RG3231-B
RG3231-A
15551
L I C
E
N
S
D
P
R
O
F
E S S
I O
N
A
N
G
I
N
E
E R
D
A
N
T
O
N B
B
E
A
N
N
W
M
X
I
C
O
8/10/2021
PROJECT
CAMPGROUND BRIDGE
COTTONWOOD
NM FLAP SJU 10(1)
BRIDGE DRAWINGPROJECT TEAM LEADER
M. FOLWELL
SCALE
S
Y T I
M E
D G
N S
P E
C
SPECIFICATIONS
GENERAL NOTES
ESTIMATED QUANTITIES
GENERAL NOTES &
NONE E. SCHAWO
RG3231-B
S2
MATERIALS
MISCELLANEOUS
GENERAL NOTES CONT.
Bridge Rating Program Version 6.8.
and Resistance Factor Rating (LRFR) methods using the AASHTOWare
These ratings were computed by the Load Factor Rating (LFR) and Load
Note:
Contracting Officer for approval prior to any deck work.
Contractor shall submit the girder profile data, camber data and finished deck elevation verification to the camber elevations. The contractor shall use this information to verify camber and finished deck elevations. The completed line of girders from centerline bearing to centerline bearing at tenth poins to calculate existing girder
Verification of girder camber before screed rails are set, the Contractor shall survey and plot girder profiles of each
Verification of Girder Camber:
on the right hand side of the road as one approaches the bridge.
shown on NMDOT standard drawing 543-09. The number plate shall be placed on the second post on the bridge deck
The Contractor shall furnish and place two (2) bridge number plates conforming to the bridge number plate details
Bridge Number Plates:
The metal railing shall be galvanized and then stained with the Natina product.
Railing Protective Coating:
specifications.
The top surface of the deck shall be machine grooved in the transverse direction of the deck per section 552 of the
Deck Slab:
information on the on-site soils.
Refer to Standard Specification 208, Structure Excavation and Backfill. The geotechnical report provides additional
Structrure Exacation and Backfill:
Concrete shall be structural concrete Class A.
30" Diameter Drilled Shaft
Drilled Shaft:
Concrete shall be structural concrete Class P (Prestressed). See Precast Girder Detail Sheets for concrete strength.
See Precast Girder Detail Sheets.
Prestressed Concrete Girders:
See Precast Girder Detail Sheets.
Prestressing Steel:
steel in the substructure shall be non-coated.
All reinforcing steel in the superstructure concrete shall be epoxy coated and all reinforcing
Bar splices, other than those shown on the plans, will not be paid for.
Minimum splice length for all bar sizes shall be as shown on the plans.
The minimum concrete cover to the face of any bar shall be 2", unless shown otherwise on the plans.
All reinforcing steel shall conform to AASHTO M31 or M322, Grade 60 deformed.
Reinforcing Steel:
Expansion joint filler shall meet the requirements of AASHTO M213.
Chamfer exposed edges of all concrete 3/4", unless noted otherwise on the plans.
Type II cement shall be used for all Cast-in-Place concrete.
All concrete shall be structural concrete Class A (AE) with a minimum 28-day compressive strength f'c=4,500 psi.
Concrete:
Seismic Zone 2 (Simple-Span Bridge)
Longitude = 107°40'45" W
Latitude = 36°48'37" N
Seismic Design:
HL-93. Maximum Dynamic Load Allowance, IM=33%
Live Load
Future Wearing Surface: 30 psf
Lateral Earth Pressure: equivalent fluid unit weight of soil, Active = 0.042 kcf
Concrete: 150 pcf.
Dead Loads
DESIGN LOAD
Projects, FP-14, U.S. Customary Units and Special Contract Requirements (SCR).
Federal Highway Administration Standard Specifications for Construciton of Roads and Bridges on Federal Highway
Construction
AASHTO LRFD Bridge Design Specifications, 9th Edition
Design
No. 55201-0200 Structural Concrete, Class A (AE).
associated to the Preformed Expansion Joint Filler with Silicone Joint Sealant installation shall be incidental to Item
Preformed Expansion Joint Filler with a Silicone Joint Sealant. The cost of all labor, equipment and material paid for with Item No. 55235-000 Expansion Joints. The joint between the deck and approach slab shall be a standard drawing 562-01. The cost of all labor, equipment and material associated to the joint installation shall be
The expansion joint between the approach slab and sleeper slab shall be a joint strip seal assembly per NMDOT
Expansion Joints:
Contracting Officer. All open holes are to fill with grout after erection is completed.
