QnA Cottonwood Campground 11.4.2021.pdf

PDF 92 KB Posted

Attached to
NM FLAP SJU 10(1) Cottonwood Campground Bridge
Solicitation number
6982AF21B000023
Issued by

About this file

This document contains a solicitation for a federal construction project and related questions and answers. The New Mexico Department of Transportation Federal Highway Administration is seeking bids to construct the NM FLAP SJU 10(1) Cottonwood Campground Bridge as a total small business set-aside. The proposed project includes installing a new 105-foot bridge to span an arroyo and reconstructing the roadway approach. Significant work includes 3,950 cubic yards of embankment, 2,120 cubic yards of class 3 riprap, 1,220 cubic yards of class 4 riprap, 194 cubic yards of structural concrete, and 430 linear feet of precast concrete girders. The cost is estimated between $1.5-3.5 million and construction is anticipated from fall 2021 to April 2022. Alternates to the specified girder sections and riprap materials will not be considered. Stay-in-place deck forms are also not permitted.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers during Advertisement for NM SJU 10(1) Cottonwood Campground – 6982AF21B000023

November 4, 2021

Questions Answers 1 The project plans call for five each, AASHTO Type 45 Precast

Girders 86 feet long each, Total 430 feet, as components in the Cottonwood Campground Bridge. During our solicitation process, we have discovered that these AASHTO Girders are not available by Vendors in New Mexico. Thus, using Vendors from outside of New Mexico will cause a significant cost increase mostly due to the hauling cost.

Will the FHWA consider alternate but equal girder sections, such as a bulbed tree?

Bid the Project as stated in the Solicitation and Plans

2 The project plans call for FHWA Class 3 and Class 4 rock rip rap on the Arroyo slopes at the bridge abutments and upstream from the bridge. During our solicitation process, we have discovered that the sizes and physical requirements of Class 3 & 4 rock rip rap are not locally available. Thus, using Vendors whose quarry is a great distance from the jobsite will cause a significant cost increase mostly due to the hauling cost.

Will the FHWA consider alternate slope protection methods such as articulated blocks, gabion baskets, or broken concrete rip rap?

Bid the Project as stated in the Solicitation and Plans

3 Can the bridge deck be formed using stay-in-place metal deck forms between the AASHTO girders?

We do not allow Stay-in-Place forms.