Size and location of erection holes in the girders shall be shown on the shop plans and will require approval by the
Girders:
(10) Includes the cost of the concrete and steel reinforcing.
(9) Includes the cost of the Natina stain finish.
(8) Includes the cost of furnishing and installing the preformed expansion joint filler with silicone joint sealant.
(7) Includes the cost of furnishing and installing intermediate diaphragms.
(6) Includes the cost of furnishing and installing sole plates.
(5) Includes the cost of furnishing and installing temporary casing for the drilled shafts.
(4) Includes the cost of furnishing and installing strip seal assemblies, and cover plates.
(3) Includes the cost of furnishing and installing steel curb.
(2) Includes the cost of furnishing and installing all joint material and misc. hardware shown for Abutment details
(1) Contract Quantity
QUANTITY NOTES:
15551
L I C
E
N
S
O
F
E S S
I O
N
G
I
N
E
E R
D
A
N
T
O
N B
B
E
A
N
N
X
I
C
8/25/2021
PROJECT
CAMPGROUND BRIDGE
COTTONWOOD
NM FLAP SJU 10(1)
BRIDGE DRAWINGPROJECT TEAM LEADER
M. FOLWELL
SCALE
c p w w o r k in g c e n tr a l0 d R
G C .d g n
P T
.4
P C
.1
15+00 grade
Proposed grade
Proposed
L
16+00
L L
L
L = 181.67'
T = 92.93'
R = 350.00'
PI 17+45.12
Curve = RTE010-2
L = 326.44'
T = 170.78'
R = 450.00'
PI 13+39.75
Curve = RTE010-1
C Access Road
C Access Road) ground line (at Existing
A rr o y o
Abut. No. 1
C Brg.
Abut. No.2
C Brg.
PLAN
L Abut. No.2
C Brg. L Abut. No. 1
C Brg.
DS No. 1
DS No. 3
DS No. 4
DS No. 6
DS No. 5DS No. 2
DRILLED SHAFT TABLE
FOUNDATION LAYOUT
1"=20'-0" E. SCHAWO
RG3231-C
S3
SW-02
SW-01
SW-01
SW-02
50/1"
99/80
50/2"
100/100 100/100
10-22-2020
77/12" 50/6"
75/6"
77/12"
50/1" 100/45
100/80
10-22-2020 grade
Proposed grade
Proposed
BORE HOLE
(SM) Silty Sand
SANDSTONE
DRILLED SHAFT
LEGEND
SW-02
50/1"
99/80
50/2"
100/100 100/100
10-22-2020
Designation
Boring
Blows/Foot or
Resistance in
Penetration Test
Test Sample and
Standard Penetration
USCS Symbol
Rock Core
Rock Quality Designation RQD (%)
Bottom of Boring
Completion
Date of
Recovery (%)
During Drilling
Groundwater Level
15+32.25
C Brg. Abut. No. 1
85'-0"
100/70
10/93
Blows/Inches driven
FOR DRILLED SHAFTS
FOUNDATION NOTES
E 2,768,120.08
N 2,114,318.66
15+31.15
Begin Bridge
15+32.25
C Brg. Abut. No. 1
E 2,768,206.24
N 2,114,338.03
16+18.36
End Bridge
4.0
24.5
5665.78
5690.28
Abut. No. 1
4.0
27.0
5663.71
5690.71
Abut. No. 2
Elev. = 5665.78
Est. Tip
Elev. = 5663.71
Est. Tip
Gravel with Silt and Sand
(GP-GM) Poorly Graded
Nominal Resistance/Shaft (Kips)
Factored Resistance * (Kips) (Strength I)
Rock Socket Length (Feet)
Estimated Shaft Length (Feet)
Estimated Tip Elevation (Feet)
Top of Shaft Elevation (Feet)
Drilled Shaft Spacing (Feet)
Quantity (Each)
Drilled Shaft Diameter (inches)
Shaft (typ.)
30"Ø Drilled foundation report: Title, Prepared by Shannon & Wilson and dated July, 2021.
1. Information regarding the nature of soil and site conditions can be obtained from the final
16+17.25
C Brg. Abut. No. 2
L
L
L
15551
L I C
E
N
S
O
F
E S S
I O
N
G
I
N
E
E R
D
A
N
T
O
N B
B
E
A
N
N
X
I
C
PROJECT
CAMPGROUND BRIDGE
COTTONWOOD
NM FLAP SJU 10(1)
BRIDGE DRAWINGPROJECT TEAM LEADER
M. FOLWELL
SCALE
c p w w o r k in g c e n tr a l0 d R
G D .d g n
A A
T y p
C lr
D S T ie s s p a c e d a t 1
Rock
(15) #11DS1 Bars
C Drilled ShaftL
DRILLED SHAFT DETAIL
SECTION A-A
C Drilled ShaftL
C Drilled ShaftL
Stagger Hook Locations
#4DS2 Ties with 135° Hooks
Drilled Shaft
30" Diameter
@ Eq. Spacing
(14) #11DS1 Bars
" C lr.
(Typ.)
Complying with ASTM A970
Headed Deformed Bars
DRILLED SHAFT DETAILS
" = 1'-0"4
1 E. SCHAWO
RG3231-D
S4
NOTES:
5" Clr.
Top of Drilled Shaft
Bottom of Abutment Cap
R o c k S o c k e t
L e n g th m in
A b u
t. N o . 2
A b u
t. N o . 1 immediately after installing the cage.
approved support mechanism at the ground surface. The Contractor will place shaft concrete
1. The Contractor will maintain the reinforcement unit at the proper elevation and orientation with an
See Foundation Layout or General Plan and Elevation For Elevation
Estimated Tip
L
C Drilled ShaftL
LC Brg.
C Cap
LC Drilled Shaft
Plan View
Cap
Abutment
Drilled Shaft
30" Dia.
spacing may be adjusted slightly to avoid conflicts.
2. #5AB3 bars in cap not shown for clarity. #5AB3 bar per detail to avoid conflicts with #9AB1 Bars in Cap.
1. Contractor will orient drilled shaft reinforcing cage
Note:
(Bottom Mat)
(6)#9AB1 Bars
(4) CSL Access Tubes
15551
L I C
E
N
S
O
F
E S S
I O
N
G
I
N
E
E R
D
A
N
T
O
N B
B
E
A
N
N
X
I
C
PROJECT
CAMPGROUND BRIDGE
COTTONWOOD
NM FLAP SJU 10(1)
BRIDGE DRAWINGPROJECT TEAM LEADER
M. FOLWELL
SCALE
c p w w o r k in g c e n tr a l0 d R
G E .d g n
12'-0" 12'-0"
"2 135'-1
L
LC Girder
1 Abut. No. 2
5 Abut. No. 1
LC Girder LC Girder LC Girder LC Girder
C Bridge
C Construction
L
Abut. No. 2 - Looking Up Stationing
Abut. No. 1 - Looking Down Stationing
LC Brg.
LC Girder LC Girder LC Girder LC Girder LC Girder
L C Bridge
C Construction
L
(BF)
Face
Back
(Typ.)
Restrainer
Expansion
(FF)
Face
Front
"16 53'-10 "16
53'-10
(Typ.) (Typ.)
A
A
B
B
(Typ.)
Joint Filler
1" Bituminous
B
B
Section A-A
V a r ie s
ELEVATION - ABUTMENT CAP
PLAN - ABUTMENT CAP
Abut. No. 2 - Looking Up Stationing
Abut. No. 1 - Looking Down Stationing
LC Brg.
L C Bridge
C Construction
L
"4 317'-6 "4
317'-6
"2 135'-1
PLAN WITH REINFORCING- ABUTMENT CAP
"4 35'-6 "4
35'-6
ABUTMENT CAP DETAILS
" = 1'-0"8
RG3231-E
S5
1'-6" 1'-6"
LC Brg.
1'-6"1'-6"
LC Brg.
1'-6"1'-6"
LC Brg.
Abut.
No. 1
Abut.
No. 2
Abutment No. 1 (Fixed)Abutment No. 2 (Expansion)
Abutment No. 2 (Expansion) Abutment No. 1 (Fixed)
Abut. No. 1 (Fixed)
Section B-B
Abut. No. 2 (Exp.)
Section B-B
(6) #9AB1
#4AB2 Bars#4AB2 Bars
(6) #9AB1
E q
S p a
M in
V a r ie s
E q
S p a
M in
.) (6) #9AB1
#4AB2 Bars#4AB2 Bars
(6) #9AB1
V a r ie s
E q
S p a
M in
.) (6) #9AB1
#4AB2 Bars#4AB2 Bars
(6) #9AB1
Restrainer
Expansion
(Typ. each bay)
Form w/ Bev. 2"x8"x4'-0"
Shear Key & Dowels
(Typ.)
Joint Filler
1" Bituminous
#9AB1 Bars#4AB2 Bars
(2)#5AB3 (2)#5AB3 (2)#5AB3
"2 135'-1
2"2" "2 170 Eq. Spa. = 34'-9
(142) #5AB3 Bars
65°0'0"
Elev. = 5690.71 (Abut. No. 2)
Elev. = 5690.28 (Abut. No. 1)
(Abut. No. 2)
Elev. = 5690.71
(Abut. No. 1)
Elev. = 5690.28
Diaphragm
Abutment #5AB4 Bars
Typical per bay
(3)#5AB4
1. Girder seat elevations are shown on the bearing detail sheet.
Note:
15551
L I C
E
N
S
O
F
E S S
I O
N
G
I
N
E
E R
D
A
N
T
O
N B
B
E
A
N
N
X
I
C
PROJECT
CAMPGROUND BRIDGE
COTTONWOOD
NM FLAP SJU 10(1)
BRIDGE DRAWINGPROJECT TEAM LEADER
M. FOLWELL
SCALE
c p w w o r k in g c e n tr a l0 d R
G F .d g n
17'-6"
35'-0"
1'-6"
PGL
17'-6"
4'-0" 1'-6"
2%2%
2'-8" (typ.)
Driving Lane
12'-0"
Driving Lane
12'-0"
Shoulder
4'-0"
C Bridge
C Access Road
L
L
4 Spaces @ 7'-0" = 28'-0"
(5) Precast, Prestressed Concrete AASHTO Girder Type III (45")
3'-6" 3'-6"
TRANSVERSE SECTION
1 2 3 4 5 (Typ.)
Diaphragm Intermediate
C GirderLC GirderL
PARTIAL TRANSVERSE SECTION
(Typ.)
Diaphragm Intermediate
Halfround Typ.
Form W/3/4" Drip Groove
See Deck Reinforcing Plan For Reinforcing Information (Typ.)
BL Bar
Spacing
TL Bars TT Bars
BT Bars
BL Bars
(Typ.)
Haunch
2" Nominal
Shoulder
TYPICAL SECTION
RG3231-F
S6
3'-6" 7'-0"
3" 5 Spa. @ 6"=2'-6" 9" 1'-0" 10 Spaces @ 6" = 5'-0" 1'-0"
BL - Bottom Longitudinal Reinforcing
BT - Bottom Transverse Reinforcing
TL - Top Longitudinal Reinforcing
TT - Top Transverse Reinforcing railing posts.
deck under Provide level
D e c k
"2
C lr
C lr
3" 6" Spacing (TL Bar Spacing)
Railing Sheets
See Type A32
A32 (typ.)
New Mexico Type
Steel
Bridge Railing, Railing Sheets
See Type A32
A32 (typ.)
New Mexico Type
Steel
Bridge Railing, 15551
L I C
E
N
S
O
F
E S S
I O
N
G
I
N
E
E R
D
A
N
T
O
N B
B
E
A
N
N
X
I
C
PROJECT
CAMPGROUND BRIDGE
COTTONWOOD
NM FLAP SJU 10(1)
BRIDGE DRAWINGPROJECT TEAM LEADER
M. FOLWELL
SCALE
c p w w o r k in g c e n tr a l0 d R
G G .d g n
C Access RoadL
FRAMING PLAN
(Ty p.)
25° 0'0"
Abut. No. 2
C Brg. L Abut. No. 1
C Brg. L
42'-6" 42'-6"
L
85'-0" (C Brg. to C Brg.)
86'-0" (Girder Length)
L L 6"6"
S p a c e s
S p a c e s
FRAMING PLAN
RG3231-G
S7
C Intermediate Diaphragm
(Typ.)
AASHTO Girder Type III (45") Precast, Prestressed Concrete
1'-7 9/16"
1'-7 9/16"
C GirderL
C GirderL
C GirderL
C GirderL
C GirderL
15551
L I C
E
N
S
O
F
E S S
I O
N
G
I
N
E
E R
D
A
N
T
O
N B
B
E
A
N
N
X
I
C
PROJECT
CAMPGROUND BRIDGE
COTTONWOOD
NM FLAP SJU 10(1)
BRIDGE DRAWINGPROJECT TEAM LEADER
M. FOLWELL
SCALE
c p w w o r k in g c e n tr a l0 d R
G H .d
BEARING DETAILS
RG3231-H
S8
Restrainer Notes plywood cap.
6. 8" PVC end cap may be used in lieu of restrainers) the expansion abutment (4 total
5. Expansion restrainers shall be placed at girders and cetered on the restrainer.
4. #11 bar shall be installed perpendicular to separate paymet will be made.
Structural Concrete, Class A (AE) and no unit bid price for Item No. 55201-0200 of the restrainers shall be included in the girders as indicated on the plans. The cost
3. Use devices equally spaced between breaking strength of 42 kips.
min. 6x19 galvanized with a minimum
2. Restrainer cables shall be 3/4" diameter concrete intrusion.
1. Seal all openings in PVC pipe to prohibit
Width
Width
Length
C Girder
C Brg.
L
L
Elastomeric Bearing Pad Detail
A A
C GirderL
L
Shear Modulus = 0.13 (Minimum)
Hardness = 60 Durometer
Elastomeric Bearing Pad
Metal Shims
11 Gauge Sheet
L Pad
C Brg.
C Brg. Pad
C Brg.L
L
C GirderL
Width
Length
Plan
Plate
C Sole
B
B
Keeper Bar
1/2"x1"x1'-8"
Length
Typ.
1 A B C
Upstation
Section B - B
Sole Plate Detail
L Plate
C Sole r e c a s t, P r e s tr e s s e d C o n c r e te A
A S
H T
O G ir d e
S u p e r s tr u c tu r e D e p th
Deck = 8"
Nominal Haunch = 2" (Min.)
C GirderL
Typ. Typ. Shoe Plate
Details this sheet
Typ. Sole Plate
Details this sheet
Typ. Elastomeric Bearing Pad
Superstructure Depth Detail
Expansion Restrainer Detail
Elevation Section 8" Dia. PVC Pipe Assembly
Galvanized
Cable Clamp, 2'-0"
2'-0"
7"
7"
3" Clr.
LC Brg.
Assembly
8" Dia. PVC Pipe
Holes for Tie
Two 3/16" Dia.
Tie Wire.
Tie with Rebar
Metal Strap
Wire Tie or
Cable
D ia p h r a g m
C a s t to
C a p
C a s t
3/4" Dia. Cable
Diaphragm
Bottom of
Board with Masonite
Polystyrene
2" Extruded
Brg. Seat
Top of
Top and Bottom
#11 Rebar x 1'-6"
7/8" x 1 3/4"
Slotted Hole
3/16" Min. Dia.
6-1/2" Long Screw
10" Dia.
3/4" Thick Plywood
(Pre-Drill)
3/16" Min. Dia.
(6) 3" Long Screws
7 7/8" Dia.
3/4" Thick Plywood
Sch. 40
PVC Pipe
8" Dia.
C Girder
C Brg.
L
L
Beam End Plan
Pad
Bearing
Plate
Sole
Flange
Bottom
Edge of
2 5/8"
Bearing Device, Elastomeric.
sole plates will be included in the cost for item 56401-1000
1. The cost of all material, labor and equipment associated to the
Plan Section A-A
15551
L I C
E
N
S
O
F
E S S
I O
N
G
I
N
E
E R
D
A
N
T
O
N B
B
E
A
N
N
X
I
C
PROJECT
CAMPGROUND BRIDGE
COTTONWOOD
NM FLAP SJU 10(1)
BRIDGE DRAWINGPROJECT TEAM LEADER
M. FOLWELL
SCALE
c p w w o r k in g c e n tr a l0 d R
G I .d g n
2'-3" 5'-2"
85'-8" 2
" Chamfer4
C BRG.L
#8E2
Symm. About C of GirderL
3 Typ.
85'-0" C BRG. to C BRG.
L L
S tr a n d s
Match SE Bar Spacing
(3)#4SE2
(3)#4SE1
(5)#4SE2
(5)#4SE1
(8)#4SE2
(8)#4SE1
C BRG.
L
3 5
#7
#8
#4
#4
#4
#4
#4
"8
"4
"8
"2
"2
"2
3'-6"
3'-5"
8'-0" 8'-8"
11'-5"
4'-4"
4'-0"
"4 32'-9
1.
2.
3.
4.
5.
NOTE:
GIRDER DATA
Weight
@ Shoe Plate
Remove Concrete
3/4" Chamfer
Shoe Plate
"2
" x 1'- 0" x 1' - 82
8'-8" to hold down
"4
2 8" 8" "4
3"3"3" 3"
Camber @ Release
Camber @ Erection
Dead Load Defelection
25.1 Tons
2.1 in.
3.7 in.
1.5 in.
7"
#4HE
2" = 1'-6"
9 Spa. @
2" = 1'-6"
9 Spa. @
1'-10"
2" 2" 2" 2"
S tr a n d s
S p a
M in
ELEVATION
SHOE PLATE
SHOE PLATE
END VIEW
SHOE PLATE DETAIL
C OF GIRDER
SECTION NEAR
L
END VIEW
GIRDER BAR BENDING DIAGRAM BRIDGE DESIGN DATA
HALF ELEVATION TYPE 45 GIRDERS 5 REQ'D
(fpe = 35.707 kips per strand; losses = 8.235 kips per strand)
PRESTRESSING STEEL:
9.5 ksi
GIRDERS
fpy = 52.1 kips per strand.
fpu = 58.6 kips per strand;
strands.
0.6" diameter seven wire low relaxation
(ultimate compressive strength)f'c = at time of initial prestress) = 7.0 ksi.
f'ci (min. compressive strength of concrete
Design is in accordance with the AASHTO LRFD bridge design specifications 9th edition BAR TYPE SIZE "R" "X" LENGTH NO. REQ'D
HE
Length
1" CLR
1" CLR
Adjust S bars to Clear Conduit
R
R "X"
"X"
RR
R1'-72
'-1 3
4"
5" Min.
GIRDER END DETAIL
2" Sleeve
" Holes for Diaphragms16
1'-7
4 Bent Strands
Diaphragm Reinforcing
2" Sleeve for
Diaphragm Reinforcing
2" Sleeve for
22 Straight Strands
4 Draped Strands
6"
6'-0"
= 2'-6" 10 Spa.@3"
= 1'-6" 3 Spa.@6"
5 Spa. @ 1'-0"= 5'-0" 12 Spa. @ 1'-6"= 18'-0" 8 Spa. @ 2'-0"= 16'-0"
4'-0" See General Note #2
CONCRETE AASHTO GIRDER
PRECAST, PRESTRESSED
RG3231-I
S9
"2
1'-8
1'-0"
"2
1'-8
1'-10"
1'-4"
COMPOSITE SLAB:
CONVENTIONAL REINFORCING BARS:
Live load = HL-93
Allowance for future wearing surface = 30 psf f'c = 4.5 ksi fy = 60 ksi girder erection.
stability. The contractor shall install diaphragms during the girders are permanently secured for lateral contractor shall leave ties and bracing in place until immediately after erection to prevent overturning. The
The contractor shall tie and brace the girders depth of 1/4 inch and a maximum of 3/8 inch.
transversely over the entire flange width to a minimum
The contractor shall score top surfaces of girders seating losses.
to 46,800 lbs. Per strand will be allowed to offset shall be 43,900 lbs. Per strand. Slight overstressing up
AASHTO M-203 (grade 270). Initial prestressing force low-relaxation strands meeting the requirements of
The design shown is based on the use of 0.6" diameter reinforcing steel.
Reinforcing bars in the girder shall be epoxy coated other approved means.
be limited by weighting, fabrication scheduling or the time of deck slab placement. Camber growth is to predicted camber at erection dimension by 1 inch at the camber growth to a value not to exceed the camber growth to 90 days. The contractor shall limit the weight of the girder acting, with an allowance for calculated value due to the effect of prestressing with
The camber at erection dimension listed is the
#4TE1
#4SE1
#4TE1
#7EE1
#4HE1
#4SE2
#8EE2
Spacing
SE Bar
(10)#4SE2
(10)#4SE1
(12)#4SE2
(12)#4SE1
S p a c in g
H E a n d H
E B a r
EE1
EE2
SE1
SE2
HE1
TE1
15551
L I C
E
N
S
O
F
E S S
I O
N
G
I
N
E
E R
D
A
N
T
O
N B
B
E
A
N
N
X
I
C
PROJECT
CAMPGROUND BRIDGE
COTTONWOOD
NM FLAP SJU 10(1)
BRIDGE DRAWINGPROJECT TEAM LEADER
M. FOLWELL
SCALE
c p w w o r k in g c e n tr a l0 d R
G J .d
INTERMEDIATE DIAPHRAGM
RG3231-J
S10
S
TYPE 45
N
(lb.)
WEIGHT
PLATE
BACK
BEAM TYPE
PRESTRESSED CONCRETE
(in.)
S1
(lb/ft)*
WEIGHT
UNIT
DIAPHRAGM
(lb.)
WEIGHT
ANGLE
CLIP
(in.)
H
(in.)
B
(in.)
C
(in.)
D
(in.)
L
(in.)
A
2"
B N S
D
L6 X 6 X 3/8"
N S
L
N S
78" Bolts W/Washers at nut and head (Typ.)
* Multiply by diaphragm length (S - A) to obtain total diaphragm weight.
15 10 2
4 2
16 2
3 13 3 3 28 16 7 galvanize the cut ends.
steel pipe (typ.) cold
1" Schedule 40 galvanize concrete cover
Minimum 3/4" threaded insert (Typ.)
7/8" High tension
CONNECTION DETAIL
INTERIOR GIRDER
elevations at connection points).
m = Slope of bent plate diaphragm (see bridge plans for
A = thickness of girder web plus 3" (See table).
c = Distance from top of beam to C of first insert.
H = Depth of bent plate diaphragm.
L = Length of back plates and clip angles.
S1= Hole spacing.
B = Distance from top of steel diaphragm to center of first hole.
CONNECTION DETAIL
EXTERIOR GIRDER
DIAPHRAGM PLACEMENT PATTERN
C SkewL
(clip angle/diaphragm connection).
D = Distance from clip angle edge to center of first hole
L
BACK PLATE DETAIL
(See note 3)
H
CLIP ANGLE DETAILS
L
N S
"2
3"2
"2
"2
SEE TABLE FOR HEIGHT "H"
3/8" BENT PLATE DIAPHRAGM
DIAPHRAGM END DETAIL SECTION A-A
Bent Plate Diaphragm
(See bridge plans for girder spacing)
15/16" Dia. Hole (Typ.)C
C
S-A m
S
15/16" Dia. Hole (Typ.)
P 5" X 3/8" X LL
Slotted Hole (Typ.)
15/16" X 2"
A
A
NOTES:
N = Number of bolt spaces in girder/clip angle connection.
incidental to item 55302-3300 Precast, Prestressed Concrete AASHTO Girder.
9. All costs associated to the material, labor and equipment associated to the steel diaphragms shall be indicating placement of diaphragm left or right of the centerline of construction.
8. All steel diaphragms shall be stamped or marked with paint on the upstation face of diaphragm achieve the specified installation tension.
bolts shall not exceed 5 kips. Tests shall be performed to determine the torque necessary to
7. At locations where steel is being fastened to concrete, the maximum installation tension for the
6. Threaded inserts and pipe inserts are incidental to the prestressed concrete beams.
prior to transport. Diaphragm installation shall be completed prior to deck placement.
5. Clip angles and back plates shall be attached to the prestressed girder at the girder fabrication site measures to ensure proper placement of inserts during the girder fabrication process.
design length by more than 1/16". The prestressed girder fabricator shall take appropriate more than 1/16". Also, the total length of the group of holes or inserts shall not vary from the
4. The vertical distance between any two holes or inserts shall not vary from the specified distance by plates.
sheet. Diaphragms shall be offset on all skewed bridges to facilitate the installation of the back
3. For skewed bridges, the opposing clip angle shall be replaced with the back plate shown on this in accordance with AASHTO M232.
2. Bolts shall meet the requirements of ASTM F3125 - Grade A325, TYPE 1. Bolts shall be galvanized
AASHTO M 111 conforming to AASHTO M270, Grade 36. Painting of these elements is not required.
1. All structural steel elements in this detail shall be composed of hot-dipped galvanized steel per
15551
L I C
E
N
S
O
F
E S S
I O
N
G
I
N
E
E R
D
A
N
T
O
N B
B
E
A
N
N
X
I
C
PROJECT
CAMPGROUND BRIDGE
COTTONWOOD
NM FLAP SJU 10(1)
BRIDGE DRAWINGPROJECT TEAM LEADER
M. FOLWELL
SCALE
c p w w o r k in g c e n tr a l0 d R
G K .d g n
C Access RoadL
(Ty p.)
25° 0'0"
Abut. No. 2
C Brg. L
Abut. No. 1
C Brg. L
S p a c e s
S p a c e s
85'-0"
S p a c e s
"8 716'-3
142 Spaces @ 6" = 71'-0"
(141) #5TTE1
29 Spaces @ 6" = 14'-6" 29 Spaces @ 6" = 14'-6"
TOP BARS
DECK REINFORCING PLAN
RG3231-K
S11
DECK REINFORCING - TOP BARS
Edge of Deck
Edge of Deck
2'-3"
Deck End of
Deck End of
"16
1'-9 "16
1'-9
"4
1-1 "4
1'-1
#5TTE2 thru #5TTE31
6" SPA.
2" CLR.
(3) #5TTE32
T
L E
T
L E
#5TTE2 thru #5TTE31
15551
L I C
E
N
S
O
F
E S S
I O
N
G
I
N
E
E R
D
A
N
T
O
N B
B
E
A
N
N
X
I
C
PROJECT
CAMPGROUND BRIDGE
COTTONWOOD
NM FLAP SJU 10(1)
BRIDGE DRAWINGPROJECT TEAM LEADER
M. FOLWELL
SCALE
c p w w o r k in g c e n tr a l0 d R
G L .d g n
C Access RoadL
(Ty p.)
25° 0'0"
Abut. No. 2
C Brg. L
Abut. No. 1
C Brg. L
S p a c e s
S p a c e s
85'-0"
"8 716'-3
143 Spaces @ 6" = 71'-6"
(142) #5BTE1
29 Spaces @ 6" = 14'-6" 29 Spaces @ 6" = 14'-6"
DECK REINFORCING - BOTTOM BARS
S p a
S p a
B
L E
B
L E
2'-3"
Lap Splice (Typ.)
Edge of Deck
Edge of Deck
Deck End of
Deck End of
BOTTOM BARS
DECK REINFORCING PLAN
RG3231-L
S12
"4
1'-1 "4
1'-1
"16
1'-6 "16
1'-6
#5BTE2 thru #5BTE31 #5BTE2 thru #5BTE31
6" SPA.
2" CLR.
(3) #5BTE32
B
L E
B
L E
15551
L I C
E
N
S
O
F
E S S
I O
N
G
I
N
E
E R
D
A
N
T
O
N B
B
E
A
N
N
X
I
C
PROJECT
CAMPGROUND BRIDGE
COTTONWOOD
NM FLAP SJU 10(1)
BRIDGE DRAWINGPROJECT TEAM LEADER
M. FOLWELL
SCALE
c p w w o r k in g c e n tr a l0 d R
G
M .d g n
C Access RoadL
(Ty p.)
25° 0'0"
Abut. No. 2
C Brg. L Abut. No. 1
C Brg. L
S p a c e s
S p a c e s
10 Equal Spaces
Span Length
LC
B r g
A b u t.
N o .1
LC
B r g
A b u t.
N o . 2
DEAD LOAD DEFLECTION DIAGRAM
grades by dimensions shown.
and superimposed dead loads, set screeds above finished
To compensate for deflection due to weight of deck slab
.0
.1
.1
.1
.1
.1
.0
.0
Lt. EOD
Rt. EODDECK PLAN
A B C D E F G H I J K L M
A B C D E F G H I J K L M
A B C D E F G H I J K L M
A B C D E F G H I J K L M
A B C D E F G H I J K L M
A B C D E F G H I J K L M
A B C D E F G H I J K L M
10 Equal Spaces = 85'-0"
"16 787'-2
LC Bridge
2. Abutment diaphragms…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .